BILL NO. 2 DEMOLITION AND SITE CLEARANCE WORKS PROJECT : MEMBINA JALAN DAN JAMBATAN ALOR GANU/TITI GAJAH, DAERAH KOTA SETAR KE TITI BESI, DAERAH KUBANG PASU, KEDAH. Bill NO. 2 - DEMOLITION AND SITE CLEARANCE (ALL PROVISIONAL) No, [code No. Description unit ] ay. | Ratecrmy | Amount (Ra) E100 [GENERAL CLEARANCE lAvove Ground A | e110 |cenera cloarance ha | 2s Water Bovies B | 120 larwater bodies he | 5 £300 |DEMOLITION AND REMOVAL FROM SITE OF ALL BUILDINGS AND UCTURES BUILDINGS: concrete E311 [individual Building Single storey © | 23114 [100-200 m (2Nos) sum E311 [Individual Building - Double storoy D_ | £3112 |erceeding 2001? (3 Nos) am |Timber £331 |individual Bulaing - Single storey E |} 6831 Jieas nan 100 m? (3 Nos) sum e400 |sTRUCTURES concrete F | 412 |Bdow ground - fog. Procast concrete box culverts} sum dude headsal,wingwel and founcaten 20 m tong x 3m wide x2 mr deep) Brickwork and Masonry 6 | €421 [aboveground ~fe.9. 10mx 1.6 m high fences) sum tsa m2) 11 | 6422.1 |Boow ground ~[e.g. block éraininclusing foundation So} sum m1 mivide x2 m deep (+40 2) J E422.2 |Below ground —[e.g. 2 mx 2 mx 3 m deep sump]. sum may £500 |SCRAPMATERIALS Metal kK | e541 Jatoveground sum Total of Bill No.2 carr sd to Summary of Tender BQ. UL BILL NO. 3 EARTHWORKS PROJECT : MEMBINA JALAN DAN JAMBATAN ALOR GANUITITI GAJAH, DAERAH KOTA SETAR KE TITI BESI, DAERAH KUBANG PASU, KEDAH. No. | Code No. BILL NO. 3 - EARTHWORKS (ALL PROVISIONAL) —_—_— Description unit | aay. Rate (RM) ‘Amount (RM) a | rin Be | ett © | Fi35 p | Fa22 F400 e | Fao [STRIPPING OF TOPSOLL ripping [Topsoil of average depth of 150 mm and disposes to] Ine Contractor's durrpsite as approved by the S.0./P.D. |EXCAVATE, LOAD, HAUL AND DEPOSIT cut to Fi Excavation in cut shall be deemed 10 Include {trimming and preparation of excavated surface and| transportation from source to place of fil. lexcavation in hard mass and rock mass shall be| |deemed to include trial excavation (direct method) land point load test (indirect method) as per JKR| [Standard Specification for Roadworks Section 2: Earthworks (JKR/SP4/S2-2018) (Cut and Dispose [Excavate in earth to disposal site approved by the| S.0./P.D at contractor dump site. [Excavate in unsuitable material as per Spesification to| sisposal site approved by the $.0,/°.. |SPREAD, GRADE AND COMPACT Fiting The following items for filling shall include} ‘compaction, testing and confirmation material and| ‘additional filling necessitated by settlement or| [penetration into underiying material as applicable. Embankments Imported material from Contactor's own source as per Speccation to form embankment |LANDSCAPING lems for landscaping shall be deemed to include| \digging, planting media, bedding, stalking, lprotection, watering. weeding, required fertilising, land replacement of dead item until the vegetation | lestabiished. [Close turfing to slopes as per spesification rm | 78,000 m | 270 im | 31,255 im | 121,600 m | 50.000 Total of Bill No.3 carriod to Summary of Tender Ba3- 1/1 BILL NO. 4 DRAINAGE WORKS PROJECT : MEMBINA JALAN DAN JAMBATAN ALOR GANU/TITI GAJAH, DAERAH KOTA SETAR KE TIT| BES!, DAERAH KUBANG PASU, KEDAH. BILL NO. 4~ DRAINAGE WORKS (ALL PROVISIONAL) No. | Code No. Description Unit yy —— Rate (RM) Amount (RM) | A | Asso. B | assez c | asso D | ats = | Fatas F | Fst42 ce | ast H | 710 J} ager k | Fat24 | ra122 M | atsi TEMPORARY WORK Construct temngorany crossing for culvert excavation Maintain temporary cossing for culver excavation [Removal yon completion temporary cossing culvert excavation NEW PIPE CULVERT lExcavation Earth commencing fom specified level [66 0.0m ia, x1..4m width x 2.3m depth] {Type of Foundation {ype Bt -SoftFoundation Fling; Other stated material; sand material as per| specification Filing; Other sated rmaterial; granular material as per| specication Precast Concnte Pi 00mm diameter sine precast concrete pipe culver [Class Y in standardilengh of im. |sumps Bricks; [120mm x 200mm x 1.2m deep}; including nid steet grating Comr for (100 KN load] as per Jorawing No. (KPKFRUI.BIC2/16/297/8M15), Inlet” Outlet Headwall/ Wingwall [Cast in-Situ(HPAR/ULE02/16/2071AM22) Fill Matorial, |General; Imposed rrateria from contactors own source] wih grading limis easper specication Genera; Imported rraterial from borrow pit es shown in the drawing with grexing limits as per specification NEW PRECAST BOX CULVERT FOR SE < 30m WIDE |Excavation Eth commencing fon specifed level [20 1.2m x2.0m with x 1.5m death} ne sum sum 557 107 290 173 36 350 450 1,890 [Page Total Cartel fo Summary of Bill No.4 BQ4- 13 PROJECT : MEMBINA JALAN DAN JAMBATAN ALOR GANUITITI GAJAH, DAERAH KOTA SETAR KE TITI BESI, DAERAH KUBANG PASU, KEDAH. BILL NO. 4~ DRAINAGE WORKS (ALL PROVISIONAL) No. M mt weit 112 leva. e182 601 M132 621 a7t0 sat F312 2230 22504 0250.2 Description unit | ay. | Rate(RMy | Amount (RM) [Type of Foundation [Reinforced Concrots Slab Foundation IGrace C1 Concrete; Blinding mass concrete, 60mm] mt | 1,220 thick to footing. Formwork; sides; Bases, footings, ple caps, and} m* | 560 joround slabs, Ft: rough finish to bases. Formwork - Ft: rough finish to footing. m | 250 [Reinforcement ~ Nominal diameter. Steted exceeding] 38 Iran s2mm Reinforcement - Nominal diameter. Stated less and| 4a including 25mm lBRC; Square Mesh - Type A; A303 (410) t 78 [Grade C40 Concrete: Footing 1 culvert i 155 lbrecast Box Culvert 200mm x 120mm single precast bax culvert in m | sw standard length of 1m. |sumpe Bricks; [1500 mm x 1500 mmx 1.5m deep}; including | nr 48 mild stool grating cover for [100 kN load) a8 per Drawing No. (KPKRUJILE/C2/16/297/AM22) Inlew Outlet Headwalli Wingwall (Cast In-Situ a 36 Fil Matoriat |General; Imported msterial from contacter's own souree| ith oracing limits as per specification |SURFACE DRAIN [Roadside Drains for Urban Area Roadside crain; precast concrete U-shaped drain with Jaxy weather flow, 200mm wide x 1200mm doop| Including precast conte struts et 6m cl. |Embankment Toe Drains [Toe drain; unlined crain 600mm wide with average| la00mm ccop IType 4 (D1) {Toe drain; cast in-situ reinforced concrete; 1200mm wide x 120mm dep including precast concrete struts lat 6 mole. [Type 2 (TD2) 9,850 m | 240 m | 7,500 m | 985 |Page Total Carried to Summary of Bill No. 4 Bo-23 PROJECT : MEMBINA JALAN DAN JAMBATAN ALOR GANU/TITI GAJAH, DAERAH KOTA SETAR KE TITI BESI, DAERAH KUBANG PASU, KEDAH, No. Code No, BILL NO. 4— DRAINAGE WORKS (ALL PROVISIONAL) Desciption Unit ay. Rate (RM) ‘Amount (RM) !summary of Bill No. 4: Drainage Works |Pege Bas - 1/3 IPege Bas - 213 7 [Total of Bill No. 4 Carried to Summary of Tender BQs-38 BILL NO.5 PAVEMENT WORKS PROJECT : MEMBINA JALAN DAN JAMBATAN ALOR GANU/TITI GAJAH, DAERAH KOTA SETAR KE TIT] BESI, DAERAH KUBANG PASU, KEDAH No. Code No, BILL NO. 5 - PAVEMENT WORKS (ALL PROVISIONAL) Deseription Unit ay. Rate (RM) “Amount (RM) Ri00 Rito R200 R221 S20 520 Ra30 S51 R300 R320 FLEXIBLE PAVEMENT Im accordance to latest Standard Specification for, Road Works hereafter roferred to as tho) |Specification (rate to Include all the tests required). NEW PAVEMENT |subgrade Preparation Earth material to receive road pavement. Rato to| inctude ciearing, grubbing, stripping top sol, scarfying| leveling, and compaction of tne top 300 mm of the Isubgrade. |Carriageway and Paved Shoulder lsub-Base 50mm thick granutar material wth a CBR value of nol less than 30%, complying with grading liits of the] Specification. |Roadbase 200mm thick crushed eggregates with a CBR value off not less than 80%, complying with the Specfication, Bituminious Pavement Courses Bituminous prime coat to be applied at @ rate of 0.5 -| 1.0 fre per square metre as per Spectization, lEiuminous tack coat to be apalied at a rate of 0.25 | 0.55 litre per square metre as por Spectication rete 0mm thick Binder Course (AC28) for paved shoulder, using bitumen of penetration grade 60-70 as pe Specication, [50mm thick Wearing Course (AC14), using bitumen of penstration grade 60-70 es per Specification, |Median and Island [Roadbase 200mm thick crushed aggregates with a CBR value of not tess than 80%, complying with the Specification. 65,200 65,200 28,000 28,000 28,000 26,000 29,250 131 Page Total cartied to Summary of Bill No. 5 QS. Us PROJECT : MEMBINA JALAN DAN JAMBATAN ALOR GANU/TITI GAJAH, DAERAH KOTA SETAR KE TITI BESI, DAERAH KUBANG PASU, KEDAH BILL NO, 5 - PAVEMENT WORKS (ALL PROVISIONAL) No. | Cade No. Desatipton unit | ay. Rao (RM) ‘Amount (RI) R500 R200 R300 | Rs20 & | R520 c | Rear H | R51 | Rs79 jeltuminious Pavement Courses Bituminous prime coat to be eppled at a rate of 0.5 1.0 tre per square metre as per Specification. {Asnhaitic Concrete 90mm thick Binder Course (AG28) for paved shoulder| lusing bitumen of penetation grade 60-70 28 per ISpociteation [Access Road |Sub-base .S0mm thick granular material wth a CAR value of no Hess than 30%, complying with grading mits of te} Specification, [Rozdbase, [200mm thick crushed aggregaies wih a CBR value Inot iss than 80%, compying wit the Specifeeton R500 [Bituminious Pavement Courses, [Bituminous prime coat lo be applied at a rate of 0.5 -| 1.0 ire per square metre as per Specification, [Bituminous tack coat to be applied at a rate of 0.25 + 0.59 tie per square metre as per Spacinication, [Asnhaltic. Concrete loom thick Binder Course (ACZ®) using bitumen Penetration grade 60-70 as per Spectication, [50mm thick Wearing Course (AC‘A), using bitumen of Penetration grade 60-70 as par Specification, [TREATMENT TO EXISTING PAVEMENT. |ting and Paving, Miling existing pavement avd cart away to designated) [spol dumping ground, clearing of debris, ot | 191 mt | tat mt | 5950 5950 1.600 4,900 2,000 at | 6.04 Page Total cared to Summary of Bll No. 5 BOs -24 PROJECT : MEMBINA JALAN DAN JAMBATAN ALOR GANU/TIT! GAJAH, DAERAH KOTA SETAR KE TITI BESI, DAERAH KUBANG PASU, KEDAH BILL NO. 5 -PAVEMENT WORKS (ALL PROVISIONAL} [re Jecco no Description Unit ay. Rate (RM) ‘Amount (RM) 500 «| R820 co | Ras0 | Resi R300 F | Rao HIREATMENT 10 EXISTING PAVEMENT (Contd) {Reconstruction of Existing Pavement |Situminious Pavement Courses Jetumincus pine coat to be applad ata rate of 0.5 + 1.0 tre per square metre as per Specifeation. lEiuminous tack coat to be applied at arate of 0.25 0.55 iro por square mate as por Speciicalon [asphaltic Concrate loom thick Binder Course (AC28) for paved shoulder| lusing bitumen of penetralion grade 60-70 a6 per Specitication. [50mm thick Wearing Course (RC‘4), using bitumen o penetration graie 60-70 ae per Specification. {carriageway anci Paved Shoulder |Sub-Base 50mm thick granular matorial with a CBR value of not less then 30%, complying with grading tims of te Speciication |Roadbase. lunbouna 200mm thick cused aggregates with @ CBR value of not ess then 20%, complying with the Specification, 1,100 4,400 4,100 44100 9,800 9.800 Page Total carried to Summary of Bill No. § 5-34 PROJECT : MEMBINA JALAN DAN JAMBATAN ALOR GANU/TITI GAJAH, DAERAH KOTA SETAR KE TIT! BESI, DAERAH KUBANG PASU, KEDAH BILL NO. 5 - PAVEMENT WORKS (ALL PROVISIONAL) —-— No. | Code No. Description unit | ay. | Rato(RMy | Amount (RM) ‘Summary of Bill No. 5: Pavement Works Page BOS - 1/4 JPage B05 - 214 lpage 805-314 Total of Bll Ho. § carried to Summary of Tonder 55-44 BILL NO. 6 ROAD FURNITURE PROJECT : MEMBINA JALAN DAN JAMBATAN ALOR GANU/TITI GAJAH, DAERAH KOTA SETAR KE TITI BESI, DAERAH KUBANG PASU, KEDAH. BILL NO, 6 - ROAD FURNITURE (ALL PROVISIONAL) No. Code No, Description Unit ay. Rate (RM) ‘Amount (RM) Ret Renz Rett Rotts Ras. Reit8 Rony Rate Reta [sIGNBOAROS. {Destination Signage [Traffic signs shall genorally be in accordance with [Post mounted signages shall bo deomod fo include foundations, support posts, purlins frame and |connections, excavation, preparation of surfaces, latsposal of excavated material, upholding eides of lexcavation, backfiling, concrete, reinforcement, INon.ttuminatod high inersity primate reto-reiectve sheeting mounted on aluminium alloy sign plate more land equal than 4.0nt. Warning and Reaulatory Trafic Sians [Traffic signs shall generally be in accordance with] {the Jatest version of Arshan Teknik Jalan) 24/87, | IPost mounted signages shall be deemed to include foundations, support posts, putlins frame and lconnections, excavation, preparation of surfaces, latsposat of excavated material, upholding sides of lexcavation, backtilina, concrete. reinforcement. INoneituninsied hich intensity prismatic retroefletive |sheoting mounted on aluminium alloy sign plate for [ype RP 1 sign {standard zo) INonatluminat high itansty prismatic retro-rflective Isheeting mounted on aluminium alloy algn plate for ype RP 6 sign (standaxd size), lNon-tluminatod high infonsty prismatic retc-reflectve [sheating mounted on aluminium alloy sign plate for |iype RP 13 sign [standard size, INon-tluminated high intensity prismatic ratro-rfictive lshesting mounted on aluninium alloy sign plate f Iype WO 9 sign (standard size} INon.tluminatod high intonsity prismatic rotro-rflectve| Isheotng mounted on aluminium alloy sign plate for |ype WD 100 sign [standard size} INon-tluminated high iniensky prismatic retro-eftectvo} Jsheetng mounted on alurinkim alloy sign plate for ype WD 100 eign [standaré tze), INon-luminated nigh intensity orsmate retro-reftectve fsneeting mounted on alurinium alloy ign plate fr |e WO 16 sign fotancerd size} INonsituminated high intonsiy prismatic rotro-rflecive| Ishesting mounted on luminium alloy sign plate for lype WD 22 sign [standard size), 6 Pago Total carried to Summary of Bill No. 6 1896-14 PROJECT : MEMBINA JALAN DAN JAMBATAN ALOR GANUITITI GAJAH, DAERAH KOTA SETAR KE TITI BESI, DAERAH KUBAI ING PASU, KEDAH. BILL NO. 6 -ROAD FURNITURE (ALL PROVISIONAL) Deserpton “Lm ay. No. |code no. a | Ren.10 8 [Rett c | Ran.s2 | Rens & | Retisa F | Rents 6 | Reiia6 Ht | Rent7 3 | Resse eas k | Reds L | Ress {Warning and Regulatory Traffic Signs (Contd). Non-iuminated high intensty prismatic retto-eflectve| |shosting mounted on aluminium alloy sign plato for [ype WO 23 sign [standard siz). |Non-iluminated high infensty prismatle retro-efective Jsheeting mounted on aluminium alloy sign plato for yoo WD 24 sign [standard size). Non-ilurinated high intonelty prismatic retio-efectve| Jsheeting mounted on aluminium alloy sign plate for ype WO 278 sign standard sta} Non-lluminated high intensity prismatle retro-eflective shooting mounted on aluminium alloy sign plate for Itype WO 270 sign [siandard size}. Nonsilurinated high intonsty prismatic ratro-refective| lsheeting mounted on aluminium alloy sign plate f Iype WD 27¢ slan (standard sizo}, INon-tturinated nigh intensity prismatl retro-rflective| |shesting mounted on aluminium alley sign plate for Ite WD 96 sian fstanderd size) !Non-tturinated high intensity pematic relro-refiectve| Isheeting mounted on slumintum attey sign plato for ype WO 39a sign standard sizo} Non-ituminated high intensity prismatic retro-rltactive [shooting mountod on elurinium elley sign plate for lt WO 396 sign fotandard size. !Non-ituminated high intensity pramatic rero-refooive| [sheeting mounted on aluminium alloy sign plate for ype WO 44 sign (standard size) [TRAFIC BARRIER, [ouarctraits |singlo mounted comugated stool boam guardrail with lpost at 2m spacing incushe of dolinestore. Rate to include tots, nuts, posts, and other ancy wor, |suardcails End lcuardrail end Type 2 . Rate to include bolts, nuts, posts, and other ancilary work or fr 19 1,990 Rate (RM) | Amount RM) Page Total carried to Summary of Bill No. 6 6-214 PROJECT : MEMBINA JALAN DAN JAMBATAN ALOR GANUITITI GAJAH, DAERAH KOTA SETAR KE TITI BESI, DAERAH KUBANG PASU, KEDAH. No. | Code No. BILL NO. 6 ROAD FURNITURE (ALL PROVISIONAL) Description Unit yy. Rate (RM) ‘Amount (RM) R700 A | Rr ERB 8 Rete for kerbs, channels, and edgings shall be| Jdeemed to include beds, backings, reinforcement, joints, and cutting, In sity concrete Kerbs, Type Skt 2s shown in Drawing DELINEATORS. Ichevron Detineator Retrorefiectiveroadstud as per Drawing MISCELLANEOUS Fight of way (ROW) marker as shown in Drawing 550 175 10 Page Total carried to Summary of Bill No. 6 98-314 PROJECT : MEMBINA JALAN DAN JAMBATAN ALOR GANU/TITI GAJAH, DAERAH KOTA SETAR KE TIT! BESI, DAERAH KUBANG PASU, KEDAH. BILL NO. 6 - ROAD FURNITURE (ALL PROVISIONAL) No. No. Description [Summary of Bill No. 6: Road Furniture [Page Bas - 14 |Page BOs - 24 [Page BOS 3H unit | ay. (RM) “Amount (RM) ‘Total of Bill No. 6 carried to Summary of Tender BQ6-44 BILL NO. 7 GEOTECHNICAL WORKS PROJECT : MEMBINA JALAN DAN JAMBATAN ALOR GANU/TITI GAJAH, DAERAH KOTA SETAR KE TITI BESI, DAERAH KUBANG PASU, KEDAH. BILL NO, 7 - GEOTECHNICAL WORKS (ALL PROVISIONAL) Code No. ito 20 sro esr02 e703 Has esto 0890 Descripton [GROUND TREATMENT |PREFABRICATED VERTICAL DRAINS. [The following items shail Intudo of supply and lay lgeotextile and PVD, filling and compact suitable Imaterial'sand layer. | Embankment fll referto 8a - Earthwork Plant and Eauipment, Provision of al necessary plant ané equipment, ltansporttion to the Sto, assombiing, and removal off rom Site attr completion of opecation. Moving and handing al necessary plant and equipment within the Site and ffom location to location as often 2s ls, and whenever necessary for execullon of whole Joveraton. \ceotextie, Wem for geotextile shall be deomed to Taclade coat lor storage at site with noccossary protection against exposure to direct sun. Non-woven gectextilo with minimum design strength of 15 kNim as Separator as per Specification, lvroven geotextie wth minimum design strongth of }200/50 kNim as basal reinforcement Hwroven geotextle with minimum design strength of 400/60 kN as basal ralnforcement [Replacement of Unsuitable Material Items Yor iting shall include fing arth in layers, compaction, and addtional filing nocossitated by) settiement or penetration into underlying materfal 25 applicable, [Pro-boring, Pre-boring, [6.0m depth, Rate to Include backfling, |Pretabricated Vertical Drains, L'00mm x 3mm) prefabricated vertical drains 2 por Speciication, lDeatnace Bi Item for sub-surface drains (dralnage blanked shail lbe deemed to include filter fabric, lining, and fier material. [soomm) thick river sand] 26 crainage blanket as por abte 2.1, Secon 2 of Speciation. unt | ay. sum 64,800 mm? | $8,600 mm | 4,700 m | 2400 m_ | 734,700 7,600 Rate (RM) “Amount (RM) Page Total Carried to Surmmary of Bill No.7 BQy-17 PROJECT : MEMBINA JALAN DAN JAMBATAN ALOR GANU/TITI GAJAH, DAERAH KOTA SETAR KE TITI BESI, DAERAH KUBANG PASU, KEDAH. BILL NO. 7 - GEOTECHNICAL WORKS (ALL PROVISIONAL) zo No. (Code No. asi0 Fs22 Fst F120 Het. 61.2 Hes Hoe 260 ea? Description |GROUND TREATMENT ICAL DRANS..Cont Prefabricated Verte! Drain laid horzontaly as eubsol lerain .TMEN' [SURCHARGE / PRELOADING |Surcharge/Pre-loading Material Items tor filing shall include compaction, and| ladattional filing necessitated ty settement or [penetration into underlying material as applicable. Imported sultable material from Contacto's on source las per Spociicaton to form surchagepreloading linctuding famration of benches \Excavation In Gut shall bo deemed to Include) trimming and preparation of excavated surface and| transportation from source to place of fll or| disposal. Earth material to fomation level and sont to dleposal site approved by the 8.0. |GROUND TREATMENT. PILED EMBANKMENT IMoving and handing of ending at plant and lequipment within the Site and from locaton te location las often asis, and wenever nocessary for exooution of whole operation. |2recast Reinforced Concrete Pilos [250mm] Grade C38/45 square procast reinforced ‘concrete piles with a working load of [800KN } Items for plling work shall be deemed to include loting records. and disposal of excavated and| surplus materials. | Suppy inital piles wit Olso shoes of 12.0m length, Suppty extosion piles of 9.0m ength. Depth even vera cinting wih fut wet al round) stot pes, Preparing honds. i ust | ay. m | 5,850 im | 74,000 mn? | 43,500 sun mw | 267 me | 247 m_ | 49267 me | 247 re | 2947 or | ser Rate (RM) ‘Amnourt (RM) Page Total Carried to Summary of Bill No.7 PROJECT : MEMBINA JALAN DAN JAMBATAN ALOR GANUITITI GAJAH, DAERAH KOTA SETAR KE TITI BESI, DAERAH KUBANG PASU, KEDAH. No. |code No, BILL NO. 7 - GEOTECHNICAL WORKS (ALL PROVISIONAL) Doseription BI IKMENT...Cot [Pe Tests, nial static toad test on (260mm square precast reinforced concrete pile up two mes working load of | 400K. (Test lad of 800KN)) subsequent estc load test on [250mm square precast reinforced concrete} pile up two times working load of 400K) (Test load of [800KN) Pile Dynamic Analyser (PDA) tost on [200mm square precast roinforaod concrete} ple |Roinforced Concrete Siab, tems for reinforced concrete slab shall be doomed) to include proparation of surfaces, mulipio ‘handling, disposal of surplus excavated material, ‘wpholding of sides excavation, additional lexcavation to provide working space, backfiling, removal of dead services and reinstatement of| original surface unless covered by saparate items. {200mm thick reinforced conerote slab with high tensile bars with nominal diameter [10mm [po0mm) thick reinforced concrote slab with 2 layers high tonsile steel fabric [A303 : A10). Formwork, bd | wen [Rate for forninork shail be deemed to Include the| [projections and intusfons and any tomporary| staging required. sites formwork Ft rough fish to ground slab, [Reinforcement Rate for reinforcement shall be doomed! to include! favour or cutting, bending, and placing. © | 1624 igh tonal bars with nominal diameter t8mmn (110), unt oy. 2,040 Rate (RM) ‘Amount (RIM) Page Total Carried to Summary of Bll No.7 8Q7-37 PROJECT : MEMBINA JALAN DAN JAMBATAN ALOR GANU/TIT! GAJAH, DAERAH KOTA SETAR KE TITI BESI, DAERAH KUBANG PASU, KEDAH. BILL NO. 7 - GEOTECHNICAL WORKS (ALL PROVISIONAL) No. } Code No. Desciption unit | ay. | Rate my |skouno TREATMENT: [PILED EMBANKMENT... Con In-situ Concrete Design Mix. [Rate for In-sits concrete designed mix shall be |deemed to include placing and compaction of| {concrete. A | 1111. |orade C1215 - Binding mass concrete, (0mm) thick | m? | 6.900 lo ground sla, B | 1142 |Grade.c25/30] - Reinforced concrete, [300mm thickto | im? | 3,160 lround sib. iS TRUMENTATION & MONITORING : JGOTECHNICAL INSTRUMENTATION Items Tor geotechnical instrumentation shall be ldeemed to include taking precaution to avold| ldamage, special care during filing andi lcompaction, maintenance and repairireplace of| ldemeged instrumentations and set up temporary lbench mark stations unless coverad by separate tems. INSTRUME! jONITORING : \VERTICAL SETTLEMENT, |Settloment Gauge / Plate. © | ceo |settement gauge / plate as per Spectication and es | nr | 57 shown in tho Drawing ona, IKeKRvun aio2rt6/297/6712) D | ca00 |itagnetic Extensometer wlth 4 plato magnet, 3 spider | nr 2 ‘magnet and 1 datum magnet as showm in Drawing no lerit a@riz INSTRUMENTATION & MONITORING : ILATERAL MOVEMENT, litem Tor inciinomelor shall be