OSHKOSH® POWER DIVIDER GROUP 260
2.1 Disassembly. 3. Remove the six 12 point cap screws from the
sides of the oil pan. See Figure 4.
NOTE
The power divider assembly weighs
approximately 572 lbs. Use a lifting device
capable of lifting more than 572 lbs.
1. Lift the power divider assembly using a suitable 1
lifting device. See Figure 2 for the power divider
lift points.
2
1. Cap screw (0.31-18 x 1.25 in.) and flat washer
2. Cap screw (0.31-18 x 5.5 in.) and flat washer
Figure 3.
260-13A, Page 3
GROUP 260 OSHKOSH® POWER DIVIDER
6. Remove the cap screw (0.75-10 x 2.25 in.) from 12. Lift the power divider housing off of the clutch
the pilot cap. See Figure 5. assembly when the clutch assembly is free of
the housing spindle.
7. Remove the pilot cap from the transmission/
power divider adapter. See Figure 5. NOTE
The clutch assembly weighs approximately 135
8. Remove the transmission/power divider adapter lbs. (61 kg). Use a lifting device capable of
from the clutch shaft. See Figure 5. safely lifting the clutch assembly.
1 2 3
13. Connect lifting device to the clutch assembly
and move clutch from the work area. See Figure
7.
1. Pilot cap
2. Cap screw (0.75-10 x 2.25 in.)
3. Transmission/power divider adapter
Figure 5.
260-13A, Page 4
OSHKOSH® POWER DIVIDER GROUP 260
3
1. Oil lines
Figure 10. Oil Lines
1 1 1
2
1. Idler shaft
2. Spindle
2
Figure 11. Spindle
1. Nut
2. Lock washer
3. Idler gear
4. Nut wrench
Figure 9. Idler Gear
260-13A, Page 5
GROUP 260 OSHKOSH® POWER DIVIDER
2.2 Assembly.
1
NOTE
The use of an oven and freezer will aid in the
assembly of the power divider housing. The
oven temperature should be approximately 250°
F (121° C) and the freezer -80° F (-62° C).
NOTE
A hydraulic press is required for assembly.
NOTE
Thoroughly clean all mounting surfaces of dirt,
grease or gasket material prior to assembly.
1. Mark the idler assembly parts (bearings, races,
spindle and gear) so that they are assembled in
a matched set. Mark one set as 1 and the
1. Oil seal second set as 2. See Figure 14.
Figure 12. Spindle Oil Seal 1 2 3
4
1. Idler shaft
2. Bearings
3. Idler gear
4. Bearing races
Figure 14. Idler Assembly Components
260-13A, Page 6
OSHKOSH® POWER DIVIDER GROUP 260
1
2
Figure 15.
260-13A, Page 7
GROUP 260 OSHKOSH® POWER DIVIDER
260-13A, Page 8
OSHKOSH® POWER DIVIDER GROUP 260
1 2
260-13A, Page 9
GROUP 260 OSHKOSH® POWER DIVIDER
NOTE
The use of dowel/locator pins will help in the
idler shaft installations.
26. Press the frozen spindle into the housing using a
hydraulic press. See Figure 24. Make sure that
the gear, bearings, shims, and spacer are
aligned with the shaft when pressed in.
32. Install the four steel oil lines. Apply Loctite® 242
to the threads of the eight elbows. See Figure
26.
33. With the oil lines installed and tightened, tighten
the eight 90° elbow jam nuts. See Figure 26.
1
Figure 24. Idler Shaft Pressed In
260-13A, Page 10
OSHKOSH® POWER DIVIDER GROUP 260
1 2
1. Retaining/Snap ring
2. Spindle bearing Figure 29. Idler Gear
Figure 27. Spindle Bearing
39. Place the main shaft bearings and main shaft
gear in an oven to warm them. See Figure 30.
36. Install the oil seal into the spindle. Apply a
coating of Loctite® 515 to the oil seal. See
4
Figure 28.
