Xg;ge;jg;Gs;sp jfty; mwpf;if

Xg;ge;jg;Gs;sp vz;. / 2023 – 2024

ma;ah>
fPo;fhZk; Ntiyf;fhd xg;ge;jg;Gs;sp ngWtjw;F
filrp ehs; :- 24.01.2023 Neuk; khiy 3.00 kzp.

Ntiyapd; ngah;:-

Engaging labours for the work of Package 22 Extension, Renovation and


Modernisation of Irrigation Infrastructure in Vanjiyar river from mile 75/1 to 85/0 of
Cauvery subbasin in Kudavasal and Nannilam taluks of Thiruvarur district for
the period of June and July - 2023.

kjpg;gPl;Lj;njhif : &. 8,77,000/-

xg;gspg;G vz;. : / 2023 – 2024


xg;ge;jg;Gs;sp mwptpg;G vz;. NIT. / 2023 – 2024 / Nfh. 14 / t.gp / 2023 / ehs;
jahhpf;fg;gl;l gbtq;fspd; vz;zpf;if : 2
tpw;fg;gl;l gbtq;fspd; vz;zpf;if : 2
kPjp : -
xg;ge;jg;gbtq;fs; fPo;fhZk; xg;ge;jf;fhuh;fSf;F toq;fg;gl;lJ.
t.vz;. Xg;ge;jf;fhuh; ngah; kw;Wk; Kfthp

Thiru D.Sekar, Contractor,


1
M.C Road,
Thanjavur

Thiru. K.Ganesan, Contractor


2 Ramani Nagar,
M.C, Road,
Thanjavur.

,dk; -y; fz;l xg;ge;jf;fhuh;fsplkpUe;J ngwg;gl;l


Xg;ge;jg;Gs;spfs; ,d;W khiy kzpf;F vd;dhy;>
nraw;nghwpahshpd; njhopy; El;g Neh;Kf cjtpahsh;> Nfhl;l fzf;F mYtyh; kw;Wk;
KJepiy tiunjhopy; mYtyh; Kd;dpiyapy; jpwf;fg;gl;lJ

,.t.m-1 K.t.njh.m Nfh.f.m. nr.ngh.


ePHtsj;Jiw.

mDg;Geh; ngWeh;.
nghwpQh;.M.,sq;Nfh> vk;.,.> Thiru D.Sekar, Contractor,
nraw;nghwpahsh;> eP.t.J.> M.C Road,
fhtpup tbepy Nfhl;lk;> Thanjavur
jQ;rht+h;;.

fbj vz;. /Nfh.14 / t.1 / 2023 / t.gp / ehs; .2023.

ma;ah>

nghUs;:- ghrdk; Engaging labours for the work of Package 22 Extension,


Renovation and Modernisation of Irrigation Infrastructure in
Vanjiyar river from mile 75/1 to 85/0 of Cauvery subbasin in
Kudavasal and Nannilam taluks of Thiruvarur district for the
period of June and July - 2023.gzpf;F tpiy tpfpjk; Fiwg;G –
njhlh;ghf

ghh;it:- jq;fSila xg;ge;jg;Gs;sp vz;. / 2023 – 2024


ehs;

-----------

Nkw;fhZk; Ntiyf;F jq;fshy; nfhLf;fg;gl;l xg;ge;jg;Gs;sp ghprPyidapy;


cs;sJ. ,J rk;ge;jkhf tpiy tpfpjk; Fiwj;J nfhLf;f> fPo;fhZk; Mtzq;fSld;
%d;W jpdq;fSf;Fs;; mYtyf Ntiy Neuj;jpy; ,t;tYtyfk; tUkhW Nfl;Lf;
nfhs;sg;gLfpwJ

1. tpiyf; Fiwg;G fbjk;.


2. njhopy; El;g cjtpahshpd; Xg;Gjy; fbjk;.
3. njhopy; El;g cjtpahshpd; fy;tpr; rhd;wpjo;.
4. ruf;F kw;Wk; Nrit thp gjpT vz;

mt;thW tuj;jtwpdhy; jq;fsJ xg;ge;jg;Gs;sp vt;tpj Kd; mwptpg;gpd;wp uj;J


nra;ag;gLk; vd;W njhptpf;fg;gLfpwJ.

nraw;nghwpahsh;> eP.t.J.>
fhtpup tbepy Nfhl;lk;> jQ;rht+h;;.

efy;:- cjtp nraw;nghwpahsh;> fhtpup tbepy cl;Nfhl;lk;> Ngusk;


mth;fSf;F chpa eltbf;iff;fhf mDg;gg;gLfpwJ.
mDg;Geh;