deomed fo includ] -boring and installation. | 6820. |inctinometer as per Spesitcaion and es shown inthe [Drawing no. (KPKRUILBNO2/16/20716712) with = ls) Depth of instalation excoading 20.0m but nat} nr 2 Jexcooding 30.0n, F | 6850. Joisplacement marker mr | lpage Total Carried to Summary of Bill No.7 BQ7-47 |, KEDAH. BILL NO. 7 - GEOTECHNICAL WORKS (ALL PROVISIONAL) IEMBINA JALAN DAN JAMBATAN ALOR GANU/TITI GAJAH, DAERAH KOTA SETAR KE TITI BESI, DAERAH Description INSTRUMENTATION & MONITORING ; YATER PRESSI [Piezometer. [lem Tor plozometar shall be deemed to include pre boring and installation. Plezomoter as per Specification and as shown In the Drawing no. (KPKRIU/LB/O2/16/297/6712) wit = la) Depth of instalation exceeding 10.0m but not exceoding 20.0. Standpipe Plezometr (Casagrande Tip) as shown In Drawing no. GTI & GT12 {Observation Wall as shown in Draning no. GTH1 & leri2 wsTauMm: STORING: ren (TBM) AT SOFT. Level item for deep leveling datunn shall be deemed 10 Include pre-besing andi Installation. [Deep levelling datum as per Specifcatlon and as shown inthe Drawing no. (KPKRMIL8/02/' 6297/6712) josh: [a) Depth of installaion exceeding 80.0, wy MONITORING : ID REPORY !Monitosing of instrument for the above instrument atthe loroject ste by [Quatited Personnel] as por |Specificaton. Rate to Include proparation of monitoring Jeport inclusive of analyse, findings and Jecommendation tobe submited on a monly] bask, STAINING STRUCTURES : SOIL SLOPE: \Geotextile/ Geoctia Item for geotextite and/or geogrid shall be deemod| lo include cost of storago at site with neccessary] protection against exposure to direct sun. PROJECT KUBANG PASU, No, } Cote No. a | costo 8 | cat cc | cst | cso e | caso F | 230 |Googri wit tensito modulus at 236 > 700KNn Unit © ay. ey a 4,800 Rate (RM) ‘Arnau (RM) — Page Total Carredto Summary of Bil No, 7 BQr-si7 PROJECT : MEMBINA JALAN DAN JANBATAN ALOR GANUITITI GAJAH, DAERAH KOTA SETAR KE TITI BESI, DAERAH KUBANG PASU, KEDAH. BILL NO. 7 - GEOTECHNICAL WORKS (ALL PROVISIONAL) No, | Code No, Description unit | ay. | Rate (RM ‘Amount (RM) \cootechnical works A | wrst.t |Adcttonal surcharge materal-supply, lay and compact Jsultabe ft 2s surcharge, Incisive of excavation trom lapproved boro area, hencling, ransport, spreading, land compacton in layers to 90% of maximum dry density 2s determined from modified 12,000, 8 | w141.2 [Supply lay end install High Duty (HD) Grace (20kc/m3) [Expanded Poysiyrone (EPS) or Lightweight Expanded (Clay Agoregates (LECA) Inclusive of cuting, water pumping, and 6 | wrar.s |100mm thick reinforced concrete slab weh Grade 30/20 rapid hastening concrete and BRC 10 4,900 D_ | w141.4 |Excavate embankmant and depose to contractor's own jaune 25,000 Paue Total Carried to Summary of Bll No. 7 PROJECT : MEMBINA JALAN DAN JAMBATAN ALOR GANU/TITI GAJAH, DAERAH KOTA SETAR KE TITI BESI, DAERAH KUBANG PASU, KEDAH. BILL NO. 7 - GEOTECHNICAL WORKS (ALL PROVISIONAL) Amount (RM) ‘Summary of Bill No. 7 : Geotechnical Work Page Bar- 17 [Page Bar 2/7 Page Ba7-a/7 Pago Bar- 4/7 Page 8a7- 5/7 [Page Bar - 6/7 [Total of Bill No.7 carried to Summary of Tender Lt BQ 79 BILL NO. 8 STRUCTURES WORKS PROJECT : MEMBINA JALAN DAN JAMBATAN ALOR GANU/TITI GAJAH, DAERAH KOTA SETAR KE TIT! BESI, DAERAH KUBANG PASU, KEDAH. BILL NO. 8- STRUCTURES ‘SUMMARY OF BIL NO. 8 ITEM No. DESCIFTION FROM PAGE. AMOUNT (RM) ‘STRUCTURES A |pRIDGEWorKS [BRIDGE 01 - SUNGAI ANAK BUKIT 81 fPiuineworks 08.171 82 |sus srRucTURE Ba8.2-77 a3 |surerstRucrure 808.34/4 8.4 |WwiSCELLANEOUS WORKS 8084-363 IBRIDGE 02- SUNGAI ALORGANU 814 [PiiNsworks BO8.1A-1/1 24 {sus STRUCTURE BOB.2A-8/4 834 |SUPER STRUCTURE BO8.34-5/5 844 _|MISCELLANEOUS WORKS Boe 44-913 B oT - CH: 1,725 85 [CULVERT 8 VEHICULAR BOX CULVERT 08.5515 [Total of Bill No, 8 carried to Summary of Tender BQ 8-Somt/t PROJECT : MEMBINA JALAN DAN JAMBATAN ALOR GANU/TITI GAJAH, DAERAH KOTA SETAR KE TITI BESI, DAERAH KUBANG PASU, KEDAH. BILL NO. 8 - STRUCTURES: Bridge 01 - Sungai Anak Bukit {8.41 - PILING WORKS (ALL PROVISIONAL) No. | Code No. Description Unit | Qty | Rate(RM) | Amount (RM) |tems for piling work shall be doomed to include] ping records and disposal of excavated and| [surplus materials. |G00WM DIAMETER PRECAST PRESTRESSED. ICONCRETE SPUN PILES (CLASS : C) Ptant and Equipment ‘A | H110 [Provision of all recessary piling plant and equipment) sum Iteansportation to the site, handling, assembling, ang removal of the ste efter completion of operation, 8 | #120. [Moving end handling of all piling plant and equipment sum jvithn the site and from location to location as often as| is, and whenever necessary for the execution of tho} [Whole piling operation. ©} 1130. [Provision of temporary staging for pling work atthe pier| sum lor sg. Anak Bukit Working ite ‘600 mm] diameter Procast Prestressed concrate les (spun piles) as a jo. (CLASS: C) D_ | #271. |Suppiy intial pile with pointed shoes of 12.0m lengih ia e | #2712 |supply extension ple of 12.0m length, mn | 62 F | 1272.1 [Depth eriven using hycraulte method. m | 40 G | 1272.2 [Depth driven raked at Inctination rato of 4 : 10 using m | 800 ydrauite methoct H | Hara Jointing with but weld including steal plata all round as| ne e Ishown in Drawing |Grade ¢32/40 Concrete 4 | #276 |Filing in pile holow section as specified Rate shallbe | nr e [doomed fo include removal of materials from within the ples before concreting kK | 276. |outott piles. Rate o inctude preparing heads, fr e Pile Test Rate for pile test deemed to Include necessary L__ | 510.1 |intial static load tost {maintain Josd teat) on 600mm) nr 1 idemeter spun pile up to two times. working load 1, 100N M_ | 510.2 [Subsequent static load test (maintain load test), on] nr 1 N- | 1520. |Pile Dynamic Analyzer (PDA) test a 10 [Total of Bill No, 8.4 cartied to Summary OF Bill No.8 Bos.t-4/1 PROJECT ; MEMBINA JALAN DAN JAMBATAN ALOR GANU/TITI GAJAH, DAERAH KOTA SETAR KE TITI BESI, DAERAH KUBANG PASU, KEDAH. BILL NO. 8 STRUCTURES: Bridge 01 - Sungai Anak Bukit 8.2- SUB STRUCTURE (ALL PROVISIONAL) Cade No | Se Description unit | aty Rate (RM) | Amount (RM) TEMPORARY WORKS. \Cofferda A | A523 [Allow for provision ofall labours, plants, material ete for! sum the design and construction of cofferdams including| lexcavation, handling, disposal of excavated spoils and| ldabris, dewatering, shoring, levelling, driving, allowing| Hor access way platform, staging and all other necessary| works for the purpose of construction of abutmonts| landior* piers and removal of all temporary works upon| bridge completion. Shop drawing shall be endorsed by| [Professional Engineer with Practising Certificate (PEPC}| to be submitted and approved by S.0.. It shall also to| include: la} Supply, construct and maintain temporary cofferdams| including interiocking sheet pile, walling and strutting, land other rolated works. lb) Supply, construct and maintain pumping eng| [dewatering during construction period Jc) Removal of and reinstatement of the site upoo| [completion |Temporary Working Platform B | A529 [Allow for provision of all Iabours, plants, material etc for] sum the design and construction of tomporary working| Jolatiorm “including excavation, handing, dewatering, ldisposal of excavated spolls and debris, shoring, levelling, driving, allowing for access way plattorm,| ‘staging and ail other necessary works for the purpose of| construction of abutments andlor* piers and removal of all temporary works upon bridge completion. Shoo| crawing shall be endorsed by Professional Engineer| Jwith Practising Certificate (PEPC) to be submitted and] lapproved by S.0. It shall also to include: la) Supply, construct and maintain temporary working platform including access, safoly equipment and lapparatusiprotection, piatform structure, decking, platform accessory, and other related works. b) Safety netings and catch pltiorm. c) Removal of and roinslatement of the site upon completion Page Total carried to Summary of Bill No. 8.2 808.2- 1/7 PROJECT : MEMBINA JALAN DAN JAMBATAN ALOR GANU/TITI GAJAH, DAERAH KOTA SETAR KE TITI BESI, DAERAH KUBANG PASU, KEDAH. BILL NO. 8 - STRUCTURES: Bridge 01 - Sungai Anak Bukit 8.2-SUB STRUCTURE (ALL PROVISIONAL) we | oe Desrpon a |ABUTMENTS |Earthwork |Cut and Dispose JExcavation in cut shall be deemed to include| |trimming and preparation of excavated surface and| transportation from source to place of fill or| disposal A | F135 |Excavate in unsuitable material as per specification to| disposal ste approved by the S.0. 297 The following items for filling shall include| |compaction, testing and confirmation material and additional filling necessitated by settlement of| penetration into underlying material as applicable. B__ | F342.1 |imported material from Contactor's awn source as per| [Specification 41 | 342.2 |imported material wall - graded granular backfill Imaterial (crushed aggrogate) behind abutment from contractors own source as per Specification 396 item for hand rail shall be deemed to include fixing| {to other work, supply of fixing components, and| \drilling or cutting of other work. D | L240.1 [Galvanised mild steel handrail of 100mm x 50mm x) m 38 l5mm thickness and 200mm high, E | 1240.2 |Galvanised mid steo! handrail post of SOmm x 50mm x) m 48 J5mm thickness and 900mm high, |crade C16/20 Concrete F | 1122 |Mass concrete 300 mm thick footing for pitching steps. [Masonry Step | 4390. [Natural stone masonry jointed in (1:3) cement motar lhush pointed for step. Rate shall be deemed to include fair facing finish, 38 \Grade C12115 Concrete H_ | 1122. Mass concrete 300 mm thick footing for masonry steps. Page Total carried to Summary of Bill No. 8.2 8082-207 PROJECT : MEMBINA JALAN DAN JAMBATAN ALOR GANUITITI GAJAH, DAERAH KOTA SETAR KE TITI BESI, DAERAH KUBANG PASU, KEDAH. BILL NO. 8 - STRUCTURES: Bridge 01 - Sungai Anak Bukit 8.2 SUB STRUCTURE (ALL PROVISIONAL) Description ‘Amount (RM) \Gabion [Rate shall be deemed to Include geofabricfiltor Imaterial terrain 1000 or equivalent. 