You are on page 1of 34

DAILY PLUMBING TASKS

Priority List –NOV


FRIDAY, 17/11/2023

72. PLUMBING DRAWINGS ARE AT NO TIME FULLY COMPLETED AND THERE MAY BE SOME ITEMS
THAT REQUIRE COORDINATION DURING CONSTRUCTION BASED ON FIELD CONDITIONS.
73. SUBSTITUTION REQUESTS DURING CONSTRUCTION SHALL BE SUBMITTED IN SUBMITTAL
FORMAT. THEY ARE NOT GUARANTEED TO BE APPROVED AND MAY REQUIRE AN ADDITIONAL SER-
VICE FOR REVIEW AND IMPLEMENTATION INTO THE DRAWINGS.
74. EQUIPMENT AND PRODUCTS ARE KNOWN TO BECOME OBSOLETE OR DISCONTINUED. THIS
MAY REQUIRE CURRENT/UPDATED MODELS TO BE IMPLEMENTED INTO THE DRAWINGS. IT IS THE
CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE ENGINEER OF RECORD AS SOON AS POSSIBLE VIA
RFI OR EMAIL.
75. UNDER NO CIRCUMSTANCES SHALL THESE DRAWINGS AND DOCUMENTS BE MODIFIED BY
ANYONE OTHER THAN THE ENGINEER OF RECORD.
Vincent,
please add this general notes to our new project template notes for all projects, also please add this to all
current projects that are under design
I got this from V:\Projects\Projects\220101\Drawings\Plumb

for taks 0<6 you can spend it's time +4hrs maximum; ex 4+4= 8hrs total
for tasks 6<16 you can spend it's time +6hrs maximum; ex 8+6= 14 hrs total
for tasks 16<24 you can spend it's time +8hrs maximum; ex 20+8= 28hrs total
for task > 24, work max. 24hrs

Please remember to not go over the estimated time too much to finish a task, if the time is really under-
estimated just do the estimated time and leave it in progress for next day so that we don't stop work-
ing on the tasks assigned

1 190601/181205 - 808 Western - RFI 460, Sal 3hrs Quang

Please go thru markups to identify the waste stub to be change back to 4", update DFU to say "172 DFU
MAXIMUM". Update riser diagrams. Make sure you have the correct TTB because one is for 800 Western
and the other for 808 Western, this task is mainly for the new building which is 808 Western. Publish the
sheets that changed and cloud on PDF with red the changes. Add on TTB "ISSUE FOR RFI 460 - 11.17.23"
V:\Projects\Projects\181205\Admin\Plumbing\Markups\23-1116 Waste Stub to 4inch
DAILY PLUMBING TASKS

2 211012 - 2911 Adams - RFI 70, Ar 4hrs Hiếu

11.16.2023 RFI 70
You have the latest files. See attached for markups. When complete, cloud the changes in red in blue-
beam and send me the updated sheets. Thank you.
2911 Adams - Plumbin...- 11072023
.pdf
.pdf

Hải yến
3 220107 - REH - RFI 129, Sal 3hrs

Please go thru markups, show the AC unit in the other door and pick up its condensate. Update riser dia-
grams as needed. Publish only the sheets that changed and cloud on PDF with RFI 129 delta.
V:\Projects\Projects\220107\Admin\Plumbing\Markups\23-1116 Electrical Room Update

Sep
3 230902 - LMPA - 100%CD - Waste line routing - Update 11/14/23, DJ 8hrs

This will be standard sequence with VBC projects - VBC being the producer them self - and having struc-
tural and MEP(us!) as part of their team - especially for plumbing - we will go back and forward several
times before structural and MEP settles. At this stage for both 230704 and 230902 when it comes to sets
and especially floor configuration - we have open card as it is to design the pipe routing as needed for VBC
to actually install it in the factory per their preference. Please use the structural sets currently available (as of
October 20th) and once VBC likes the routing - structural will accommodate to create different boxing
methods in the floor.

Yes - as in 230704 - all waste is in the floor - again we have open card when it comes to structural - height
stays 9-1/4" - but structural will support and reconfigure later to our needs for all waste pipes routed
through the floor, Interstitial space is ONLY for PEX and PVC for CD - any ceiling horizontal routings. Draw-
ing calls for 5 -1/4" but even structural has confirmed 5-7/8"
image.png
DAILY PLUMBING TASKS

Client has requested that all WH to be moved to second floor on all family and single living modules. Please
see markups. V:\Projects\Projects\230902\Admin\Plumbing\Markups (Internal)\23-1115 VN
markup\220036_LifeMoves Palo Alto_MP - 23-1115 VN markup WH to 2nd floor.pdf

UPDATE 11/17/2023

Update 11/16/23 - Addendum 1:


Please see title block update:
"V:\Projects\Projects\230902\Drawings\Arch_archive\23-1116 Titleblock markup for Addendum 01 -
clouding R01"
Addressing two 3rd party's reviews.

