You are on page 1of 17

REPUBLIC OF THE PHILIPPINES

DEPARTMENT OF PUBLIC WORKS & HIGHWAYS


REGION IV-A
QUEZON 2ND DISTRICT ENGINEERING OFFICE
LUCENA CITY

C.Y. 2021 PROJECT


DETAILED ENGINEERING DESIGN PLAN FOR THE
LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM,
BUILDINGS AND OTHER STRUCTURES, MULTIPURPOSE/
FACILITIES, CONSTRUCTION OF MULTI-PURPOSE BUILDING
BARANGAY COTTA, LUCENA CITY, QUEZON

SUBMITTED: RECOMMENDED: APPROVED:

FAUSTINO MARK ANTHONY S. DE LA CRUZ WILFREDO L. RACELIS MA. CHYMBELIN D. IBAL


CHIEF, PLANNING AND DESIGN SECTION ENGINEER III ASSISTANT DISTRICT ENGINEER
DATE: OIC - OFFICE OF THE ASSISTANT DISTRICT ENGINEER OIC - OFFICE OF THE DISTRICT ENGINEER
DATE: DATE:
TABLE OF CONTENTS REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE BUILDING OFFICIAL
TITLE PAGE
G-1 COVER PAGE

ARCHITECTURAL
A-1 PERSPECTIVE DISTRICT / CITY / MUNICIPALITY
TABLE OF CONTENTS
SUMMARY OF QUANTITIES
SITE DEVELOPMENT PLAN
LOCATION & VICINITY MAP

A-2 GROUND FLOOR PLAN


SECOND FLOOR PLAN
ROOF PLAN
GROUND FLOOR REFLECTED CEILING PLAN
SECOND FLOOR REFLECTED CEILING PLAN
FRONT & RIGHT SIDE ELEVATION
REAR & LEFT SIDE ELEVATION
RAMP PLAN & SECTION DETAIL LAND USE & ZONING
TYPICAL TOILET DETAIL
PROJECT SITE SIGNAGE DETAIL

A-3 SCHEDULE OF DOORS & WINDOWS


STAIR DETAIL & WINDOWSILL DETAIL
CANOPY DETAIL & RAILING 1 & 2 DETAIL
TYPICAL ARCHITRAVE & KEYSTONE DETAIL
N DETAIL OF MOLDING 1, 2 & 3
CROSS SECTION
3 VICINITY MAP W E
LONGITUDINAL SECTION

A-1 SCALE NTS A-4 FIELD OFFICE DETAIL


S LINE & GRADE
A-5 PROJECT BILL BOARD DETAIL

A-6 SANITATION TENT PLAN


SUMMARY OF QUANTITIES
STRUCTURAL
S-1 GENERAL CONSTRUCTION NOTES

S-2 GENERAL CONSTRUCTION NOTES

S-3 FOUNDATION PLAN ARCHITECTURAL


PERSPECTIVE SECOND FLOOR FRAMING PLAN
ROOF FRAMING PLAN

S-4 RC FOOTING SCHEDULE


N TYPICAL FOOTING DETAIL, DETAIL OF BEAM
SCHEDULE OF BEAMS, COLUMN & RC SLAB
WALL FOOTING DETAIL
W E
S-5 ENDWALL DETAIL
S STAIR DETAIL, ROOFING FIXER
J-BOLT SPACING
ROOF PANEL SIDE LAP DETAIL
ISOMETRIC VIEW OF CONNECTION OF STRUCTURAL
ROOFING TO PURLINS

PROJECT SITE S-6 DETAIL ELEVATION OF TRUSS 1


REFERENCE WELD DETAIL
S-7 SPOT DETAIL OF TRUSS
DETAIL OF TRUSS ANCHORAGE & PURLIN
CONNECTION DETAILS

E L E C T R I C A L
E-1 ELECTRICAL NOTES
ELECTRICAL LEGENDS & SYMBOL SANITARY
SPECIFICATION
ELECTRICAL RISER DIAGRAM
SINGLE LINE DIAGRAM
LOAD SCHEDULE
GROUND FLOOR LIGHTING LAYOUT
SECOND FLOOR LIGHTING LAYOUT
GROUND FLOOR POWER LAYOUT
SECOND FLOOR POWER LAYOUT

P L U M B I N G
P-1 PLUMBING NOTES & LEGENDS
ELECTRICAL
GROUND FLOOR SEWER LINE LAYOUT
SECOND FLOOR SEWER LINE LAYOUT
SEWER LINE ISOMETRIC DIAGRAM
GROUND FLOOR WATER LINE LAYOUT
SECOND FLOOR WATER LINE LAYOUT
WATER LINE ISOMETRIC DIAGRAM
SEPTIC TANK DETAIL

1 SITE DEVELOPMENT PLAN 2 LOCATION MAP P-2 CATCH BASIN DETAIL


GROUND FLOOR DRAINAGE LAYOUT
A-1 SCALE 1:500 MTS A-1 SCALE NTS SECOND FLOOR DRAINAGE LAYOUT
ROOF DRAINAGE LINE LAYOUT
DRAINAGE LINE ISOMETRIC DIAGRAM
MECHANICAL
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED:
REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
C.Y. 2021 PROJECT PERSPECTIVE
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS DETAILED ENGINEERING DESIGN PLAN FOR THE SITE DEVELOPMENT PLAN CESAR ANTONIO P. JADER
REGION IV-A LOCATION MAP ARCHITECT II
LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM, VICINITY MAP
PREPARED: A 2
QUEZON II DISTRICT ENGINEERING OFFICE BUILDINGS AND OTHER STRUCTURES, MULTIPURPOSE/FACILITIES, SUMMARY OF QUATITIES CHARLOTTE KAYE A. CONSTANTINO FAUSTINO MARK ANTHONY S. DE LA CRUZ WILFREDO L. RACELIS MA. CHYMBELIN D. IBAL
TABLE OF QUANTITIES
LUCENA CITY CONSTRUCTION OF MULTI-PURPOSE BUILDING
JIM PAUL K. ABRIL
ENGINEER II CHIEF, PLANNING AND DESIGN ENGINEER III
OIC - OFFICE OF THE ASSISTANT DISTRICT
ASSISTANT DISTRICT ENGINEER
OIC - OFFICE OF THE DISTRICT ENGINEER
2 7 17
BARANGAY COTTA, LUCENA CITY, QUEZON SECTION
ENGINEER
ENGINEER II DATE: DATE: DATE: DATE:
A A' B B' C A A' B B' C A A' B B' C A A' B B' C A A' B B' C
7000
3500 1750 1750

W W
1 1
1 1 1 1 1
W W W W
3 3 3 3

2250
W W STORAGE 2 TOILET 2
STORAGE 1 TOILET 1
1 STORAGE 1 TOILET 1 1 STORAGE 2 TOILET 2

4500
D D D D
W
2 2 2 2
4

2250
W W W
1 D 1 1
SERVICE
4
DOOR

9000
2 2 DOWN 2 2 2
D
3
W W W
1 UTILITY 1 1 UTILITY
STAIRWELL
ROOM ROOM
OPEN

4500

4500
BELOW

W W W
1 1 1
UP D
1
3 D
3 3 3 3
W W W W

1500

1500
RAMP 1 1 1 2 2
UP

4 4 4 4 4
2250 2500 2250
UP

GROUND FLOOR SECOND FLOOR


1 GROUND FLOOR PLAN 2 SECOND FLOOR PLAN 3 ROOF PLAN 4 REFLECTED CEILING PLAN 5 REFLECTED CEILING PLAN
A-2 SCALE 1:100 MTS A-2 SCALE 1:100 MTS A-2 SCALE 1:100 MTS A-2 SCALE 1:100 MTS A-2 SCALE 1:100 MTS

A A' B B' C 4 3 2 1 C B' B A' A 1 2 3 4

SEE MOLDING-3
DETAIL
SEE MOLDING-2
DETAIL

SEE CANOPY
DETAIL

6 FRONT ELEVATION 7 RIGHT SIDE ELEVATION 8 REAR ELEVATION 9 LEFT SIDE ELEVATION
A-2 SCALE 1:100 MTS A-2 SCALE 1:100 MTS C 1
A-2 SCALE 1:100 MTS A-2 SCALE 1:100 MTS

300mm X 300
UNGLAZED W
FLOOR TILE FIN. 3

A STAINLESS STEEL A' A' A A'


STAINLESS STEEL 300mm X 300 250mm HIGH, 25mm THK CONCRETE
GRAB RAIL STAINLESS STEEL
GRAB RAIL
GRAB RAIL 1 GLAZED WALL
TILE FIN.
SIGNAGE LETTERING
FONT STYLE: TIMES NEW ROMAN
SCHEDULE OF FINISHES:
W
1 FLOOR FINISH:
400X400mm GLAZED FLOOR TILE FINISH
3 (SIZE & COLOR FOR APPROVAL BY THE END USER)

A PLAIN CEMENT FINISH


(COLOR FOR APPROVAL BY THE END USER)

RAMP
UP WALL FINISH:
D 150mm THK CHB EXTERIOR WALL
B 7 W/ PLAIN CEMENT PLASTER PAINTED FINISH
(COLOR FOR APPROVAL BY THE END USER)
P L A N T B O X 4 100mm THK CHB EXTERIOR WALL
W/ PLAIN CEMENT PLASTER PAINTED FINISH
(COLOR FOR APPROVAL BY THE END USER)

PLAN SECTION A 14 SIGNAGE DETAIL CEILING FINISH:


A-2 SCALE 1:30 MTS
10 RAMP PLAN DETAIL 11 RAMP SECTION B 12 RAMP SECTION A 13 TYPICAL TOILET DETAIL
FIBER CEMENT BOARD ON METAL
FURRING FRAME W/ PAINT FINISH
A-2 SCALE 1:50 MTS
A-2 SCALE 1:50 MTS A-2 SCALE 1:50 MTS A-2 SCALE 1:50 MTS
EXPOSED UNDERSLAB W/ PAINT FINISH

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED:


REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
C.Y. 2021 PROJECT GROUND FLOOR PLAN
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS DETAILED ENGINEERING DESIGN PLAN FOR THE CESAR ANTONIO P. JADER
SECOND FLOOR PLAN
REGION IV-A ARCHITECT II
ROOF PLAN
LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM, GROUND & SECOND FLOOR REFLECTED CEILING PLAN
PREPARED: A 3
QUEZON II DISTRICT ENGINEERING OFFICE BUILDINGS AND OTHER STRUCTURES, MULTIPURPOSE/FACILITIES, FRONT, RIGHT SIDE, REAR & LEFT SIDE ELEVATION CHARLOTTE KAYE A. CONSTANTINO FAUSTINO MARK ANTHONY S. DE LA CRUZ WILFREDO L. RACELIS MA. CHYMBELIN D. IBAL
LUCENA CITY CONSTRUCTION OF MULTI-PURPOSE BUILDING RAMP PLAN & SECTION DETAIL, TYPICAL TOILET DETAIL
SIGNAGE DETAIL JIM PAUL K. ABRIL
ENGINEER II CHIEF, PLANNING AND DESIGN ENGINEER III
OIC - OFFICE OF THE ASSISTANT DISTRICT
ASSISTANT DISTRICT ENGINEER
OIC - OFFICE OF THE DISTRICT ENGINEER
3 7 17
BARANGAY COTTA, LUCENA CITY, QUEZON SECTION
ENGINEER
ENGINEER II DATE: DATE: DATE: DATE:
TYPICAL DETAIL OF DETAIL OF
9 KEYSTONE 10 MOLDING-1
A-3 SCALE 1:10 MTS A-3 SCALE 1:15 MTS

