1. What is the Carbon Steel definition as per NACE MR-0175?

a. Alloy of carbon and iron containing up to 2 % mass fraction carbon and up to 1.65 % mass
fraction manganese and residual quantities of other elements, except those intentionally
added in specific quantities for de-oxidation (usually silicon and/or aluminum). Carbon
steels used in the petroleum industry usually contain less than 0.8 % mass fraction carbon.

2. For HIC testing how much H2S gas purity required.


a. 99.5%
3. Tack welds used to secure alignment shall be removed completely when they have served their
purpose, before completing weld.
a. True /False

4. Welder qualification expiration based on


a. If the welder did not perform weld process more than 6 month
b. If the welder is sick and not done welding more than 6 month
c. When there is a specific reason to question the welder's ability to make welds that meet
the specification
d. All of above
5. Inspection code covers the in-service inspection, repair, alteration, and rerating activities for
pressure vessels
a. API 510
6. A pneumatic test may be used in lieu of the standard hydrostatic test:

a. As per the instruction of manufacturer


b. As per the instruction of manufacturer inspector
c. As per the instruction of client inspector
d. Vessel are so designed and/or supported that they cannot safely be filled with water;
vessel not readily dried, that are to be used in services where traces of the testing liquid
cannot be tolerated and the parts of which have, where possible, been previously tested
by hydrostatic pressure to the pressure required in UG-99.

7. What is the bottom head insulation nut distance

a. 300 mm

8. Shell to nozzle weld joint category

• Category A
• Category B
• Category C
• Category D
9. RT requirement for Joint Efficiency 0.70 of Category B
• Full
• Spot
• None
• None of the above

10. What is the minimum projection of less than 6” NPS Nozzle?


• 6 inches
• 8 inches
• 2 inches
• None of the above

11. Standard for RT procedure acceptance criteria?

• ASME V
• ASME VIII
• ASME IX

12. Pneumatic test of Equipment to be pressure tested the time of final erection at site to be
approved by?
a. Saudi Aramco inspection department manager
13. What shall not be witnessed and certified in inspection location by Agency Inspector?
a. Fire extinguisher certificate and validation
14. What is the permissible type of Flange in Sec VIII Div 1?
a. Forged steel LWN
b. Forged steel weld neck
c. Slip on Flange
d. Studded Nozzle
e. All of the above.
15. Materials for Pressure Vessels in de-aeration service shall be according to?
a. NACE RP0590
16. Manufacturer shall provide free access to inspector to visit all area for inspection?
a. True or False
17. Definition of SCC as per NACE MR-0175?
a. Stress Corrosion Cracking (SCC): Cracking of metal involving anodic processes, produced
by the combined action of corrosion and tensile stress (residual or applied).
cracking of metal involving anodic processes of localized corrosion and tensile stress
(residual and/or applied) in the presence of water and H2S

18. Definition of SSC as per NACE MR-0175?


a. Sulfide Stress Cracking (SSC): Brittle failure by cracking under the combined action of
tensile stress and corrosion in the presence of water and H2S.
TRIVIA: Sulfide stress cracking (SSC) is a cathodic cracking mechanism.
Stress corrosion cracking (SCC) is an anodic cracking mechanism.

19. Definition of NACE MR-0175?


a. National Association of Corrosion Engineers, Material Requisition, metallic material
requirements to provide resistance to Sulphide Stress Cracking (SSC) and/or stress
corrosion cracking (SCC) for petroleum production, to be used in hydrogen sulphide
(H2S) bearing hydrocarbon service, caused by cathodic failure, in petroleum refining
industries.

