Vestal Meridian
Vestal Meridian
LEADERS STANDARD
WORK PRESENTATION
Don Vestal
Meridian Brick Plant 145
Phenix City, Alabama
STANDARD WORK
The “One Best Way” to accomplish
a specific task or operation. It is the
current best, safest, most compliant
method identified. It is the
“standard” or model for how
something gets done.
WARNING
VISUAL CONTROL TOOLS -Warns for abnormalities
SHOWING
VISUAL AIDS -One Point Lessons
-Visual Information (CTQs)
READING
-Manuals
PROCEDURES, INSTRUCTIONS, AND MANUALS
-Procedures
11
-Instructions
SIX CHARACTERISTICS OF
STANDARD WORK Current
Correct
STANDARD WORK
COMMUNICATION
Standard work must be documented,
communicated and be accessible so
that people will know what they are
and can follow them.
If standard work is not documented,
communicated and made accessible,
people may still follow an old version
which will create waste and not meet
the required expectation
A1b
Go To Next
Line (A4).
A1 Open the gates to the truck hopper by opening and A2: Go up stairs next to the Simpliicty Screen to access the A3: At the top of the cat walk, you will be able to view the three
securing each gate with the bungee cords (located on catwalk (Fig. A2a). Always use three points on contact bays in the clay shed. The bay on the right side is for clay
the area circled in green). Once the gates are secure, when climbing starts. At the top of the stairs, you will find received from the Woolfolk Mine (See Fig. A3c). The
go back into the grinding room and ensure the traveler the catwalk to the traveler belt and control switch (See middle bay is for clay from the Uchee Mine, and any
belt is set for the correct bay. The Supervisor will inform Fig. A2b) Again, always use three points of contact when reclaim form Plant 4 (See Fig. A3b). The bay on the left
you of where the crude clay is coming from. We have 4 climbing the stairs. side of the shed is for clay from the Lewis Mine (See Fig.
sources of crude clay; Woolford, Uchee, Lewis, and A3a). The bays are labeled with white signs (blocked in
Reclaim from Plant 4. green). As listed in A1, ensure your Supervisor has
informed you of where the clay is coming from.
=
A4 A5a
A5 A5b A5c A6
UCHEE
Go To Next
Page 1 of 2
Step A7
A4 At the top of the catwalk, look at the traveler belt and A5 At the top of the catwalk, you will find the switch to move
ensure it is going to the correct bay. The traveler belt is the traveler belt (See Fig. A5a). If you want to move the A6 Rember, If we are dumping Reclaimed product form Plant
marked with the green arrow. belt to the left, you push the top bottom. If you want to 4, we will always dump that product in the Uchee Bay of
move the belt to the right, push the bottom button (See Plant 3. WE WILL NOT DUMP RECLAIMIN ANYOTHER
Fig. A5b). CRITICAL TASK: If the belt is empty you can BAYBESIDES UCHEE. Once traveler is set, walk down
move it to the right (See Fig. A5c). If you want to move it to the catwalk and stairs and go back to the control room.
the left, it must have clay on it or the belt will not move.
You will have to turn on the feeder belts to get some clay
on the belt. If not using reclaim, skip step A6 and go to
A7. You will need to walk back down the catwalk to the
OBJECTIVE: Crude Clay Startup SOP REV DATE DESCRIPTION Plt Mgr
Approval
SAFETY/PPE: Safety Glasses, Hard Hat, Safety Shoes, Protective Gloves Prd Mgr
TOOLS: Safety
Training
THE FRAMEWORK OF STANDARDIZATION
Executive/Site Leader
Promotes a “Show Me” vs a
“Tell Me” type of attitude.
LEADERS STANDARD WORK BENIFITS
1. Enhances “event-driven” process improvement
5. Strategy is known by everyone and everyone benefits and knows how to contribute
6. Ensures best practices are being followed and prevents “back sliding” of Continuous
Improvement activities.
COMPONENTS 0F LEADERS STANDARD WORK
1. Auditing
-Starts with front line standard work auditing and works upward (layered process audits).
-Critical Process Steps or Critical to Quality points audited
2. Expectations
- Define outcome metrics that indicate success
- Assigns attributes to a process that help achieve the desired outcomes for success
-Determines how you as a leader will verify expectations are being met
3. Tasks
Scheduled tasks – Puts the appropriate audits in place to verify adherence to the process
Unscheduled but predictable tasks - Ensures adherence to service level targets
Unscheduled and unpredictable tasks – Ensure adherence to service level targets and no disruption
to scheduled tasks to accomplish.
20
LEADERS STANDARD Leaders Standard work should be layered
WORK (developed) for the bottom up.
weekly, and monthly basis. Value Stream Managers (40% repetitive work)
Focuses on specific activities Monitor and support supervisors in their ability to carry out
their standard work
where the work is being done.