12.0 m x 1.0 m x 1.0 m rock-filed gabion with PVC-| |coated wire gauge sizo of 2.7 mm as per Specification land as shown in the drawing, Rock-filed gebion mattrass, 300mm thick with PVC-| lcoated wire gauge as per Specification and shown tn] the drawing. |Subsurface Drains Item for subsurface drains shall bo doomed to] include geotextiles fabric, lining, and filter material. |subsolt drains; 10mm diametor HOPE perforated pipe| including aggrogate (20 mm - 40 mm) wrapped with |gootoxtios fier. Joutlet drains; 100mm diameter UPVC pipe including tings. Rate fo include bends, fiter fabric and concrete] surround. IPermeable Laver J600mm thick permeable layer comprising of [20mne| 40mm] crushed stone as per Specification Grade 612/15 Concrete 150mm thick Lean conerete blinding Bituminous Paint Coating Prepare and apply two (2) coats of bituminous paint to: Buried surfaces: Rough concrote surfaces of class F1 of [abutment, wingwalls and approach slab. ISupply and lay googrid or equivalent in according to] drawing Page Total carried to Summary of Bill No. 8.2 B08.2-3/7 PROJECT : MEMBINA JALAN DAN JAMBATAN ALOR GANU/TITI GAJAH, DAERAH KOTA SETAR KE TIT! BESI, DAERAH KUBANG PASU, KEDAH, nis m2 72 1531.4 t31.2 1891.3 624 (625 1627 i716 m7 BILL NO. 8 - STRUCTURES: Bridge 01 - Sungal Anak Bukit 8.2-SUB STRUCTURE (ALL PROVISIONAL) In Situ Concrete Design Mix For Abutment, Wing lwalls, Parapet Wall and Approach Slab Rate for in situ concrete designed mix shall be deemed] to include placing and compaction of concrote Grade C1245 Concrete Lean conerete blinding, [50 mm] thick [to approach| slab) Lean concrete blinding, [100 mm} thick {to abutment and] wing walls). Grade 632/40 Concrete Reinforced concrete al bridge abutment, wing walls, parapet wall and approach slab. Formwork For Abutment, Wing walls, Parapet Wall Rate for formwork shall be deemed to include the| [projections and intrusions and any temporary| [staging required. [Sides and Soffit |F1: Rough finish for buried surfaces of abutment, |wingwalls and approach slab. F2: Fair nish for exposed surfaces of abutment, lwingwalls and approach siab. F3: smooth finish for exposed surfaces for parapet wall lReinforcement For Abutment, Wing walls, |Wall and Approach Slab. Rate for reinforcement shall be deemed to include| labour for cutting, bending, and placing. rapet High Tensile Bars ‘Nominal ciameter: 12 mm, Nominal diameter: 16 mm. INominal diameter: 20 mm. Nominal diameter: 25 mm. owls bar — plein, [16mm dameter x 200mm long] high tensile bars at 3000 mm cic at approach slab Dowels bar ~ sleeved and capped, 32 mm diameter »| }700 mm jong high tensile bars at diaphragmvshoar key. io ne 7% 102 245 270 159 30 18 TA 198 24 Amount (RM) Page Total carried to Summary of Bill No. 8.2 8082 -4/7 PROJECT : MEMBINA JALAN DAN JAMBATAN ALOR GANU/TITI GAJAH, DAERAH KOTA SETAR KE TITI BESI, DAERAH KUBANG PASU, KEDAH. BILL NO. 8 - STRUCTURES: Bridge 01 - Sungai Anak Bukit 8.2 SUB STRUCTURE (ALL PROVISIONAL) we Desobton Une [Gy [Rate] Amount [PIERS leaxhuors ICutand Dispose [Excavation In cut shall be deemed to include| Itrimming and preparation of excavated surface and| Itransportation from source to place of fill or| \disposal. A | F135 excavate in unsuitable material to dsposal site| ona lapproved by the S.0. [Eitling [The following items for filling shall include| |compaction and additional filling necessitated [settlement or penetration into underlying material as| lapplicable. B | F342 |imported material from Contactor’s own source as per] m? | 723 ISpecification In Situ Concrete Design Mix For Por and Pier Head IRate for in situ concrete designed mix shall be| |dcomed to include placing and compaction of| lconcrete. \Grade €12/15 Concrete | 1111 Lean concrote binding, 100 mm thick to piers. wi 116 \Grade €32/40 Concrete D | 1174 Reinforced concrete to piers and piers cross head. me 397 IEormwork For Pier and Pier Head [Rate for formwork shall be deemed to include the| lprojections and intrusions and any temporary| Istaging required. Isicies and Soffit | 1631.1 |F1: ough finish for buried surfaces of Pilo caps, wi 101 F | 1531.2 |F3: smooth finish to piers and pior head m | 390 Page Total carried to Summary of Bill No. 8.2, Ba82-5i7 PROJECT : MEMBINA JALAN DAN JAMBATAN ALOR GANU/TITI GAJAH, DAERAH KOTA SETAR KE TITI BESI, DAERAH KUBANG PASU, KEDAH. BILL NO. 6 - STRUCTURES: Bridge 01 - Sungal Anak Bukit 8.2-SUB STRUCTURE (ALL PROVISIONAL) Description Unit | Qty} Rate (RM) | Amount (RM) [Reinforcement For Pier and Pier Hoad Rate for reinforcement shall be deemed to include lHigh Tensile Bars A | 1624 [Nominal diameter: 12 mm. t 18 B_ | 1625. |Nominal diameter: 18 mm, t 18 © | 1626. |Nominal diameter: 20 mm, t a D | 1627. |Nominal diameter: 25 mm, t 2 E | 1628 Nominal diameter: 32 mm, t 32 F | t717_ |Dowels bar ~ sleeved and capped, 32 mm diameter x} nr | 12 }700 mm long high tensile bars at diaphragmishear koy. Page Total carried to Summary of Bill No. 8.2 BQ82-67 PROJECT: MEMBINA JALAN DAN JAMBATAN ALOR GANU/TITI GAJAH, DAERAH KOTA SETAR KE TIT BESI, DAERAH KUBANG PASU, KEDAH. BILL NO. 8 STRUCTURES: Bridge 01 - Sungai Anak Bukit 8.2- SUB STRUCTURE (ALL PROVISIONAL) Code no | oe Description Rate (RM) | Amount (RM) [Summary of Bl No, 8.2- Substructure Page BO8.2- 177 Page 808.2 - 2/7 Page 8082-37 Page 808.2 - 4/7 Page 808.2 - 6/7 Page 808.2 - 6/7 [Total of Bill No, 8.2 carried to Summary Of Bill No.8 BO8.2 -7/7 PROJECT : MEMBINA JALAN DAN JAMBATAN ALOR GANU/TITI GAJAH, DAERAH KOTA SETAR KE TITI BESI, DAERAH KUBANG PASU, KEDAH. a | asset 8 | assa2 ce | 1430 o | ive BILL NO. 8 - STRUCTURES: Bridge 01 - Sungai Anak Bukit, '8.3- SUPER STRUCTURE (ALL PROVISIONAL) Description Unit ty Rate (RM) ‘Amount (RM) |PRE-TENSIONED/POST-TENSIONED™* IPRESTRESSED BEAMS: lTemporary Works For Beam Lauching ) Provision oF temporary works for the boam launching| including all necessary plant and equipment, crane, temporary platform, mobilisation and demobilisation of lequipment to site and installation, handing, assembiing| and others related works and removal off the site ater Jcomplation of the operation of beam launching. Rate Jshall be deemed to include the provision of facility enc] lineir continuing operation and maintenance. li) Provision for securing stability of beam after launching and placing. which includes temporary stays, moliisation and derrobilisation of installation, handling, assembling and other related works and removal off the| site after the S.0. is staisfed of its stabilty. Rate shall be deemed to include the provision of faciliy and their continuing operation anc maintenance, Prestressed Beams Item for supply and erection of precast conerete| [shall be deemed to include concrete, reinforcement, Htormwork, joints and finishes; and items for] lprestressod precast units shall include| prestressing, [Rate for prestressing shall be doomed to includo| tendon, ducts, jacking, grouting, anchorage andl lother components and tasks ancillary to] prestressing, Grade 50 prestressed post-tensioned beam, Tee section 30 m long as per Drawing and Specification, DECK SLAB AND DIAPHRAGM For Stee! Beam, Preensioned Prostressed Beam land Post-tensioned Prestressed Beam \Cast in-situ Concrete For Deck Slab and Diaphragm in Situ Concrete Design [Rate for in situ concrete designed mix shall be ldeemed to include placing and compaction of] lconerete. \Grade €32/40 Conereto [Reinforced concrete slabs to bridge deck and llaptragm, a 268 Page Total carried to Summary of Bill No. 83 8083-14 PROJECT : MEMBINA JALAN DAN JAMBATAN ALOR GANU/TITI GAJAH, DAERAH KOTA SETAR KE TIT! BESI, DAERAH KUBANG PASU, KEDAH. BILL NO. 8~ STRUCTURES: Bridge 01 - Sungal Anak Bukit 8.3- SUPER STRUCTURE (ALL PROVISIONAL) No | Code No. Description Unit} aly} Rate(RM) | Amount (RM) |Formwork For Deck Slab and Diaphragm Rate for formwork shall be deemed to Include the| projections and intrusions and any temporar| [staging required. Istde A | 1818. |F2: Fer finish to deck slabs and daphragm, we 199 Isornit B | 1525 JF: Fai finish to coment board permanent formwork a 162 shown in Drawing Reinforcement For Deck Stab and Diaphragm Rate for reinforcement shall be deemed to inctude| labour for cutting, bending, and placing. High Tensite Bars © | 1626 Nominal diameter: 12 mm. t 19 D_ | 1625 Nominal diameter: 16 mm. t | aso E | 1626. |Nominal diameter: 20 mm, t 05 F | 1627. |Nominal diameter: 25 mm. 1 | 146 [PARAPET recast New Jersey Parapet Item for supply and erection of precast concrete] parapet wall shall be deomed to includo| reinforcement, connections, joints and accossorios| for wail joints. lPrecast concrete parapets with concrete grade 'c32140 including reinforcoment, anchorage, hooks. ltc. with ribbed finish as per drawing. | 1480.41 [Type (1) as shown in drawing we] at H | 14802 ftype (2) as shown in drawing 6 linsitu Concrate Parapet Wall in Situ Concrote Design Mix Rate for in situ concrete designed mix shall be| Jdeemed to include placing and compaction of concrete. |crade ¢32/40 Concrete 4 | 1178 Jother concrete forme parapet wall m | 2 Formwork [Rate for formwork shall be deemed to include the Jprojections and intrusions and any temporary) [staging required, K | 1514 |F9: smooth finish to wats. me | 229 Page Total carviod to Summary of Bill No. 8.3 Ba83- 214 PROJECT : MEMBINA JALAN DAN JAMBATAN ALOR GANU/TITI GAJAH, DAERAH KOTA SETAR KE TITI BESI, DAERAH KUBANG PASU, KEDAH. a | 1624 B | 1625 c | i627 D | L240 e | vais & | ase o | vate H | A322 BILL NO. 8 - STRUCTURES: Bridgo 01 - Sungai Anak Bukit 8.3 - SUPER STRUCTURE (ALL PROVISIONAL) [Reinforcement [Rate for reinforcement shall be deemed to includ labour for cutting, bending, and placing. High Tensile Bars. Nominal ctameter: 12 mm. Nominal diameter: 18 mm, Nominal diameter: 32 mm, Handrail and Post On New Jersey Parapet tom for handrial and post shall be deemed to linctude fixing to other work, supply of fixing [components and drilling or cutting of other work. 00 mn OD x 4 mm thick x 9.64kg/rm circular hollow |soction galvanised iron handrail and post fixed on) precast concrete perapeis wall as shown In drawing. Rete to include ful assembles, [BRIDGE BEARING |ELASTOMER LAMINATED RUBBER BEARING ISupply and install the following bearings inclusive lof mortar grout, epoxy mortar and all temporary} |work. [510mm x 200mm x 85.5 mm thick elastomer laminated ubber bearing as shown in Drawing, [Testing of materiais (2 nos.) ; 510mm x 300mm x} 5.5mm thick Laminated Eiastomeric bearings at Rubber Research Institute of Malaysia all in accordance] wth BS5400 part 9:1983, BEARING PAD AND PLAIN [RUBBER STRIP [Supply and install the following bearings inclusive] lof mortar grout, epoxy mortar and all temporary] work. 200mm wide x 25mm thick x 11,000mm length plain} rubber stip bearing as shown in Drawing, HTesting of materials; [200mm wide x 50mm thick x} H,000mm length plain rubber strip at Rubber |Research Institute of Malaysia all In accordance with 185400 part 9:1983, sum 28 26 15 190 ‘Amount (RIM) Page Total carried to Summary of Bill No, 8.3 Ba83-3/4 PROJECT : MEMBINA JALAN DAN JAMBATAN ALOR GANU/TITI GAJAH, DAERAH KOTA SETAR KE TITI BESI, DAERAH KUBANG PASU, KEDAH. BILL NO. 8- STRUCTURES: Bridge 01 - Sungai Anak Bukit {83 - SUPER STRUCTURE (ALL PROVISIONAL) [Summary of BillNo. 83 - Superstructure Page Bass 1/4 Page Ba8.3- 2/4 Page Bass. 3/4 Qty Rate (RM) ‘Amount (RM) Total of Bill No. 8:3 carried to Summary Of Bill No.8 O8.3- 4i4 PROJECT : MEMBINA JALAN DAN JAMBATAN ALOR GANUITITI GAJAH, DAERAH KOTA SETAR KE TITI BESI, DAERAH KUBANG PASU, KEDAH. BILL NO. 8- STRUCTURES: Bridge 01 - Sungal Anak Bukit 8.4 - MISCELLANEOUS WORKS (ALL PROVISIONAL) No. | Code No. Desctstion unt | ay | Rate(RM) | Amount (RM) IEXPANSION JOINTS [Rate for joints shall be deemed to include| lrormwork. A | 1713 [Expansion oints, 50mm wide to deck slabs. m 24 B | 1715.1. [Joint filer or joint sealant, Somm wide to parapets. m | 133 © | 1715.2 [loint filer or pint sealant, 50mm wide to approach m 2 [slabs with pint lleror joint sealant laass PLAQUE [Rate shall be doomed to include fixing cost D_} vaz0_ [Brass plaque 420mm x 297mm x 3.2mm thick as shown] ne 2 Jon the drawing |PROTECTIVE COATING FOR DURABALITY AND. |AESTHETICAL Protective coating shall be deemed to include| lproparation of surfaces, application of base| lorimerisealer required before painting and all Inecessary temporary staging. IThe protective coating shall consist of a dual protective system formed by two coats of silane-| siloxane based primer or equivalent and two coats| lof solvent based methacrylate pigmented or| loquivalent as the top coat, F | Nast [extemal surtaces parapets nt | 3964 DRAINAGE TO STRUCTURES ABOVE GROUND lwater Down Pipe. Rate for downpipes shall be deemed to include| Iixing and supply of fixing components as shown in ldrawing, G | 2410 |100mm diameter UPVC Class B rain water down pipes | nos | 122 including G. pipe hanger. metal strip, T Joint, bends, Jelbow, equal tee, end cap, ec. at 1500mm centres at |deck slab with grating fting. age Total carried to Summary of Bill No. 8.4 B08.4- 1/3 PROJECT : MEMBINA JALAN DAN JAMBATAN ALOR GANUITITI GAJAH, DAERAH KOTA SETAR KE TITI BESI, DAERAH KUBANG PASU, KEDAH. BILLNO. 