DOUBLE-LEAF MULTI ACTION SWING WOODEN SINGLE-LEAF SWING MARINE SINGLE-LEAF SWING MARINE SINGLE-LEAF SWING MARINE
D PANEL DOOR W/ 6mm THK. TEMPERED GLASS D PLYWOOD FLUSH DOOR D PLYWOOD FLUSH DOOR D PLYWOOD FLUSH DOOR
1 2 3 4
(2 SETS) (4 SETS) (1 SET) (1 SET)

1 SCHEDULE OF DOORS
A-3 SCALE 1:30 MTS
A A' B B' C

FRONT VIEW SIDE VIEW SEE MOLDING-1


DETAIL

4 WINDOWSILL DETAIL HALLWAY


A-3 SCALE 1:10 MTS
POWDER COATED ON ALUM. FRAME POWDER COATED ON ALUM. FRAME POWDER COATED ON ALUM. FRAME POWDER COATED ON ALUM. FRAME
W CASEMENT AND FIXED TYPE GLASS W CASEMENT AND FIXED TYPE GLASS W AWNING TYPE GLASS WINDOW W AWNING TYPE GLASS WINDOW
1 WINDOW W/ 6mm THK. BROWN GLASS 2 WINDOW W/ 6mm THK. BROWN GLASS 3 W/ 6mm THK. BROWN GLASS 4 W/ 6mm THK. BROWN GLASS
(15 SETS) (2 SETS) (4 SETS) (1 SETS)
DETAIL OF
2 SCHEDULE OF WINDOWS 11 MOLDING-2 UTILITY
A-3 SCALE 1:30 MTS
A-3 SCALE 1:10 MTS
PANTRY ROOM

B' C
13 CROSS SECTION
A-3 SCALE 1:100 MTS
C
2
4 3 2 1
DOWN
15 SPOT DETAIL
A-3 SCALE 1:15 MTS
2 3
W
1
50mmØ G.I. PIPE NEWEL POST
S E E T R U S S D E T A I L
50mmØ G.I. PIPE HANDRAILS TYPICAL
OPEN
BELOW
25mmØ G.I. PIPE INT. HANDRAILS
5 CANOPY DETAIL 6 ARCHITRAVE DETAIL
A-3 SCALE 1:25 MTS A-3 SCALE 1:25 MTS DETAIL OF
12 MOLDING-3
A-3 SCALE 1:10 MTS
TOILET 2
W
1

W SEE SPOT DETAIL


2
3
TOILET 1

INFORMATION / UTILITY ROOM


WAITING AREA

PLAN SECTION A
3 STAIR DETAIL 7 RAILING-1 DETAIL 8 RAILING-2 DETAIL 14 LONGITUDINAL SECTION
A-3 SCALE 1:50 MTS A-3 SCALE 1:25 MTS A-3 SCALE 1:25 MTS A-3 SCALE 1:100 MTS

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED:


REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
C.Y. 2021 PROJECT SCHEDULE OF DOORS & WINDOWS
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS DETAILED ENGINEERING DESIGN PLAN FOR THE CESAR ANTONIO P. JADER
REGION IV-A STAIR DETAIL, WINDOWSILL DETAIL
ARCHITECT II
CANOPY DETAIL, TYPICAL ARCHITRAVE DETAIL
LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM,
RAILING 1 & 2 DETAIL PREPARED: A 4
QUEZON II DISTRICT ENGINEERING OFFICE BUILDINGS AND OTHER STRUCTURES, MULTIPURPOSE/FACILITIES, TYPICAL DETAIL OF KEYSTONE CHARLOTTE KAYE A. CONSTANTINO FAUSTINO MARK ANTHONY S. DE LA CRUZ WILFREDO L. RACELIS MA. CHYMBELIN D. IBAL
LUCENA CITY CONSTRUCTION OF MULTI-PURPOSE BUILDING DETAIL OF MOLDING 1, 2 & 3
JIM PAUL K. ABRIL
ENGINEER II CHIEF, PLANNING AND DESIGN ENGINEER III
OIC - OFFICE OF THE ASSISTANT DISTRICT
ASSISTANT DISTRICT ENGINEER
OIC - OFFICE OF THE DISTRICT ENGINEER
4 7 17
BARANGAY COTTA, LUCENA CITY, QUEZON CROSS & LONGITUDINAL SECTION SECTION
ENGINEER
ENGINEER II DATE: DATE: DATE: DATE:
W W W
1 2 1

D
1

3 FRONT ELEVATION 4 RIGHT SIDE ELEVATION 5 REAR ELEVATION 6 LEFT SIDE ELEVATION
A-4 SCALE 1:150MTS A-4 SCALE 1:150MTS A-4 SCALE 1:150MTS A-4 SCALE 1:150MTS

W
1

P E R S P E C T I V E 2

D W
1 1

1 FLOOR PLAN
GENERAL NOTES: A-4 SCALE 1:75MTS D-1 W-1 W-2

1. ALL PLUMBING WORKS INCLUDED HEREIN SHALL BE EXECUTED ACCORDING TO THE


PROVISIONS OF THE PHILIPPINE PLUMBING CODE, THE NATIONAL BUILDING
CODE, AND THE RULES AND REGULATIONS OF THE LOCAL GOVERNMENT.
2. COORDINATE THE DRAWING WITH OTHER RELATED DRAWINGS AND SPECIFICATIONS. PLAN 9 SCHEDULE OF DOOR & WINDOWS
THE ENGINEER SHALL BE NOTIFIED IMMEDIATELY OF ANY DISCREPANCY FOUND A-4 SCALE 1:100MTS
HEREIN.
3. ALL PIPES SHALL BE INSTALLED AS INDICATED ON PLANS. ANY RELOCATIONS 11 ROOF FRAMING PLAN
REQUIRED FOR PROPER EXECUTION ON OTHER TRADES SHALL BE WITH PRIOR A-4 SCALE 1:150MTS
APPROVAL OF THE ARCHITECT OR ENGINEER.
4. PROPOSED SANITARY UTILITIES SHALL CONFORM TO THE ACTUAL LOCATION DEPTHS
a b
AND INVERT ELEVATIONS OF ALL EXISTING PIPES AND STRUCTURES VERIFIED BY
THE CONTRACTOR.
20W 20W
5. ALL SLOPES FOR HORIZONTAL DRAINAGE SHALL MAINTAIN 0.5% MINIMUM UNLESS
OTHERWISE SPECIFIED.
Sab
6. SIZES OF WATER SUPPLY PIPES TO FIXTURES SHALL BE IN ACCORDANCE WITH THE
MANUFACTURERS INSTRUCTIONS.
7. THE CONTRACTOR SHALL VERIFY ALL EXISTING UTILITIES AT SITE AND COORDINATE 2 ROOF PLAN 14 ELECTRICAL LAYOUT
THE WORKS WITH THE SEWER EFFLUENT DISPOSAL POINT AND WATER LINE SERVICE A-4 SCALE 1:150MTS A-4 SCALE 1:150MTS
CONNECTING POINT.
8. ALL PIPE SIZES ARE IN MILLIMETERS AND ALL DIMENSIONS ARE IN METERS UNLESS
OTHERWISE SPECIFIED.

LEGEND & SYMBOLS: SECTION

1-40 WATTS,
FLOURESCENT LAMP 12 DET. SEC. OF WALL FTG. (WF) 13 DET. OF PEDESTAL FOOTING (PF) LPP
SP/WP SOIL PIPE/ WASTE PIPE
A-4 SCALE 1:50MTS A-4 SCALE 1:50MTS
CEILING LIGHT OUTLET DP DRAIN PIPE
VP VENT PIPE
Sa ONE-GANG SWITCH CWL COLD WATER LINE

Sab TWO-GANG SWITCH


GV GATE VALVE 10 FOUNDATION PLAN
CV CHECK VALVE A-4 SCALE 1:150MTS
FC FLEXIBLE CONNECTOR
Sabc THREE-GANG SWITCH
M WATER METER
SS SOIL STACK 15
S2W TWO WAY SWITCH
VS VENT STACK A-4 SCALE NTS

VAC VENT ABOVE CEILING


CONDUIT (FELXIBLE PVC) PANELBOARD LPP
VSTR VENT STACK THRU ROOF
LOAD SCHEDULE POWER SUPPLY : 230V, 60Hz, SINGLE PHASE, LINE TO LINE SERVICE
FCO FLOOR CLEANOUT
CONDUIT (uPVC) NO. OF OUTLET SIZE OF CONDUCTORS AND
CO CLEANOUT CKT NO. LOAD DESCRIPTION VA VOLTS AMPERES PROTECTION
LO CO SW SCO CONDUITS
PANEL BOARD (LPP) FV FLOAT VALVE
WC WATER CLOSET
CONVENIENCE OUTLET LAV LAVATORY
FD FLOOR DRAIN
CIRCUIT HOMERUN AD/CB AREA DRAIN/CATCH BASIN
F FAUCET
TB TUB DRAIN
KILOWATT-HOUR METER KS KITCHEN SINK

SERVICE ENTRANCE
DS DOWN SPOUT 8 SEC. DET. OF WINDOW 7 DETAIL OF RAFTER TRUSS (5-SETS)
PVC POLYVINYL CHLORIDE A-4 SCALE 1:150MTS
CB CATCH BASIN
A-4 SCALE 1:50MTS

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED:


REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
C.Y. 2021 PROJECT FIELD OFFICE DETAIL
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS DETAILED ENGINEERING DESIGN PLAN FOR THE CESAR ANTONIO P. JADER
REGION IV-A ARCHITECT II
LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM,
PREPARED: A 5
QUEZON II DISTRICT ENGINEERING OFFICE BUILDINGS AND OTHER STRUCTURES, MULTIPURPOSE/FACILITIES, CHARLOTTE KAYE A. CONSTANTINO FAUSTINO MARK ANTHONY S. DE LA CRUZ WILFREDO L. RACELIS MA. CHYMBELIN D. IBAL
LUCENA CITY CONSTRUCTION OF MULTI-PURPOSE BUILDING
JIM PAUL K. ABRIL
ENGINEER II CHIEF, PLANNING AND DESIGN ENGINEER III
OIC - OFFICE OF THE ASSISTANT DISTRICT
ASSISTANT DISTRICT ENGINEER
OIC - OFFICE OF THE DISTRICT ENGINEER
5 7 17
BARANGAY COTTA, LUCENA CITY, QUEZON SECTION
ENGINEER
ENGINEER II DATE: DATE: DATE: DATE:
1 DPWH STANDARD PROJECT BILL BOARD
A-5 SCALE NTS

OPTION 1 OPTION 2
2 BILLBOARD ORIENTATION 3 TYPICAL FARM ELEVATION 4 FRONT ELEVATION 5 FRONT ELEVATION
A-5 SCALE NTS A-5 SCALE NTS A-5 SCALE NTS A-5 SCALE NTS

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED:


REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
C.Y. 2021 PROJECT PROJECT BILL BOARD DETAIL
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS DETAILED ENGINEERING DESIGN PLAN FOR THE CESAR ANTONIO P. JADER
REGION IV-A ARCHITECT II
LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM,
PREPARED: A 6
QUEZON II DISTRICT ENGINEERING OFFICE BUILDINGS AND OTHER STRUCTURES, MULTIPURPOSE/FACILITIES, CHARLOTTE KAYE A. CONSTANTINO FAUSTINO MARK ANTHONY S. DE LA CRUZ WILFREDO L. RACELIS MA. CHYMBELIN D. IBAL
LUCENA CITY CONSTRUCTION OF MULTI-PURPOSE BUILDING
JIM PAUL K. ABRIL
ENGINEER II CHIEF, PLANNING AND DESIGN ENGINEER III
OIC - OFFICE OF THE ASSISTANT DISTRICT
ASSISTANT DISTRICT ENGINEER
OIC - OFFICE OF THE DISTRICT ENGINEER
6 7 17
BARANGAY COTTA, LUCENA CITY, QUEZON SECTION
ENGINEER
ENGINEER II DATE: DATE: DATE: DATE:
1 PERSPECTIVE
A-6 SCALE NTS