D.Sekar, Contractor,
M.C Road,
Thanjavur.

ngWeh;

nraw; nghwpahsH,
ePHtsj;Jiw,
fhtpup tbepy Nfhl;lk;,
jQ;rhT+H.

ma;ah>

Ntiyapd; ngaH : Engaging labours for the work of Package 22


Extension, Renovation and Modernisation of
Irrigation Infrastructure in Vanjiyar river from mile
75/1 to 85/0 of Cauvery subbasin in Kudavasal
and Nannilam taluks of Thiruvarur district for the
period of June and July - 2023.
ghh;it : 1. xg;ge;jg;Gs;sp ehs;.24.01.2023.
2. jq;fspd; fbj fbj vz;. /Nfh.14 / t.1 / 2023
/ t.gp / ehs;. 01.2023.

ehd; 24.01.2023 md;W eilngw;w nlz;upy; Nkw;fz;l Ntiyf;F


nfhLj;Js;s xg;ge;jg;Gs;spapy; (+)3.00% tpiy tpfpjk; Fwpg;gpl;L ,Ue;Njd;.
jhq;fs; Nfl;Lf; nfhz;ljw;fpzq;f jw;NghJ kjpg;gPl;L tpiy tpfpjj;jpw;Nf
nra;J nfhLf;f rk;kjpf;fpNwd;. NkYk; Ml;fs; $yp kw;Wk; vupnghUs;
tpiythrp mjpfkhf cs;sjhy; ,jw;F NkYk; Fiwj;J nfhLf;f ,ayhJ vd
gzpTld; njhptpj;Jf; nfhs;fpNwd;.

,g;gbf;F

(D.Sekar)
mYtyfFwpg;G (njhlh;r;rp)

nr.ngh. /ma;ah>
nraw;nghwpahsh; mth;fsp;d; mwpTiuapd; gb jpU. D.Sekar

Contractor vd;w xg;ge;jf;fhuuiu tpiy tpfpjk; Fiwj;J nfhLf;FkhW Nfhug;gl;lJ.

mjw;Nfw;g me;j xg;ge;jf;fhuuhy;; xg;ge;jg;Gs;spapy; NfhhpapUe;j mjhtJ kjpg;gPl;L

tpiy tpfpjj;ijtpl $Ljy (+) 3.00 % rjtPjj;jpw;F gjpyhf jw;NghJ kjpg;gPl;L

tpiy tpfpjj;jpw;Nf nra;J ju rk;kjf; fbjk; nfhLj;Js;shh;. mf;fbjk; ,j;Jld;

nraw;nghwpahsh; mth;fspd; ghh;itf;Fg; gzpe;J itf;fg;gLfpwJ.

tpiyFiwg;Gf;F gpd;dh;:-

Jiwapd; xg;ge;jg;Gs;spapd; kjpg;G & 4,94,405/-


$Ljy; / FiwT rjtPjk; (-) 0.03 % tpfpjk;

$Ljy; / FiwT njhif & 148/-

Xg;ge;jg;Gs;sp njhif & 4,94,257/-

tpiyf;Fiwg;gpw;F gpd;dh; jpU. K.fNzrd; vd;w xg;ge;jf;fhuupd;

xg;ge;jg;Gs;spia 1 (XU ) ,dk; / ,dq;fs; kl;Lk;) & f;F Vw;fyhkh?

vd;gJ Fwpj;Jk; ,t;Ntiyf;F epakdk; nra;ag;gl cs;s njhopy; Elg cjtpahsH

rk;kjf; fbjk; Mfpatw;iw toq;fpAs;sjhy; xg;ge;jg; gj;jpuj;jpy;

ifnahg;gkpLtjw;fhf xg;ge;jf;fhuiu mYtyf ehl;fspy; Nfhl;l mYtyfk; tu

Nfhuyhkh? vd;gJ Fwpj;Jk; nraw;nghwpahsh; mth;fspd; Miz Ntz;b gzpe;J

rkh;g;gpf;fg;gLfpwJ.

,.t.m-1 K.t.njh.m Nfh.f.m. nr.ngh.


mDg;Geh;

D.Sekar, Contractor,
M.C Road,
Thanjavur.

ngWeh;

nraw; nghwpahsH,
ePHtsj;Jiw,
fhtpup tbepy Nfhl;lk;,
jQ;rhT+H.

ma;ah>

jq;fs; mYtyfj;jpy; fPo;fz;l gzpf;F Xg;ge;jk; Nkw;nfhz;Ls;s


jpU D.Sekar vd;w Xg;ge;jf;fhuhplk; fPo;fz;l gzpia Nkw;ghHitapl njhopy;El;g
cjtpahsuhf gzpGhpa rk;kjpf;fpNwd;. ,j;Jld; vdJ fy;tp rhd;wpd; efy;
,izj;Js;Nsd;.