1 3
2
1
1
1. Bearing
2. Bearing race
3. Spacer
4. Main shaft gear
Figure 30. Main Shaft Gear Assembly
NOTE
The main shaft gear assembly bearings are a
1. Oil seal matched set. The bearing assembly must be
Figure 28. Spindle Oil Seal assembled in order.
37. Turn the power divider housing over. 40. Press the main shaft gear bearing races into the
heated main shaft gear.
38. Install the locking tab washer and nut onto the
two idler shafts. See Figure 29. Torque nuts to 41. Install one of the heated main shaft gear
200 ft. lbs. (271 Nm). bearings onto the spindle.
Continue to tighten nut until a washer tab aligns 42. Install the main shaft gear onto the spindle.
with a notch in the nut. Bend the washer tab into
43. Install the spacer onto the spindle.
the aligning notch in the nut.
260-13A, Page 11
GROUP 260 OSHKOSH® POWER DIVIDER
NOTE
Expansion plugs only need to be installed in a
new spindle.
47. Install the three 10mm expansion plugs in the
end of the spindle. See Figure 32. Press the
plugs in so that they are just below the face of
the spindle.
260-13A, Page 12
OSHKOSH® POWER DIVIDER GROUP 260
1. Clutch assembly
2. Spindle
Figure 33. Clutch Assembly Installation
260-13A, Page 13
GROUP 260 OSHKOSH® POWER DIVIDER
57. Apply a bead of Loctite® 515 to the oil pan 59. Apply a bead of Loctite® 515 to the base of the
mounting flange. See Figure 37. power divider housing where the oil pan mounts
to the housing.
60. Install locator studs into the base of the power
divider housing to aid with installing the oil pan.
See Figure 39.
NOTE
The power divider assembly weighs 2
approximately 572 lbs. Use a lifting device
capable of lifting more than 572 lbs.
58. Lift the power divider assembly using a suitable 1. Locator studs
lifting device. See Figure 38 for power divider lift 2. Oil pan
points. Figure 39. Oil Pan Installation
260-13A, Page 14
OSHKOSH® POWER DIVIDER GROUP 260
2
1. Cap screw (0.31-18 x 1.25 in.) and flat washer
2. Cap screw (0.31-18 x 5.5 in.) and flat washer
Figure 41. Oil Pan Cap Screws
260-13A, Page 15
GROUP 260 OSHKOSH® POWER DIVIDER
3
6
4 5
2 7
24 10
11
23
12
13
22
14
15
21
16
20
17
18
19
1. 10mm expansion plug (qty 3) 13. Ball bearing (70 x 125 x 24 mm)
2. Spindle nut and lock washer 14. Transmission/power divider adapter flange
3. Idler shaft lock washer and nut 15. Retaining ring
4. Taper roller bearing (M40 x 90 x 25.25) 16. O-ring (0.504 OD)
5. Spacer and shim(s) 17. Bearing assembly (5.00 x 6.68 x 2.26)
6. Power divider housing 18. Spindle gear (59 tooth)
7. Apply Lubriplate onto clutch assembly shaft prior to installation 19. Oil pan
8. O-ring (6.443 OD) 20. Hydraulic clutch
9. Spindle 21. Cap screw (0.44-14 x 1.5 in)
10. Oil seal 22. Spring coupling assembly
11. Transmission/power divider pilot cap 23. Needle bearing (50 x 72 mm)
12. Cap screw (0.75-10 x 2.25 in) 24. Caterpillar flywheel
Figure 42. Power Divider Center Section Cutaway View
260-13A, Page 16
OSHKOSH® POWER DIVIDER GROUP 260
3. PUMP DRIVE
10
3
4 5 6 7 8 9
1 2
11
12
14 13
17 16 15
18
19 20 22 26 28 29 32 33 34
23 24
21 25 27
30 31
260-13A, Page 17
GROUP 260 OSHKOSH® POWER DIVIDER
3.1 Disassembly. 7. Remove the rear cover from the pump drive
housing.
NOTE
A hydraulic press is required for disassembly. 8. Press the bearing from the cover.