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED:


REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
C.Y. 2021 PROJECT SANITATION TENT PLAN
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS DETAILED ENGINEERING DESIGN PLAN FOR THE CESAR ANTONIO P. JADER
REGION IV-A ARCHITECT II
LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM,
PREPARED: A 7
QUEZON II DISTRICT ENGINEERING OFFICE BUILDINGS AND OTHER STRUCTURES, MULTIPURPOSE/FACILITIES, CHARLOTTE KAYE A. CONSTANTINO FAUSTINO MARK ANTHONY S. DE LA CRUZ WILFREDO L. RACELIS MA. CHYMBELIN D. IBAL
LUCENA CITY CONSTRUCTION OF MULTI-PURPOSE BUILDING
JIM PAUL K. ABRIL
ENGINEER II CHIEF, PLANNING AND DESIGN ENGINEER III
OIC - OFFICE OF THE ASSISTANT DISTRICT
ASSISTANT DISTRICT ENGINEER
OIC - OFFICE OF THE DISTRICT ENGINEER
7 7 17
BARANGAY COTTA, LUCENA CITY, QUEZON SECTION
ENGINEER
ENGINEER II DATE: DATE: DATE: DATE:
GENERAL CONSTRUCTION NOTES
GENERAL NOTES NOTES ON CONCRETE MIXES & PLACING
1. ALL CONCRETE SHALL DEVELOP A\ MIN. COMPRESSIVE STRENGTH AT THE END OF TWENTY EIGHT 3. IF SLABS AR E REINFORCED BOTHWAYS BARS ALONG THE SHORTER SPAN SHALL BE PLACED
1.0 STANDARDS AND REFERENCES
(28) DAYS W/ CORRESPONDING MAXIMUM SIZE AGGREGATE & SLUMP AS FOLLOWS. BELOW THOSE ALONE THE LONG SPAN AT THE CENTER AND OVER THE LONGER SPAN FOR
THE FOLLOWING SHALL GOVERN THE DESIGN FABRICATION AND CONSTRUCTION OF THE PROJECT.
MAX. SIZE OF REINFORCING BARS NEAR THE SUPPORTS. THE SPACING OF THE BARS AT THE COLUMN STRIPS
1.1 NATIONAL STRUCTURAL CODE OF THE \ PHILIPPINES (N.S.C.P 2015) VOL. 1, SEVENTH EDITION. 28 DAYS STRENGTH MAX SLUMP
LOCATION AGGREGATE SHALL NOT BE MORE THAN ONE AND A\ HALF (1 12 ) SLAB THICKNESS.
2.0 DESIGN CRITERIA ALL OTHERS, INCLUDING 20 mm 100mm 4. TEMPERATURE BARS FOR SLAB SHALL BE GENERALLY PLACED NEAR THE FACE IN TENSION AND
4000 PSI (27.6 MPa)

CONF. REINF.
2.1 LOADINGS SUSPENDED SLABS SHALL NOT BE LESS THAN 0.0025 X\ GROSS-SECTIONAL AREA (Ag) OF THE SLAB.
JOINT HOOP SPACE @ "2Sh" WHEN
COLUMNS 4000 PSI (27.6 MPa) 20 mm 100mm SEE SCHEDULE BELOW)
A. DEAD LOAD THERE ARE BEAMS HAVING WIDTH OF
20 mm 100mm

D JOINT REINF. D
4000 PSI (27.6 MPa)
CONCRETE 23.56 kN/m3 BEAMS AT LEAST ONE-HALF THE COLUMN
2500 PSI (17.5 MPa) 20 mm 100mm WIDTH &\ DEPTHS NOT LESS THAN
STEEL 76.93 kN/m3 SLAB ON FILL SCHEDULE OF MINIMUM SLAB REINFORCEMENT
THREE QUARTERS OF THE DEEPEST
150 CHB WALL 3.11 kPa 2. MAINTAIN MINIMUM CONCRETE COVER FOR REINFORCING STEEL AS FOLLOWS. MINIMUM TEMPERATURE BARS BEAM THAT FRAME INTO FOUR

CONF. REINF.
100 CHB WALL 2.98 kPa SUSPENDED SLABS 20mm 100 mm 10 mm ø @ 250 mm EACH WAY SIDES OF THE COLUMN. ALL OTHER
B. LIVE LOAD SLAB ON GRADE 40mm 125 mm 10 mm ø @ 250 mm EACH WAY CONDITIONS USE HOOPS @ "Sh" CENTERS.

Sh
WALLS ABOVE THE GRADE 25mm
ROOF DECK 1.90 kPa 150 mm 10 mm ø @ 250 mm EACH WAY
BEAM STIRRUPS AND COLUMN TIES 40mm

COLUMN TIES AS
OFFICE 2.40 kPa

PER SCHEDULE
175 mm 10 mm ø @ 250 mm EACH WAY
WHERE CONCRETE IS EXPOSED TO FOR COL. BAR SPLICES SEE TABLE
TOILETS 1.90 kPa 200 mm 10 mm ø @ 250 mm EACH WAY
CORRIDORS ABOVE, STAIRS 3.80 kPa EARTH BUT POURED AGAINST FORMS 50mm OF MIN. LAP SPLICE LENGTH OF
WHERE CONCRETE IS DEPOSITED COLUMN REINFORCEMENT
CORRIDORS ON GROUND 4.80 kPa 5. UNLESS OTHERWISE NOTED IN THE PLANS ALL BEDDED SLABS SHALL BE REINFORCED WITH 10 mm ø
DIRECTLY AGAINST EARTH 75mm

CONF. REINF.
C. WIND LOAD AT 250mm O.C. EACH WAY TO CENTER OF SLAB AND CONSTRUCTION JOINTS FOR SAME SHALL
NOT BE LESS THAN 3.65 METER APART.

Sh
D
BUILDING CATEGORY = 1 (ESSENTIAL FACILITIES) 3. CONCRETE SHALL BE DEPOSITED IN ITS FINAL POSISITON WITHOUT SEGREGATION. RE-HANDLING
(URBAN OR SUBURBAN AREAS WITH OR PLACING SHALL BE DONE PREFERABLY WITH BUGGIES , BUCKETS OR WHEELBARROWS, 6. PROVIDE EXTRA REINFORCEMENTS FOR CORNER SLAB ( TWO ADJACENT DISCONTINUOES EDGES) NOTE:

D JOINT REINF.
EXPOSURE CAT. B NUMEROUS CLOSELY SPACED OBSTRUCTIONS) AS SHOWN BELOW.
NO CHUTES WILL BE ALLOWED EXCEPT TO TRANSFER CONCRETE FROM HOPPERS TO BUIGGIES, ALL CONCRETE REINF. DETAIL SHOULD
WHEELBARROWS OR BUCKETS IN WHICH CASE THEY SHALL NOT \ EXCEED SIX (6) METERS BE DONE IN ACCORDANCE WITH ACI
7. CONCRETE SLAB REINFORCEMENT BE PROPERLY SUPPORTED WITH 10mm STEEL CHAIR
WIND VELOCITY V=250 KPH DETAILING MANUAL (LATEST EDITION)

CONF. REINF.
IN AGGREGATE LENGTH. OR APPROVED EQUIVALENT SPACED AT 1.0 METER ON CENTER BOTHWAYS.
P = qh [(GCpf)-(GCpi)] (DESIGN WIND PRESSURE) 4. NO DEPOSITING OF CONCRETE SHALL BE ALLOWED WITHOUT THE USE OF VIBRATORS UNLESS
WHERE: qh = VELOCITY PRESSURE (kPa) AUTHORIZED IN WRITING DESIGNER AND ONLY FOR UNUSUAL CONDITIONS WHERE VIBRATIONS
ø12x1000 LONG AT
GCpf = EXTERNAL PRESSURE COFFECIENT ARE EXTREMELY DIFFICULT TO ACCOMPLISH. MID-DEPTH OF SLAB
GCpf = INTERNAL PRESSURE COFFECIENT 5. ALL ANCHOR BOLTS, DOWELS, AND OTHER INSERTS SHALL BE PROPERLY POSITIONED & SECURED TYPICAL COLUMN ELEV. SHOWING
D. SEISMIC LOAD IN PLACE PRIOR TO PLACING OF CONCRETE. DOWN INTO EDGE BEAM. EXTENDED
4- ø12 @ 1800 LONG TOP BARS BEND AT EACH CORNER DOWELS AND TIES SPACING
Cvl 6. ALL CONCRETE SHALL BE KEPT MOST FOR A MINIMUM OF SEVEN CONSECUTIVE DAYS IMMEDIATELY BARS MIN. OF 1,200 (4'-0") INTO BARS. 1- ø12 TOP &
V= W DESIGN BASE SHEAR) BOTT. BARS
RT AFTER POURING BY THE USE O\ WET BURLAP, FOG SPRAYING, CURING COMPOUNDS OR OTHER
APPROVED METHODS. 4- ø12 BOTT BARS
2.50CaI

400
Vmax = W Vmin = 0.11 CalW
RT 7. STRIPPING OF FORMS AND SHORES: LAP SPLICE LENGTH:
0.80 ZNvI
Vmin = W ZONE 4) FOUNDATION 24 HOURS AT ANY LEVEL NO MORE THAN
R

0
ALTERNATE BARS SHOULD BE

60
SUSPENDED SLAB EXCEPT WHEN 8 \ DAYS SLAB 38mm
WHERE: W =\ TOTAL DEAD LOAD OPENING CLEAR SPLICED. MIN. DISTANCE BET.

0
ADDITIONAL LOADS ARE IMPOSED

60
T = NATURAL PERIOD = Ct (h) 21 DAYS TWO ADJACENT BARS SPLICES
WALLS
SHALL BE 600mm.

H (CLEAR HEIGHT OF COL.)


WHERE: C\ = NUMERICAL COEFFICIENT

400
BEAMS 14 DAYS
h = BUILDING HEIGHT 21 DAYS L
COLUMNS
I = IMPORTANCE FACTOR = 1.00
IN TWO WAY SLAB EXTEND

WITHIN CENTER
HALF OF "H"
R =NUMERICAL FACTOR = 8.50 8. THE CONTRACTOR SHALL SUBMIT THE SCHEDULE OF POURING AND THE LOCATION OF THE BARS UP TO BEAM SUPPORT

60
CONSTRUCTION JOINTS TO THE STRUCTURAL ENGINEER AT LEAST (4) DAYS PRIOR TO THE

0
SEISMIC COEFFICIENT Cv = 0.44 Nv 0.25L
POURING FOR APPROVAL. OMIT TRIMMER BARS WHERE
Ca = 0.64 Nv OPENING IS FRAMED BY BEAM TOP BARS @ SUPPORT (CONT.)
NEAR SOURCE FACTOR (5 km) Nv = 1.0 9. THE CONTRACTOR SHALL FURNISH AND MAITAIN ADEQUATE FORMS AND SHORINGS UNTIL THE TYPICAL CORNER SLAB DETAIL REQ'D. BOTT. BARS @ SUPPORT
Na = 1.0 CONCRETE MEMBERS HAVE ATTAINED THEIR WORKING CONDITION AND STRENGTH. TYPICAL SLAB

JT. REINF.
Z = SEISMIC ZONE = 0.40 (ZONE 4) OPENING DET.