Ntiyapd; ngaH : Engaging labours for the work of Package 22


Extension, Renovation and Modernisation of
Irrigation Infrastructure in Vanjiyar river from mile
75/1 to 85/0 of Cauvery subbasin in Kudavasal
and Nannilam taluks of Thiruvarur district for the
period of June and July - 2023.

,g;gbf;F.
mDg;Geh;

D.Sekar, Contractor,
M.C Road,
Thanjavur
ngWeh;

nraw; nghwpahsH,
ePHtsj;Jiw,
fhtpup tbepy Nfhl;lk;,
jQ;rhT+H.

ma;ah>

Ntiyapd; ngaH : Engaging labours for the work of Package 22


Extension, Renovation and Modernisation of
Irrigation Infrastructure in Vanjiyar river from mile
75/1 to 85/0 of Cauvery subbasin in Kudavasal
and Nannilam taluks of Thiruvarur district for the
period of June and July - 2023.

24.01.2023 md;W jq;fs; mYtyfj;jpy; xg;ge;jk; Nkw;nfhz;Ls;s


Nkw;fz;l gzpf;F njhopy;El;g cjtpahsuhf gzpGhpa jpU. g.khhpag;gd;
vd;gtiu epakpj;Js;Nsd;. ,j;Jld; mtuJ rk;kj fbjKk; fy;tp rhd;wpd;
efYk; ,izj;Js;Nsd;.

,g;gbf;F.
ePHtsj;Jiw.
mDg;Geh; ngWeh;.
nghwpQh;.M.,sq;Nfh> vk;.,.> Thiru D.Sekar, Contractor,
nraw;nghwpahsh;> eP.t.J.> M.C Road,
fhtpup tbepy Nfhl;lk;> Thanjavur
jQ;rht+h;;.

fbj vz;. /Nfh.14 / t.1 / 2023 / t.gp / ehs; .01.2023.

ma;ah>

nghUs;:- ghrdk; Engaging labours for the work of Package 22 Extension,


Renovation and Modernisation of Irrigation Infrastructure in
Vanjiyar river from mile 75/1 to 85/0 of Cauvery subbasin in
Kudavasal and Nannilam taluks of Thiruvarur district for the
period of June and July - 2023.gzpf;F xg;ge;jg;Gs;sp
Vw;Wf;nfhs;Sjy; - njhlh;ghf

ghh;it:- 1.jq;fSilaxg;ge;jg;Gs;sp ehs; . 24.01.2023


2.jq;fsJtpiyFiwg;Gfbj ehs;. 05.01.2023
----------

Nkw;fhZk; Ntiyf;Fjq;fshy; mspf;fg;gl;l xg;ge;jg;Gs;sptpiyf;


Fiwg;gpw;Fg; gpd; tUk; njhif %yk; &.876493 /- (&gha; vl;L ,yl;rj;J vOgj;jp
Mwhapuj;J ehE}w;wp njhz;Z}w;wp %d;W kl;Lk;) ,dk; / ,dq;fs; 1)
Vw;Wf;nfhs;sg;gLfpwJ.

vdNtcldbahf ,t;tYtyfj;jpw;Fte;Jxg;ge;jj;jpy; ifnahg;gk;


,LkhWNfl;Lf; nfhs;sg;gLfpwJ.

,f;fbjk; fpilj;jTld; cjtp nraw;nghwpahsh;> fhtpup tbepy


cl;Nfhl;lk;> Ngusk; mth;fis njhlh;G nfhz;L gzp Jtq;Ftjw;fhd midj;J
G+Hthq;f eltbf;iffisAk; Nkw;nfhs;sNfl;Lf; nfhs;sg;gLfpwJ.

nraw;nghwpahsh;> eP.t.J.>
fhtpup tbepy Nfhl;lk;> jQ;rht+h;;

efy;:- cjtp nraw;nghwpahsh;> fhtpup tbepy cl;Nfhl;lk;> Ngusk;


mth;fSf;F chpa eltbf;iff;fhf mDg;gg;gLfpwJ.
ePHtsj;Jiw.
mDg;Geh; ngWeh;.
nghwpQh;.M.,sq;Nfh> vk;.,.> K.Ganesan, Contractor
nraw;nghwpahsh;> eP.t.J.> Ramani Nagar,
fhtpup tbepy Nfhl;lk;> M.C, Road,
jQ;rht+h;;. Thanjavur.

