Professional Documents
Culture Documents
TABLE OF CONTENT
1
3.3.1 AS HIERARCHY CONFIGURATION........................................................62
3.3.2 ES HIERARCHY CONFIGURATION........................................................64
PARTII CEMAT STANDARD CONFIGURATION.....................................................66
1. HARDWARE CONFIGURATION................................................................................66
1.1 CPU CONFIGURATION.................................................................................... 68
1.2 CP CONFIGURATION.......................................................................................73
2. BUILD A MIAN LIBRARY AND MAKE CONFIGURATION.........................................76
2.1 BUILD A MIAN LIBRARY...................................................................................76
2.2 MAKE CONFIGURATION ACCORDING CEMAT REQUIREMENT...................80
3. CONFIGURATION THE CFC CHART........................................................................85
3.1 COPY ALL THE CONTENTS OF MAIN LIBRARY TO EACH PLC
PROGRAMING FOLDER........................................................................................ 85
3.2 CFC CHART SETTING......................................................................................87
3.3 LOADING CEMAT BLOCKS..............................................................................89
2
PARTI PCS7 STANDARD CONFIGURATION
3
During the SIMATIC Manager startup, the following picture1-1 will appear short-time.
Picture 1-1
Picture 1-2 is the main interface of the SIMATIC Manager.
Picture 1-2
4
2. BUILD A NEW MULTI-PROJECT
5
Notes:
the default view is
component view.
A new folder be
found
Picture 2.1-3
On the SIMATIC Manager, there are three kinds of views that Component View, Plant
View and Process View. (Click the view on the SIMATIC Manager to check them)
-On the Component View, configuration can be done;
-On the Plant View, putting the plant hierarchies and CFC Charts inserted can be done;
-On the Process View, tag, parameters, messages and variables management can be
done.
6
2.2 CREAT A SINGLE PROJECT IN A MULTI-PROJECT (FOR THE PLC: AS)
As the following Picture 2.2-1, right click the exampled multi-project “MANUAL” to
“Create in Multi-project”.
Picture 2.2-1
And then Picture 2.2.1-1 will be appeared.
To name the single project and to set the type on Picture 2.2.1-1
7
To define a storage location for the new single project on Picture 2.2.1-2
Right click the exampled new folder “TEST” to “Insert new object”, select “SIMATIC 400
STATION” and name it (For example: “RAW MILL”) on Picture 2.2.2-1.
8
A new folder be
found
Picture 2.2.2-1
Double click the “RAW MILL” on Picture 2.2.2.-2 to entrance the PLC Hardware
configuration interface as well as the Picture 2.2.3-1.
Picture 2.2.2-2
9
2.2.3 MAKE HARDWARE CONFIGURATION FOR THE AS
Picture 2.2.3-1
Double click exampled “RAW MILL”, and open the SIMATIC 400 STATION configuration
interface same as Picture 2.2.3-2.
Make preparation like the description on the Picture 2.2.3-3 according to the project’s
requirements. (the configuration on the Picture 2.2.3-3 only to be an example)
10
Components’ Profile
Configuration Area
Picture 2.2.3-2
11
Click it and compile the PLC
configuration
RACK
Power
CPU
ETHERNET
Picture 2.2.3-3
Click Compile on the Hardware Configuration and the following dialog Picture 2.2.3-4
coming.
Picture 2.2.3-4
12
2.2.3.1 PROFIBUS-DP INTERFACE OF THE PLC CONFIGURATION
On the exampled Picture 2.2.3-4, double click “DP” and set the parameters for the
profibus-DP interface.
Follow-up the following Pictures:
-Picture 2.2.3.1-1
-Picture 2.2.3.1-2
-Picture 2.2.3.1-3
-Picture 2.2.3.1-4
Picture 2.2.3.1-1
13
Picture 2.2.3.1-2
Picture 2.2.3.1-3
14
Picture 2.2.3.1-4
15
2.2.3.2 ETHERNET INTERFACE OF THE PLC CONFIGURATION
On the exampled Picture 2.2.3-4, double click “CP443-1” and set the parameters for the
Ethernet interface.