CONF. REINF. TIES LAT. TIES


S = SOIL TYPE = D
NOTES ON FOOTINGS
2.2 DESIGN STRESSES 1. FOOTINGS ARE DESIGNED FOR AN ALLOWANCE SOIL BEARING PRESSURE OF 96 KPa (2000psf).
NOTES ON COLUMNS 0.165L SPLICE
BOTTOM BARS
A. CONCRETE COMPRESSIVE STRENGTH @ 28 DAYS: CONTRACTOR SHALL REPORT TO THE ENGINEER, IN WRITING ,THE ACTUAL SOIL CONDITIONS AT MID SPAN
a. FOOTINGS, COLUMNS, BEAMS AND SLABS f'c = 20.7 MPa (3,000 psi) UNCOVERED AND CONFIRM ACTUAL BEARING CAPACITY OF SOIL BEFORE DEPOSITING CONCRETE. 1. PROVIDE EXTRA SETS OF TIES AT 100 O.C. FOR TIED COLUMN REINFORCEMENT ABOVE EXTRA TOP BARS
0.22L
2. FOOTING SHALL REST AT LEAST 1500mm BELOW NATURAL GRADE LINE UNLESS \ OTHERWISE @ SUPPORT
b. SLAB ON FILL f'c =17.5 MPa (2,500 psi) AND BELOW BEAM-COLUMN CONNECTIONS FOR A DISTANCE FROM FACE OF CONNECTION
C. SLAB f'c = 20.7 MPa (3,000 psi) INDICATED IN PLANS. NO FOOTING SHALL REST ON FILL EQUAL TO GREATER OF THE OVERALL THICKNESS OF COLUMN, 1/6 THE CLEAR HEIGHT OF
3. MINIMUM CONCRETE PROTECTION FOR REINFORCEMENT SHALL BE 75mm CLEAR FOR CONCRETE. COLUMN OR 450mm.
B. REINFORCING STEEL BARS
4. IN CASES WHERE THE SOIL CONDITION IS SUCH THAT THE MINIMUM ALLOWABLE SOIL PRESSURE
a. FOR BARS 16mm AND GREATER (INTERMEDIATE GRADE DEFORMED BAR) fy = 414 MPa (60,000 psi) 2. COLUMN TIES SHALL BE PROTECTED EVERYWHERE BY A COVERING OF CONCRETE CAST
OF 96KPa (2000 psf) CAN NOT BE ATTAINED AT A\ PRACTICAL DEPTHS THE USE OF MICROPILES , TYP. DETAIL OF COL. LAP SPLICE
b. FOR BARS LESS THAN 16mm (STRUCTURAL GRADE DEFORMED BAR) fy = 275 MPa (40,000 psi) MONOLITHICALLY WIT HTHE CORE WITH A\ MINIMUM THICKNESS OF 40mm AND NOT LESS
C. STRUCTURAL STEEL ASTM-A36
BORED PILES, OR DRIVEN PILES MAY BE ADOPTED IN LIEU OF STANDARD ISOLATED FOOTINGS.
THAN 40 TIMES THE MAXIMUM SIZE OF COARSE AGGREGATE IN MILLIMETERS.
& EXT. GIRDER TO COL. CONNECT.
FOR TRUSSES, BRACINGS , & STRUTS fy = 248 MPa (36,000 psi) 3. WHERE COLUMNS CHANGE IN SIZE ,VERTICAL REINFORCEMENT SHALL BE OFFSET AT A
D. MASONRY UNIT (CHB) SLOPE MONOLITHICALLY WITH THE CORE WITH MINIMUM THICKNESS OF 40mm AND
NON -LOADING BEARING CHB WALLS fm' = 3.45 MPa (500 psi) NOTES ON REINFORCEMENT NOT LESS THAN 40 TIMES THE MAXIMUM SIZE COARSE AGGREGATE IN MILLIMETERS
E. WELDS E 60XX ELECTRODE 1. UNLESS OTHERWISE NOTED IN PLANS, THE YIELD \ STRENGTH OF REINFORCING BARS SHALL BE:
F. STRUCTURAL BOLTS ASTM- A307 a. Ft = 96.60 mPa (14, 000 psi)
4. UNLESS OTHERWISE INDICATED IN THE PLANS, LAP SPLICES FOR VERTICAL COLUMN NOTES ON BEAMS AND GIRDERS
A. FOOTINGS , FOOTING BEAMS AND GIRDERS fy = 414 MPa ( 60,000 psi )
b. Fv= 69.00 mPa (10, 000 psi) REINFORCEMENT SHALL BE MADE WITHIN THE CENTER HALF OF COLUMN HEIGHT, AND
3.0 IN THE INTERPRETATION OF THE DRAWING, INDICATED DIMENSIONS SHALL GOVERN. B. COLUMNS AND SHEAR WALLS fy = 414 MPa ( 60,000 psi ) 1. UNLESS, OTHERWISE NOTED IN PLANS , CAMBER ALL BEAMS AND GIRDER AT
THE SPLICE LENGTH SHALL BE LESS THAN 40 BAR DIAMETERS. WELDING OR APPROVED
DISTANCES AND SIZES SHALL NOT BE SCALED FOR CONSTRUCTIONS PURPOSES C. BEAMS AND GIRDER fy = 414 MPa ( 60,000 psi ) LEAST 6 mm ø FOR EVERY 4.50 M OF SPAN, EXCEPT CANTILEVERS FOR WHICH
MECHANICAL DEVICES MAY BE USED PROVIDED THAT NOT MORE THAN ALTERNATE BARS
4.0 IN REFERENCES TO OTHER DRAWINGS, SEE ARCHITECTURAL DRAWINGS FOR DEPRESSIONS IN FLOOR D. NON-LOAD BEARING WALL PARTITIONS ,BEDDED SLABS , FLOOR & ROOF SLABS, THE CAMBER SHALL BE AS NOTED IN PLANS OR AS ORDERED BY THE ENGINEER
PARAPETS ,CATCH BASIN,SIDE WALK ARE WELDED OR MECHANICALLY SPLICED AT ANY LEVEL AND THE VERTICAL DISTANCES
fy = 275 MPa ( 40,000 psi ) BUT IN NO CASE LESS THAN 20 mm FOR EVERY 3.0 M\ OF FREE SPAN.
SLABS, OPENINGS IN THE WALLS AND SLABS, INTERIOR PARTITIONS, LOCATIONS OF DRAINS ETC. BETWEEN THESE WELDS OR SPLICES OF ADJACENT BARS IS NOT LESS THAN 600mm.
2. ALL REINFORCING BARS SIZE 10mm OR LARGER SHALL BE DEFORMED IN ACCORDANCE WITH THE ASTM A-706
5.0 IN CASE OF DISCREPANCIES AS TO THE LAYOUT, DIMENSIONS AND ELEVATIONS BETWEEN THE 2. TYPICAL BARS BENDING AND CUTTING DETAILS FOR BEAMS SHALL BE AS
BARS SMALLER THAN 10mm MAY BE PLAIN.
STRUCTURAL PLANS AND ARCHITECTURAL DRAWINGS, THE CONTRACTORS SHALL NOTIFY BOTH THE SHOWN IN FIG. B-1
3. SPLICES SHALL BE SECURELY WIRED TOGETHER & SHALL LAP OR EXTEND IN ACCORDANCE w/ (TABLE B
STRUCTURAL ENGINEER AND ARCHITECTS. TABLE OF LAP SPLICE & ANCHORAGE LENGTH) UNLESS OTHERWISE SHOWNON DRAWINGS , SPLICES SHALL BE H
6.0 ALL CONCRETE WORKS AND CONCRETE REINFORCEMENTS SHALL BE DONE IN ACCORDANCE WITH THE
STAGGERED WHENEVER POSSIBLE.
ACI.318-14M BUILDING CODE REQUIREMENT AND ALL STRUCTURAL STEEL WORKS ACCORDING WITH THE CROSS-TIE
AISC-05 IN SOFAR AS THEY DO NOT CONFLICT WITH THE LOCAL BUILDING CODE REQUIREMENT.

350mm. MAX.
NOTES ON CONCRETE SLABS L1 L2
7.0 ACI REFERS TO AMERICAN CONCRETE INSTITUTE, AISC REFERS TO AMERICAN INSTITUTE OF STEEL
1. ALL SLAB REINFORCEMENTS SHALL BE 20mm CLEAR MINIMUM FROM BOTTOM AND FROM THE TOP OF SLAB.
1
L1 3
1
L1 3 L2 1 L2 1
CONSTRUCTION AND ASTM REFERS TO AMERICAN SOCIETY FOR TESTING MATERIALS. 3 3
2. UNLESS OTHERWISE SHOWN, REINFORCEMENT IN CONTINUOUS ELEVETED SLAB SHALL BE CUT AS FOLLOWS: 10

H
8.0 CONSTURCTION NOTES AND TYPICAL DETAILS APPLY TO ALL DRAWINGS UNLESS OTHERWISE SHOWN OR d
m
in
NOTED. MODIFY TYPICAL DETAILS AS DIRECTED TO MEET SPECIAL CONDITIONS. .
9.0 SHOP DRAWING WITH ERECTION AND PLACING DIAGRAMS OF ALL STRUCTURAL STEELS, MISCELLANEOUS BENT BAR
IRON, PRE-CAST CONCRETE, ETC. SHALL BE SUBMITTED FOR ENGINEERS APPROVAL BEFORE FABRICATION. L1 L2 1 1 L2 1 L2 1
L1 5 L1 5 5 5
10. CONTRACTOR SHALL NOTE AND PROVIDE ALL MISCELLANEUOS CURBS, SILLS ,STOOLS EQUIPMENT AND L1/4 L1/4 L2/4 TOP BARS
MECHANICAL BASES THAT ARE REQUIRED BY THE ARCHITECTURAL ,ELECTRICAL AND MECHANICAL DRAWINGS. TOP BAR 2-12mmø SIDE BARS WEB BARS
BOTTOM BARS
11. ALL RESULTS OF THE MATERIAL TESTING FOR CONCRETE, REINFORCING BARS & STRUCTURAL STEEL MUST
BE NOTED &\ APPROVED BY THE MATERIALS ENGINEER/STRUCTURAL DESIGNER. FIGURE B-1

BOTTOM BAR

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED:


REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
C.Y. 2021 PROJECT GENERAL CONSTRUCTION NOTES
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS DETAILED ENGINEERING DESIGN PLAN FOR THE CESAR ANTONIO P. JADER
REGION IV-A ARCHITECT II
LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM,
PREPARED: S 8
QUEZON II DISTRICT ENGINEERING OFFICE BUILDINGS AND OTHER STRUCTURES, MULTIPURPOSE/FACILITIES, CHARLOTTE KAYE A. CONSTANTINO FAUSTINO MARK ANTHONY S. DE LA CRUZ WILFREDO L. RACELIS MA. CHYMBELIN D. IBAL
LUCENA CITY CONSTRUCTION OF MULTI-PURPOSE BUILDING
JIM PAUL K. ABRIL
ENGINEER II CHIEF, PLANNING AND DESIGN ENGINEER III
OIC - OFFICE OF THE ASSISTANT DISTRICT
ASSISTANT DISTRICT ENGINEER
OIC - OFFICE OF THE DISTRICT ENGINEER
1 7 17
BARANGAY COTTA, LUCENA CITY, QUEZON SECTION
ENGINEER
ENGINEER II DATE: DATE: DATE: DATE:
GENERAL CONSTRUCTION NOTES
4- ø16 VERT. BARS

TABLE 'A' TABLE 'B'


REINFORCING CONCRETE LINTEL BEAMS IN NOTES ON STIRUPS
TENSION BARS COMPRESSION BARS CONCRETE BLOCK WALLS SEE CONSTRUCTION NOTES
4- ø16 VERT. BARS
1. ALL REINFORCEMENT SHALL BE BENT COLD UNLESS

550
FOR MASONRY WALL REIN-
TABLE OF LAP SPLICE & ANCHORAGE LENGTH (mm) FORCEMENTS (TYPICAL) OTHERWISE PERMITTED BY THE STRUCTURAL ENGINEER.