fbj vz;. /Nfh.14 / t.1 / 2023 / t.gp / ehs; .2023.

ma;ah>

nghUs;:- ghrdk; Engaging labours for the work of Package 22 Extension,


Renovation and Modernisation of Irrigation Infrastructure in
Vanjiyar river from mile 75/1 to 85/0 of Cauvery subbasin in
Kudavasal and Nannilam taluks of Thiruvarur district for the
period of June and July - 2023.Vw;fg;glhjJ - njhlu;ghf.
ghh;it:- jq;fSila xg;ge;jg;Gs;sp vz;. /2023 - 2024 ehs;.04.01.2023.
-------
Nkw;fz;l Ntiyf;F jq;fshy; 24.01.2023 md;W nfhLf;fg;gl;l xg;ge;jg;Gs;sp
Vw;Wf;nfhs;sg;gltpy;iy vdNt> jq;fshy; nrYj;jg;gl;l gpizj; njhifia jpUk;g
ngw;Wf;nfhs;SkhW Miz toq;fg;gLfpwJ.

nraw;nghwpahsh;>eP.t.J.>
fhtpup tbepy Nfhl;lk;> jQ;rht+h;;.
ePHtsj;Jiw.
mDg;Geh; ngWeh;.
nghwpQh;.M.,sq;Nfh> vk;.,.> K.Ganesan, Contractor
nraw;nghwpahsh;> eP.t.J.> Ramani Nagar,
fhtpup tbepy Nfhl;lk;> M.C, Road,
jQ;rht+h;;. Thanjavur.

fbj vz;. /Nfh.14 / t.1 / 2023 / t.gp / ehs; .01.2023.

ma;ah>
nghUs;:- ghrdk; Engaging labours for the work of Package 22 Extension,
Renovation and Modernisation of Irrigation Infrastructure in
Vanjiyar river from mile 75/1 to 85/0 of Cauvery subbasin in
Kudavasal and Nannilam taluks of Thiruvarur district for the
period of June and July - 2023.Vw;fg;glhjJ - njhlu;ghf.
ghh;it:- jq;fSila xg;ge;jg;Gs;sp vz;. /2022 - 2023 ehs;.04.01.2023.

-------
Nkw;fz;l Ntiyf;F jq;fshy; 24.01.2023 md;W nfhLf;fg;gl;l xg;ge;jg;Gs;sp
Vw;Wf;nfhs;sg;gltpy;iy vdNt> jq;fshy; nrYj;jg;gl;l gpizj; njhifia jpUk;g
ngw;Wf;nfhs;SkhW Miz toq;fg;gLfpwJ.
…Xk;…
nraw;nghwpahsh;>eP.t.J.>
fhtpup tbepy Nfhl;lk;> jQ;rht+h;;.

KJepiy tiunjhopy; mYtyu;


mYtyfFwpg;Gnjhlh;r;rp

nr.ngh.ma;ah>

Fiwe;j xg;ge;jg;Gs;sp mspj;Js;s jpU. K.fNz………rd; vd;w xg;ge;jf;fhuu;

,e;j Ntiyf;F xg;ge;jk; Vw;fg;gLtjw;F Njitahd fhg;Gj; njhif kw;Wk; $Ljy;

fhg;Gj; njhifahf nraw;nghwpahsh; mth;fspd; ngahpy; gpizak; nra;ag;gl;l itg;G

epjpgj;jpuk; mspj;Js;shh;. fhg;G njhiftpguk; gpd;tUkhW:-

Rs.10,000/- (Rupees Ten thousand only) In the shape of Deposit Advice Account No.

7472611728 & 7472610292 Date.31.03.2023 & 10000 * 2 = 20000 Indian Bank,

Thanjavur Junction

jpU. K.f………………….Nzrd; vDk; xg;ge;jf;fhuh;; ifnahg;gkpl;Ls;s tiuT

xg;ge;jgj;jpuk; kw;Wk; xg;ge;jk; Vw;fg;gl;ljw;fhd tpguk; njhptpf;Fk; fbj tiuTk;>

kz;ly fzf;fhaUf;fhd fbj tiuTk; Vwfg;glhj xg;ge;jf;fhuUf;F tpguk;

njhptpf;Fk; fbj tiuTk; nraw;nghwpahsh; mth;fspd; xg;GjYf;fhf ,j;Jld;

gzpe;J rkh;gpf;fg;gLfpwJ.