8 - STRUCTURES: Bridge 01 - Sungai Anak Bukit ‘84 MISCELLANEOUS WORKS (ALL PROVISIONAL} No |Code No. Description Unit Rate(RM) | Amount (RM) |ETWEEN PARAPET, ler FOR STREET LIGHTING Inplasticised Pol hloride (uPVC) Pi [Cabel at Parapet A | 0434 |2:nos 100 mm Unplesicised polyvinyl chide (UPVO)]—m Ppes to MS 628, wih bell mouth joints encase in) concrela in between bridge parapet end cable ptt in accordance withthe crawing. IciPipe B | 0438 [2n0s ‘oom GI pipe complete with duct seal, encase] rm in concrete in between bridge parapet and cabie pit in accordance with the drawing, |Gable Pit © | 835 [480mm x 460mm x 760mm precast cable plt to be fl nr lth sand in accordanco with the crawing. lUnptasticised Polyvinyl Chioride (uPVC) Pipes for [Cable t Parapet Type 2 D | 0436 feos 100mm Unplastcised polyvinyl chloride (uPvC)]—m pes to MS 628, with bell moutn ts as per drawing and specication, lopening Cable Access At Parapet Type 2 | 0690 Provide 250mm x 250nm opening for cable access fn) nr aecordance with the drawing, |Corbel Procast Parapet For Lightning Post F | 0434 100 mm Unpiasticised polyviny! chiorie (uPVC) pipes) m to MS 628, with bell mouth joints encase In eoneret in lbetween bridgo parapet and corble precast parapet in leccordance with the crewing, Page Total carried to Summary of Bill No. 8.4 Ba8.4 -2/3, PROJECT : MEMBINA JALAN DAN JAMBATAN ALOR GANUITITI GAJAH, DAERAH KOTA SETAR KE TITI BESI, DAERAH KUBANG PASU, KEDAH. BILL NO. 8 STRUCTURES: Bridge 01 - Sungal Anak Bukit ‘8.4 - MISCELLANEOUS WORKS (ALL PROVISIONAL} Description [Summary of Bill No. 8.4 Miscellaneous Works Pace BOB. - 113 Page BOB.4- 213 Amount (RM) [Total of Bill No. 8.5 carried to Summary Of Bill No.8 BaB4- 3 PROJECT : MEMBINA JALAN DAN JAMBATAN ALOR GANU/TITI GAJAH, DAERAH KOTA SETAR KE TITI BESI, DAERAH KUBANG PASU, KEDAH. © | Hts0 pb | Her © | Hered F | Hore2 ce | Hers H | Hove a | Hs104 kK | He102 L | 520 BILL NO. 8- STRUCTURES : Bridge 02 - Sungal Alor Ganu 8.14 - PILING WORKS (ALL PROVISIONAL) Desciption Rate (RM) | Amount (RM) [tems for piling work shall be deemed to include} joing “records and disposal of excavated and! |surplus materials, Plant and Equlpment Provision ofall necessary pling plant and equipment, Iransporiation tothe site, handling, assembling, and removal of the site ater completion of operation Itoving end handing ofall pling piant and equipment |withn the site and from locaton fo location as often as is, and whenever necessery for the execution of the }whole pling operation. [Provision of temporary staging for pling work at the banks/etutment of Sp. Alor Gen, lworking Pile ‘600 mmi diameter Py crete (pls (spun piles) as_a working pila. (Clase C) Supply int ple with pointed shoes af 12.0m length [Depth driven using hydraulic method lDepth crven roked at incintion ratio of 4 : 10 using lhyerauiic method |Grade ¢32/40 Concrete Fting in pile holiow section as specified Rate shall ba Jdeomad to include romoval of materials from within tho [piles before concretin. |Cutott pies. Rate to include prepering heads, Pil [Rate for plo tost deemed to Include necessary. nts, inserts and. hers. [rolated works. Initia static load tost (maintain toad test) on 600mm Jdiameter spun ple up to two times working load of 1, 100KN JSubsequent static load test (meintain load test), on} Jo00mm diameter spun plo Up to two times working load) Jor 1,100 kN Pile Dynamic Analyzer (PDA) test a fig 28 120 216 28 28 [Total of Bill No. 8.14 carried to Summary OF Bill Now BOBAA- 111 PROJECT : MEMBINA JALAN DAN JAMBATAN ALOR GANU/TITI GAJAH, DAERAH KOTA SETAR KE TIT! BESI, DAERAH KUBANG PASU, KEDAH. BILL NO. 8 - STRUCTURES : Bridge 02+ Sungal Alor Ganut 8.2A- SUB STRUCTURE (ALL PROVISIONAL) No | Code No. Description Unit A | F135 8 | raat co | rasa © | L404 F | n122 H | tee JABUTMENTS earthwork cut ana bi Excavation in cut shall be deemed to include! icimming and preparation of excavated surface andl ltansportation from source to place of fill or |disposal. Excevato in unsuitable matorial as por speciation to| Jcisposal site approved by the $.0. Futing |The following items for filling shall include Jcompaction, testing and confirmation material and] ladditional fling necessitated by settlement or} [penetration into underlying material as applicable, Imported material fom Contactors awn source as per Specification Imported material well - graded cranuiar backfl |material (crushed aggregate) behind abutment trom contractors own source a8 por Spacificaton |Grouted Stone Pitching Steps {Hand rail tom for hand rail shall be deemed to Include fixing| to other work, supply of fixing components, andl driting or cutting of other work. [Galvanised mid stoe! handrail of 100mm x 50mm >| 5mm thickness and 900mm high, |Gelvanised mitd steel handrail post of SOmm x 50mm 3 |Smm thickness anc a¢amm high. |Grade C16/20 Concrete ‘Mass concrete 300 mm thick footing for pitching stops, Masonry Step Natural stone masonry jointed in (1:3) cement motar tush pointed for step. Rate shall bo doomed to include flr facing fish, IGrade €12/15 Concrote Mass concrete 300 mn thick footing for masonry steps. m ay 642 44 44 Rate (RM) ‘Amount (Rh) Page Total carried to Summary of Bill No. 8.24, BOB.2A- 1/4 PROJECT ; MEMBINA JALAN DAN JAMBATAN ALOR GANUITITI GAJAH, DAERAH KOTA SETAR KE TIT! BES!, DAERAH KUBANG PASU, KEDAH, BILL NO. 8 STRUCTURES : Bridge 02 - Sungal Alor Ganu 82A- SUB STRUCTURE (ALL PROVISIONAL) No Code No. Description unt [ay | Retecrmy | amount ry leabion [Rate shall be deemed to include qvofabric ter material terrain 100) of equivalent. 6211 2.0 mx 1.0 mx 1.0 m rockefiled gabion with PVC] mgt | 44 coated wir gauge size of 2.7 mm es par Specification land as shown in the drawing. Reto to include for layin| lancerwater. 6212. |Rocktlled gation mattress, [800mm] tick with PVC-| 370 costed wire gauge es per Specification and show In the crewing |subsurtace Drains [tem for subsurface drains include geot 2810 |Subsoi drains; 60mm dlameler HOPE perforated pipe] om | 23 including aggregate (20 mm ~ 40 mm} wrapped wh ceotextios titer. 2320 out crains; 100mm ciametsr UPVC pipe including] om | 64 tings. ato to include bends, fiter fabric and concrete euro. Permeable Laver R211 |600mm thick permeable layer comprising of [20mm-| mm? 56 |4omm crushed stone as per Speciation. lorade C12/15 Concrete 1111 |1S0mm thick Leen conerte binding m | 14 Situminous / Coat Tat Paint Coating |Prepare and apply two (2) coats of bituminous / coal] tar pane to: Not Jeuriec sures: Roush concrete surteoss of class Fi] mé | 353 ot abuément, vingwals and approech slab 16550 |supoty and lay googrd or oquivalont in accoreing to] ne | 98 srawing Page Total carried to Summary of BIN No. 824 BO82A-214 PROJECT; MEMBINA JALAN DAN JAMBATAN ALOR GANUITITI GAJAH, DAERAH KOTA SETAR KE TITI BESI, DAERAH KUBANG PASU, KEDAH. BILL NO. 8 - STRUCTURES : Bridge 02 - Sungal Alor Ganu 8.2A- SUB STRUCTURE (ALL PROVISIONAL} No | Code No, Description Unit | Qty} Rate(RM) | Amount (RM) In Situ Concrete Design Mix For Abutmant, Wing walls, Parapet Wall and Approach Slab Rate for in situ concrete designed mix shalt be deemed) to include placing and compaction of concrete JGrade 012/15 Concrete A | 1114.4 Lean conerate binding, [50 mm] thick {to approach] m@ | 78 stab, B | 1141.2 |Lean concrete binding, 100 mm thick to abutment and) om? | 135 approach slab concrete seating IGrade ©32/40 Concrete © | 1172 Reinforced concrete at bridge abutment, wing walls, » | 310 parapet wall and approach slab. “ormwork For Abutmor Walt land Approach Slab. |Rate for formwork shall be deomed to Include the [projections and intrusions and any tomporary staging required, Sides and Soffit 1D | 1534.1. Ft: Rovph fish for burled surfaces of abutment, 301 lingwalls end approach slab E | 1531.2 |e2: Fair finish tor exposed surfaces of abutment, me | 185 |wingwalls and aporoach slab. F | 1531.3. |F3: smooth fnish for exposed surfaces for parapet wall |? 30 Reinforcement For Abutment, Wing walls, Parapet |Wall and Approach Slab. |Rate for reinforcement shall be deomod to include llebour for cutting, bending, and placing. High Tensite Bars G | 1624 {Nominal dtamoter: 12 mm t 36 H | 1625. [Nominal diemotor: 16 mm, 1 67 J | 1626 [Nominal emoter: 20 mm. t 102 K | 1627 [Nominal dlamotor: 25 mm, t | 252 L_| 1716 |Domels bar — plain, [16mm diameter x 200mm fongil) nr 8 bigh tensile bars at 3000 mm cle at approach slab M | 1717 |Dowals bar ~ sleeved and capped, 32mm diameter x) nr 24 700mm long, high tensile bare at diapheogmishear key. ‘Pago Total carried to Summary oF Bill No. 8.20 BOS.2A- 3/4 PROJECT : MEMBINA JALAN DAN JANBATAN ALOR GANU/TITI GAJAH, DAERAH KOTA SETAR KE TIT! BES}, DAERAH KUBANG PASU, KEDAH. BILLNO. 8 - STRUCTURES : Bridge 02- Sungal Alor Ganu ‘8.28. SUB STRUCTURE (ALL PROVISIONAL) No. | Code No. Deseription Unit | ay] Rate(RM) | Amount (RM [Summary of Bil No. 824 - Substructure Page BO8.2A- 1/4 lPage BOB.2A -2/4 [Page BA8.2A - 3/4 [Total of Bill No. &.2A carried to Summary OF Bill No. BO8.2A- 4/4 PROJECT : MEMBINA JALAN DAN JAMBATAN ALOR GANU/TITI GAJAH, DAERAH KOTA SETAR KE TITI BESI, DAERAH KUBANG PASU, KEDAH. BILLNO. 8- STRUCTURES : Bridge 02 - Sungai Alor Ganu 3A - SUPER STRUCTURE (ALL PROVISIONAL) Descrition IPRE-TENSIONEDIPOST-TENSIONED™* |PRESTRESSED BEANS [Temporary Works For Beam Lauching I} Provision of temporary wars for tho beam launching linctucing a necessary plant and equipment, crene, temporary platform, mobilisation and demobilsation of Jequipment io sito and installation, handing, assembling lend others related works and removal off the site afer Jcompietion of the operation of beam launching. Rat shall be decrned to include the provision of feclity and their continuing operation and maintenance. i) Provision for securing stabllty of beam ater launching and placing, which includes temporary stays, moliisation and demobilisation of installation, handing, Jassembling snd other related works and romoval off th sito aftor the S.0. is stistied of its stability. Rate shall lbe deemed fo include the provision of facilly and thet continuing operation and maintenance, Prestressed Beams Item for supply and erection of procast concrete shall be deemed to induce concrote, reinforcement, formwork, Joints and finishes; and items for Jorostressed precast units shell include lbrestressing. |Rate for prestressing shall be deemed to include} Jtendon, ducts, jacking, grouting, anchorage and] lather ‘components and tasks ancillary tol [orostressing. lcrado 50. prostressed posttensioned beam, (Teo section 30: long} as per Drawing ard Spectteton, Unit ay Rate (RI) “Amount (RM) sum sum Page Total carried to Summary of Bil No. 8.38 BOB.AA- 1/5 PROJECT : MEMBINA JALAN DAN JAMBATAN ALOR GANU/TITI GAJAH, DAERAH KOTA SETAR KE TIT! BESI, DAERAH KUBANG PASU, KEDAH. BILL NO. 8- STRUCTURES : Bridge 02- Sungai Alor Ganu 8.3A- SUPER STRUCTURE (ALL. PROVISIONAL) Description Unit | ay | Rate) | Amount (ma) [Formwork for deck stractare and dlophragm [Rate for formwork shall be deemed to include the| lprojections and intrusions and any temporary| staging required. IDECK SLAB AND DIAPHRAGH For Steel Beam, Pre-tensioned Prestressed Beam land Post-tensioned Prestrossod Beam \Cast in-situ Concrete For Deck