20. Joint efficiency -


a. a joint efficiency depends only on the type of joint and on the extent of examination of
the joint and does not depend on the extent of examination of any other joint.
21. At what test pressure inspector shall do the inspection of vessel under hydro test
a. At test pressure
b. At MAWP
c. At MAWPX1.3
d. At MAWP/1.3
22. Welder shall be re-qualified if changes in the essential variables in welding procedure. it may be welding
process . then true
a. True
b. False
23. PMI requirement as per ASME Sec VIII Div. 2
a. For all tubular products of heat exchangers and vessel, all internals including
impingements and baffle supports, fasteners above 13mm, support rings of alloy pipes
which not identified/ marked, Ring type gaskets & Clamp type connector gasket.

ANNEX 6-A: The following should be considered for 100% PMI as per Div 2:

All pressure retaining welds, pressure retaining tubing & piping component, plate, forging, casting and
other raw materials from which pressure retaining components are fabricated, external valve
components, air cooled heat exchanger tubes, materials with no alloy type identification .

ANNEX 6-A :The following should be considered for PMI on a sampling basis as per Div 2:

all tubular products of heat exchangers and vessel, all internals including impingements and baffle
supports, fasteners above 13mm, support rings of alloy pipes which not identified/ marked, Ring type
gaskets / Clamp type connector gasket, insert rings .

a process used to verify that materials other than carbon steels have the specified amount of alloying
elements that are detectable by portable X-ray fluorescent techniques . (XRF: X-ray fluorescence)

SAES-A-206. Elements lighter than sulfur (S) cannot be detected by these tools. Therefore, this technique
can not be used to detect carbon (C).

An optical emission spectrograph may be used to check for all the required elements, including carbon
SAES-A-206 Acceptance criteria:

Alloys shall be acceptable if the alloying elements are each within 10% of the specified range of values

Welds with consumables that match, or nearly match, the base metal composition shall be within ±12.5%
of the ranges given in ASME SEC IIC for each element

24. True or False - Minimum thickness required for shell and head is 6mm?
a. True
25. True or False. On Heat exchanger pressure test is required on shell side and tube side.
a. True
26. Thermocouple distance requirement for PWHT?
a. 15 ft (4.6Mtr) distance and max diff in temp 140°C

“During the heating period there shall not be a greater variation in temperature throughout the
portion of the vessel being heated than 250°F (140°C) within any 15 ft (4.6 m) interval”

27. As per SAMSS, who will approved the pneumatic test instead of hydro?
a. Manager of Saudi Aramco Inspection Department.

28. As per SAMSS, minimum thickness for carbon steel shell and head?
a. 6mm
29. Definition of combination welding procedure?
a. A WPS may consist of more than one PQR with the essential variables, supplementary
essential variables etc.

30. Definition of Peeling?


a. Peel test: a destructive method of testing that mechanically separates a lap joint by
peeling. The specimens shall be peeled or separated mechanically, and fracture shall
occur in the base metal by tearing out of the weld in order for the specimen to be
acceptable
31. Definition of MDMT?
a. Minimum design metal temperature, determined by the design engineer, specified in
the datasheet.
32. Definition of MAWP?
a. Maximum allowable working pressure

33. ASME VIII refer to which inspector


a. Ans: Authorized inspector
34. True or False, 1” dia nozzle is allowed in all service.

a. False
35. RT-3 means
a. (Spot RT)
36. Butt weld full penetration Category D joints fully radiographed?
a. RT
b. SPOT
c. RT-1
d. NONE

37. Purpose of peeling test is to check?


Ans : a - bonding

38. As per Nace MR 0175, CRA Clad material resistant to localized and general corrosion.
TRUE / FALSE
“CRA – Alloy intended to be resistant to general and localized corrosion of oil field
environments that are corrosive to carbon steels”
39. HIC test standard Time?
a. 96 Hours

40. Saudi Aramco inspector have authority to visit the manufacturer facility -
a. Any time any stage
b. all the above
41. HIC standard?
a. NACE TM0284
42. Guided bend tests purpose?
a. (Ans : To check soundness and ductility of the weld metal)

43. As per sec ix welding variable for welder if automatic welding changes to manual welding?
a. Essential Variable
b. supplementary essential
c. Non Essential
d. None of the above

44. What is Arc Seam welding?


A seam weld made by an arc welding process.