550
TABLE OF LAP SPLICE & NCHORAGE LENGTH (mm) FIN. FLR. LVL.

600 (MIN.) VARIES


LINTELS IN BLOCK WALLS
2. AS SHOWN IN THE DESIGN DRAWINGS OR
BAR SIZES fc`= 20.7MPa(3000psi) fc`= 27.6 MPa (4000psi) BAR SIZES fc`= 20.7MPa(3000psi) fc`= 27.6 MPa (4000psi)
PERMITTED BY THE STRUCTURAL ENGINEER.
(DEFORMED MM) EMBEDMENT LAPPED EMBEDMENT LAPPED
(DEFORMED MM)
EMBEDMENT LAPPED EMBEDMENT LAPPED
CLEAR TOTAL MIN. HEIGHT OF REINFORCEMENT NAT. GRD. LVL.
SPAN LENGTH fc' LINTEL DOWEL BARS TO MATCH 3. TIES & CLOSE STIRRUPS MUST BE AT 135.
Ø10 300 300 300 300 Ø10 225 300 300 L L+0.40M MPa mm BOTTOM TOP STIRRUPS CHB VERTICAL BARS 550 550
300 300 300 300 250 300
ø10 BOTT. BARS
Ø12 300 Ø12 275 180 DEG. HOOKS
@ 300 O.C.

250

Dbar
1.20 M 1.60 M 200 1- ø10 1- ø10 ø6mm @ 200 mm
Ø16 300 400 300 400 Ø16 350 400 325 400
TYPICAL CONNECTION DETAIL

D+12db
1.50 M 1.90 M 14.0 200 1- ø10 1- ø10 ø6mm @ 200 mm 3- ø10 BOTT. BARS
Ø20 400 550 350 500 Ø20 450 500 475 500 1.80 M 2.20 M 200 1- ø12 1- ø10 ø6mm @ 200 mm
400
OF R.C. WALL AT CORNERS
Ø25 600 800 550 750 Ø25 550 625 550 625
2.10 M 2.50 M 250 1- ø12 1- ø10 ø6mm @ 200 mm
Ø28 750 1000 650 850 Ø28 625 675 625 675 2.40 M 2.90 M 17.0 250 1- ø12 1- ø10 4db OR 65mm
ø6mm @ 200 mm
1300 850 1100 775 700 775 2.70 M 3.10 M 250 1- ø16 1- ø12 ø10mm @ 200 mm
Ø32 950 Ø32 700
DOWEL TO MATCH
NOTES ON WELDS
90 DEG. HOOKS

Dbar
3.00 M 3.40 M 300 1- ø16 1- ø12 ø10mm @ 200 mm CHB VERT. BARS
NOTES: NOTES: 1. USE E60xx ELECTRODES FOR ALL MEMBERS WELDED.
1. TOP PLAIN BARS, MULTIPLY VALUE BY 2 1. TOP PLAIN BARS, MULTIPLY VALUE BY 2 3.30 M 3.70 M 20.0 300 1- ø16 1- ø12 ø10mm @ 200 mm
2. NOT MORE THAN 33% OF THE BARS SHALL BE 2. NOT MORE THAN 33% OF THE BARS SHALL BE 3.60 M 4.00 M 300 1- ø20 1- ø12 ø10mm @ 200 mm 300 2. WELDS SHALL DEVELOP THE FULL STRENGTH OF MEMBERS JOINED UNLESS

L
12db
DOWEL
SPLICED WITHIN THE REQUIRED LAP LENGTH SPLICED WITHIN THE REQUIRED LAP LENGTH (TYP.) OTHERWISE SHOWN OR DETAILED IN THE DRAWINGS.

400
3. VALUES GIVEN ABOVE CAN ALSO BE USED FOR COLUMNS
12 THK. EXPANSION JOINT)
WITH MASTIC FILLER FIN. FLR. LVL. D
NOTES ON STRUCTURAL STEEL

250
1. STRUCTURAL STEEL TO BE USED FOR FABRICATION AND ERECTION OF THIS
3. IF THE BEAM REINFORCING BARS END IN A WALL, THE CLEAR DISTANCE FROM THE BAR TO THE FARTHER FACE OF THE 1- ø16 VERT. BARS 6- ø10 BARS (AS SHOWN)

DOWEL)
STRUCTURE SHALL COMPLY WITH ALL THE PERTINENT PROVISION OF AISC MAIN BAR END HOOKS
ø10 BOTT. BARS @300 O.C

400
WALL IS NOT LESS THAN 25mm. EMBEDMENT LENGTH SHALL BE SHOWN IN A TABLE 'A' FOR TENSION BARS AND TABLE 'B' CHB WALL SPECIFICATION FOR THE DESIGN, FABRICATION AND ERECTION OF STRUCTURAL ALL GRADES
1- ø16 VERT. BARS
FOR COMPRESSION BARS UNLESS UNLESS SPECIFIED IN PLAN. TOP BARS AND SHALL NOT BE SPLICED WITHIN THE FOR SIZE AND SPACING STEEL FOR BUILDING LATEST EDITION. BAR SIZE DIAMETER 180 HOOK 90 HOOK
COLUMN OR TWO STIRRUPS SHALL BE PROVED AT ALL SPLICES. OF HOR. &\ VERT. BARS DEFORMED mm
SEE CONSTRUCTION NOTES. 2. ALL STRUCTURAL STEEL SHAPES SHALL CONFORM TO ASTM A36 STRUCTURAL D+2db L L
FOR SIZE AND SPACING
4. IF THERE ARE TWO OR MORE LAYERS OF REINFORCING BARS, USED 25mm BAR SEPARATORS SPACED AT 1.0M ON OF HOR. & VERT. BARS DOWEL TO MATCH STEEL UNLESS OTHERWISE INDICATED. 10 mm ø 60 75 125 150
SEE CONSTRUCTION NOTES. CHB VERT. BARS
ON CENTER ON NO CASE SHALL THERE BE THAN TWO (2) SEPARATORS BETWEEN LAYERS OF BARS 3. ALL WELDED CONNECTIONS SHALL DEVELOP THE FULL STRENGTH OF THE 12 mm ø
WHERE DEPRESSED 75 100 150 200
CHB WALL MEMBERS CONNECTED.
5. MINIMUM CONCRETE PROTECTION FOR REINFORCING BARS OR STEEL SHAPES SHALL BE AS SHOWN IN FIGURE B-2 300 SLAB OCCURS
16 mm ø 95 125 175 250

DOWEL
UNLESS ELSEWHERE. (TYP.) 4. UNLESS OTHERWISE SPECIFIED ALL WELDING RODS SHALL CONFORM WITH
CORNER WALL

400
OPENING OR END WALL E60 ELECTRODES. 20 mm ø 115 150 200 300
FIN. FLR. LVL. 5. ALL BOLTS USED UNLESS OTHERWISE SPECIFIED SHALL BE ASTM A 307 BOLTS. 25 mm ø 150 200 230 450

250
28 mm ø 240 300 350 550
MAIN REINFORCEMENT MAIN REINFORCEMENT
6- ø10 BARS (AS SHOWN) NOTES ON EMBBED PIPES 32 mm ø 300 335 450 600
CHB WALL R.C. COLUMN OR WALL ø10 BOTT. BARS @300 O.C
t OR 1\/4 D

t OR 1\/4 D
SLEEVES FOR UTILITY 400
t

SLEEVES FOR UTILITY 1- ø16 VERT BARS DOWEL BARS TO MATCH C. THAT PASS THRU BEAMS SHALL NOT
PIPES MAX. 1\/5 D PIPES MAX. 1\/5 D CHB HOR. BARS
D

EXCEED 100mm IN DIAMETER OR 1/3 BEAM DETPH WHICHEVER IS LESS, UNLESS


( EXPANSION JOINT)
WITH MASTIC FILLER
12 THK. EXPANSION JOINT
WITH MASTIC FILLER
TYPICAL CHB FOOTING DETAILS OTHERWISE APPROVED IN WRITING BY THE STRUCTURAL ENGINEER.
PROVIDE 3- ø10 EXTRA STIRR PROVIDE 33- ø10 EXTRA STIRR
EACH SIDE OF SLEEVES EACH SIDE OF SLEEVES ( WHERE APPLICABLE ) 2. NO PIPES SHALL BE ALLOWED TO PASS THRU BEAMS VERTICALLY. 135 DEG. HOOKS

L
3. NO PIPES SHALL BE EMBEDDED IN COLUMNS.

DOWEL
400
LE
TYP. DET. FOR SLEEVES TYP. DET. FOR SLEEVES FOR SIZE AND SPACING
THRU CONCRETE BEAM THRU CONCRETE BEAM OF HOR. &\ VERT. BARS NOTES ON CONSTRUCTION JOINTS IN CONCRETE D
SEE CONSTRUCTION NOTES. 400
FIG. B-2 FIG. B-3

6d
1. WHERE A CONSTRUCTION JOINT IS TO BE MADE, THE SURFACE OF CONCRETE

b
DOWEL
SHALL BE CLEANED AND ALL LAITANCE AND STANDING WATER REMOVED SHEAR
INTERSECTION WALL INTERSECTINGR.C. COLUMN OR WALL KEY SHALL BE PROVIDE AT THE JOINT. L1

VERIFY DEPRESSION
30 BAR DIA. 30 BAR DIA. L
TYPICAL CONNECTION DETAIL OF MASONRY WALL min. min. MAIN REINFORCEMENTS TO BE

D=FOR BEAM
CONTINUOUS (TOP & BOTT. BARS)

t=FOR SLAB
6. WHEN A\ BEAM CROSSES A GIRDER , REST BEAM ON TOP OF GIRDER BARS, BEAM REINFORCING BARS SHALL BE
SYMMETRICAL ABOUT THE CENTER LINE WHENEVER POSSIBLE. MAIN REINFORCEMENTS WHERE JOINTS IS AT POINT OF
TO BE CONTINUOUS STRESS, PROVIDE SHEAR RODS
7. GENERALLY, NO SPLICES SHALL BE PERMITTED AT POINTS WHERE CRITICAL BENDING STRESSES OCCUR, SPLICES WITH ENGINEERS APPROVAL STIRRUP AND THE TIE HOOKS
WHERE SO PERMITTED SHALL BE INDICATED IN TABLE 'A' AND 'B'. WELDED SPLICES SHALL DEVELOP IN TENSION AT ALL GRADES
200(MIN) 200 (MIN) ø10x1000 LONG
@ 300 O.C. 180 HOOK 90 HOOK
LEAST 125% OF THE SPLICED YIELD STRENGTH OF THE BAR NOT MORE THAN 50% OF THE BARS AT ANY ONE SECTION 30 ø BAR 30 ø BAR BAR SIZE DIAMETER
50 DEFORMED mm
IS ALLOWED TO BE SPLICED THEREIN. D=FOR BEAM MIN.) MIN.) D+2db L L
40

D/3
ø10 STIRRUPS 2t=FOR SLAB 10 mm ø 40 125 85 100

D/3
@ 150 O.C.

t/3 t/3
30 BAR DIA. (min.)

t/3
10 mm ø 50 165 115 115

D/3
10 mm ø 65 200 140 150
NOTES ON CONCRETE HOLLOW BLOCKS WALLS CHB WALL FOR SIZE AND SPACING TYPICAL DETAIL FOR BEAM SLAB BEAM
OF HOR. & VERT. BARS 10 mm ø 115 300 165 300
1. UNLESS OTHERWISE SHOWN IN PLANS ALL CONCRETE HOLLOW BLOCKS AND CERAMIC BLOCKS SHALL BE REINFORCED OPENING
SEE CONSTRUCTION NOTES OR SLAB CHANGE SOFFIT TYPICAL SLAB & BEAM 10 mm ø 150 335 230 405

