Professional Documents
Culture Documents
Test Requierd
Test Requierd
Design & Build of Roads & Infrastructure Networks of Business Park Avenue at Dubai
Project:
South
Date & Time: 14th June 2023
S/N Test
1.0 Gravity line
1.1 Sewerage and Stormwater lines
A Air-Test
B Water-test
C Deflection-test 3%,5%
D Torch mirror test
2.0 Gravity Manhole
A Soundless test (sewerage Manhole)
GRP thickness (sewerage Manhole)
B
C Water test
3.0 pressure line
3.1 Potable water, Irrigation, and firefighting, chilled water
A Pressure-test
Flushing and Disinfection test (For Potable Water only)
B