45. How much projection for 6” nozzle acceptable? ( Ans 6 inch)

46. Carbon and low alloy steel over 38 mm post weld heat treatment is mandatory, what about the
lower thinner materials?
Ans: Mandatory for over 32 mm to 38mm, if preheat is not applied at min 200F (95c) during
welding.
47. Minimum Holding Temperature for different P Nos:
a. P1 – 595c ( 1Hr/in – Up to 2inches, then 15min per inch)
b. P3 – 595 c ( 1Hr/in – Up to 2inches, then 15min per inch)
c. P4 - 650c ( 1Hr/in – Up to 5inches, then 15min per inch)
d. P5 – 675c ( 1Hr/in – Up to 5inches, then 15min per inch)

48. What is U Tube Heat Exchanger?


a. Heat Exchanger with one stationary tubesheet attached to the shell and channel. The
heat exchanger contain bundle of U tubes attached to tubesheet.

49. Floating head heat exchanger definition?


a. Heat Exchanger with one stationary tubesheet attached to shell and channel, and on
floating tubesheet that can move axially.
50. Fixed Tube Heat Exchanger Definition ? FALSE
a. Heat exchanger with two stationary tubesheets each attached to shell and channel.

51. What is maximum Out of roundness allowed?


a. 1%ID
b. 1%OD
c. 1% and we can measure inside dia or outside dia

52. One question on UW-03

Weld Categories A, B, C, D
53. Weld built-up on surface is required 100% MPT or PT. True (or) False

a. True
Lethal service is a term used to describe the use or storage of poisonous
54. What is ‘’ Lethal Service’’? gases or liquids under pressure, which can cause death if inhaled even in
very small amounts
a. Ans : A

55. What are the permissible types of flanges according to ASME Sec. VIII?
a. Forged steel LWNF
b. Forged Steel WNF
c. Studded Nozzles
d. Slip On Flanges
e. All of the above.
56. Who will verify the U stamp after punching on vessel?
Authorized inspector (AI)

57. Manufacture has to record all brazing procedure qualification and welder performance
qualification records.
a. True

58. Which NACE standard cover SSC cracking.


a. NACE MR-0175
59. What is Arc Seam welding?
a. Seam weld by Arc welding process, (Linear weld or overlapping spot weld made by an
arc welding process
b. ..
c. welding from both side by arc welding process
d. …..
60. min gap between pressure retaining weld to edge of other welds
a. 25mm
b. —
c. —
d. 50mm
61. Dial pressure gage for hydro test recommends up to 3 times as per ASME Sec VIII Div -1 but it’s
not less than 1 times or more than 3 times.
a. True.
b. False
62. True or False, The inspector shall review welding procedure and verify whether it conforms to
the requirement of Section IX to his satisfaction. The manufacturer shall provide evidence that
the WPS is as per requirements.
a. True / False
63. True False, when joint efficiency changes this may affect the PWHT holding temperature.
a. False
64. True or False, RT performed as per Section-V article2, The Imperfection and indication
observed on weld metal is acceptable
65. True or False Minimum thickness required for shell and head is 6mm as per SEC VIII div 1.
a. True
66. The minimum shell and head thickness shall be
a. 50mm
b. 20mm
c. 10mm
d. 6mm
67. Credit should not be given for calculating thickness for primary loading.
(a) RF pads (b) cladding (c) liners (d) all of above
68. True or false, during filling of water for hydro test of vessels vent shall be keep open at highest
point.
a. True

69. Reason for material rejection during receiving inspection

a) True Certified Copy


b) Original MTCs illegible
c) PO not available
d) None of the above

70. Which NACE standard cover material de-aeration service?


a. (ans NACE RP0590).