• state

Please see markups for addendum 01 (both sets in the folder)- please cloud responses with R01 (as per
project 230704) - also provide narrative as a separate document:
"V:\Projects\Projects\230902\Admin\Plumbing\Markups (Internal)\23-1116 VN markup\State"

• client

Please see markups (for both sets) - this work does not need to be clouded - add comments in Blue-
beam as per markup as needed: "V:\Projects\Projects\230902\Admin\Plumbing\Markups (Internal)\23-
1116 VN markup\Client"
Please publish both sets and the narrative (one word document is OK for both sets) and email them to
me.

4 230308 - 1047 Crenshaw - 75%CD - 11.3.23, Andreew 2hrs Yến

please address the markups located here to fix some issues from yesterday's task regarding SP-1A&1B:

V:\Projects\Projects\230308\Admin\Plumbing\Markups & Sketches\23-1116 Markups for VN

When completed, please post the updated set here in the comments.

Thank you!

Thành
5 220702 - 4th & Ivy - 100%CD - 11.10.23, Andree 6hrs

please address the markups below:

V:\Projects\Projects\220702\Admin\Plumbing\Markups\23-1116 Markups for VN

When completed, please post the updated set here in the comments.
DAILY PLUMBING TASKS

6 220705 - Expo Point – Match Revit, Sal 20hrs


please try to work on Expo Point as much as 16 hrs because we have a due date on 2 weeks, we need
to prepare a sheet index for this Friday

UPDATE 06/13/23
Water pressure tables are as follows:
2 psi/100ft CPVC for all commercial stubs and distribution from WM to Boilers
8 psi/100ft CPVC for distribution from PRV's on boilers to water submeters inside units
12 psi/100ft PEX for piping inside the units after the water submeter

Go thru markups saved below and update the boiler pad locations and some of the distribution drops after the
boiler. Please have this equipment location updated by tomorrow. Also please update the general sheets per
the markups saved there.
V:\Projects\Projects\220705\Admin\Plumbing\Markups\23-0612 Boiler Pads

Please update per new landscape drawings located on BIM 360 here: https://docs.b360.autodesk.com/pro-
jects/62e19160-d2d8-4645-b60b-4f4fd3e78de0/folders/urn:adsk.wip-
prod:fs.folder:co.I6EFTdTXTpido2N6Od0n_g

Also when working on the markups, please make sure to add expansion loops for all cold, hot and HWR water
lines that go over 60ft in straight line.

UPDATE 06/26:
Please see markups below and do the study for the 2 options; either increase the courtyard storm tank to
90k SF and only markup the areas you will be collecting the storm and only model the furthers run to get
the new invert. Option 2 is studying the same but for 115k SF into the tank.
V:\Projects\Projects\220705\Admin\Plumbing\Markups\23-0626 Possible Storm Redesign

UPDATE 06/30

Please see markups, reroute to avoid staircase and give me the total SF loads for both sides and the inverts to
the tanks please.

THE BEST STUDY.pdf

After study, please move GI and show POC's that are marked up on the markups below.

2023-06-29 Site Coordination.pdf

Besides a PDF today, please also export CAD of site plan and level 1.

07/10: NEW Unit set up: Vincent, Catus 14hrs


DAILY PLUMBING TASKS

_ All 22 new units being created and set up sheets. They are: A1.2, A2.2, A3.1, B1.2, B1.3, B2.1, B2.2, B3.1,
B4.1, B5.1, B6.1, B7.1, C1.3, C2.3, D1.3, D1.4, D1.6, D3.2, E1.1, E2.1, E3.1, S1.2

UPDATE 07/12

Please go thru markups saved below. Combine all waste and storm dropping into common areas in the
building, I think I clouded them all in the markups. Mechanical will be working on addressing the ID
markups that are also saved in the folder (it's a big file so maybe just coordinate with M directly in the of-
fice as to what to avoid). ID latest drawings should be on BIM 360. Please coordinate with mechanical to
avoid ducts and mechanical equipment. Give me a feedback document showing the plumbing on the ceil-
ing and any possible conflicts with M or ID.

V:\Projects\Projects\220705\Admin\Plumbing\Markups\23-0711 Ceiling on Common Areas

Also, please keep in mind about the minimum owner design requirements and provide a feedback for what is
missing and/or needed for the 60%CD submittal on 7/21/23.

V:\Projects\Projects\220705\Admin\Plumbing\Markups\23-0711 Min Owner Requirements

UPDATE

Please continue with combining waste above common areas, also please see email regarding conflicts with
vents. Please give me status of how many units we have done so far and how many are we missing. We
need a progress set by tomorrow, so please make sure all sheets are there and send me a sheet index file.
V:\Projects\Projects\220705\Admin\Plumbing\Markups\23-0713 Vents Conflicts
Can you please coordinate this vents conflicts on the roof?
UPDATE 07/18/23
Continue combining waste/vent on ceilings of common rooms, see additional markups below. Provide feed-
back document with markups for the locations where we need lower ceilings.
V:\Projects\Projects\220705\Admin\Plumbing\Markups\23-0717 Ceiling on Common Areas #2