,.t.m-1 K.t.njh.m Nfh.f.m. nr.ngh.


ePHtsj;Jiw.
mDg;Geh; ngWeh;.
nghwpQh;.M.,sq;Nfh> vk;.,.> Thiru D.Sekar, Contractor,
nraw;nghwpahsh;> eP.t.J.> M.C Road,
fhtpup tbepy Nfhl;lk;> Thanjavur
jQ;rht+h;;.

fbj vz;. /Nfh.5 / c.t / 2023 / t.gp / ehs; .2023.

ma;ah>

nghUs;:- ghrdk; Engaging labours for the work of Package 22


Extension, Renovation and Modernisation of Irrigation
Infrastructure in Vanjiyar river from mile 75/1 to 85/0 of
Cauvery subbasin in Kudavasal and Nannilam taluks
of Thiruvarur district for the period of June and July - 2023.
gzpf;F xg;ge;jk; Vw;Wf;nfhs;Sjy; -
njhlh;ghf

ghh;it:- xg;ge;jg;Gs;spehs; . 24.01.2023. vz;. / 2023 - 2024


---------
Nkw;fhZk; Ntiyf;Fjq;fshy; ifnahg;gkplg;gl;l xg;ge;jk; &.876493 /- (&gha; vl;L

,yl;rj;J vOgj;jp Mwhapuj;J ehE}w;wp njhz;Z}w;wp %d;W kl;Lk;) ,dk; /


LS
,dq;fs; 1 (Xd;W kl;Lk;) Vw;Wf;nfhs;sg;gl;L Nfhl;l mYtyf xg;ge;j vz ;. / 2023- 2024-y;

gjpT nra;ag;gLfpwJ. Vw;Wf;nfhs;sg;gl;l xg;ge;jj;jpd; efy; xd;Wjq;fSf;F ,j;Jld; mDg;gp

itf;fg;gLfpwJ. jhq;fs; ,t;Ntiy njhlh;ghf cjtpnraw;nghwpahsh; >ePMJ.> Mw;Wg;ghJfhg;G

cl;Nfhl;lk;> Fk;gNfhzk;; mth;fSld; njhlh;G nfhz;L> Nkw;fhZk; Ntiyf;Fhpa ,lj;jpid xg;Gf;

nfhz;L> Ntiyapid njhlq;fp xg;ge;jtpjpfspd ;gbfhyf ;nfLtpw;Fs; jtwhJ Kbj;J xg;gilf;FkhW

Nfl;Lf;nfhs;sg;gLfpwJ.

,izg;G:- xg;ge;jefy; -1
nraw;nghwpahsh;> >eP.t.J.>
fhtpup tbepy Nfhl;lk;> jQ;rht+h;;

LS
efy; mry; xg;ge;jvz;. / 2023- 2024 kw;Wk; Mtzq;fSld; cjtp nraw;nghwpahsh;> ePMJ.>

Mw;Wg;ghJfhg;G cl;Nfhl;lk;> Fk;gNfhzk;; mth;fSf;F jf;f Nky; eltbf;iff;fhf mDg;ggg;gLfpwJ.

,t;Ntiy xg;ge;jj;jpy; eph;zapf;fg;gl;l fhyf;nfLtpw;Fs; jtwhJ Kbg;gjw;F Njitahd midj;J

eltbf;iffSk; vLf;FkhWNfl;Lf; nfhs;sg;gLfpwJ. ,t;Ntiyf;F Kjy; gl;bay; toq;Fk; Kd;

tpw;gidthp ghf;fpapd;ik rhd;wpjo; tpw;gidthp gjpTvz;. ngw;W gjpT nra;Jnfhs;SkhW

Nfl;Lf;nfhs;sg;gLfpwJ.

,izg;G:- xg;ge;jefy; -1
nraw;nghwpahsh;> >eP.t.J.>
fhtpup tbepy Nfhl;lk;> jQ;rht+h;;
W.R.D
From To
Er. M.Elango, M.E. The Accountant General,
Executive Engineer, WRD., Tamil Nadu.
Cauvery Basin Division, Chennai – 600 035.
Thanjavur.
Lr. No /F.14/D.1 / D.B / 2023/ Dt. .2023.
Sir,

Sub:- Agreement – Copy of agreement for the work of Engaging


labours for the work of Package 22 Extension, Renovation
and Modernisation of Irrigation Infrastructure in Vanjiyar
river from mile 75/1 to 85/0 of Cauvery subbasin in
Kudavasal and Nannilam taluks of Thiruvarur district for
the period of June and July - 2023.