71. What is minimum qualification require for NDT interpreter.


a. (ans ASNT level 2).
72. True or False, As per ASME SEC VIII Div-2 Edition 2015, If any suspicious on supplied material,
vessel manufacturer shall arrange a visit of inspectors to the manufacturer facility/ mill upon
request.
a. True
73. Before shipment cleaning , drying inspection satisfaction is required by
a. SAVID Inspector
74. True or False PWHT is not required as per SEC VIII DIV-1 if peening done on final pass of weld
metal by manual, electric or pneumatic means
a. False
75. True or False, Welder re qualification require if permanent deletion of traceability of joints
a. False
76. As per sec VIII Div 1, welder should put his stamp on near the weld seam
a. True / false
77. All materials PMI to be verified as per SAES-A-206 True Or False
a. False
78. Define Layered vessel as per DIV-2? (Div 2 para 4.13.2)
a. A vessels having two or more layers on shell, Heads
b. A vessels having two or more layers on shell, Heads, Nozzles
c. c…
d. d…
79. True or False. On Heat exchanger pressure test is required on shell side and tube side
a. True
80. NDT method AET?
a. Acoustic Emission testing
81. What is the minimum holding time for Hydrostatic testing –
a. 1 hour per 25mm
b. 1 hour minimum (As per 32-SAMSS-004)
82. What stands for RT 1
a. Full Radiography

83. During fit-up inspection of 1inch plate, you observed misalignment of 3 mm – is it acceptable –
True or false (UW -33)

a.
84. Vessel Hydro test was carried on 30 Bar and the pressure gauge used is 60 bar –acceptable
a. true or false.
85. Shell ID 3000mm and thickness 12mm , how much for 1degree-
a. 26.38 mm
86. Reinforcement Pad was fouling on Circ seam joint, So what is NDT requirement of Pad area –
• RT of butt weld in vessel for a length equal to the projection of the reinforcing pad
attachment weld plus a minimum of 50 mm on either side. Minimum length of the
radiographed weld is 12 inches. The butt weld shall be ground flush prior to installation
of the pad.
a. RT of butt weld in vessel for a length equal to three time the nozzle opening diameter
with centre of opening at mid length. Butt weld shall be ground flush before installing.
87. As per ASME Section VIII how will u calculate Hydro test pressure- In True/ False he may asked hydro 1.1
a. 1.3 Times MAWP X L.S.R (St/Sd) time MAWP -False
88. In formed Heads for 2:1 Ellipsoidal type , How much for Knuckle region-
a. 0.17D - Knuckle Radius, Spherical radius 0.90 D
89. For PWHT, What is the loading temperature in furnace?
a. 425 C
90. In L/seam RT examination Slag was observed, it was 6mm and shell thickness was 25mm.As per
UW 51 it is acceptable – True /False
From UW 51 –
“6 mm for thickness up to 3/4 in. (19 mm)
1/3t for thickness from 3/4 in. (19 mm) to 21/4 in.(57 mm)
19 mm for thickness over 21/4 in. (57 mm)”
So 25/3 = 8.3 mm accepted. So True.

91. 1” Carbon steel plate SA 516 Gr.70N and MDMT was -30 Degrees, Impact test is not applicable –
True /False
As per 32-SAMSS-004
92. Is it acceptable to do Hydro-test after Primer Coat of an ASME Section VIII Div 1, pressure vessel-
For normal services yes, for lethal service no
93. Related to Dish Ends what stands for F & D – Flange & Dish
94. What are the list of requirements of Hydro testing as per UG-99
95. What is Autogenous welds – Fusing of base metal without addition of filler
96. Weld joint category?
UW-03 (

97. After final inspection of SS Vessel corrosion was found on the weld areas. What you will do?
a. PMI reports verification
b. Pickling and passivation
c. Carbon content verification through MTC
d. All of the above

98. RT3 stands for? UG-116

a. complete vessel satisfies SPOT Radiography

99. Peening? UW-39

a. Peening shall not be used on the root or on the final layer unless the weld is subsequently
post weld heat treated.

b. In no case, is peening to be performed in lieu of any post weld heat treatment


requirement.
100. Minimum holding time to perform hydro test?