After start with new irrigation and civil tasks:


• Please update per new Civil & Landscape backgrounds saved below.
V:\Projects\Projects\220705\Drawings\Arch_archive\23-0714 Civil & Landscape Plans
• Provide irrigation water lines inside the building up to Irr POC on courtyards per markups below:
V:\Projects\Projects\220705\Admin\Plumbing\Markups\23-0717 irrigation lines for VN
UPDATE 07/19
• Stop working on combining waste on common areas and any coordination with Mechanical.
• Do not lend your PC to anyone, please work on this project 16hrs or more if possible, we need to com-
plete a lot of pending items, including riser diagrams (points 4 & 5 below).
Please work on the following in the priority assigned:
DAILY PLUMBING TASKS

• Update Civil LID to our latest review where the left tank had 77,300 SF and the garage tank had 63,862
SF, focus on rerouting the main branches to the correct tanks, route from previously shared court-
yards POC's from civil/landscape to tanks. Do not combine any storm routing that you haven't been
combined yet. Do not spend a lot of time with this, we need time to be spend on the riser diagrams,
only have main branches and big equipment shown.
• Go thru markups and revise the LID routings, including the SP discharge.
• V:\Projects\Projects\220705\Admin\Plumbing\Markups\23-0718 LID and SP change
Go thru plumbing schedules for all common areas and unit plans and update per previously shared
Appendix A excel document (focus on having all the YELLOW fixtures schedules called out in our
plans, please quickly go thru all the green too) and go thru markups.
• V:\Projects\Projects\220705\Admin\Plumbing\Markups\23-0714 Markups
• Start with unit riser and common area riser diagrams, they can be a 3D view of what is already model
on Revit, it doesn't have to be lines like the ones made in autocad, please determine which method is
faster and execute. We can start by having one riser diagram for each unit type only (1bed, 2bed,
3bed...) then continue with point 5 below.
• We need typical building riser diagrams in our plans for our due date Friday; this can be 3D views of
only the piping already shown in our model, just grab the piping and put it in a new sheet and call it
riser diagram.
UPDATE
BIM360 has the latest drawings Landscape and Civil drawings, please check there, see below. When Point 2
is completed, please send me CAD drawing of the ground level.

docs.b360.autodesk.com
https://docs.b360.autodesk.com/projects/62e19160-d2d8-4645-b60b-
4f4fd3e78de0/folders/urn:adsk.wipprod:fs.folder:co.I6EFTdTXTpido2N6Od0n_g/detail

docs.b360.autodesk.com
https://docs.b360.autodesk.com/projects/62e19160-d2d8-4645-b60b-
4f4fd3e78de0/folders/urn:adsk.wipprod:fs.folder:co.wZ_0iHniRTuCOGlKP-oJvw/detail

Please send me the sheet where the booster pump room is shown with the relocated equipment and 6"
concrete pad

Also for Point 3: also add the schedule for the Buffer Tank (BT) per markups below
V:\Projects\Projects\220705\Admin\Plumbing\Markups\23-0719 WH's Schedules to Include BT

UPDATE 07/24

This was a really good set! Thank you. Please go thru markups and update as needed in the following order:
1. V:\Projects\Projects\220705\Admin\Plumbing\Markups\23-0721 general for VN
2. V:\Projects\Projects\220705\Admin\Plumbing\Markups\23-0717 irrigation lines for VN
DAILY PLUMBING TASKS

3. V:\Projects\Projects\220705\Admin\Plumbing\Markups\23-0720 Roof Vents Conflicts

Then keep working on any previous pending items we have. At the end of the day please create a new
folder on the markups folder with the following:
• A word document listing all pending items there are left with estimated times to complete if possible.
• New plumbing publish set.
• Any feedback markups documents you've completed for the day.

UPDATE 07/25

Very good feedback and responses, please do the same tonight. Please prioritize as follows:
1. 23-0721 pending markups + my feedback to the pending items, see feedback for the rest of the items
below.
2. 23-0724 new markups showing water distribution on the building. Please see feedback document
for the distribution on the rest of the building with PRV-G1 and G2 (G for Garage) and PRV-C1 and
C2 (C for Common areas in building), make sure the water is coming from the correct water
line/PRV and at least have a water POC for all common areas.
3. 23-0717 irrigation lines.
4. 23-0720 double check this is good.
5. Continue with the condensate lines inside the units, see feedback for guides and create typical con-
densate riser diagrams for the unit stacks that cannot gravity to lavatory.
6. Storm comments, see feedback
UPDATE 07/26

I didn't see the word document saved on your feedback folder.