Ref:- Tender No. / 2022 – 2023 / Dated.

------------

A copy of agreement No. LS


/ 2023 - 2024 of this division for the above work in
favour of Thiru. D.Sekar is sent herewith for information.

Encl:- Copy of Agreement -1 No.


Executive Engineer, WRD.,
Cauvery Basin Division, Thanjavur.
Copy communicated to The Deputy Commercial Tax Officer ,Thanjavur..for information the
value of contract is Rs. 8,76,493/-
Name of Work : Engaging labours for the work of Package 22 Extension, Renovation and
Modernisation of Irrigation Infrastructure in Vanjiyar river from mile 75/1 to 85/0 of Cauvery
Name of work:
subbasin in Kudavasal and Nannilam taluks of Thiruvarur district for the period of June
and July - 2023.
Technical Sanction Name of the Contractor to Place in which the
Sl. G.O in which the work
No. and Date of whom the work entrusted work is under
No is sanction
Sanction execution
D.Sekar, Contractor,
1 M.C Road,
Wages / 2023 – 2024 Thanjavur

Executive Engineer, WRD.,


Cauvery Basin Division, Thanjavur.

Copy to the Assistant Executive Engineer, WRD, Cauvery Basin Sub Division, Peralam for
necessary action. The Assistant Executive Engineer is requested to report the date handing
over the site to the contractor immediately.

Executive Engineer, WRD.,


Cauvery Basin Division, Thanjavur.
ARTICLES OF AGREEMENT
W.RD

ARTICLES OF AGREEMENT made this th day of between the Governor of


Tamil Nadu (here in after called the Governor which expression shall, where the context so admits
include his successors - in - office and assigns) of the one part Thiru D.Sekar, Contractor, M.C
Road, Thanjavur (here in after called the contractor which expression shall where the context so
admits include the heirs, executors, administrators and legal representative) to the other part, where as
the Government of Tamilnadu (hereinafter called the Government) are desirous of “Engaging

labours for the work of Package 22 Extension, Renovation and Modernisation


of Irrigation Infrastructure in Vanjiyar river from mile 75/1 to 85/0 of Cauvery
subbasin in Kudavasal and Nannilam taluks of Thiruvarur district for the
period of June and July – 2023”.have caused an estimate of probable quantities contained in
schedule A drawings and specifications describing the work to be done to be prepared and whereas
the said schedule A, drawings numbered serially 1, 2 inclusive (schedule B) and the specification
(schedule C) have been signed by or on behalf of the parties here to.

And whereas the said schedule A, drawings numbered serially 1, 2 inclusive (schedule B) and
the specification (schedule C) have been signed by or on behalf of the parties here to. And whereas
the contractor has agreed to the retention by the Government of the earnest money deposit and
additional security deposit Rs.20,000/- (Rupees Twenty thousand only) In the shape of
Deposit Advice Account No. 7472611728 & 7472610292 Date.31.03.2023 & 10000 *
2=20000 Indian Bank, Thanjavur JunctionBank, Kumbakonam,

paid by him when he submitted his tender as security for the due fulfillment of the contract to
the satisfaction of the Executive Engineer, Cauvery Basin Division, Thanjavur (hereinafter referred to
as the EXECUTIVE ENGINEER

A deduction of 2% will be made towards income tax from every payment made to the
Contractor. A deduction of 2% will be made towards sale tax from every payment made to the
Contractor for civil work exceeding Rs. 1,00,000 ( Rupees one lakh only)

And whereas Contractor has also signed the copy of the Tamilnadu Detailed standard
specifications and addenda volume there to maintained in the Executive Engineer, Cauvery Basin
Division Office in acknowledgement of being bound by all the conditions of the clauses of the standard
preliminary specification and all the specification for items for works described by a standard
specification Number in Schedule A.

Contractor Executive Engineer, WRD,


Cauvery Basin Division, Thanjavur
Whereas the Contractor has agreed to execute upon and subject to the conditions set forth in the
preliminary specifications of the Tamilnadu Detailed Standard Specifications and such other conditions
as are contained in all the specifications forming part of the contract (here in after to as "the said
conditions") the works shown upon the drawings and described in the said specifications and set forth
in schedule A as the "probable quantities" and comply with rate of progress noted at end if this Articles
of Agreement for sum of Rs.876493 /- ( Rupees Eight Lakhs Seventy Six Thousand Four Hundred
and Ninety Three only) such other such other sum as may be arrived at under the clause of standard
Preliminary Specification relating to "Payment on lump sum basis or by final measurement at unit
price".
Now it is hereby agreed as follows :-
1) In Consideration of the payment of said sum Rs.876493 /- ( Rupees Eight Lakhs Seventy Six
Thousand Four Hundred and Ninety Three only) as may be arrived at under the clause of the
standard specification relating to "payment of lump sum basis or by final measurement at unit prices the
contract will upon and subject to the said conditions execute and complete the works shown upon the
said drawings and described in the said specifications and to the extent of the probable quantities
shown in schedule A with such variations by way of alterations of additions to or deduction from the
said work and method of payment therefore as are provided for in the said conditions.