Follow-up the following Pictures:
-Picture 2.2.3.2-1
-Picture 2.2.3.2-2
-Picture 2.2.3.2-3
-Picture 2.2.3.2-4
-Picture 2.2.3.2-5
Picture 2.2.3.2-1
16
Picture 2.2.3.2-2
Picture 2.2.3.2-3
17
Picture 2.2.3.2-4
18
Picture 2.2.3.2-5
2.2.3.3 MPI INTERFACE OF THE PLC CONFIGURATION (This action is for SIMULATION)
On the exampled Picture 2.2.3-4, double click “MPI/DP” and set the parameters for the
MPI interface.
Follow-up the following Pictures:
-Picture 2.2.3.3-1
-Picture 2.2.3.3-2
19
Picture 2.2.3.3-1
Picture 2.2.3.3-2
20
2.2.4 FINISH THE PLC HARDWARE CONFIGURATION
After finish the PLC hardware configuration, check and compile shall be done.
21
Picture 2.2.4-1
Picture 2.2.4-2
22
2.3.1 DEFINE A STORAGE-LOCATION FOR THE SINGLE PROJECT
23
2.3.2 INSERT A PC STATION (OS/ES) TO A SINGLE PROJECT
24
2.3.3 MAKE HARDWARE CONFIGURATION FOR PC STATION
25
26
2.3.3.1 MAKE ETHERNET INTERFACE HARDWARE CONFIGURATION
27
THE FOLLOWING TWO PICTURES IS HOW TO GET THE PC ETHERNET’S MAC ADDRESS:
28
29
30
31
2.3.3.2 MAKE MPI INTERFACE HARDWARE CONFIGURATION (ONLY FOR SIMULATION)
32
33
34
35
2.3.3.3 FINISH THE CONFIGURATION FOR THE PC STATION
36
2.4 START AND SAVE THE PLC SIMULATOR
37
38
2.5 NETWORK CONFIGURATION
39
40
2.5.1 MERGE THE MPI BUS
41
42
2.5.2 MERGE THE ETHERNET BUS
43
44
2.5.3 COMPILE THE NETWORK
45
2.5.4 MAKE A S7_Programming CONNECTION BETWEEN AS AND ES/OS AND COMPILE
46
47
48
49
2.6 HARDWARE DOWNLOAD TO PLC
2.6.1 AS DOWNLOADING
50
51
52
2.6.1.2 AS NETWORK DOWNLOADING
53
54
2.6.1.3 AS STATION DOWNLOADING
55
2.6.2 PC STATION (OS/ES) DOWNLOADING
56
3. SETTING AND UPDATING HIERARCHY ON THE PLANT VIEW
57
58
59
60
3.2 PLANT HIERARCHY UPDATING
61
62
63
3.3 HIERARCHY CONFIGURATION
64
65
3.3.2 ES HIERARCHY CONFIGURATION
66
67
PARTII CEMAT STANDARD CONFIGURATION
1. HARDWARE CONFIGURATION
68
69
1.1 CPU CONFIGURATION
70
71
72
73
74
1.2 CP CONFIGURATION
75
76
Notes:
While finish the CPU and CP configuration, Compile and download shall be done.
77
2. BUILD A MIAN LIBRARY AND MAKE CONFIGURATION
78
79
80
81
2.2 MAKE CONFIGURATION ACCORDING CEMAT REQUIREMENT
82
83
84
85
86
3. CONFIGURATION THE CFC CHART
3.1 COPY ALL THE CONTENTS OF MAIN LIBRARY TO EACH PLC PROGRAMING
FOLDER
87
88
3.2 CFC CHART SETTING
89
90
3.3 LOADING CEMAT BLOCKS
91
92
93