Please go thru priority list below:
1. 23-0725 updated markups for VN
1. This markup has a better water distribution for the 10" CW line going to the left of the
building and the PRV's
2. Clean the extra piping on Level 2 where we have a lot of waste/vent piping we shouldn't
have
3. Also includes markups for the condensate on units, please work on this after water distri-
bution, create typical riser diagrams for Condensate stacks needed where we cannot grav-
ity out.
4. Detail Sheets markups, make sure we add the details shown on this markups
2. 23-0717 Irrigation Lines
3. Storm
UPDATE 07/27

Please work on the pending items in the following priority, my comments are on RED:
1. 23-0725 updated markups for VN
DAILY PLUMBING TASKS

1. This markup has a better water distribution for the 10" CW line going to the left of the
building and the PRV's => done for water routing, other pending - Please finish the pend-
ing items
2. Also includes markups for the condensate on units, please work on this after water distri-
bution, create typical riser diagrams for Condensate stacks needed where we cannot grav-
ity out. => completed for 28 units, followed your new instructions for how CD routing not
gravity out. No CD diagrams - Hold on inside unit design, skip to creating typical conden-
sate riser diagrams. We need this by the end of day today.
2. 23-0717 Irrigation Lines. Please try to finish this today.
3. Continue working on inside unit condensate design.
We are submitting our 60%CD sets tomorrow. Please update sheet index and send me a new excel for-
mat sheet index. Also make sure you publish a clean and complete PDF set.

UPDATE

I didn't see the common area on Level 1 completed, can you make sure it is, coordinate with structural and
mechanical to avoid conflicts and markup any conflicts that cannot be avoided.
Then check for footings and structural elements for all the main pipes we have already shown and move
away from conflicts as needed. After this check, start combining all storm and then sewer for all the build-
ing.

After that area, please continue to coordinate the main routing underground with the footings and avoid
the footings as much as possible. Then please separate the ground level in two sheets:
1. Only below grade piping
1. Create Section plans (A, B, C and D sections) for below grade plumbing only.
2. Include all drains located in ground level, storm tanks and drywells
3. Include all water, gas, waste and vent that are below grade
4. Include the sump pump and sewage ejector
2. Only above grade piping, keep showing this on Level 01 floor plans
1. Include all water, gas, waste/vent above grade
After the sheet's separations, please complete all storm routing inside the building and start with the storm
riser diagrams.

UPDATE 08/09

1. Please complete all other courtyards above grade except for Level 8 Garage drains, and start with
the sizing and riser diagrams.
2. As for the other drains on the ground level, please hold on to those while I get the complete infor-
mation from Landscape and Architect.
3. Arch just told me they about to complete a revised locations of the deck drain on Level 8 courtyard
and that the Arch model was already updated. Please update the level 8 drain locations, after 1 and 2
points are done.
DAILY PLUMBING TASKS

UPDATE 10/11

Please read below, Level 8 is completed and some drains on L2 and L3 were revised. Please update our plans
and do the riser diagrams for all storm drains above grade, please still hold on the ones on the ground level
courtyard.
Hi Salvador,

The deck drains on Level 8 have been updated and the overflow drains and planter drains have been placed in
the Revit model.
Please also confirm that the placement and quantity of overflow drains are acceptable.
We also revised some of the overflow drain locations on L2 and L3 so make sure to review them as well.

Let us know if you have any concerns.

UPDATE 08/15

Please update plumbing to match civil. See attached for her markups. This should be priority 1.

UPDATE 08/16
That comment was by Civil engineer. They are designing some of the inside courtyards on ground level so
we just need to pick up the POC. Then proceed as follows:
1. Please continue on completing everything inside the garage per new model that will be uploaded
tonight. Plumbing will need to route a lot of the pipes in between beams, avoid penetrating the
beams, it doesn't matter if we cannot combine a lot and we have a lot of penetrations on top floors.
Try to combine pipes on the levels below without having the pipes too low. Publish all the Sector B's
(where the garage is enlarged) and cloud on PDF all the penetrations that we have between floors at
the end of day.
2. See email with Interior Design coordination and cutsheets. Provide plumbing to all items mentioned
on the email.

HED has provided the precast model for the garage. It is located here
V:\Projects\Projects\220705\Drawings\Arch_archive\23-0815 Precast Garage Model

Please coordinate any equipment that has conflicts.

Vincent,

Please download and saved all cutsheets. See email below for the locations where we have items that would
need to provide plumbing. Please update the model.

Team,
DAILY PLUMBING TASKS

Here are the cutsheets for the Sauna, Aqua Massage, and Fireplace as promised. In addition, I have in-
cluded cutsheets for a coffee machines we received from Landmark that will be located as indicated be-
low. These will require some electrical and plumbing connections it looks like. Please let us know if you
need anything else to get these incorporated.

Thanks so much!