1. Secure a lifting device to the pump drive 9. Remove the bearing snap ring from the cover.
assembly. The pump drive assembly weighs 10. Remove the inner bearing and spacer.
approximately 67 lbs. ()
11. Loosen and remove the cap screw (0.50-13 x
2. Loosen and remove the ten cap screws (0.38-16 1.5 in) and flat washer securing the yoke to the
x 1.25 in) and flat washers securing the pump main shaft, See Figure 45.
drive assembly to the power divider housing.
12. Remove the yoke from the main shaft.
3. Remove the pump drive assembly from the
power divider housing using the two jack bolt
psotions.
4. Bend the lock washer tab down and remove the
nut from the main shaft.
1
5. Remove the lock washer from the main shaft.
6. Remove the six cap screws (0.38-16 x 1.0 in)
2
with washers from the pump drive rear cover.
See Figure 44.
1 2
260-13A, Page 18
OSHKOSH® POWER DIVIDER GROUP 260
13. Remove the clutch/main shaft assembly from 15. Remove the three piston rings from the main
the pump drive housing. shaft. Unlock piston ring locking end and use a
couple pieces of thin metal to help with sliding
14. Remove the main shaft/clutch assembly from the piston rings up and off of the main shaft.
the clutch drive cup. See Figure 46. See Figure 47.
2 2
260-13A, Page 19
GROUP 260 OSHKOSH® POWER DIVIDER
1
2
260-13A, Page 20
OSHKOSH® POWER DIVIDER GROUP 260
1. Restrictor plug
1. Restrictor plug
Figure 51. Restrictor Plug Removal
NOTE
The use of an oven and freezer will aid in the
assembly of the pump drive. The oven
temperature should be approximately 250° F
(121° C) and the freezer -80° F (-62° C).
NOTE
A hydraulic press is also required for assembly.
NOTE
Thoroughly clean all mounting surfaces of dirt,
grease or gasket material prior to assembly.
1. Install the restrictor plug in the nose housing.
See Figure 52. Figure 53. Nose Housing with Bearing Installed
260-13A, Page 21
GROUP 260 OSHKOSH® POWER DIVIDER
4. Apply a coating of Loctite® 515 to the perimeter Figure 55. Pump Drive Housing
of the nose housing oil seal. Press the oil seal
into the housing. See Figure 54. 7. Secure the nose housing to the pump drive
housing with six cap screws (0.38-16 x 2.0 in)
and flat washers. Apply a coating of Loctite®
515 to the threads of the six cap screws. Torque
screws to 23 ft. lbs. (31 Nm). See Figure 56.
1
2
1. Bearing
1. Pump drive housing Figure 57. Drive Gear - 35 Tooth
2. O-ring
3. Small rubber hose
260-13A, Page 22
OSHKOSH® POWER DIVIDER GROUP 260
12. Install the 2.36-18 inch nut onto the main shaft
2 and tighten to 200 ft. lbs. (271 Nm) using nut
wrench. See Figure 60.
NOTE
Freezing the main shaft prior to assembly will
aid in assembly. 1
1. Nut
2. Nut wrench
Figure 60. Main Shaft Nut
260-13A, Page 23
GROUP 260 OSHKOSH® POWER DIVIDER
13. Install the three piston rings onto the main shaft.
The piston rings are very brittle. Use pieces of 1 2
thin metal to aid in sliding the piston rings over
the main shaft and into position. See Figure 61.
14. Close the ends of the piston rings by hooking
them together once they are installed on the
main shaft.
1. Restrictor plug
2. Expansion plug
Figure 62. Main Shaft End
1
17. Install the main shaft/clutch assembly into the
clutch drive cup. See Figure 63.
2
1. Metal slide
2. Piston ring
Figure 61. Piston Rings
NOTE
The restrictor plug and expansion plug only
need to be installed in a new main shaft.
15. Install the threaded restrictor plug in the center
of the main shaft on the clutch assembly side.
See Figure 62.
16. Install the 8 mm expansion plug in the main shaft
on the clutch assembly side. Lightly tap the plug
into the main shaft with a hammer. See Figure
62.