Slab and Diaphragm ln Sity Concrete Design Mix JRate for in situs concrote designed mix shall bo| ldeemed to Include placing and compaction of| lconerete. lGrade C32/40 Concrete A | 1178 |Reinforced conerete slabs to fridge deck) and we 105 {dapiragm. |Eormmork For. am Rate for formwork shall be deemed to include the! protections ancl intrusions and any temporary stacing recuired. side B | 1515. |F2: Fab finish to deck stabs and diaphragm, m | 202 Softit c | 1525. Jes: Fair fnish to cement board permanent formwork as] im? | 202 shown in Drawing [Reinforcomont For Deck Slab and Diaphragm |Rate for reinforcement shall be deemed to includa| labour for cutting, bending, and placing, high Tenste Bars | 1626 JNorninal ameter: 12 mm, t 03 E | 1625 [Nominal clametor: 16 mm, t 248 Pago Total carried to Summary of Bill No. &.3A BOBSA-2/5 PROJECT : MEMBINA JALAN DAN JAMBATAN ALOR GANU/TITI GAJAH, DAERAH KOTA SETAR KE TITI BESI, DAERAH KUBANG PASU, KEDAH. BILL NO. 8 - STRUCTURES : Bridge 02 « Sungai Alor Ganu ‘A3A- SUPER STRUCTURE (ALL PROVISIONAL) |Procast concrete parapets with concrete grade \¢32/40 including reinforcement, anchorage, hooks loc. with ribbed finish as per drawing. A | 80.1. [Type (1) 28 shown in craving or 36 B | 1490.2. [Type (2) a6 shown In drawing ar 4 in-situ Concrote Parapet Wall lin Situ Concrete Destan Mix |Rate for in situ concrote designed mix shell bel |deemed to include placing and compaction of lconcrete, IGrace €32/40 Concrete c | 1178 [Other concrete forms parapet wall m | ot Formwork [Rate for formwork shall be deemed to Include the| projections and intrusions and any temporary| staging required. D_ | 1564 [Fa smooth nih to wal 6 Rate (RM) ‘Amount (RM) Page Total carried to Summary of Bill No. 8,3 BOB.SA- 315 PROJECT : MENBINA JALAN DAN JAMBATAN ALOR GANU/TITI GAJAH, DAERAH KOTA SETAR KE TITI BESI, DAERAH KUBANG PASU, KEDAH. A | 1624 8 | 1625 co | tear p | tes0 e | vas F | asz2 o | vat # | ase BILL NO. 8 - STRUCTURES : Bridge 02 - Sungal Alor Ganu 894. SUPER STRUCTURE (ALL PROVISIONAL) Description lReinforcement Nominal diameter: £2 mun Nomine! diameter: 16 mm. !Nominal diameter: 82 mm, lHanetrait Jersey Parapet jinctude fixing to of [components and drill other work, 100 mm OD x 4 mm thick x 9.64kg/m circular hollow] Jsection galvarised iron handrail end post fixed on] recast concrete parapets wall as shown. in drawing Rate toinciude full assembiies. [BRIDGE BEARING |ELASTOMER LAMINATED RUBBER BEARING {Supply and install the following bearings inclusive ‘mortar grout, spoxy mortar and all temporary] [work '5t0mm x 300mm x 655 mm thick elastomer leminatod| rubber beering as shown in Drawing. [Testing of materials; 510mm x 300mm x 666mm thick lLeminated Elastomeric bearings at Rubber Rescarch Institute of Malaysia alin accordance with BS5400 part 1983, PLAIN RUBBER BEARING PAD AND PLAIN. |RUBBER STRIP [supply and install the following bearings Inclusive lof mortar grout, epory mortar and all temporary work. {200mm wide x 25mm thick x 14,000nn length plain rubber strip bearing as shown in Drawing. [Testing of materials; (00mm wide x 50mm thick x H1,000mm length plain rubber strip st Rubber Research Instiute of Maleysia all in ecoocdance wih] Unit nw aly Rate (RM) ‘Amount (RM) 09 og 08 5 4 Page Total carried to Summary of Bill No. 8.38 BO8.3A 415 PROJECT : MEMBINA JALAN DAN JAMBATAN ALOR GANU/TITI GAJAH, DAERAH KOTA SETAR KE TITI BESI, DAERAH KUBANG PASU, KEDAH. No Cod No. BILLNO, STRUCTURES : Bridgo 02 - Sungai Alor Ganu 8,3A- SUPER STRUCTURE (ALL PROVISIONAL) Description Unit ay Rate (RM) ‘Amount (RM) summary of Bill No, 8.34 Superstructure JPage 608.34 - 1/5 Page 808.94 - 2/5 Page 808 3A -3/5 Page BOB.2A - 4/5, [Total of Bill No. 8.3A carried to Summary OF Bill 808.38 - 515 PROJECT : MEMBINA JALAN DAN JAMBATAN ALOR GANUITITI GAJAH, DAERAH KOTA SETAR KE TITI BESI, DAERAH KUBANG PASU, KEDAH. No |code Neo, BILL NO. 8- STRUCTURES : Bridge 02 - Sungal Alor Ganu 8.4A- MISCELLANEOUS WORKS (ALL PROVISIONAL) Description Unit ty Rate (RM) A | is a | tea co | ims2 D | vsz0 E | ss F | aso EXPANSION JOINTS for ed to include formwork, |Expension joins, 50mm wide to deck slabs. Joint filer or joint seat, 50mm wide to parapets, Joint filer or joint sealent, 50mm wide to approach slebs| lth Joint er or joint sealant lBRASS PLAQUE \Rate sti include fixing cost Brass plaque 420mm x297im x3.2mm thick as shown lon the drawing PROTECTIVE COATING FOR DURABALITY AND JAESTHETICAL Protective coating shall be deemed fo Inck Jpreparation of surfaces, application of —baso| lorimerisealor required before painting and all [necessary temporary staging. |The protective coating shall consist of a dual lacotective system formed by two coats of silane isloxane based primer or equivalent and two c lof solvent based methacrlate piamented [equivalent as the top coat. E External suraces of perapets DRAINAGE TO STRUCTURES ABOVE GROUND, \Water Down Pipe [Rate for downpipos shall be deemed to include| fixing and supply of fixing components as shown in larawing. 100mm dlameter uPVC Class B rain water down pipes Inclucing 6.1 pipe hanger, motal strip,‘ jont, ond, loon, equal tee, end cap, ofc. at 150mm centres at [deck stab with grating fing. 25 48 1149 42 ‘Amount (RM) Page Total carried to Summary of Bill No. 8.48. BOBAA- 1/3 PROJECT : MEMBINA JALAN DAN JAMBATAN ALOR GANU/TITI GAJAH, DAERAH KOTA SETAR KE TIT! BESI, DAERAH KUBANG PASU, KEDAH. BILL NO. 8 « STRUCTURES : Bridge 02 » Sungal Alor Ganu ‘840 - MISCELLANEOUS WORKS (ALL PROVISIONAL) No | Code No. Description unit | aly lconnecti #EN PARAPET AND Pir. IFOR STREET LIGHTING Unplasticised Polyvinyl Chloride (uPVC) Pipes for [cabel at Parapet \SLPipe A | 0438 [2 nos 100mm Gt pipe Class C complete with duct seal) — m 26 Jencase in concrete in between bridge parapet and cable] bitin accordance with the drawing leabte Pit 8 | U635. 460mm x 460mm x 760mm precast cable pit to be fill nr 4 jwith sand in accordance with the drawing. lUnplasticisod Polyvinyl Chloride (uPVC) Pipes for} [Cable at Parapot Type 2 © | 0434 |2 nos 100mm Unplasticised polyvinyl chloride (UuPVO)] —m e pipes to MS 628, with ball mouth joints as per drawing land specification. lopening Cable Accoss At Parapet Type 2 D_ | 0690 |Provide 260mm x 250mm opening for cable accoss in} nos 6 accordance with the drawing, |Corbet ‘or Lighting Post E | 0434 |100 mm Unplasticised polyvinyl chiride (UPVO) pipes to] m 6 Ns 628, with bell mouth jonts encase in concrete in] between bridge parapet and and corble precast parapet} in accordance with the érawing. Rate (RM) Amount (RE) Page Total carried to Summary of BIN. 8.48 BQ8.4A- 2/3 PROJECT : MEMBINA JALAN DAN JAMBATAN ALOR GANU/TITI GAJAH, DAERAH KOTA SETAR KE TIT BESI, DAERAH KUBANG PASU, KEDAH. BILL NO. 8 - STRUCTURES : Bridge 02- Sungal Alor Gant. ‘8.44 - MISCELLANEOUS WORKS (ALL PROVISIONAL) $$ Code No. Description Unit | @ly | Rate (rm | Amount (RIM) [summary of Bill No. &.4A -Miscollaneous Works. lPage Bas.4a- 1/3 IPage Bas.4A- 29 Total of Bill No. 8.48 carried to Summary OF Bill No. Bo8.4A-33 PROJECT : MEMBINA JALAN DAN JAMBATAN ALOR GANU/TITI GAJAH, DAERAH KOTA SETAR KE TITI BESI, DAERAH KUBANG PASU, KEDAH. BILLNO. 8- STRUCTURES : Culvort - CH: 1,725 8.5. CULVERT & VEHICULAR BOX CULVERT (ALL PROVISIONAL) Rae EN) oun (RN No Code No, Deserpton oy |TEMPORARY WORKS ‘4 | 4823. |Alow for provision of all labours, plants, materal etc for] sum Ie design ané construction of cofferdams including} lexcavation, handing, cisposal of excavated spoils and) ldebrs, dewatering, shoring, leveling, diving, ailowing| for access way platform, staging and all other necessary works for the purpose of construction ff [abutments andior* piers and removal of all tomparary| \works upon bridge completion. Shop drawing shall be| lendorsed by Professional Engineer with Practising |Certficate (PEPC) to be submitted and approved by| s.0.. It shall also to include ls) Supply, construct and mainteln temporary) lcotterdams including interlocking shest ple, waling and| [stutting, and other roiated works. lb) Supply, construct and mainiain pumping and| [dewatering during construction period Jo) Removal of and reinstatement of the site upon| Jcompietion Jo) Construct var cversion (it necessary) FOUNDATION [Foundation Type : Piting tema for nlina work sill be deemed to Inet Joling records and disposal of excavated and| Jsurplus materials, IM PRECAST REINFORCED. JCONCRETE PILES (R.C PILES) Plant and Equipment B | H110 [Provision of all necessary ping pant and equipment) sum transportation to the site, handling, essembing, and| removal ofthe site efter completion of operation. | #120 |Noving and handing of all pling plant and equipment! sum jsithin the site and from location to location aa often as| ls, and whenever necessary for the execution of the| }shole piling operation D_ | 1190. [Provision of temporary staging for piling work at calert | sum land inievioutet structures, Working Pile }200mm x 200mm Precast Reinforced Conerote Piles. I(R.¢ Piles) as a working pile E | 1261.1 | Supply intial pite with pointed shoes of 12.0m length © 6 F | 1261.2 supply extension plies of 6.0m length. © 60 6 | H262. Depth ckiven using hydraulic method. m | 4,080 Page Total carried to Summary of Bill No. 8.5 Bass- 15 PROJECT : MEMBINA JALAN DAN JAMBATAN ALOR GANUTTITI GAJAH, DAERAH KOTA SETAR KE TITI BESI, DAERAH KUBANG PASU, KEDAH. Te CodeNe BILL NO. 8- STRUCTURES : Culvert -c! 4,725 8.5- CULVERT & VEHICULAR BOX CULVERT (ALL PROVISIONAL) Descripion Tat He64 510.4 H5102 F135 F342 e570 Rett nin lworkd [200mm x 206rmm P forced Con les (R.C Piles) as a working pile (cont'd [Jointing with butt weld all round 2s shown in Drawing |Cutot piles. Rate to include preparing heads, pie Test Rate for pil 10d to include necoss eau rts and ac nd others [olatod works, Initial static toad test (maintain load tes!) on 200mm x [200mm precast reinforced concrete pias up to two limes working oad of 2254N, [Subsequent static load test (maintain load test) , on] J200mm x 200mm precast reinforced concrete piles up| fo two times working load of 225%N. EARTHWORK [cut and Dispose [Excavation in cut shall be doomed to include| iimming and preparation of excavated surface and| ltensportation from source to place of fill or disposal, Excavate in unsuitable materiel as per spoctieation to] leisposel site approved by the 8.0, Fining |The following items for filing shall ineludel compaction, testing and confirmation matertal anq| ladditional filing necossitated py settlement or [penetration into underlying material es applicable, ral imported river sand materiel from contractors own| source as per Specification [Non-woven Geotextile. Item for non-woven geotextile shall be deemed to include cost of storage at site with neccessary [protection anainst exposure to direct sun, Nonwoven geotextio. typo a8 soperator as. pet Specification, |Pormesbio Laver looomm thick parmestie layer comprising of [20mm |domvn] crushed stone as per Specticton. |Grade 612/15 Concrete 150mm thick Lean concrete blinding nr Page Total eartied to Summary of Bill No, 8.5 BOBS - 215 PROJECT : MEMBINA JALAN DAN JAMBATAN ALOR GANU/TITI GAJAH, DAERAH KOTA SETAR KE TIT! BESI, DAERAH KUBANG PASU, KEDAH. BILL NO. 8 - STRUCTURES : Culvert - CH: 1,728 8.5 CULVERT & VEHICULAR BOX CULVERT (ALL PROVISIONAL) Dade No Descriston tao a) ano IN-SITU REINFORCED CONCRETE for Culvert /Vehiouler Box culvert, Headral, |wingwat, Parapet, Approach Slab and Inlo/Outl |Structures) Rate for in situ concrete designed mix shall be| |deomed to include placing and compaction of lconcrete, \Grade €1215 Concrote 1111 |Lean conerate binding Somm thick to box culvert and lapproach sla. 454 IGrade €32/40 Concrete 1178 |Reinforced concrete to cuertvehicular box culvert heacwall, wingwel, parapet, Approach Siab and ntovoutlet structures wr Form [Rate for formwork stall be deomed fo include the| larolections and Intrusions and any temporary! [staging required, sides and Sofrit 1614 Jt: rough finish to bured surface of euner, approach | oy? | 107 stab and inletoutet stuctues, 1534 |F2: Fate fnish to culvert/ vehicular box culvert, me | 175 hoadwall, wingwall, parapet and intevoutot structures Reinforcement [Rate for reinforcoment shall be deemed to include| labour for cutting, bending, and placing. High Tensile Bors 1624 |Nominal diameter: 12 rim. t 25 1625 | Nominal diameter: 16 mm. cl 85 1626 |Nominet ciameter:20 mm. t 115 1627 |Nominal clameter:25 mm. t 36 1628 |Nominal dtamater: 32 ram. t | 200 \Jon [Rate for joints shall be ceomed to Include formwork 1715.1. [Joint fller or joint sealant, 25mm wide to approach} — rm 6 slabs 1714 | 150mm wide rubber waterstop. Rate to include cutting] —m 19 land Jointing of weterstope end provision of special tings at angles and junctions. 