Professional Documents
Culture Documents
Contractor shall maintain all information provided by the City as confidential and shall not disclose any
information to any part unless authorized in advance by the City to disclose such information. In addition,
Contractor shall maintain all draft, preliminary, and final work, conclusions, analysis, and other documents
generated by the Contractor as confidential, and shall not disclose any such information or document to
any party unless authorized in advance by the City to disclose such information. For purposes of this
Agreement, disclosure includes, but is not limited to providing copies of document, or discussing information
or conclusions verbally or in writing that are included in or generated from the information provided by the
City or work of the Contactor.
IX. Attachments
A. Grand Connection Route
B. Proposed Grand Connection Segments
C. I-405 Grand Connection Segment
D. Study Area Map
E. City Council Principles
7 8
SAMPLE ONLY
SUBMITTED BY : THESE DRAWINGS ANDS PECIFICATIONS AND
OTHER CONTRACT DOCUMENTS DULY SIGNED, PROJECT TITLE: A P P R O V E D B Y : SHEET CONTENTS SHEET NO.
STAMPED OR SEALED,AS INSTRUMENTS OF SERVICE,
ARE THE INTELLECTUAL PROPERTY & DOCUMENTS
JULIANA RECAÑA FREDERICK TALIBO PROPOSED RENOVATION OF
TEAM CLEAR ROSE LABITA HAMY CONTERO
OFTHEARCHITECT, WHETHER THE OBJECT FOR
WHICH THEY ARE MADE EXECUTED OR NOT. IT SHALL
BE UNLAWFUL FOR ANY PERSON TO DUPLICATE OR
TO MAKE COPIES OF THE SAID DOCUMENTS FOR USE TWO-STOREY RESIDENTIAL
G E O D E T I C
BP220 00-00
IN THERE PETITIONS OF AND FOR OTHER PROJECTS
NATHALIE ODLIME MATTHEW DOQUILO ORBUILDINGS,WHETHEREXECUTEDPARTLYORIN
WHOLE,WITHOUTTHEWRITTENCONSENTOFTHE BUILDING AR. MARIA STANTON
ARCHITECT OR AUTHOR OF SAID DOCUMENTS.
JR. BORJA ST. BRGY. 09, CAGAYAN DE ORO
SECTION 33 R.A. 9266
LOCATION : MISAMIS ORIENTAL, PHILIPPINES OWNER