As per 32-SAMSS-004 – 1 hour/25mm. and shall not be less than one hour.

101. ASME Sec 1 stands for? (LIST OF SECTIONS to be verify)

a. Section I Rules for Construction of Power Boilers

102. Telltale holes are used in RF pads for?

a. To release entrapped gases during welding this was not option in paper but i select option B to
facilitate pneumatic
b. To facilitate pneumatic testing of RF pad.

103. As per 32-SAMSS-004 whose approval is required for shipping?

a. SAVID

104. Taper Transition (UW-9C)? Remember it


a. Ans : 3:1 taper transition
105. A vessel having a shell/or heads made up of two or more separate layers –

a. Ans Layered vessel? (Div 2 para 4.13.2)

106. RF pad minimum thickness?

a. 10mm (32-SAMSS-004), shall not exceed the shell thickness.

107. Pressure retaining weld edge to edge distance?

a. Ans : 1 inch

108. Pressure Vessel definition?

109. Thickness measurement techniques using NDT?

a. Ans : UT

110. Tracability shall be carried out for the cutting parts best method before or after?

a. Prior to cutting
b.

111. Impact testing method as per Sec VIII Div 1?

a. Charpy

112. Other than hardness what is the other requirement as per NACE MR 0175?

a. Heat Treatment & less than 1% Nickel by weight

113. PMI requirement as per ASME Sec VIII Div. 2?

a. Appendix 6 A

114. Welder shall be re-qualify if changes in the essential variables done?

a. TRUE

115. What do you mean about essential variables in WPS?

116. Procedure qualification and Welder qualification for brazing requirements?

a. ASME SEC IX

117. Two different P no’s PWHT?

a. Higher P No/ higher holding temperature of the two.

118. Pneumatic testing in lieu of hydro testing?

a. Manager of Saudi Aramco Inspection Department


119. Guided bend tests conducted based on? soundness and ductilty
ASME Section IX?

120. Vessel containing lethal substance with shell thickness of 20mm requires:

a. Spot radiography (RT -3)

b. Full length radiography (RT -1)

c. No radiography (RT-4)

d. Penetrant is sufficient if radiography testing is not available

121. Minimum Design thickness for a vessel shell is 10 mm. The following four plates were
received with actual thickness equal to: 10.2 mm, 9.7mm, 10.3mm, and 9.6 mm. As per ASME Sec.
VIII Div. l, how many plates will you release for vessel fabrication?

UG-16 - No plate shall have under tolerance exceeding 0.01 inch (0.3 mm) or 6 % of the ordered
thickness, whichever is less.

a. 1
b. 2
c. 3
d. All of the 4 plates.

122. As per ASME Sec. VIII Div. 1, if permanent deformation is observed due to over pressure
during hydrotesting:

a. The inspector should ask for re-test using proper test pressure and new pressure gauges.

b. Follow-up the hydro-testing by a pneumatic test at proper pressure, taking suitable


precautions as given in code

c. The inspector may ask for providing of additional stiffening rings around vessel and carry
out re-hydro test at proper test pressure.

d. The inspector may reject the vessel


123. Post weld heat treatment of vessel welds generally results in:

a. Improvement in ductility

b. Increase of tensile strength

c. Increase of strength and ductility

d. None of the above

“These changes can increase hardness of the material and reduce toughness and ductility. The use of
PWHT can help reduce any increased hardness levels and improve toughness and ductility to levels
acceptable for design”

124. In a 30 mm thick cylinder shell the longitudinal as well as circumferential joints are double
welded butt welds with full penetration. Which of the following is true with regards to the
longitudinal and circumferential joints?
a. They are from the same category but different types
b. They are the same type but different categories
c. Both the category and the type are the same
d. Both the category and type are different