Coffee Machine (Level 1):


DAILY PLUMBING TASKS

Small Coffee Machine (Level 2):


DAILY PLUMBING TASKS

Small Coffee Machine (Level 3):


DAILY PLUMBING TASKS
DAILY PLUMBING TASKS

Sauna and Aqua Massage Locations (Level 8):


DAILY PLUMBING TASKS

Fireplace Location (Level 8):


DAILY PLUMBING TASKS

UPDATE 08/17

Vincent, I just saw your Teams message, please hold on the garage for now as I sent the questions to the
Arch and Structural.
1. Can you please confirm we have completed all storm from levels 2 to 7? If not we have to get this
done ASAP.
2. Complete all items per Interior Design (see email)
3. Address the issues on the excel file below and provide feedback on excel when done.
4. Please continue with the water distribution

VIMMRK

2022-LP017-001 - USC Expo Point_issues - 8.16.23.vimmrk

Can you see if you can open these issues? I just talked to Nezar and he said Erica in VN Mechanical team
has Revizto, if the excel file below is hard to see the comments, please ask Erica for help to open the
".vimmrk" file above

XLSX

2022-LP017-001 - USC Expo Point_issues - 8.16.23.xlsx


DAILY PLUMBING TASKS

UPDATE 08/18
Please do the following today:
1. Go thru markups and complete garage design
1. V:\Projects\Projects\220705\Admin\Plumbing\Markups\23-0816 Parking Garage
Markups
2. Complete all items per Interior Design (see email)
3. Address the issues on the excel file (or Revizto) and provide feedback on excel when done.
4. Please continue with the water distribution
5. Continue with Mechanical conflicts

Hi @Vincent Dang , please adjust the view range on level 1 below grade floor plan sector A to avoid cutting
through the slab

UPDATE 08/21

• ok so space is a little over 8', we still have over 1ft to route pipes
• The example looks good. Thank you.
• Yes that is the gap Arch was talking about, if you think that's a better routing then use it, if not stay
where they are. If you use the gap and there's a parking space in front then we do need a pipe pro-
tection.
DAILY PLUMBING TASKS

image.png

First off all, bottom of the T stem to the finished floor is 8'-1/2'' NOT 8'-3/4'' per section cut screenshot
shown on the markup (page 8)

image.png

This is just an example of how I treat the system, in general piping will run between T stem and when it is
near to the parking wall we will drop under T stem. And I made sure in the parking aisle the piping will stay
close to the ceiling and run parallel to beams also 8'-2'' met (or try to meet), when drop down under T stem
and going against the parking wall (no vehicle circulation here) 7' met

image.png

Lastly I wonder about where we can place the vertical piping. Per instruction here is the 7'' gap, It is not
clear for me, please see image at last and confirm that the 7'' mentioned area is the YELLOW strip? Can we
DAILY PLUMBING TASKS

locate the vertical piping there? How many piping, distance between them? Is there any pipe protection
needed? (We normally placing vertical piping against columns since no car can hit the piping)

please move the water line as shown here, in the chase behind the tub next to the storm pipe

UPDATE 08/23

Hold on the parking garage, please continue with the rest of the items.

UPDATE 08/24

Please see below. We need to add a drain and hose bibb for all bike rooms.
DAILY PLUMBING TASKS

Hi Salvador,

I came across below from Landmark comments on the architectural set, not sure if they comment on plumbing
as well.

Just wanted to make sure you are accommodating this. Thank you!

UPDATE 08/25
Please focus on Fixing the Gas Meter room per markups saved below. Please have the gas meter room en-
largement plan, site plan showing the gas line POC and the gas riser diagrams published today.
Then continue with the rest of the pending stuff. Please provide a list of all pending items you have on this
and the estimated time to complete.
V:\Projects\Projects\220705\Admin\Plumbing\Markups\23-0824 Gas Meter Layout
DAILY PLUMBING TASKS

UPDATE 08/29
Since we got new licenses for the Flyaway project, please make sure you use the extra plumbing license plus
the Arch we have been using before, so it should be 16 + 8 = 24 hrs available for plumbing.

Please update per new Landscape backgrounds on BIM360. Also please look for the latest Civil on BIM360 and
update. Please follow the markups saved below to group certain pipes going down as well as move the vents'
penetration on the roof.
https://docs.b360.autodesk.com/projects/62e19160-d2d8-4645-b60b-4f4fd3e78de0/folders/urn:adsk.wip-
prod:fs.folder:co.I6EFTdTXTpido2N6Od0n_g/detail
V:\Projects\Projects\220705\Admin\Plumbing\Markups\23-0828 Garage Penetrations
V:\Projects\Projects\220705\Admin\Plumbing\Markups\23-0828 Roof Coordination

Update Storm Riser diagrams for any changes made and tonight please publish the Site Plan, Roof Plans (over-
all and all sectors for all roofs and level 8 deck) and Storm Riser Diagrams.

After the above, please make sure we have hose bibs on the locations below and make sure the schedule for the
hose bibs come from Appendix A and are lockable HB's on common areas:
• Retail trash staging with floor drain
• Bike rooms (lockable), with floor drain
• Pet wash room, with floor drain
• Residential trash staging with floor drain
• Trash chute access room (one at each floor) with floor drain.
• Garage (per markups shared before)

UPDATE 08/30

Please give me a list of items needed. Consider we need to complete 85%CD by September 1st so we need
to manage the time left to accomplish getting at least the major items completed such as typical riser dia-
grams for city submittal. Tonight I also need all level 8 floor plans, where we have the roof drains for the
whole building, also please publish the Storm Riser diagrams again if you have any updates in them, Civil is
submitting to LID tomorrow so I need to give them all the STORM system to submit.
UPDATE 08/31