17152 |Joint sealant at construction joints / movement jit. m 10 Page Total carted to Summary of Bill No. B08.5- 3/5 PROJECT : MEMBINA JALAN DAN JAMBATAN ALOR GANUITITI GAJAH, DAERAH KOTA SETAR KE TITI BESI, DAERAH KUBANG PASU, KEDAH. BILL NO. 8 - STRUCTURES : Culvert - CH: 1,725 85 - CULVERT & VEHICULAR BOX CULVERT (ALL PROVISIONAL) Pees Daxian Ga ee laeass pLaque ate shall be deemed to include fina cost A | vaz0 forse plaques20nmx 257mmx3.2nm ihickas shown] ar | 2 onthe devine Dowel Bar cated at cuvertseament, approach sia, inlovoutet and hers 8 | 1716 oowes —plar: témm diameter 7commiongstoo! | ne | as ars at 200mm corte Lnplasticsed Polyviny| Chorio (sPVO) Pipes for Icabelat Parapet | o4e4 [20s 100 mm Urplastiised payvint chioiée (uPvoy} om =| 10 pesto US B28, th bel meu fonts ab por Srawire and Spectictn BITUMINOUS PANT COATING [Prepare and apply two (2) coats of bituminous paint} es al > | nost Jauriessuaces: Roun concrete suaces of cass Fi]? | 107 lot curt, wingwalls and approach slab. Page Total carried to Summary of Bill No. 8.5 B08 5-45 PROJECT : MEMBINA JALAN DAN JAMBATAN ALOR GANUITITI GAJAH, DAERAH KOTA SETAR KE TIT! BESI, DAERAH KUBANG PASU, KEDAH. BILL NO. 8 - STRUCTURES : Culvert - CH: 1,725, 8.5- CULVERT & VEHICULAR BOX CULVERT (ALL PROVISIONAL) Dacian Tay |Summary of Bit No, 8.5 ; Culvert Structure Page Baas - 15 lPage Baas 25, lpageBaas- 95 Page Ba8.5- 45, ‘Total of Bll No. 8.5 carried to Summary Of Bill No.8 BQ8.5- 5/5 BILL NO.9 TRAFFIC MANAGEMENT AND CONTROL PROJECT: MEMBINA JALANDAN JAMBATAN ALOR GANUITITI GAJAH, DAERAH KOTA SETAR KE TITI BESI, DAERAH KUBANG PASU, KEDAH. BILL NO. 9- TRAFFIC MANAGEMENT AND CONTROL (ALL PROVISIONAL) We [soa a vw [om | Reema lTomporary Stroot Lightings A | 0260 [Temporary strest ightings ar 4 B_ } 0290. [Flood Lightings deem to include with electrical power © 4 [Traffic Signals [Temporary Traffic Signals shall bo deemed to Include Jsignal posts or signal mast ans, signal lantern. Jcontroter, cabling, fecdor pillar and remove! upon} lcompletion. © | 02134 [Traffic signals with [.....] optical system mounted on set 1 poles as per Specification D_ | 0213.2 |Tratfic signets with [.....J optical system mounted on set 1 \gantry as per Spectfcaton, 100 SEMENT PLAN {Traffic Management Plan and the associated work ehall bo in accordance with the latest version of Specification for Road Works : Section 19 £ | 6120 [Preparation of trafic management plan including| sum Jemergency response plan. Rate to include the cost of any] survey required, Iterature, references, consultations, ang| the protuiction of the document. It shall also include the cost for the engagarnont of profesional civil engineers wilh Jexperience in road coriruction required for carrying oul} the respective study and the preparation ofthe site plan. 0130. | TRAFFIC MANAGEMENT TEAM (TMT) / EMERGENCY RESPONSE TEAM (ERT) [Trafic Management Team (TMT) / Emergency Response| ‘Taam (ERT) shall ben accordance withthe latest version ‘Specification for Road Works : Section 19 |Aopoinment of Qualified and Trained TMT F | cts2. |Taicmanagement offer [1 person manantn] 42 & | 133. | uporisor person) mmansmih | 42 H | 134 {rate controler 2 person} mansmth | 42 200. | TEMPORARY Ri URE tems for temporary road furiture shall be deemed to] Inctuce the supply, instalation, maintenance, and removal {upon complaton, [The supply of temporary road furnture shell be deemed to| {Temporary road furniture shell be deemed to include cost {or the inspecton, immediate repair and rapiacement of lany damaged, missing or stolen iteme throughout the| Jduration of the construction, and removal upon| [completion Page Total carried to Summary of Bill No, 9 Q9- 1/5 PROJECT: MEMBINA JALAN DAN JAMBATAN ALOR GANU/TITI GAJAH, DAERAH KOTA SETAR KE TITI BESI, DAERAH KUBANG PASU, KEDAH. BILL NO. $- TRAFFIC MANAGEMENT AND CONTROL (ALL PROVISIONAL) Daseription “Asrount (RM) [Temporary Traffic Sian [Temporary traffic signs shall be in accordance with [specification for Road Werks : Section 19 INor-iluminated retro-reflective sheeting Portable Nuorascent orange prismatic nat axceetng 1.0 ni, Portable uoroscont orange prismatic exceeding 1.0 m? out not exceeding 2.0m? Portable ftuoroscent orange prismatic exceeding 2.0m? but not exceeding 3.0m? Portebie fluoroscant orange prismatic exceeding 3.0m? but not excaoding 4.0m? Barriers and Barricades JPortable Heavy Duty water or sanc-filed barrier [100mm] x 800mm (H) x Sc0mm (Hy) [Portable Concrete Barrier [1000mm (L) x 800mm (+) x 500mm (w)] Portate trafic guidance cones with reflective bands Double sided reflective sting delineators rrounied on a| post at every 1m interval Flashing arrows Bettery operated on powder coated mild steel ple. [Beacon lights [Battery operated beacon lights. lBinkers 2) Polycarbonate lens battery operated blinkers. lsubmission 6 seis of Traifle Management Safely rapor| lonce in every 3 months. (quately). Rate to include the Joost of any survey required, Illeraures, references, consultations, ane tha production ofthe documeat Road safety audit report [on a quarterly basis in five sets], IRate to include the cost of any suvey requied, literatures, references, consultations, and the production jortre document. Page Total carried to Summary of Bill No. 9 PROJECT: MEMBINA JALAN DAN JANBATAN ALOR GANUITITI GAJAH, DAERAH KOTA SETAR KE TITI BESI, DAERAH KUBANG PASU, KEDAH. BILL NO. 9- TRAFFIC MANAGEMENT AND CONTROL. (ALL PROVISIONAL) as Summary of Bill No. 9 : Traffic Management anal Control Page 809-13 Page BQ - 2/3, Total of Bill No. 9 cartied to Summary of Tender pQ9-35 BILL NO. 10 ENVIROMENTAL PROTECTION AND ENHANCEMENT WORKS PROJECT: DAERAH KUBANG PASU, KEDAH. |EMBINA JALAN DAN JAMBATAN ALOR GANU/TITI GAJAH, DAERAH KOTA SETAR KE TITI BESI, BILL NO. 10 - ENVIRONMENTAL PROTECTION AND ENHANCEMENT WORKS (ALL PROVISIONAL) Code No. A | Bio 8 | 8120 c | sao. Description Unit Rate (RM) ‘Amount (RM) NON PHYSICAL WORKS [ENVIRONMENTAL MANAGEMENT PLAN (EMP) Preparation of EMP shall be deemed to include the cost of any survey required, Itsrature, references, ‘consultation and the production of the documents. It shall also include the cost for the engagement of registered environmental consultant required for Jcartying out the preparation of the sald report in laccordance with DOE Guidelines: Preparation, submission and apgroval of EMP by environmental cons utant registered with DOE Inoluding! 1a) Lanc:Disturbing Polution Pravontion and Miigetion Measures (LD-PaM2)* lo) Erosion and Sediment Control Plan le) Fora Management Plan® \¢) WitdlferFauna Management Pian’ le) Coral Reef and Marine Ecosystem Menagemant Plant |) Social impact Assessment {g) Sit Curiain Maintenance Plan* |APPOINTMENT OF ENVIRONMENTAL OFFICER, Ite.0) [Provision of a ful ine environmental offior (E.0.) for lenvironmental management works only, throughout the contract period forthe implementation of EIA anelor LKR Sistom Pongurusan Alem Sokitar (SPAS) or project move than RIM 20 milion including earthwork [Eor nonEIA Project* F.C. shall have a degree in Gil Engineering or lEnvironmental Science with minknum throe (3) years of Ietoted experience in onvronmental management works. WATER QUALITY CONTROL AND MONITORING |Water Quality Sampling and In Situ Testing [water quality testing shall be deemed to include testing by accredited laboratory: [Conduct in-situ monthly riverstreamlother waterbody |aualty monitoring as speciied and as shown in the Idrawing forthe folowing parameters or as dractad by Ine $.0 throughout the contract poriod :- . Turbidity. i. pH. li. Dissolved Oxygen (00). lv. Temperature, v. Sea surface temperature (for marine related projects). * rman-nth n Page Total carried to Summary of Bill No, 10 BIO - 18 PROJECT : MEMBINA JALAN DAN JAMBATAN ALOR GANU/TITI GAJAH, DAERAH KOTA SETAR KE TITI BESI, DAERAH KUBANG PASU, KEDAH. BILL NO. 10 - ENVIRONMENTAL PROTECTION AND ENHANCEMENT WORKS (ALL PROVISIONAL) Description Unit | aly. | Rate(RM) | Amount (RM) NON - PHYSICAL ont) |Water Quality Sampling and (Cont A | 8349.2. [Conduct in-situ monthly water qualty menting of he | sum lefluent cischarge at accommodation, workshop and ‘canteen area as specified forthe folowing parameters loras directed by the S.0. throughout he contract period i Turby. i. pe i. Dissolved Oxygen (00). lv. Temperature B | 8349.3 |For EIA project: sum ‘Conduct in-situ turbisity tas atthe discharge outlat of Ite sift trap, sediment pond, sediment basin within 30 |ninutes after rainfall event of more than 12.5mm or as |érected by S.0. iF raining continuos for mare than 24- hours the measurement shal be done delly.