125. The MAWP of an existing vertical vessel will be affected in which of the following
circumstances?
a. If the vessel part MAWP changes for any of the vessel parts
b. If the design pressure is reduced ( other factor remaining the same)
c. If the vessel height is changed by adding or deleting a shell course
d. Both A and C
126. Identify category A joints from the following:
a. Longitudinal joints
b. circumferential joints, shell to shell
c. Shell to hemispherical head joint
d. Both A and C above
127. If all other conditions remain the same the design thickness of which dished head (Torispherical,
Hemispherical, Ellipsoidal) will be maximum?
a. Torispherical
128. Any Thickness-offset within the allowable tolerance shall be provided a minimum taper of:
a. 3:1
129. ASME Section VIII, Divison 1 specifies different acceptance criteria for weld reinforcement,
which of the following statements are true?
a. Permitted reinforcement for longitudinal seams is higher than circumferential seams
b. permitted reinforcement for longitudinal seams is lower than circumferential seams
c. Permitted reinforcement for longitudinal seams is the same as circumferential seams
d. permitted reinforcement does not depend on the location of the seam

130. MAWP for a vertical vessel is measured at:


a. Top most part of the vessel
b. Bottom most part of the vessel
c. At the midpoint between the top and the bottom of the vessel
d. None of the above
131. Which of the following statements is true?
a. All defects are not discontinuities
b. All discontinuities are defects
c. Discontinuities are rejectable defects
d. Defects are rejectable discontinuities
132. A pressure vessel is designed with 0.85 joint efficiency and full penetration welds. The RT
requirement will be:
a. Nil
b. Spot
c. 100%
d. The T-joints will need to be radiographed
133. Two head to shell joints, one joining a seamless hemispherical head to shell was radiographed
for the full length and the other joint joining a seamless standard torispherical head to shell was
spot radiographed. The weld joint efficiency for each of these joints will be: UW-12 (D)
a. 1, 0.85
b. 1, 1
c. 0.85, 1
d. 0.85, 0.85
134. ASME Section VIII Division 1 recommends the use of U.T. in place of R.T. (for a fully
radiographed vessel) for:
a. All butt welds in vessels
b. All butt and fillet welds in vessels
c. For closing seams only
d. The code does not permit the use of U.T. at all
135. Vessel MAWP for a tall vertical vessel will normally be:
a. Greater than vessel part MAWPs
b. Lower than vessel part MAWPs
c. Maybe A or B depending on vessel height
d. Is always same as vessel design pressure
136. For a vessel constructed of Type 1 welds:
a. RT3 means E = 1
b. RT2 means E = 0.85
c. RT1 and RT2 may mean E = 1
d. RT4 means spot radiography
137. Rounded indication acceptance criteria.
a. 3mm
b. All the above
138. During RT for welder qualification, rounded indication acceptance?
a. 20% of the thickness or 3mm which is smaller
139. Long seam to long seam distance. (UW-8) - Circumferential welded intersection, vessels made
up of two or more courses shall have the centers of the welded longitudinal joints of adjacent
courses staggered or separated by a distance
a. Ans: at least five times the thickness of the thicker Plate
140. Who is responsible for U STAMP verification
a. Ans : Authorized inspector (AI)
141. Brazing essential variables
Base metal, Brazing filler metal, Brazing flux gas or atmosphere, Flow, position, Joint design, Post braze heat treatment
142. Is welder is allowed to punch his weld no beside of weld seams
a. true
143. SSC TEST REQUIREMENT
a. (MR-0175)

144. As per ASME SEC VIII IMPACT TEST REQUIREMENT.


UCS 66
145. Best NDT method for thickness verification
a. UT
146. Densitometer calibration time.
a. 3 months in paper they might write Desitometer so don't confuse its same just spelling mistake
147. What is the min joint efficiency –as per sec viii div 1
a. 0.0085
b. 100
c. 1
d. NONE OF THE ABOVE
148. What document does ASME VIII require for a two piece head that was weld fabricated by
another company? - U2 Form