Please make sure you add plumbing to the showers and water fountains on level 8 and go thru markups
showing new drains added and add them as needed.
V:\Projects\Projects\220705\Admin\Plumbing\Markups\23-0830 Added Drains
Then do as much of the other pending items as possible.
Please use “9/8/2023 85% CD” for the title block.
Also please get the sheet index and publish a complete set.
DAILY PLUMBING TASKS

UPDATE
Please add the MAWA table to our detail. Do our graywater ready calcs and add to the same detail. com-
bine the gray water stacks needed from the units above Retail R102 and R101 as well as Trash Room A101 if
needed. Create graywater riser diagrams.
Also by tomorrow I need to know exactly how much DFU is going to each of the SS POC's.

UPDATE 09/07

Please make sure you have the routing of the graywater shown on the floor plans. Publish a complete set with
sectors and everything, get a new sheet index if it's different than last week. We are submitting TOMORROW.
Also please have a Plumbing PC application filled out and if it's already done send it to me again.

UPDATE 09/08

Please go thru markups below. Then continue with the rest of the pending items.
V:\Projects\Projects\220705\Admin\Plumbing\Markups\23-0907 Roof Markups

image.png

Also please relocate the inlet of the GI-1 as shown above. SP will now be on the side and a independent 6" SS
later will go to the street as shown. Please also add the sample port detail below for the other SP that has a side
outlet for GI-2. Make sure you specify on the schedules of the GI and SP as to which one have side outlets to say
something like this “Model JZ2500G with custom side outlet". Also "Model di200 for SP-2 with custom side out-
let"
V:\Projects\Projects\220705\Admin\Plumbing\Markups\23-0907 GI & SP Relocation

PDF

di200.pdf

UPDATE

Yes they have shifted a few things, but the latest files should be on BIM360 right? That's where you are get-
ting all the latest drawings right?
DAILY PLUMBING TASKS

Please add this notes below to the Gas Riser Diagrams as well as the Gas Room Enlargement. Please publish
those two sheets with the notes included. Then continue with the rest of the pending items.

UPDATE 09-15-23

LADBS rejected our submittal so now we need to focus on this to fix it. Please assign people to work on this ei-
ther on AutoCAD or a regular Revit model, whichever is faster. If you need to work on autocad then it's fine, we
need to complete this. Please note our main objective is to complete the Riser Diagrams.

1. Please note that the single 10" SS POC going to 39th St is now split into two 8" SS POC's (plus the 6"
SS you already have from the GI outlet). For the one 8" SS POC located north, get that fill up to the
max of 2112 DFU at 1% and then start sloping at 0.5% but do not connect anything else. Please note
that for this calculations you only need to do markups on a PDF, you DO NOT have to show it on the
model or the floor plans, only do the calcs for what you can grab and based on that complete the
Waste/Vent Riser Diagrams. See markups below.
2. For the other 10" SS POC's going to Figueroa, do a sketch of the routing they need to take and what
are they grabbing on PDF and then complete the Waste/Vent Riser Diagrams for those SS POC's.
3. Complete water riser diagrams, do markups on PDF as needed to figure out the routing but it should
be pretty straight forward because the building is pretty symmetric.
4. Only complete the floor plans (model) when you're finish with points 1-3.

V:\Projects\Projects\220705\Admin\Plumbing\Markups\23-0914 Complete Riser Diagrams

Please note we need this fast, and this project is relatively simple so please follow the new method of doing
complete riser digram below.

PDF

Modera Melrose Simplified Risers.pdf


DAILY PLUMBING TASKS

UPDATE 09-18

Please go thru markups to get a better sewer routing.


V:\Projects\Projects\220705\Admin\Plumbing\Markups\23-0915 Sewer Routing

UPDATE 09-19

Please check the water riser diagrams and make sure everything drafted is printed. Work on completing
everything and have it finish by 10pm California time. Everything needs to look complete for the plan
checker to accept the plans. Upload to the link below at 10pm.
https://www.dropbox.com/scl/fo/ull6p2cl0iu6ldzsupbxo/h?rlkey=3n9i8ehybnzi9y304t77hh4rf&dl=0

Also when published, make sure you delete on bluebeam PDF the DD and CD dates and add 09/18/2023
City Submittal as shown below.

UPDATE 09-20

Can you please resolve the issues attached here? Also I’m cc’ing Armando because I’m going on vacation so he
will be taking care of expo and the priority list too so please contact him for any questions.
DAILY PLUMBING TASKS

If you look in the calendar, you can click on the vacation task for me and Joseph and see who is in charged of
each of our projects. Also the links are below:

Can you please resolve the issues attached here? Also I’m cc’ing Armando because I’m going on vacation so he
will be taking care of expo and the priority list too so please contact him for any questions.

If you look in the calendar, you can click on the vacation task for me and Joseph and see who is in charged of
each of our projects. Also the links are below:

UPDATE 09-27
Please see attached for the EBM drawings. We need to provide water to the hose bibs at the location indi-
cated on their drawings. Note that all of these hose bibs are located on the ground floor.

