To/ (Client) (M&E Engineer) (Architect)
cc:
☐ ☐ ☐
(Quantity Surveyor) (C&S Engineer) (Others)
Priority A reply is expected by:
: ☐ Urgent ☒ Normal (dd/mm/yyyy)
15-01-2018
Bron Saw/
Requested 10-01-2018
by:
Engineer
(Name/ Designation) Signature Date of Request
Consultants’ Comments:
Returned
by:
(Name/ Designation) Signature Date Returned
For ACROMEC usage only:
Received
by:
(Name/ Designation) Signature Date of Receipt
Page 1 of 1
23 24
22
22
21
BASEMENT WALL BASEMENT WALL BASEMENT WALL
20
16
19
T 12A
S
18
15 17
13 14 16 15
AY
V E W
D RI
AY 3A
W O-W 381 ST
E T
WI D
8M
100
LOOP
OUT
180
0
LOOP
LOOP
IN
LOOP
DRIVEWAY
23
7M WIDE
TWO-WAY
DRIVEWAY
ST
PH NEUTRALIZATION SYSTEM PIPING LAYOUT FOR BASEMENT 13A