149. Which NDE methods are commonly used to inspect the integrity of stainless steel strip lining?
- UT
150. TRUE or FALSE: It is possible for a forging to have the required reinforcement as an integral part
of the forging, rather than a separate reinforcing plate.
a. True
151. TRUE or FALSE: The requirement for ‘spot RT’ means that 10 % of all welds must be
radiographed.
a. False
152. After cutting-back the cladding of a clad plate vessel, what test is required before welding an
internal attachment?
a. CuSO4 Test
153. Welding on a low temperature pressure vessel, which of the following are important?
a. The interpass temperature is not exceeded.
b. The specified preheat temperature is achieved before welding attachments.
c. The welding machine is calibrated.
d. All of above

154. In the ASME code, the Inspector referred to is the:


a. National Board qualified inspector.
b. The manufacturer’s inspector.
c. The client’s inspector.
d. The inspector employed by ASME.

155. Vessels made up of two or more courses shall have the centres of the welded longitudinal Joints
of adjacent courses staggered or separated by a distance?
a. At least 5 times the thickness of the thicker

156. Castings are not permitted to be used in pressure vessels


a. False
157. What is the purpose of the ‘’Tell Tale’’ Holes in Reinforcing pads? –
a. To provide free passage of air flow between RF Pad and the shell
b. To facilitate the Pneumatic Test to be carried out on the RF Pads

158. Rounded Indications acceptable limit for welder and welding operator qualifications as per SEX
IX?
a. 20% of t or 3mm (1/8”)

159. ULT in Name plate


a. Low temperature vessel.

160. As per Sec VII Div-1 - RT1 / 2/ 3/ 4?


161. What is product specification?

162. What factors will lead to PWHT requirement (question starts with low alloy) –
a. Improper preheat was performed.
163. Dosimeter Calibration interval?
a. 1 year (As per SAEP-1141)

164. Which standard for rules of repair, inspection, alteration of pressure vessels?
a. NBIC NB 23
b. Section VIII
c. API 5L
d. API 6L
165. Design calculation shall be prepared by?
a. Manufacturer
b. Design Engineer experienced in Sec VII
c. AI
d. End User
166. Welder or Welding Operator – Change from Automatic welding to manual welding
a. is an essential Variable
167. There are no extra requirements for opening in the pressure welds.
a. False
168. List of Important Clauses from ASME Section VIII
i. UG 80 – Permissible out of roundness of cylindrical, conical and spherical
shells
ii. UG 81 – Tolerances for Formed Head
iii. UG 84 – Impact Test Acceptance criteria
iv. UG 99- Standard Hydrostatic Test
v. UG 100 – Pneumatic Test
vi. UG 102- Test Gauges
vii. UG 116 – Required marking
viii. UW -3 – Weld joint categories
ix. UW 12 – Joint Efficiency
x. UW 33- Alignment Tolerances
xi. UW 40 – PWHT Procedure
xii. UW 51- Full RT
xiii. UW 52 – Spot RT
xiv. UCS 56 - PWHT Requirements
xv. UCS 66 – Impact Test Requirements of materials.
xvi. Appendix 4 – Rounded indication acceptance criteria
xvii. Appendix 6 – MT acceptance criteria
xviii. Appendix 8 – PT acceptance criteria
xix. Div 2 Appendix 6A – PMI Requirements.

1- what is manual welding


A) perform by hand
B)Arc welding process (definition of SMAW

2- what is lethal service


Read definition above also other than 20% H2S definition

3-TRUE /FALSE OPENINGS IN OR ADJACENT TO WELDS- Any type of opening that meets the requirements
for reinforcement given in UG-37 or UG-39 may be located in a welded joint. (TRUE)

4-Change in Essential variable of Welding process require requalification of welder-TRUE