UPDATE 10-03
Please make sure that all LID relevant pages are ready for LID re-submittal. Please estimate hours if addi-
tional work on risers is needed. Please start to work on storm riser diagrams tonight Please see markup
from architect.

PDF

UPDATE 10-04

Please confirm the markups below have been addressed.

PDF

230905 Roof Coordination- MP Notes.pdf

Please update the storage tanks locations per new civil drawings saved below:
V:\Projects\Projects\220705\Drawings\Arch_archive\23-1002 Civil Update Storage Tanks

Publish all Storm Riser diagrams and all ground level floor plans.
Like this comment

UPDATE 10/06
please update per new Civil drawings and match the sizes and locations for the LID system (storm piping
location, CDS units, storage tanks, drywells, overflow drains and curb-o-lets sizes to the street curb). After
we connect to the CDS unit on the courtyard, everything should be label as 'per civil'. For the sump pump
discharge, also show the overflow drain and curb-o-let by civil on our drawings. Make sure we have all
these on our riser diagrams. See email for the new Civil backgrounds to be used.
V:\Projects\Projects\220705\Admin\Plumbing\Markups\23-1005 LID Markups
DAILY PLUMBING TASKS

I need this by tomorrow. Please publish all the storm riser diagrams, site plan, first ground level and roof
levels.

Hi Salvador,

The CAD has been uploaded onto BIM360. As mentioned in our call, we have up-
dated the SD pipe to be 15” in the courtyard, from the POC. The 15” overflow from
the CDS will connect to a 36” SQ catch basin, which then connects to (3) 3”x27”
curb-o-lets.
https://docs.b360.autodesk.com/projects/62e19160-d2d8-4645-b60b-
4f4fd3e78de0/folders/urn:adsk.wipprod:fs.folder:co.wZ_0iHniRTuCOGlKP-
oJvw/detail

UPDATE 09/10
Please see email for reference to the garage drainage updates.
Please see email below and attached for the changes that were made on the drains for the garage. Revit model
has been updated so please update this.

Hi Salvador,
The garage level drains have been revised per markup I sent previously. The area to look at is the Level 7 ramp
and landing.
Please revise accordingly. Let me know if you have any questions.

Thanks Salvador, I avoided trench drains for two reasons.


1. I don’t think we can feasibly fit a trench drain within the 4” of topping slab. I’m accustomed to trench
drains requiring more depth.
2. The topping slab needs to be continuous and providing a trench drain along the whole width of the
parking bay may pose a structural issue as it completely separates the concrete topping between land-
ing and ramp.

Maru,

You are right on the emergency drains not needing a 1/8” slope as these are not open to sky so they’re not
storm drains. For the ones that are, a solution I have seen is a trench drain but I don’t how feasible would that
be with this precast garage construction. Adding more drains is okay.

Sincerely,

Salvador Talancón

Hi Maru,
Please see attached for our notes. We do not see an issue with what you are proposing, however, we can dis-
cuss our notes further during the meeting today.

Thank you.
DAILY PLUMBING TASKS

Hi Katherine,
To continue our discussion regarding the floor drains at the garage level. I have attached a sketch of my study
of how to resolve the 1/8” min slope issue discussed during our last meeting.
I think the only area of concern will be where we provide storm drains on Level 7 and the mid ramp between
Level 6 & 7. We will need to add a few drains to maintain the 5” average concrete thickness (4” min. – 6” max.
at the highlighted areas) and avoid dropping the double T’s more than 2”. After you review, please let me
know if you want to have a separate meeting to discuss.

Armando,
Since Salvador is out, can you take a look at the proposed solution for the garage and let us know if you see any
issues or concerns?

UPDATE 10-12

The model we have provided is different from what we rushed to submit last time to the city. Owner and
their BIM clash team noticed the discrepancy between the PDF submittal set and the model. Can you please
confirm if you have completed updating the model per everything that was done on CAD to be able to
submit? IF model still not completed then please have this your #1 priority and provide estimate of how
long you need to reflect everything on the model.

UPDATE 10-17
what is the estimated time to complete matching Revit to CAD? Please provide one every day. Also if you
can get more Live Link hours from other disciplines please do so.

UPDATE 11/02

please go thru the markups saved below. Please make sure to have a narrative for all major changes done
to the drawings from now on.
use this from mechanical as example to do the Plumbing narrative.

UPDATE 11/03
Please see my feedback to your comments, continue working on this and any major changes please add to
the narrative.
V:\Projects\Projects\220705\Admin\Plumbing\Markups\23-1101 LM Comments up to Level 1

also, please continue commenting here for any feedback related to this comments, including the people,
hours and bullet points of what was done. I'm going to leave another comment but only for landscape/irri-
gation markups

Landscape/Irrigation Comments
DAILY PLUMBING TASKS

Please go thru markups below and start by only reviewing the comments and estimate time of what needs
to be done, please post feedback PDF by replying to this comment.
V:\Projects\Projects\220705\Drawings\Arch_archive\23-1102 Landscape-Irr Comments

Please update this as well. Add changes to the narrative please.