DOWEL)
1- ø16 VERT
AS SHOWN IN THE SCHEDULE OF CONCRETE HOLLOW BLOCKS AND CERAMIC BLOCK REINFORCEMENT. BARS TYPICAL

400
DOWEL BARS TO MATCH
CHB VERT. BARS
CONSTRUCTION JOINT DET.
2. PROVIDE 150 mm x 300 mm STIFFERNER COLUMN REINFORCED WITH 4-12mm WITH 10 mm ø TIES AT 150mm ON CENTER
WHERE CONCRETE HOLLOW BLOCK TERMINATES AND AT EVERY 3.0M LENGTH OF CONCRETE HOLLOW BLOCK 2- ø12 TOP BARS NOTES ON CONCRETE WALLS

200
WALLS UNLESS NOTED IN STRUCTURAL PLANS. FIN. FLR. LVL.
2- ø12 BOTT BARS 1. ALL WALLS SHALL BE REINFORCED ACCORDING TO THE FOLLOWING SCHEDULE OF WALL
REINFORCEMENT UNLESS OTHERWISE INDICATED IN THE PLANS.
NOTE:
ELEVATION SECTION PROVIDE THESE ADDITIONAL BARS FOR
ALL OPENINGS PLUS BARS (NOT
TYP. DET. OF LINTEL BEAM AT CHB WALL OPENING WALL REINFORCEMENT
VERTICAL
SHOWN) PARALLEL TO SIDE OF OPENING
EQUAL TO THE NUMBER OF TERMINATED
THICKNESS HORIZONTAL VERTICAL REMARKS SECTION BARS AT OPENING
NOTES ON CONCRETE HOLLOW BLOCKS WALLS REINFORCEMENTS 100mm ø10mm @250mm O.C ø10mm @300mm O.C HORIZONTAL BARS
VER. BARS SEE ARCHITECTURAL &\ MECHANICAL
125mm ø 10mm @250mm O.C ø10mm @250mm O.C AT CENTERS VERTICAL PLANS FOR SLAB OPENING LOCATION.
BLOCK THICKNESS REINFORCEMENT NOTES DOWEL BARS TO BARS STAGGED OUT
MATCH VERT. BARS 150mm ø12 mm @ 250mm O.C ø12mm @300mm O.C HOR. BARS
FLR. SLAB OR BEAM
HORIZONTAL LAPPED A. MINIMUM LAPS AT SPLICE= 0.25 M
DOOR
75 mm 10mm ø EVERY 3RD LEVEL 10mm ø 500 mm O.C B. PROVIDE RIGHT ANGLED REINFORCEMENT 1. ALL JOINTS AND CELLS REINFORCING BARS SHALL HAVE 25mm CLEAR CONCRETE COVER FROM FACE OF WALL EXCEPT FOR OPENING
AT CORNERS 0.92 m LONG CONTAINING REINFORCING WALLS IN CONTACT WITH THE GROUND WHERE A MINIMUM OF 60mm SHALL BE PROVIDED AND FOR
125 mm 10mm ø EVERY 3RD LEVEL 10mm ø 500 mm O.C
C. WHERE CHB OR CER. BLK WALL DOWELS BARS SHALL BE FILLED EXPOSED FACES OF FORMED WALLS WHERE THE MINIMUM SHALL BE 50mm CLEAR.
150mm 10mm ø EVERY 3RD LEVEL 10mm ø 500 mm O.C WITH THE SAME SIZE AS VER. OR HOR. WITH CONCRETE GROUT. 38mm CLEAR WINDOW
REINFORCEMENT SHALL BE \ PROVIDED 2. FOR REINFORCEMENTS SEE 2. CARRY VERTICAL BARS AT LEAST 60mm ABOVE FLOOR LEVEL TO PROVIDE FOR SPLICES WHEN NECESSARY OPENING
200 mm 10mm ø EVERY 3RD LEVEL 10mm ø 500 mm O.C
CONSTRUCTION NOTES. STOP AT 50mm BELOW TOP SLAB OR SOLID BAND WHERE THE WALL ENDS VERTICAL AND HORIZONTAL BARS
SHALL BE SPLICED BY LAPPING A DISTANCE EQUAL TO 30 DIAMETERS AND WIRED SECURELY WITH 16 G.I. WIRE
1- ø16 CONT. HOR. BARS PROVIDED THAT SPLICES IN ADJACENT BARS ARE STAGGERED AT LEAST 1.50M O.C.
FOR FLOOR SLAB ONLY
3. UNLESS OTHERWISE NOTED IN THE PLANS, ALL OPENINGS IN WALLS 250mm OR THICKER SHALL BE REINFORCED
AROUND WITH 2-20mm ø BARS. FOR 225mm, 200 mm, 175mm, 150mm THICK WALLS, USE 2-16mm ø. FOR 125mm AND
100mm THICK WALLS, USE 2-12m ø BARS. ALL WALLS SPANNING SHALL HAVE VERTICAL REINFORCEMENT BENT
TYP. EXTERIOR WDW. & DOOR OPENING
TYP. SECTION OF MASONRY A U-FORM LIKE STIRRUPS AND SPACED ACCORDING TO THE SCHEDULE UNLESS OTHERWISE NOTED..
PARTITION REINFORCEMENTS

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED:


REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
C.Y. 2021 PROJECT GENERAL CONSTRUCTION NOTES
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS DETAILED ENGINEERING DESIGN PLAN FOR THE CESAR ANTONIO P. JADER
REGION IV-A ARCHITECT II
LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM,
PREPARED: S 9
QUEZON II DISTRICT ENGINEERING OFFICE BUILDINGS AND OTHER STRUCTURES, MULTIPURPOSE/FACILITIES, CHARLOTTE KAYE A. CONSTANTINO FAUSTINO MARK ANTHONY S. DE LA CRUZ WILFREDO L. RACELIS MA. CHYMBELIN D. IBAL
LUCENA CITY CONSTRUCTION OF MULTI-PURPOSE BUILDING
JIM PAUL K. ABRIL
ENGINEER II CHIEF, PLANNING AND DESIGN ENGINEER III
OIC - OFFICE OF THE ASSISTANT DISTRICT
ASSISTANT DISTRICT ENGINEER
OIC - OFFICE OF THE DISTRICT ENGINEER
2 7 17
BARANGAY COTTA, LUCENA CITY, QUEZON SECTION
ENGINEER
ENGINEER II DATE: DATE: DATE: DATE:
A A' B B' C A A' B B' C A A' B B' C

PC-1 RB-2/LRB-1 PC-2 RB-2/LRB-1 PC-1


1'
F-1, C-1 F-1, C-1 F-1, C-1

RB-2

RB-2

RB-2
FTB-1 FTB-1 B-1 B-1 RB-2 RB-1 RB-1 RB-2
1 1 1
TRUSS-1
16MMØ CROSS BRACING

WF-1
S-1 S-1 WITH STD. TURNBUCKLE

B-1

RB-2

RB-2
FTB-1
WF-1 WF-1 B-2 B-2
FTB-1

FTB-1

RB-1

RB-1
B-1
B-1

B-1
S-1
S-1
F-1, C-1 F-1, C-1 F-1, C-1
FTB-1 FTB-1 B-1 B-1 RB-1 RB-1 RB-2
RB-2
2 2 2
TRUSS-1

12MMØ PLAIN BAR SAG ROD


S-1

B-1
STAGGERED (WITH NUTS AND BOLTS)
WF-1

RB-2

RB-1

RB-1

RB-2
B-2
FTB-1

B-1
B-1
FTB-1

B-1
SLAB ON FILL S-1
t=100mm + FINISH W/
10mmØ @300mm O.C.
EACHWAY TEMP. BARS

B-1
S-1
F-1, C-1 F-1, C-1 F-1, C-1 F-1, C-1
FTB-1 FTB-1 FTB-1 RB-2 RB-1 RB-1 RB-1 RB-2
3 3 3 TRUSS-1
B-1 B-1

RB-2
B-1

RB-2
RB-2
RB-2 RB-2/LRB-1 RB-2/LRB-1 RB-2
WF-1

WF-1

RB-2
B-3
B-3
3'

RB-2

RB-2
S-1 PC-1 PC-2 PC-1
WF-1
WF-1 WF-1

RB-2
4 4

RB-2
4
B-2 RB-2
F-2, C-1 F-2, C-1 2"x6"x1.5mm C-PURLIN SPACED
4' PC-1 PC-2 PC-1 @0.50m O.C. WITH 2"x2"x4.5mm
ANGLE CLEATS

1 FOUNDATION PLAN 2 SECOND FLOOR FRAMING PLAN 3 ROOF FRAMING PLAN


S-3 SCALE 1:100 MTS S-3 SCALE 1:100 MTS S-3 SCALE 1:100 MTS

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED:


REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
C.Y. 2021 PROJECT FOUNDATION PLAN
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS DETAILED ENGINEERING DESIGN PLAN FOR THE CESAR ANTONIO P. JADER
REGION IV-A SECOND FLOOR FRAMING PLAN
ARCHITECT II
ROOF FRAMING PLAN
LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM,
PREPARED: S 10
QUEZON II DISTRICT ENGINEERING OFFICE BUILDINGS AND OTHER STRUCTURES, MULTIPURPOSE/FACILITIES, CHARLOTTE KAYE A. CONSTANTINO FAUSTINO MARK ANTHONY S. DE LA CRUZ WILFREDO L. RACELIS MA. CHYMBELIN D. IBAL
LUCENA CITY CONSTRUCTION OF MULTI-PURPOSE BUILDING
JIM PAUL K. ABRIL
ENGINEER II CHIEF, PLANNING AND DESIGN ENGINEER III
OIC - OFFICE OF THE ASSISTANT DISTRICT
ASSISTANT DISTRICT ENGINEER
OIC - OFFICE OF THE DISTRICT ENGINEER
3 7 17
BARANGAY COTTA, LUCENA CITY, QUEZON SECTION
ENGINEER
ENGINEER II DATE: DATE: DATE: DATE:
COLUMN SCHEDULE
R. C. FOOTING SCHEDULE C-1 PC-1 PC-2
FOOTING DIMENSIONS REINFORCEMENTS REMARKS
MARK

N.G.L

F.T.B F.T.B

PLAN SECTION

1 TYPICAL FOOTING DETAIL


S-4 SCALE NTS TOP BAR REINFORCEMENT BOTTOM BAR REINFORCEMENT

R. C. S L A B S C H E D U L E

4 R.C. SLAB SCHEDULE


S-4 SCALE NTS
2 DETAIL OF BEAM
S-4 SCALE NTS

4" CHB WITH 12mmØ


SPACED @ 0.6m VERTICAL
AND EVERY 3 CHB'S HORIZONTAL BAR
BEAM SCHEDULE
BEAM STEEL REINFORCEMENT
DIMENSIONS STIRRUPS
BEAM
( in / mm ) REBAR SUPPORT MID SPAN Ø 10mm
MARK
( mm Ø ) UNLESS NOTED OTHERWISE
b h TOP BOTTOM TOP BOTTOM
3-12mmØ

12mmØ SPACED @ 0.4m O.C.