Figure 63. Pump Drive Clutch Assembly
260-13A, Page 24
OSHKOSH® POWER DIVIDER GROUP 260
18. With the clutch installed in the drive cup, spin the
main shaft and make sure that there is no
binding.
19. Place the pump drive housing assembly over the
1
clutch/main shaft assembly. See Figure 64.
1. Flat washer
2. Cap screw (0.50-13 x 1.5 in)
Figure 65. Pump Drive Yoke
NOTE
The rear cover bearings are a matched set and
must be kept on order.
22. Install the pump drive rear cover inner and outer
bearing snap ring. See Figure 66.
Figure 64. Pump Drive Housing 23. Place the cover and two bearings in the oven.
20. Slide the yoke onto the main shaft. See Figure 24. Install the inner heated bearing and spacer onto
65. the main shaft.
21. Secure the yoke to the main shaft with a cap 25. Press the bearing cups into the pump drive rear
screw (0.50-13 x 1.5 inch) and 0.5 inch flat cover. Let the cover cool before proceeding.
washer. Apply a coating of RTV to the face of
the washer, and Loctite® 242 to the threads of
the cap screw. Torque the cap screw to 80 ft.
lbs. (108 Nm).
260-13A, Page 25
GROUP 260 OSHKOSH® POWER DIVIDER
26. Install the pump drive rear cover new O-ring 30. Install the lock washer onto the main shaft.
(7.23 x 7.51 x 0.139) onto the cover. See Figure
66. Apply a coating of petroleum jelly to the O- 31. Install the main shaft lock nut onto the main
ring before installing cover. shaft. Torque the nut to 150 ft. lbs (203 Nm).
Continue tightening the nut if necessary until a
1 2 nut slot aligns with a lock washer tab.
32. Bend the lock washer tab into one of the nut
slots.
1. O-ring
2. Snap ring
Figure 66. Pump Drive Rear Cover
27. Install the pump drive rear cover onto the pump
drive housing. See Figure 67.
28. Secure the cover to the housing with six cap
screws (0.38-16 x 1.0 inch) and flat washers.
Apply Loctite® 242 to the threads of the cap
screws. Torque the cap screws to 23 ft. lbs. (31 1 2
Nm). See Figure 67.
1. Mounting holes for cap screws with Loctite® 515
29. Install the heated outer bearing onto the main 2. Pump drive housing mounting surface - Loctite® 515
shaft. See Figure 67. Figure 68.
1 2 3 4
34. Apply a bead of Loctite® 515 to the power
divider housing pump drive mounting surface.
35. Install two dowel pins in the top and bottom
center holes on the power divider housing pump
drive mounting surface.
36. Using a lifting device raise the pump drive
assembly and place it on the power divider
housing. See Figure 69.
37. Secure the pump drive assembly to the power
divider housing with ten cap screws (0.38-16 x
1.25 inch) with flat washers. Apply Loctite® 515
to the threads of two of the cap screws and
install them in the position shown in Figure 68.
Apply Loctite® 242 to the remaining eightcap
screws.
1. Cover
2. Bearing
3. Main shaft
4. Cap screw (0.38-16 x 1.0 in) and flat washer
Figure 67.
260-13A, Page 26
OSHKOSH® POWER DIVIDER GROUP 260
Figure 69.
260-13A, Page 27
GROUP 260 OSHKOSH® POWER DIVIDER
5 7
6 8
4
1
2 3
9
10
24 11
12
23
13
20
19
21
22
D1
18
17
16 15 14
260-13A, Page 28
OSHKOSH® POWER DIVIDER GROUP 260
4. PTO ASSEMBLY
2
3
4 5
4
6 7
8
9
2
1
10
13
11
12
260-13A, Page 29
GROUP 260 OSHKOSH® POWER DIVIDER
4.1 Disassembly. Perform the following procedure to 4.2 Assembly. Perform the following procedure to
disassemble the power divider PTO assembly. assemble the power divider PTO.
