Professional Documents
Culture Documents
Hapy Gold Mines
Hapy Gold Mines
This Report reflects the reviews and comments by the County of Alameda’s geotechnical reviewer,
ENGEO, Inc. (ENGEO) of San Ramon, California.
1.1 Purpose
The purpose of this report is to provide the background information and results of all of the prior
studies, field testing, and lab analyses that are used in the Lake Evaluation Reports at Eliot Quarry
(KANE GeoTech, 2015a, 2015b, 2015c). The Lake Evaluation Reports are where the results of
the slope stability analyses are presented for each lake.
1. Literature Review. KANE GeoTech reviewed existing literature and other archived materials
such as geotechnical investigations, maps, and aerial images. CEMEX made available
previous reports and exploration drill logs for the site. A stratigraphic history of the area was
constructed and used to interpret the depositional environment of the Livermore Formation.
2. Geotechnical Investigation. CEMEX retained a drilling contractor to drill and sample the site.
KANE GeoTech performed pocket penetrometer strength testing and collected grab samples
for further analyses. Split spoon tests were obtained by the driller at locations and depths
determined by KANE GeoTech in the field depending on the strata encountered.
3. Materials Testing. Laboratory testing was performed on samples to evaluate moisture content
and density, Atterberg limits, grain size, USCS identification, and shear strength.