5 WALL FOOTING DETAIL


SCHEDULE OF BEAMS S-4 SCALE NTS
3
S-4 SCALE NTS

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED:


REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
C.Y. 2021 PROJECT RC FOOTING SCHEDULE
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS DETAILED ENGINEERING DESIGN PLAN FOR THE CESAR ANTONIO P. JADER
TYPICAL FOOTING DETAIL
REGION IV-A ARCHITECT II
DETAIL OF BEAM
LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM, COLUMN SCHEDULE
PREPARED: S 11
QUEZON II DISTRICT ENGINEERING OFFICE BUILDINGS AND OTHER STRUCTURES, MULTIPURPOSE/FACILITIES, SCHEDULE OF BEAMS CHARLOTTE KAYE A. CONSTANTINO FAUSTINO MARK ANTHONY S. DE LA CRUZ WILFREDO L. RACELIS MA. CHYMBELIN D. IBAL
LUCENA CITY CONSTRUCTION OF MULTI-PURPOSE BUILDING RC SLAB SCHEDULE
WALL FOOTING DETAIL JIM PAUL K. ABRIL
ENGINEER II CHIEF, PLANNING AND DESIGN ENGINEER III
OIC - OFFICE OF THE ASSISTANT DISTRICT
ASSISTANT DISTRICT ENGINEER
OIC - OFFICE OF THE DISTRICT ENGINEER
4 7 17
BARANGAY COTTA, LUCENA CITY, QUEZON SECTION
ENGINEER
ENGINEER II DATE: DATE: DATE: DATE:
TOP OF PARAPET

APEX OF LRB-1

A A' B' C
LR
B-1 B-1
LR

TOP OF ROOF BEAM


PC-1 PC-2 PC-1
TOP OF PARAPET
RB-2
TOP OF LRB-1

4" CHB WALL


PLASTERED/PAINTED FINISH

-1 LRB
LRB -1
PC-1
2 END WALL DETAIL (GRID 4')
S-5 SCALE 1:25MTS

TOP OF ROOF BEAM

RB-2 RB-2 RB-2 RB-2 2


RB-2 RB-2

4" CHB WALL


PLASTERED/PAINTED FINISH 10 mmØ BAR 7
S-5

10 mmØ BAR

1 END WALL DETAIL (GRID 1' & 3') 12mmØ SPACED @ 0.20 O.C.
Temperature Bars
7-10mmØ ( EACH STEP )
S-5 SCALE 1:40 MTS

7-10 mmØ BAR each step 7-16mmØ Main bar


12 mmØ BAR @ 0.20 O.C.
Temperature Bars

7-16 mmØ BAR MAIN BAR

4 DETAIL SECTION OF STAIR 3 STAIR DETAIL


S-5 SCALE 1:20 MTS S-5 SCALE 1:50 MTS

0.49 mm (BMT) LONGSPAN


PRE-PAINTED CORR. ROOFING
(0.50 mm TCT) ROOFING

.LC PURLIN
PANEL 1 PANEL 2
LC PURLIN
6mmØ J-BOLT SPACED
AS SHOWN AT ALL
PURLINS

ISOMETRIC VIEW OF
5 ROOFING FIXER 6 J-BOLT SPACING 7 ROOF PANEL SIDE LAP DETAIL 8 CONNECTION OF ROOFING TO PURLINS
S-5 SCALE NTS S-5 SCALE 1:10 MTS S-5 SCALE 1:10 MTS S-5 SCALE NTS

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED:


REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
C.Y. 2021 PROJECT ENDWALL DETAIL (GRID 6 & 5)
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS DETAILED ENGINEERING DESIGN PLAN FOR THE ENDWALL DETAIL (GRID 7) CESAR ANTONIO P. JADER
REGION IV-A STAIR DETAIL, ROOFING FIXER ARCHITECT II
LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM, J-BOLT SPACING, ROOF PANEL SIDE LAP DETAIL
PREPARED: S 12
QUEZON II DISTRICT ENGINEERING OFFICE BUILDINGS AND OTHER STRUCTURES, MULTIPURPOSE/FACILITIES, ISOMETRIC VIEW OF CONNECTION OF ROOFING TO PURLINS CHARLOTTE KAYE A. CONSTANTINO FAUSTINO MARK ANTHONY S. DE LA CRUZ WILFREDO L. RACELIS MA. CHYMBELIN D. IBAL
LUCENA CITY CONSTRUCTION OF MULTI-PURPOSE BUILDING
JIM PAUL K. ABRIL
ENGINEER II CHIEF, PLANNING AND DESIGN ENGINEER III
OIC - OFFICE OF THE ASSISTANT DISTRICT
ASSISTANT DISTRICT ENGINEER
OIC - OFFICE OF THE DISTRICT ENGINEER
5 7 17
BARANGAY COTTA, LUCENA CITY, QUEZON SECTION
ENGINEER
ENGINEER II DATE: DATE: DATE: DATE:
NOTES ON ROOF CONSTRUCTION :

1. IN ACTUAL FABRICATION OF STEEL TRUSSES, MEMBERS MEETING AT POINT SHALL HAVE


THEIR GRAVITY AXIS INTERSECT AS NEARLY AS PRACTICABLE AT A COMMON POINT.
2. THE CONTRACTOR SHALL PROVIDE TEMPORARY ERECTION BRACINGS AND SHORING, AND
MAKE ACTUAL MEASUREMENTS IN THE FIELD PRIOR TO FABRICATION/INSTALLATION OF
ALL TRUSSES.
3. THE FABRICATOR/CONTRACTOR SHALL SUBMIT SHOP DETAILED DRAWINGS PRIOR TO
FABRICATION OF TRUSSES FOR APPROVAL OF THE DIRECTOR, BUREAUS OF DESIGN.

2 REFERENCE WELD DETAIL


S-6 SCALE 1:10 MTS

A A' B' C
1
S-6

APEX OF ROOFING
2
APEX OF TRUSS - 1 S-7

TOP OF ROOF BEAM

4 3
S-7 S-7

1 DETAIL ELEVATION OF TRUSS 1


S-6 SCALE 1:20 MTS

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED:


REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
C.Y. 2021 PROJECT DETAIL ELEVATION OF TRUSS 1
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS DETAILED ENGINEERING DESIGN PLAN FOR THE CESAR ANTONIO P. JADER
REGION IV-A REFERENCE WELD DETAIL
ARCHITECT II
LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM,
PREPARED: S 13
QUEZON II DISTRICT ENGINEERING OFFICE BUILDINGS AND OTHER STRUCTURES, MULTIPURPOSE/FACILITIES, CHARLOTTE KAYE A. CONSTANTINO FAUSTINO MARK ANTHONY S. DE LA CRUZ WILFREDO L. RACELIS MA. CHYMBELIN D. IBAL
LUCENA CITY CONSTRUCTION OF MULTI-PURPOSE BUILDING
JIM PAUL K. ABRIL
ENGINEER II CHIEF, PLANNING AND DESIGN ENGINEER III
OIC - OFFICE OF THE ASSISTANT DISTRICT
ASSISTANT DISTRICT ENGINEER
OIC - OFFICE OF THE DISTRICT ENGINEER
6 7 17
BARANGAY COTTA, LUCENA CITY, QUEZON SECTION
ENGINEER
ENGINEER II DATE: DATE: DATE: DATE:
W.M.
T.C.
T.C. W.M. W.M.

W.M.

T.C. T.C.
W.M.
W.M.
6mm THICK GUSSET PLATE B.C.
B.C.
W.M. W.M.
6mm THICK GUSSET PLATE
W.M. 6mm THICK GUSSET PLATE
6mm THICK GUSSET PLATE

2 SPOT DETAIL 2 3 SPOT DETAIL 3 4 SPOT DETAIL 4


S-7 SCALE 1:10 MTS S-7 SCALE 1:10 MTS S-7 SCALE 1:10 MTS
1 SPOT DETAIL 1
S-7 SCALE 1:10 MTS

6mm
FULL
WELD

FULL 6mm
WELD T.C.

TYP. 6mm

25mm THK. LEVELING GROUT

6mm
TYP.

FULL
WELD 6mm
300 x 300 x 16mm THK. STEEL BASE
⅊, W/ 2 - 20mm Ø x 300mm LONG ANCHOR BOLTS; EACH SIDE
LC PURLINS
FULL
10mm THICK STEEL , ⅊
W/ 18mmØ HOLES; TYPICAL
WELD 6mm
16mm Ø CROSS-BRACINGS,
T.C. W/ STANDARD TURN-BUCKLE
ELEVATION 16mm Ø STEEL CROSS-BRACINGS, 10mm THICK STEEL , ⅊
W/ STANDARD TURN-BUCKLE W/ 18mmØ HOLES; TYPICAL

4 - 6mm Ø x 40mm MACHINE


RB-1
BOLTS W/ STD. NUTS & WASHERS, SPACED AS SHOWN

6 DETAIL OF PURLIN SPLICE 7 DETAIL CONN. OF CROSS BRACING


S-7 SCALE 1:10 MTS S-7 SCALE 1:10 MTS

FULL WELD

. 12mmØ SAGRODS W/

125 x 125 x 50 x 6mm STEEL JOINT STANDARD NUT & WASHER
CONNECTOR, FULL WELD TO TOP CHORD

LC PURLINS

ROO
FIN
G

300 x 300 x 12mm THK. STEEL BASE T.C.


10mm Ø SAG RODS @ LC PURLINS
⅊, W/ 4 - 20mm Ø x 300mm LONG ANCHOR BOLTS; EACH SIDE
MID-POINT, STAGGERED T.C.
4 - 6mm Ø x 40mm MACHINE BOLTS W/ STD.
NUTS & WASHERS, SPACED AS SHOWN

PLAN

5 DETAIL OF TRUSS ANCHORAGE 8 DETAIL CONN. OF PURLIN TO TOP CHORD 9 DETAIL CONN. OF PURLIN TO SAG ROD
S-7 SCALE 1:10 MTS S-7 SCALE 1:10 MTS S-7 SCALE 1:10 MTS

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED:


REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
C.Y. 2021 PROJECT SPOT DETAIL 1, 2, 3 & 4
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS DETAILED ENGINEERING DESIGN PLAN FOR THE CESAR ANTONIO P. JADER
DETAIL OF TRUSS ANCHORAGE
REGION IV-A ARCHITECT II
DETAIL OF PURLIN
LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM, DETAIL CONNECTION OF CROSS BRACING
PREPARED: S 14
QUEZON II DISTRICT ENGINEERING OFFICE BUILDINGS AND OTHER STRUCTURES, MULTIPURPOSE/FACILITIES, DETAIL CONN. OF PURLIN TO TOP CHORD CHARLOTTE KAYE A. CONSTANTINO FAUSTINO MARK ANTHONY S. DE LA CRUZ WILFREDO L. RACELIS MA. CHYMBELIN D. IBAL
LUCENA CITY CONSTRUCTION OF MULTI-PURPOSE BUILDING DETAIL CONN. OF PURLIN TO SAGROD
JIM PAUL K. ABRIL
ENGINEER II CHIEF, PLANNING AND DESIGN ENGINEER III
OIC - OFFICE OF THE ASSISTANT DISTRICT
ASSISTANT DISTRICT ENGINEER
OIC - OFFICE OF THE DISTRICT ENGINEER
7 7 17
BARANGAY COTTA, LUCENA CITY, QUEZON SECTION
ENGINEER
ENGINEER II DATE: DATE: DATE: DATE:
ELECTRICAL NOTES: SPECIFICATION
· TYPE OF SERVICE SHALL BE 230V, 1Ø, 3W, 60HZ.

· METHODS OF WIRING SHALL BE IN RSC, AND TYPE OF CONDUCTOR SHALL BE TW


COPPER FOR BRANCH CIRCUIT AND THWN FOR SERVICE ENTRANCE.
A A' B B' C A A' B B' C
· ALL MATERIALS AND EQUIPMENT SHALL BE EFFECTIVELY BONDED AND JOINDED.
7000 7000
· ELECTRICAL INSTALLATION SHALL BE DONE THE DIRECT SUPERVISION OF A DULY 3500 1750 1750 3500 1750 1750
LICENSED ELECTRICAL ENGINEER MASTER ELECTRICIAN.