Supervisors (60% repetitive work)
Monitor and support team members in their ability to carry
out their standard work
CTQ
Document Number: Document Owner:
DRAFT UNTIL APPROVAL Donut Line Supervisor Issued: 17 Feb 2016
CRITICAL TO QUALITY
LINE ZONE OBSERVED DEFECT RECOMMENDED CORRECTIONS VISUAL
Donuts not dropping between 1. Ensure all donuts are releasing from the cutters at the same time
flight bars
2. Move DCA forward or back until donuts drop between flight bars
DCA UNIT
3. Ensure donuts are the same size, replace cutters if necessary
WHITE CAPS 1. Ensure air bars are blowing donuts into flipper correctly
GREASE NOZZLES
FLIPPER BACKSTOP REQUIREMENT Slight wet bleed and body bleed through after the sand and slurry apllication
(donuts enter the flipper station at same time and hit the backstop (see pic.)
DONUT
FLIPPER
2. Ensure the grease level is correct (between 4.5 - 5.5)
3. Ensure flight bars are level in the fryer
PICTURES OF QUALITY REQUIREMENTS
QUALITY REQUIREMENTS ACCEPTABLE ACCEPTABLE
4. Ensure donut flipper is not "pausing"
Contact S upervis or if is s ue is not corrected
1. Ensure donuts are running at the correct drops per. Min. 89-90
DPM on the North Side Fryer, 76-77 DPM on the South Side Fryer
DONUTS TO S OFT OR TO
2. Validate the correct temperture for the fryer zones. North S ide
Fryer: Zone 1 365+/-5 set point,actual 375 +/-10, Zone 2: 365+/-5 Fig. 1 Fig. 2
set point,actual 375 +/-10.
Fryer
HARD
S outh S ide Fryer: Zone 1 375+/-5 set point, actual 375 +/-10,
Zone 2: 365+/-5 set point,actual 375 +/-10.
3. Contact Supervisor if all settings are correct and donuts ZONE TEMP DPM METER
are still to hard or soft Loca te d on Loca te d on
Frye r cotrol pa nel
s ide of DCA unit
1. Clean any thick glaze off side of waterfall to ensure consistent coverage
DONUTS NOT
GLAZE 2. Ensure donuts are not stacking on top of each other
COMPLETELY COVERED
STATION IN GLAZE
3. Contact Supervisor/Maint. To adjust belt speed or adjust
glaze thickness
ENROBER
COMPLETELY COVERED waterfall to remove built up chocolate
2. Ensure donut rakes are preventing donuts from 1. Not enough slurry on the face of the product. Verify amount on forming "Green Sheet"
2. To much Sand on the face of the product. Verify amount on forming "Green Sheet"
stacking on top of each other.
3. Contact S upervis or if is s ue is not res olved Waterfall Donut Rake
Too much chocolate 1. Ens ure bl owoff i s on a nd removi ng exces s chocol a te Air blowoff
ENROBER
2. Ens ure wa terfa l l i s not turned on too hi gh
3. Contact Supervisor if issue is not resolved
Exes s chocolate on botton 1. Ensure detail rod is turned on and scrapping off
3. Not enough pressure on roller after sand application and 45 deg roller
the excess "footing" on donut.
2. Visually inspect column after 45 deg. rollers and ensure you a can a slight body bleed through on the texturing (See Fig. 2 above)
contact S upervis or
1. W alk the entire line and inspect every transition for excess gaps or
bent rails that are damaging donuts
CONVEYOR Donuts Broken or 2. If no damage poiints can be found, Contact S upervis or
TRANSITIONS Damaged (S mas hed)
3. If your column does not match Fig. 1 and Fig. 2, check your green sheets and adjust the slurry and sand as needed.
SWEEPERS
If donuts are not coming down even, Contact S upervis or
(Maintenance will have to adjus t timing of s weepers ) NO VIS UAL AS S IGNED
3. Ensure there is enough pressure on the rollers after the sand apllication and the 45 deg. rollers.
S outh S ide Bagger Only Date Date
1. Count amount of donuts in bag and weigh the donuts
(target 18 donuts for a bags except crunch (14 donuts))
Supervisor Production Manager Removal Date
SCALES Bagger is paus ing 2. Verify all settings match the run right settings Date Date
3. Reload program in HMI
4. Contact S upervis or
CI Manager Plant Manager
LEADERS STANDARD WORK (REVIEW)
• Fundamental to any company that is committed to Continuous Improvement
and Culture Change.
• Formalizes the Leadership System.
• Requires the commitment to detail the important responsibilities of the Leader
• Involves having a daily plan of what the leader’s key duties are
• Provides critical visual and interaction with Team to ensure expectations are clear for
the results and behaviors we are seeking as Leaders.