2) The term Executive Engineer in the said conditions shall mean the Public works officer in
charge of the Cauvery Basin Division, Thanjavur who shall be competent to exercise all the powers and
privileges reserved herein, in favour of the Government with the previous sanction of or subject to the
rectification by the # Executive Engineer, Cauvery Basin Division, Thanjavur in cases where such
sanction or ratification may be necessary.
Note :- Of the six recite clauses relating to the additions security marked the one suitable to the kind of
security actually deposited should be retained and the rest scored out with due attestation at the time
of execution of the agreement.

1) The arbitrator fulfilling the duties set forth arbitration clause of the Standard Preliminary
specifications shall be Superintending Engineer of Vellar Basin Circle, Cuddalore upto Rs.50000/- and
beyond that as specified in special condition in para 32.

2) Times shall be considered as the essence of the agreement and the Contractor here by agrees
to commence the work as soon as this agreement is accepted by competent authority as defined by the
Tamilnadu Public works Department code and the site (or premises) is handed over to him as provided
for in the said conditions agrees to complete the work within 2 (Two) month from the date of such
handing over to the site (or premises) and to show progress as defined in the tabular statement "Rate
of progress below subject never the less to the provisions for extension of contained clause 59 of the
Standard Preliminary Specification.

Contractor Executive Engineer, WRD,


Cauvery Basin Division, Thanjavur
3) The said conditions shall be read and constructed as forming part of this agreement and the
parties hereto will respectively abide by and submit themselves to the conditions and stipulations and
perform the agreements on their parts respectively.

4) Upon the terms and conditions of this agreement being fulfilled and performed to the
satisfaction of the Executive Engineer the security deposited by the Contractor as here in before recited
or such portion there of as he may be entitled to under the said conditions shall be returned to the
Contractor.

In witness where of the Contractor Thiru D.Sekar, Contractor, M.C Road, Thanjavur has
here up to set hand his and I Er. M.Elango, M.E. Executive Engineer, WRD., Cauvery Basin
Division, Thanjavur on behalf of and by the order and direction of His Excellency the Governor of
Tamil Nadu hereunto set his hand the day and year first above written.

Signed by the Contractor. Thiru. D.Sekar,


Contractor,
M.C, Road.,
Thanjavur

In Presence of Witness :- S.Gomathi sangeetha


Junior Draughting Officer,
Cauvery Basin Division,Thanjavur.

Signed for on behalf of Governor of Tamil Nadu :- Er. M.Elango,M.E.,


Designation :- Executive Engineer, WRD
Cauvery Basin Division, Thanjavur.

In Presence of Witness :- M.Rajendran,


Designation :- Senior Draughting Officer,
Cauvery Basin Division, Thanjavur.
RATE OF PROGRESS

The following rate of progress and proportionate value of work done from time to time, as will
be indicated by the Executive Engineer's Certificate of the value of work done will be required.

Date of commencement of this program will be the date on which the site (for premises) is
handed over to the Contractor.

Period after date of Commencement ` Percentage of work Completed


(Based contract lump - sum amount)
(1) (2)

One Month 50 %

Second Month 100 %

Note :- The periods to be entered in column 1. for purpose of defining the rate of progress may
be fixed by the Executive Engineer to suit each case.

Contractor Executive Engineer, WRD,


Cauvery Basin Division, Thanjavur
Tender No. / 2023 - 2024

WRD
Cauvery Basin Division, Thanjavur
PERCENTAGE TENDER SYSTEM

Name of Work: Engaging labours for the work of Package 22 Extension,


Renovation and Modernisation of Irrigation Infrastructure
in Vanjiyar river from mile 75/1 to 85/0 of Cauvery
subbasin in Kudavasal and Nannilam taluks of
Thiruvarur district for the period of June and July - 2023.

Date of Tender: 24.01.2023. E.M.D :Rs.8,770/-

Estimate Value of work : Rs. 7,42,791 /- ( Rupees Seven Lakhs Forty Two
Thousand Seven Hundred and Ninety One Only )

I Thiru.D.Sekar, offer to execute the above work with Tender

Premium of at estimate rate over the departmental estimated value of work indicated above.