· ALL WORKS HERE UNDER SHALL COMPLY IN ACCORDANCE WITH THE LATEST
PROVISION OF THE PEC, NBC, LOCAL ORDINANCE AND MERALCO REQUIREMENTS.
1 1
LEGENDS & SYMBOLS:
STORAGE 1 TOILET 1 STORAGE 2 TOILET 2

4500

4500
Sab
Sabc
S2W
SERVICE
DOOR

9000

9000
2 2 DOWN

UTILITY
ROOM
OPEN

4500

4500
BELOW

UP

3 3

1500

1500
RAMP
UP

KWHM
4 4
UP

2250 2500 2250 2250 2500 2250

100 AT
GROUND FLOOR POWER LAYOUT SECOND FLOOR POWER LAYOUT
30 AT 30 AT
1 2
SCALE 1:100 MTS SCALE 1:100 MTS
30 AT 30 AT
3 4
60 AT 60 AT
6
60 AT 60 AT
7 8
SPARE SPARE Ø
9 10
A A' B B' C
A A' B B' C
7000
7000 3500 1750 1750

RISER DIAGRAM 3500 1750 1750


POWER RISER DIAGRAM

ELECTRICAL RISER DIAGRAM 2 SINGLE LINE DIAGRAM 1


1
SCALE NTS SCALE NTS
STORAGE 2 TOILET 2
STORAGE 1 TOILET 1

4500
4500
SERVICE

9000
NO. OF OUTLET SIZE OF CONDUCTORS AND
CKT NO. LOAD DESCRIPTION VA VOLTS AMPERES PROTECTION
DOOR 2 DOWN

9000
CONDUITS
LO CO SW SCO 2

UTILITY
OPEN
ROOM

4500
BELOW

4500
UP
3
3

1500
1500
RAMP
UP
4
4
UP
2250 2500 2250
2250 2500 2250

GROUND FLOOR LIGHTING LAYOUT SEOND FLOOR LIGHTING LAYOUT


SCALE 1:100 MTS SCALE 1:100 MTS

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED:


REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
C.Y. 2021 PROJECT ELECTRICAL NOTES, SPECIFICATION, LEGENDS &
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS DETAILED ENGINEERING DESIGN PLAN FOR THE CESAR ANTONIO P. JADER
SYMBOLS
REGION IV-A ARCHITECT II
ELECTRICAL RISER DIAGRAM
LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM, SINGLE LINE DIAGRAM
PREPARED: E 15
QUEZON II DISTRICT ENGINEERING OFFICE BUILDINGS AND OTHER STRUCTURES, MULTIPURPOSE/FACILITIES, LOAD SCHEDULE CHARLOTTE KAYE A. CONSTANTINO FAUSTINO MARK ANTHONY S. DE LA CRUZ WILFREDO L. RACELIS MA. CHYMBELIN D. IBAL
LUCENA CITY CONSTRUCTION OF MULTI-PURPOSE BUILDING GROUND & SECOND FLOOR POWER LAYOUT
GROUND & SECOND FLOOR LIGHTING LAYOUT JIM PAUL K. ABRIL
ENGINEER II CHIEF, PLANNING AND DESIGN ENGINEER III
OIC - OFFICE OF THE ASSISTANT DISTRICT
ASSISTANT DISTRICT ENGINEER
OIC - OFFICE OF THE DISTRICT ENGINEER
1 1 17
BARANGAY COTTA, LUCENA CITY, QUEZON SECTION
ENGINEER
ENGINEER II DATE: DATE: DATE: DATE:
1 A

100mmØ PVC VS
PLUMBING NOTES: A'
VST
R

35
A A' B B' C A A' B B' C 00
00
B
45 70
7000 7000
2 0 0 B'
00 17
90 5 0
3500 1750 1750 3500 1750 1750 LAV
17 C
50
00 ST
DC LC 45 OR
100mmØ 3 AG O
PVC SP E2 C
TOD
SS
4 FIL WC
1 CO 1 CO 00
ET
2
LAV 100mmØ LAV 15 UR
FD WC FD WC CO
PVC SP
STORAGE 1 TOILET 1 STORAGE 2 TOILET 2 DO
UR UR

100mmØ PVC SS
WN
BEOPE
LO N
22 W

4500

4500
CO 50
S

CO 25
00
1 A
SERVICE
DOOR 22
50
A'

9000

9000
2 2 DOWN 35
00
45
00 B
70
2 0 0 B'
00 17
UTILITY 90 5 0
ROOM LAV
OPEN 17 C
50

4500

4500
BELOW
00 ST
45 OR
3 AG CO
E 1T DC
OFDI WC
4 S LE
T1 LC
00
15 UR
UP R
UPAMP S
DOERV CO
3 3 OR ICE
PLUMBING LEGENDS: U
ROTILI CAN
AL

1500

1500
RAMP
UP
22
50 OM TY AGE
UP EW
TOS
4 4 25
UP
UP 00

2250 2500 2250 2250 2500 2250 22


50

GROUND FLOOR SECOND FLOOR


1 SEWER LINE LAYOUT 2 SEWER LINE LAYOUT 3 SEWER LINE ISOMETRIC DIAGRAM
P-1 SCALE 1:100 MTS P-1 SCALE 1:100 MTS P-1 SCALE NTS

1 A

A'
35
0
45
00 0 B
70
2 0 0 B'
A A' B B' C A A' B B' C 00 17
90 50
C
7000 7000
0
LAV 17
50
0 ST
3500 1750 1750 3500 1750 1750 45 OR
3 AG
E 2T C
4 O ILUER W
100mmØ T2 V
00 G
PVC 15

1 1

12mmØ uPVC BLUE PIPE


LAV LAV DO
WN
WC 100mmØ WC BEOPE
PLAN STORAGE 1 TOILET 1
PVC
STORAGE 2 TOILET 2
22
50
LO N
W

UR UR
25
4500

4500
00
1 A
S 22
50
A'
SERVICE 35
0
DOOR 45
00 0 B
70
2 0 B'
9000

9000
0
2 2 DOWN 00 17
90 50
C
UTILITY 0
LAV 17
50
0 ST
ROOM 45 OR
OPEN
3 AG
E1
TO C
ILER W
4500

4500
BELOW
4 UT
00 S 1
15
R
UPAMP S
DOERV
OR ICE
UP
U
ROTILI
22 OM TY E
3 3 50 PIP
UP
LUE
CB
uPV
1500

1500
UP
RAMP
25 mØ
UP 00 12m
4 4 WM
UP
22
50 GV
R
2250 2500 2250 2250 2500 2250 ATE
MW Y
FRO SUPPL
SECTION
GROUND FLOOR SECOND FLOOR
7 SEPTIC TANK DETAIL 4 WATER LINE LAYOUT 5 WATER LINE LAYOUT 6 WATER LINE ISOMETRIC DIAGRAM
P-1 SCALE P-1 SCALE 1:100 MTS P-1 SCALE 1:100 MTS P-1 SCALE NTS

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED:


REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
C.Y. 2021 PROJECT PLUMBING NOTES & LEGENDS
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS DETAILED ENGINEERING DESIGN PLAN FOR THE CESAR ANTONIO P. JADER
GROUND & SECOND FLOOR SEWER LINE LAYOUT
REGION IV-A ARCHITECT II
SEWER LINE ISOMETRIC DIAGRAM
LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM, GROUND & SECOND FLOOR WATER LINE LAYOUT
PREPARED: P 16
QUEZON II DISTRICT ENGINEERING OFFICE BUILDINGS AND OTHER STRUCTURES, MULTIPURPOSE/FACILITIES, WATER LINE ISOMETRIC DIAGRAM CHARLOTTE KAYE A. CONSTANTINO FAUSTINO MARK ANTHONY S. DE LA CRUZ WILFREDO L. RACELIS MA. CHYMBELIN D. IBAL
LUCENA CITY CONSTRUCTION OF MULTI-PURPOSE BUILDING SEPTIC TANK DETAIL
JIM PAUL K. ABRIL
ENGINEER II CHIEF, PLANNING AND DESIGN ENGINEER III
OIC - OFFICE OF THE ASSISTANT DISTRICT
ASSISTANT DISTRICT ENGINEER
OIC - OFFICE OF THE DISTRICT ENGINEER
1 2 17
BARANGAY COTTA, LUCENA CITY, QUEZON SECTION
ENGINEER
ENGINEER II DATE: DATE: DATE: DATE:
1 0 A
85 16
00
RD A'
00 35
45 00 B
2 0 0 70
00 B'
90
RD 35
00 C
00
45
3 16
00
PLAN SECTION 4 00
15 850 RD

RD

1 CATCH BASIN DETAIL


RD
P-2 SCALE 1:10 MTS
RD10700

RD 1 A
RD
A'
35
00 B
00 0 0
45 15 70
2 00 B'
0
9 00 17
50
A A' B B' C A A' B B' C A A' B B' C
17 C
7000 7000 5 0
00 ST
7000 45 OR
3500 1750 1750 3500 1750 1750 3 AG
E2
1600 3500 3500 1600 TO
4 ILE
T2
00
15

850
1 CB CB 1 DS DS
1 RD RD DO
DS DS WN
BEOPE
LO N
22 W
50
STORAGE 2 TOILET 2 STORAGE 1 TOILET 1

25
00
4500

4500

4500
1 A
22
50
CB A'
35
00 B
SERVICE 00
45 70
DOOR 2 00 B'

10700
9000

9000

9000
2 CB CB 2 2 00 17
DOWN
DS DS RD RD 90 50
DS DS
CB 17 C
5 0
00 ST
UTILITY 45 OR
ROOM 3 A GE
OPEN 1T
O
4 ILE
4500

4500

4500
BELOW
00 T1
15 CB CB
R
UPAMP S
DOERV
OR ICE
T
RES T U
UP
NEA TLE CB ROTILI
DS DS TO OU 22 OM TY
3 3
DS DS
3
RD RD TAP INAGE 50
T UP CB
CB CB
DRA E A RES ET
L

850
N T UP
TO OU
1500

1500

1500
25
RAMP
TAP INAGE 00
UP CB
DS DS DRA
T

1500
4 CB CB 4 DS DS 4 RD RD RES T22
NEA TLE 50 CB
UP
TO OU
TAP INAGE T
DRA RES T
NEA LE
2250 2500 2250 2250 2500 2250
P TO E OUT
A
T INA G
DRA

GROUND FLOOR SECOND FLOOR ROOF


2 DRAINAGE LAYOUT 3 DRAINAGE LINE LAYOUT 4 DRAINAGE LINE LAYOUT 5 DRAINAGE LINE ISOMETRIC DIAGRAM
P-2 SCALE 1:100 MTS P-2 SCALE 1:100 MTS P-2 SCALE 1:100 MTS P-1 SCALE NTS

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED:


REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
C.Y. 2021 PROJECT CATCH BASIN DETAIL
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS DETAILED ENGINEERING DESIGN PLAN FOR THE CESAR ANTONIO P. JADER
GROUND FLOOR DRAINAGE LAYOUT
REGION IV-A ARCHITECT II
SECOND FLOOR DRAINAGE LAYOUT
LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM, ROOF DRAINAGE LINE LAYOUT
PREPARED: P 17
QUEZON II DISTRICT ENGINEERING OFFICE BUILDINGS AND OTHER STRUCTURES, MULTIPURPOSE/FACILITIES, DRAINAGE LINE ISOMETRIC DIAGRAM CHARLOTTE KAYE A. CONSTANTINO FAUSTINO MARK ANTHONY S. DE LA CRUZ WILFREDO L. RACELIS MA. CHYMBELIN D. IBAL
LUCENA CITY CONSTRUCTION OF MULTI-PURPOSE BUILDING
JIM PAUL K. ABRIL
ENGINEER II CHIEF, PLANNING AND DESIGN ENGINEER III
OIC - OFFICE OF THE ASSISTANT DISTRICT
ASSISTANT DISTRICT ENGINEER
OIC - OFFICE OF THE DISTRICT ENGINEER
2 2 17
BARANGAY COTTA, LUCENA CITY, QUEZON SECTION
ENGINEER
ENGINEER II DATE: DATE: DATE: DATE:

You might also like