Expo Point - Janitor Closet on Level 8

Hi Salvador,

I relocated the sink in janitor closet on level 8 as below for better access.

Let me know if you see any issue. If not, please update your plans accordingly. Thank you!
DAILY PLUMBING TASKS

UDPATE 11/06

Keep the garage line separated from the residential building like you said on markups. I requested the
drainage plan on level 1. Please do the rest of what you can do with what you already have for now. Post
updates about this task on this thread please.

UPDATE 11/08
regarding the hose bibs on every level of the trash rooms, please see comment below and update our
model:
Trash chute rooms on unit floors only get floor drains, no hose bibs. The main trash/dumpster area
gets hose Bibb and floor drains
DAILY PLUMBING TASKS

I'm still figuring out the drainage at the bottom of the 2 stairwells that go to the electrical vault, please hold
on that.

UPDATE 11/09

can you please provide markups on the PDF for each of your questions you have? Like the drains on level 1,
markup and overlay the lower asphalt layer, point to the water fountain locations.

After the tasks from comments above are addressed, please go thru these markups below. Provide work
done per day, PDF feedback and estimated time on this comment.
V:\Projects\Projects\220705\Admin\Plumbing\Markups\23-1108 LM Comments Level 1 and above

UPDATE 11/13/2023

Can you be more detail into what you have done and what's missing for you to continue?
1. Please have the level 1 publish and cloud all hose bibbs that we already have.
2. This should be completed right?
3. This should be completed right?
4. This should be completed right?
5. Please publish the roof levels and cloud where we have Roof Hydrants (hose bibbs on roof), this
should be standard and be located in a 100ft radius.
6. For this, Fire Sprinkler confirm to have the HD and floor drain on level 1 only. No plumbing for the
Vault level.
7. This should be completed right?
8. This should be completed right?

The planter drains only for the courtyards is for every courtyard on level 1 right? We do not have deck/area
drains for any of the level 1 courtyards? can you screenshot a 3D view for every courtyard on level 1 please?

See comment in green above.

For Facade Access Consultant drawings please see below:


V:\Projects\Projects\220705\Drawings\Arch_archive\23-0925 Facade Access EBM 85% CD
DAILY PLUMBING TASKS

Please go thru the markups below regarding Structural Coordination with Plumbing distribution pipes on
corridors.
V:\Projects\Projects\220705\Admin\Plumbing\Markups\23-1110 Structural Conflicts

UPDATE 11/16/2023

I talked to Civil about the comments for the Storm Storage tanks and CDS units on both the garage and
courtyard and he said that those are OLD backgrounds. Can you please check and remove all the older
backgrounds and only have the newest one? Also for the GI pipe inlet, please have 6" going to the GI inlet
and outlet.

UPDATE 11/17
11/02: Markups: Vincent, Catus, Jenny 24hrs
please move the grease interceptor as shown on Option #1 on the email attached. That should match with what
Civil already has, if not that's okay, they should pick it up after. But please update and publish the site plan and
ground level when done today.
DAILY PLUMBING TASKS

11/09: Markup on 23-1108 LM comments: Vincent, Jenny, Catus 18hrs


For all hose bibbs on common areas, please make sure you schedule a different type of hose bibb which is
lockable. Please refer to Appendix A of this project where we have all the plumbing fixtures that the owner
wants to have. For all other hose bibbs inside rooms such as the booster pump room and other areas where
regular people cannot enter, keep the non-lockable hose bibb.

Please go thru the markups below regarding Structural Coordination with Plumbing distribution pipes on
corridors.
V:\Projects\Projects\220705\Admin\Plumbing\Markups\23-1110 Structural Conflicts

Actually I was working with the structural engineer to see if he could resolve it and he did, please see email
attached here, if you already moved, just make sure it's not in conflict with anything else.

Also, please add this table below to our general sheets.


image.png

also make sure you look for conflicts on the garage level. Electrical team sent me the conflict below. Please
publish and cloud any conflicts you see that cannot be resolved.
image.png
0
DAILY PLUMBING TASKS

7 230503 - 88 Long Court - 50%CD - 11.22.23, Andreew 12hrs

please update project backgrounds per the files located here:

V:\Projects\Projects\230503\Drawings\Arch_archive\23-1115 50% CD Arch Backgrounds

Changes in the above backgrounds should be minor, but please update the plumbing design as needed.

Please address the markup located here:

V:\Projects\Projects\230503\Admin\Plumbing\Markups & Sketches\23-1116 Markups for VN

Additionally, please review the storm system and mark up which storm drains are currently causing the is-
sues with headroom in the garage area and would need to be routed elsewhere in order for the main storm
POC to maintain acceptable headroom over both parking stalls and drive aisles. DO NOT actually reroute or
address the storm drains you mark up.
DAILY PLUMBING TASKS

When completed, please provide me with the updated set (from background updates only) as well as the
storm system markups described above.

Thank you!

You might also like