NOTE NOTE
A hydraulic press is required for disassembly. The use of an oven and freezer will aid in the
assembly of the PTO. The oven temperature
1. Disconnect the oil line connected to the PTO
housing. should be approximately 250° F (121° C) and the
freezer -80° F (-62° C).
2. Remove the seven hex socket head cap screws
(0.25-20 x 1.0 in) securing each of the four Freeze the two shafts, two ball bearings, and
adapter flanges to the PTO housing. two roller bearing outer pieces.
3. Remove the twelve mounting bolts securing the Heat the PTO housing, two gears, and roller
PTO assembly to the power divider housing. bearing inner races.
1. Snap ring
2. PTO housing snap ring groove
Figure 73. PTO Housing Snap Rings
Figure 72. 2. Install the two ball bearings into the PTO
housing. See Figure 74.
7. Turn the PTO housing over and remove the
gears and spacers from inside of the PTO
housing.
8. Using a hydraulic press, press the two ball
bearings out of the PTO housing.
9. Using a hydraulic press, press the roller bearing
assembly off of the two PTO shafts.
10. Remove the four PTO housing snap rings. See
Figure 73.
260-13A, Page 30
OSHKOSH® POWER DIVIDER GROUP 260
1. Spacer
Figure 75. Spacer 1. Roller bearing outer assembly
2. Roller bearing inner race
5. Slide the inner gear (P/N 3582962 is stamped on Figure 77. Roller Bearing
gear) through the housing opening into the
housing. 9. Place one spacer on top of the right-side ball
Make sure that the spacer and gear hole are bearing.
aligned with the ball bearing. 10. Slide gear (P/N 3582961 is stamped on gear)
6. Align the PTO shaft key with the key way in the through the housing opening into the housing.
gear and press the PTO shaft into the gear using Make sure that the spacer and gear hole are
a hydraulic press. If possible freeze shaft prior aligned with the ball bearing.
to assembly. See Figure 76.
11. Align the PTO shaft key with the key way in the
260-13A, Page 31
GROUP 260 OSHKOSH® POWER DIVIDER
gear and press the PTO shaft into the gear using
a hydraulic press. If possible freeze shaft prior
to assembly.
NOTE
The roller bearing is a two part bearing.
12. Press the roller bearing into the housing. If
possible freeze bearing prior to assembly.
13. Press the roller bearing inner race into the
bearing. If possible freeze bearing inner race
prior to assembly.
14. Install the four external snap rings on both sides
of the two PTO shafts.
15. Install the two dowel pins into the PTO housing
mounting surface. See Figure 78.
22. Install 90° elbow oil fitting into the PTO housing.
260-13A, Page 32
OSHKOSH® POWER DIVIDER GROUP 260
2 4 3 1
1 2 3 4
8 4 7 3 1
1 8 3 7 4
1. Hex socket head cap screw (0.25-20 x 1.00 in.) 5. Snap ring (3.35 OD)
2. Roller bearing (45 x 85 x 19 mm) 6. Spacer (1.78 x 2.5 x 0.65 in.)
3. Flange adapter 7. PTO shaft
4. External retaining ring 8. Ball bearing (45 x 85 x 19 mm))
Figure 80. PTO Section View
260-13A, Page 33
GROUP 260 OSHKOSH® POWER DIVIDER
12
A A
11
5 6 7
1 3 4 3
2
10 B
27
21 20
26 19
16 16 16
VIEW A-A
25 17 15
SCALE: 1:2
15
18 14
13
24 22
23
16
260-13A, Page 34
OSHKOSH® POWER DIVIDER GROUP 260
1 3
3
4
2 5 6
8 10
1 1 7
1 11
12
9
6
13
15
15
14
17
16
260-13A, Page 35
GROUP 260 OSHKOSH® POWER DIVIDER
6. TESTING
The power divider manifold located on the top of the
center section has 5 test ports for testing power divider
component operation. See Figure 83.
2 3
4 5
1. TP1 4. TP4
2. TP2 5. TP5
3. TP3
Figure 83. Power Divider Test Ports⎯Top View
260-13A, Page 36