In case of variations in quantity of various items of works during execution. I agree that the

amount payable for the individual item of work will be as per the Department Unit rates

indicated in the tender schedule for the item as varied in accordance with the tender premium

and the actual quantity of work done

Date: 20.05.2022
Place: Thanjavur Signature & Address of Contractor
Thiru.D.Sekar,
Contractor,
M.C, Road Thanjavur

Executive Engineer, WRD.,


Cauvery Basin Division, Thanjavur.
;
Tender No. / 2023 - 2024
WRD
Cauvery Basin Division, Thanjavur
PERCENTAGE TENDER SYSTEM
Schedule issued to :.

Senior Draughting Officer, WRD.,


Cauvery Basin Division, Thanjavur.

Name of Work: Engaging labours for the work of Package 22 Extension,


Renovation and Modernisation of Irrigation Infrastructure in
Vanjiyar river from mile 75/1 to 85/0 of Cauvery subbasin in
Kudavasal and Nannilam taluks of Thiruvarur district for the
period of June and July - 2023.

Date of Tender: 24.01.2023 E.M.D :Rs.8,770/-

Estimate Value of work : Rs. 7,42,791 /- ( Rupees Seven Lakhs Forty Two
Thousand Seven Hundred and Ninety One Only )

I / We
offer to execute the above work with a Tender premium of

(+) % (in words) (Plus Percentage)


----------------------------------------------------------------------------------------------------
(-) % (in words) (Minus Percentage)

over the departmental estimated value of work indicated above. In case of variations
in quantity of various items of works during execution. I / We agree that the amount
payable for the individual item of work will be as per the Department Unit rates
indicated in the tender schedule for the item as varied in accordance with the tender
premium and the actual quantity of work done.

Date : 24.01.2023
Place : Thanjavur Signature & Address of Tenderer

Executive Engineer, WRD.,


Cauvery Basin Division, Thanjavur.
mDg;Geh;

D.Sekar, Contractor,
M.C Road,
Thanjavur.

ngWeh;
nraw;nghwpahsH,
ePHtsj;Jiw,
fhtpup tbepy Nfhl;lk;,
jQ;rhT+H.

ma;ah>

nghUs;: Ntiyf;fhd Xg;Ge;jg;Gs;sp ml;ltiz (Schedule) toq;f


Ntz;b.

fhtpup tbepy Nfhl;lk; jQ;rhT+H eilngw cs;s


Xg;ge;jg;Gs;spapy; fye;Jnfhs;s fPo;fz;l gzpf;F Xg;ge;jg;Gs;sp ml;ltiz
(Schedule) toq;fpLkhW Nfl;Lf;nfhs;fpNwd;. Mjw;fhd nrYj;J rPl;ilAk;
,izj;Js;Nsd;.

Ntiyapd; ngaH : Engaging labours for the work of Package 22


Extension, Renovation and Modernisation of
Irrigation Infrastructure in Vanjiyar river from mile
75/1 to 85/0 of Cauvery subbasin in Kudavasal
and Nannilam taluks of Thiruvarur district for the
period of June and July - 2023.

,g;gbf;F

(D.Sekar)
mDg;Geh;
K.Ganesan, Contractor
Ramani Nagar,
M.C, Road,
Thanjavur.

ngWeh;
nraw;nghwpahsH,
ePHtsj;Jiw,
fhtpup tbepy Nfhl;lk;,
jQ;rhT+H.

ma;ah>

nghUs;: Ntiyf;fhd Xg;Ge;jg;Gs;sp ml;ltiz (Schedule) toq;f


Ntz;b.

fhtpup tbepy Nfhl;lk; jQ;rhT+H eilngw cs;s


Xg;ge;jg;Gs;spapy; fye;Jnfhs;s fPo;fz;l gzpf;F Xg;ge;jg;Gs;sp ml;ltiz
(Schedule) toq;fpLkhW Nfl;Lf;nfhs;fpNwd;. Mjw;fhd nrYj;J rPl;ilAk;
,izj;Js;Nsd;.

Ntiyapd; ngaH : Engaging labours for the work of Package 22


Extension, Renovation and Modernisation of
Irrigation Infrastructure in Vanjiyar river from mile
75/1 to 85/0 of Cauvery subbasin in Kudavasal
and Nannilam taluks of Thiruvarur district for the
period of June and July - 2023.

,g;gbf;F

(K.Ganesan)