Project 1
Project 1
Fall 2018
Case study
The Government of KPK intends to construct a primary school at Jalozai to help local people of that region get their
children educated. This project has been assigned to the Design Cell of UET Peshawar and you, being the team member
of the designers, have been assigned to work on the drawings of a specific classroom attached to verandah of the school
building.
Specifications
Schedule of openings
Schedule of area
You have to fill in the data regarding area after calculating once you complete the drawings. Also mention the scale on
which each drawing is to be plotted on drawing sheet in the title block. Every student has to submit copy of at least one
drawing of any actual building project along with this assignment. You can also work on the isometric drawing of this
project as practice for exam.