* {water Quaity Sampling ar tory Testing |water quality testing shall be deamed to include testing by accredited laboratory: © | 8359.1 [Conduct monthly rvedstroam/otnor water body quality | sum Jnonitoring as specified and as shown in the drawing for tne fotowing parameters or as dracied by the 5.0. tiroughout the contract period |. Total suspended solid (TSS). i. Biochemical oxygen demand! (80D), il. Chemical oxygen demand (COD). tv, Eschorichia coll (E.0o!). ly. Ammoniacal nitrogen. lv. Oil and grease, D_ | 8359.2 [Conduct monthly water qualty monitoring ofthe eftuent| sum |dscharge at accommodation, workshop and canteen larea es spectied for ine following parameters or as lBrected by the $.0. throughout the contract period |. Total suspended sols (TSS) i, Biochemical oxygen demand (80D). i. Chemical oxygen demand (COD). Escherichia col (E col). lv. Ammeniaca nitrogen. }i. Ol and grease. E | 8969.3. Jconcuct monthly water qually monitoring at the sum Jischarge outlet of sit trap, sediment pond, sediment basin as specified for Total Suspervlod Solids (TSS) or las directed by the $.0. throughout ine contract period Page Total carried to Summary of Bill No. 10 BOO-28 PROJECT : MEMBINA JALAN DAN JAMBATAN ALOR GANUITITI GAJAH, DAERAH KOTA SETAR KE TITI BESI, DAERAH KUBANG PASU, KEDAH. BILL NO. 10 - ENVIRONMENTAL PROTECTION AND ENHANCEMENT WORKS (ALL PROVISIONAL) No, Unit ay. Rate (RM) Amount (RM) 459 8539 8541 3542 Ba10 8820 830 Code No. Description INON ~ PHYSICAL WORKS (cont'd |AIR QUALITY CONTROL AND MONITORING lair Quality Sampling lair quality sampling shall be deemed to include testing by accredited laboratory: IConduct quarterty ir quality monitoring for Particulate IMatter (PM), Particulate Matter (PM=), NO,, SOx, CO land ©, for 24-hour period including wind velocity and jsrection as specified throughout the contract peri. Al laquipment or generator set that produce haat and Jpower shall be monitored for NO» and CO periodically. INOISE AND VIBRATION CONTROL AND MONITORING INoise Level Measurement [Noise level moasuroment shall be deemed to include monitoring by accredited laboratory: (Coneuet quarterly noise manitering (24 hours) including Leg, Le and Loo as species or as diracted by the §.0 Ihroughout the contract period lvibration Measure Vibration measurement shall be deomed to includo| Imonitoring by accredited laboratory |Concuct vibration monitoring as specifies or as required throughout the contract period [Ground vibration moniteing Structural vibration montoring ENVIRONMENTAL MONITORING REPORT Preparation of five (6) copies (per month) of the itlowing report (submited with photos) throughout the |eontract period = Monthy environmental monitoring report. AUDIT ‘This audit where applicable shall be in accordance |with DOE requirements: (Conduct quarterty 3:4 party audit as spectied including preparation of ve (5) copies of Environmental Ault Report (per auc) throughout the contract period, ‘Conduct an environmental closure aucit prior to Issuance of certhicate of practical comelation inclucing preparation of five (5) copies ofthe report. sun sun |Page Total carried to Summary of Bill No. 10 BOIO- 3/8 PROJECT : MEMBINA JALAN DAN JAMBATAN ALOR GANU/TITI GAJAH, DAERAH KOTA SETAR KE TITI BESI, DAERAH KUBANG PASU, KEDAH. BILL NO. 10 - ENVIRONMENTAL PROTECTION AND ENHANCEMENT WORKS (ALL PROVISIONAL) No. |code No, Description unit ay. Rate (RM) ‘Amount (RM) Bez0 Bato 420 INON ~ PHYSICAL WORKS (cont'd) \Vibration Measuroment (cont'd ITRAINING® [The contractor shall provide training in the field of Jenvironment forthe project team. This training shall include post EVA, Envronmental Management System (EMS) and waste management including schedule lwaste. The training shall be conducted and given by an Jostablished organisation with reputable track records in lervironmental protecton and enhancement works during project management and construction, [PHYSICAL WORKS DUST AND MUD CONTROL, [Tyre Washing Facilities tom for tyre washing facilities shall be deemed to Include construction of tyre washing concrete platform, and provision and maintenance of water |supply and portable water jets: |Provision, operation, maintenance and removal upon project completion of Tyre Washing Factities including operators, water tank, water supply and other necessary equipments as specified and as per drawing to clean vehicie tyres at various exits of the worksites or as directed by the S.0, Wash Trough Provision, operation, maintenance and removal upon project completion of wast trough Inciuding operators, water tank, water supply and other necessary lequipments as specified and as per drawing to clean vehicle tyres at various exits of the worksites or as rected by the S.0. |Water Bowser Truck Itom for water bowser truck shall be deemed to Include provision and maintenance of vehicle, water| supply and driver: Water bowser truck for carrying out water spraying Jaiong haulfaccess roads, existing roads, near settlements and other required area, for @ minimum of inree times per day. Set to Summary of Bill No. 10 BQIO- 4/8 PROJECT : MEMBINA JALAN DAN JAMBATAN ALOR GANUITITI GAJAH, DAERAH KOTA SETAR KE TITI BESI, DAERAH KUBANG PASU, KEDAH, BILL NO, 10 - ENVIRONMENTAL PROTECTION AND ENHANCEMENT WORKS (ALL PROVISIONAL) No. [Code No. a | a20 8 | e220 c | e2s0 D | e260 Description PHYSICAL WORKS (cont'd) |SURFACE RUN-ON OR RUN-OFF CONTRO [sit Fence [Construction of 1.0 mhigh sit fence including non- |woven geotextle and wooden post with dimension as [specified and as per dawing or 2s directed by the S.0, rurblatty ci urtain Instellaon of Tubidly curtai’Sit curtain Including sit Jcurain screen made ftom high strength woven lpolyester geotextle, tattom weigih, echoring and and Itoatation system as speciied and as per drawing or as, ldrecter by the $.0. lsand Bags Supply and lay gunny sack (or equivalont)sizo (35.50. men x 60-70 mn fled with send as specified and as [shown in the drawingor as cirected by the S.0. \check Dam |Construction of check dam using rocks es specified and| Jas shown in the drawing or as directed by the 8.0. Unit ayy. Rate (RM) Amount (RM) 3.242 120 125 10 Pago Total carried to Summary of Bill No 10, BQIO- 5/8 PROJECT : MEMBINA JALAN DAN JAMBATAN ALOR GANU/TITI GAJAH, DAERAH KOTA SETAR KE TITI BESI, DAERAH KUBANG PASU, KEDAH. BILL NO. 10 - ENVIRONMENTAL PROTECTION AND ENHANCEMENT WORKS (ALL PROVISIONAL) A | Basia B | e212 c | F410 D | 202 e | F430 F | ear @ | part H | pa722 a | Ber23 Description Rate (RM) Amount (RM) [PHYSICAL WORKS (cont'd) PC E WORKS, |Drain Excavation Jorain excavation shall be doomed to include| preparation site, excavation, leveling, timming, shaping] land compacting suriace of excavation to the requirod| ines, levels, grade and dimensions end disposal ol surplus excavated materialseinstatement of site on| completion of the work, Inspection at rogular interval ‘and after heavy rain to’ check for clogs and sediment laden and removal of accumulated sediment to dspesal [site and reshaping of tamporary drainage In earth, depth not exceeding 1.5 m. in cart, depth exceeding 1.5m, |EROSION CONTROL Natural |closed tufing [Proprietary Products Isupply, install and maintain proprietary or any man= Imade products available In the market to conto! lerosion on slopes subjocted to JKR's approval, [Erosion control blanket (Fibromat or equivalent), Biodegradable blenket. (or any other sultable products } |SEDIMENT CONTROL, sult Trap [Excavation to form sit rap as per drawing Joacktiling and disposal of surplus material, [sand bedeling for sit traps. [Stone fing at init and outlet. [25mm size aggregate fling including geotextle. 20 5 150 5 224 Page Total carried to Summary of Bill No. 10 BQID-6/8 PROJECT : MEMBINA JALAN DAN JAMBATAN ALOR GANUITITI GAJAH, DAERAH KOTA SETAR KE TITI BESI, DAERAH KUBANG PASU, KEDAH. BILL NO. 10 - ENVIRONMENTAL PROTECTION AND ENHANCEMENT WORKS (ALL PROVISIONAL) E | 5286 F | p2s7 @ | Bass 4 | 8630 Description Rate(RM) | Amount (RM) MAINTENANCE Items for maintenance shall be deemed to inclue disposal of accumulated debris, sodiment and silt to an approved site, unless otherwise stated: fence. Hrrbiity curtains eran, Sena bags Check dam, sediment basin sit trop. sr ROTECTION Provision and maintenance of canvastarpauln sheeting io immediately cover tops stockole for tring and lendscaoing [PHYSICAL WoRK (conte WASTE MANAGEMENT Item for scheciuled waste shall be deemed to [include storage, labeling and transportation from site by a licensed contractor for disposal as per [Department of Environment (DOE) Regulation: Household sold waste storage and asposal [Construction sold waste storage anc dsposal Tea Provision and maintenance of grease raps a kitchen lend accommodstion areas, site office, workshop and lschectied waste storage. man NT OF DISPOSAL. SITE FOR SURP! [MATERIALS Item coverage shall be deemed to inchile all necessary works as mentioned in the "Instruction to contractors on Jcisposal of surpis cut material drawing and ‘Surplus materia! disposal embankment drawing, sum sum sum eum © sum Page Total carried to Summary of Bill No. 10 BQID-78 PROJECT : MEMBINA JALAN DAN JAMBATAN ALOR GANU/TITI GAJAH, DAERAH KOTA SETAR KE TITI BESI, DAERAH KUBANG PASU, KEDAH. BILL NO. 10 - ENVIRONMENTAL PROTECTION AND ENHANCEMENT WORKS (ALL PROVISIONAL) /Code No, Description [And Enhancement Works Page Bato - 118 page 610-28 Page B10 - 98 Page B10 4/8 page B10 - 56 Page Bat0- ee Page BA10- 716 Unit ayy Rate(RM) | Amount (RM) [Summary of Bill No. 10 : Environmental Protection Total of Bill No, 10 carried to Summary of Tender BQIO-88 BILL NO. 11 ROUTINE MAINTENANCE WORKS PROJECT : MEMBINA JALAN DAN JAMBATAN ALOR GANU/TITI GAJAH, DAERAH KOTA SETAR KE TITI BESI, DAERAH KUBANG PASU, KEDAH. BILL NO, 14 - ROUTINE MAINTENANCE WORKS (ALL PROVISIONAL) Tem No. (Code No. Description Unit ay. Rate (RM) ‘Ammount (RM) A361.4 A3512 361.3 Aast4 IROUTINE MAINTENANCE WORKS DURING ICONSTRUCTION PERIOD |MAINTAIN THE EXISTING ROAD Provision of all labour, equipments, tools material} ltransport and whstover necessary to all the works| lstated below 2 per standard JKR road] specification: IMaintenan: nt Surface The works shall comprise of a) Patching of potholes to be commenced immediately Jb) Treatmentisealing of surface cracks Jc) Reinstate edge deterioration of back filed renchos |) Treatment to striping of aggreagate le) Treatment fr rutting 1) Treatment to ceteroration of concrete pavement surface la} Repair to concrete pavement joints h) Repair t paving tlocks and slabs. The works shall comprise grass cuting, disposal of eu grass and debris. The frequency of grass cutting shall be carried out once a month. The limit and extent a described below 5) Rosd shoulder b) Slope area Je) Bem drain, interceptor drain and all other types of, rain on slopes 1d) Median Je} Clear vegetation on paved surface [Road Furnitures [The works shall comprise of cleaning works and shall be carried out 4 cyceslyear of cleaning of ) Guardratls and bariers 1) Signages and posts i) Kilometer post and detineator post ly) Traffic signal aspects. [The works shall comprise of repainting works and shall be carried out 2 years/cycle of repainting of i) Borers i) Signages and trafic signal posts i) Kilometer post and deineator post Iv) Road kerbs. rth mth oyele cydle Page Total carried to Summary of Bill No. 14 BQU- 1 PROJECT : MEMBINA JALAN DAN JAMBATAN ALOR GANU/TITI GAJAH, DAERAH KOTA SETAR KE TIT! BESI, DAERAH KUBANG PASU, KEDAH, BILL NO, 14 « ROUTINE MAINTENANCE WORKS (ALL PROVISIONAL) Te | cogs no, No, Description Unit yy Rate (RM) ‘Amount (RM) A | assis B | Res © | asst le IANCE, iS IGONSTRUCTION PERIOD (cont'd) MAINTAIN THE EXISTING ROAD (cont) [Bridges and Culverts [Provision of all labour, equipments, tools material] lransport and whatever necessary to all the works| lstatod boiow as por standard JKR roadl specifications : [carted out 4 cyclostyear of clesning of: 1) Expansion joints hi) Weep holes i) Parapets hy) Besring shelves \¥) Graft and markings }4) Weterway or culvert opening and bridge carriageway! }vi) Removal of vegetation and lubricating and greasing |operation for stool bearings HThe works shall comprise of repainting roadline marking jwhen faded by using Hot-applied reflacirtsed al |weather thermoplastc rosd markings [Chevron marking m Drainage land repair works end shal be card out 4 cyclesiyear le) Debris in tned drains 1b) Dobis in unined crains lo) Debris in sump lo) Debus in culverts Je) Biooked gratings | Ropair to damaged drains and sumps. a) Repair to misaligned unived drains h) Resoat mis-seated covers ) Repair to damagod covers it nd Dis Obstruct Provision of all tabour, equipmonts, tools material! ltransport and whatovor necessary to all the works| stated below : lcose material and debris, carcass as and when] required |The works shall comprise of cleaning works and shal be} cycle |The works shall comprise of cleaning debris, desiting| cycle Liter collecton and disposal, removal and cisposal off sum Page Total carted to Summary of Bll No. 14 Bau 25

You might also like