Inspection Activities Risk Assessemnt
Inspection Activities Risk Assessemnt
Probability
Value
Value
Risk needs to additional reduction measures ﺧﻄﺮ ﻳﺤﺘﺎج اﺿﺎﻓﺔ اﺟﺮاءات ﻟﺘﻘﻠﻴﻞ ﻗﻴﻴﻢ
اﻟﺨﻄﺮ
Risk needs to reduction measures ﺧﻄﺮ ﻳﺤﺘﺎج ﻟﺘﻘﻠﻴﻞ ﻗﻴﻤﺘﻪ
Acceptable risk ﺧﻄﺮ ﻣﻘﺒﻮل ﺑﻌﺪ اﺧﺬ اﺟﺮاءات اﻟﺤﻤﺎﻳﺔ
Add.: Bldg. #12 st. # 1 branched from El Nasr St. in front of Green Plaza, Semouha, Alexandria – Egypt.
Tel. No.: +2 03 4265180 Fax No.: +2 03 4280961 Lab. No.: +2 03 4200185 Mob: 01276132866
E-mail: info@inspectame.com - inspectame@yahoo.com web: www.inspectame.com
Inspecta Middle East Training Center
Mob: 01271780287 E-mail: imetc@inspectametc.com
INSPECTA MIDDLE EAST Since 1992 انسبـكـتـا مـيـدل ايـست
Material, Welding Inspection, Engineering & Heat Treatment Services
Additional control
R Risk after Acceptabl
Existing control measures measures Final
Potential C P Control e
RISK Impact required? (Yes Risk
HAZARD P* measures /Unaccept
/No) if Yes R
C C P R able
mention
Overloading of All drives will carry a valid license & will be
vehicles. competent for working.
اﳊﻤﻮﻟﺔ اﻟﺰاﺋﺪة Diving defense
ﲨﻴﻊ اﻟﺴﺎﺋﻘﲔ ﺳﻮف ﳛﻤﻠﻮن رﺧﺼﺔ ﺻﺎﳊﺔ وﺳﻮف ﺗﻜﻮن ﳐﺘﺼﺔ ﻟﻠﻌﻤﻞ.
training course
ﻟﻠﻤﺮﻛﺒﺎت. Comprehensive check –up should be
(Lack of ﺳﻴﺘﻢ إﺟﺮاء ﻓﺤﺺ ﺷﺎﻣﻞ ﻣﻦ ﻗﺒﻞ ﻗﻄﺎع اﻟﺼﺤﺔ واﻟﺴﻼﻣﺔ واﻟﺒﻴﺌﺔ. applied to all
Maintenance)
ﻧﻘﺺ اﻟﺼﻴﺎﻧﻪ Vehicles shall be of adequate capacity and a design derivers.
suitable for the work to which they are allocated. ﺗﺪرﻳﺐ اﻟﺴﺎﺋﻘﲔ ﺑﺎﻟﺘﺪرﻳﺒﺎت
ﳚﺐ أن ﺗﻜﻮن اﳌﺮﻛﺒﺎت ذات ﺳﻌﺔ ﻣﻨﺎﺳﺒﺔ وﺗﺼﻤﻴﻢ ﻣﻨﺎﺳﺐ ﻟﻠﻌﻤﻞ اﻟﺬي ﻳﺘﻢ اﻟﻼزﻣﻪ
Driving at an -Serious injuries
unsafe speed ﲣﺼﻴﺼﻪ ﳍﺎ. The driver will
Acceptable
اﻟﻘﻴﺎدة ﺑﺴﺮﻋﺔ -Fatality The driver will wear seat belt and ensure all comply with
8 6 48 the maximum 8
ﻏﲑ آﻣﻨﺔ passengers are wearing their belt. ﻣﻘﺒﻮل
- Damage of vehicle ﻳﺮﺗﺪي اﻟﺴﺎﺋﻖ ﺣﺰام اﻷﻣﺎن وﻳﻀﻤﻦ أن ﲨﻴﻊ اﻟﺮﻛﺎب ﻳﺮﺗﺪي ﺣﺰاﻣﻬﻢ. speed limit of
Vehicle motor client road.
Vehicles will be equipped with a spare wheel.
failure • ﻳﻠﺘﺰم اﻟﺴﺎﺋﻖ
ﺳﻴﺘﻢ ﲡﻬﻴﺰ اﳌﺮﻛﺒﺎت ﺑﻌﺠﻠﺔ اﺣﺘﻴﺎﻃﻴﺔ.
ﻣﺸﻜﻠﻪ ﲟﺤﺮك اﻟﺴﻴﺎرﻩ ﺑﺄﻗﺼﻰ ﺳﺮﻋﺔ
Tire failure. ﻟﻠﺴﺮﻋﺔ ﰲ ﻃﺮﻳﻖ
ﻓﺸﻞ اﻹﻃﺎرات
اﻟﻌﻤﻴﻞ.
Incompetent
driver.
ﺳﺎﺋﻖ ﻏﲑ ﻣﺆﻫﻞ
Add.: Bldg. #12 st. # 1 branched from El Nasr St. in front of Green Plaza, Semouha, Alexandria – Egypt.
Tel. No.: +2 03 4265180 Fax No.: +2 03 4280961 Lab. No.: +2 03 4200185 Mob: 01276132866
E-mail: info@inspectame.com - inspectame@yahoo.com web: www.inspectame.com
Inspecta Middle East Training Center
Mob: 01271780287 E-mail: imetc@inspectametc.com
INSPECTA MIDDLE EAST Since 1992 انسبـكـتـا مـيـدل ايـست
Material, Welding Inspection, Engineering & Heat Treatment Services
2-HANDLING OF TIMBER
Activity (Carpentry activity )
R Risk after
Existing control measures Additional control measures Final Acceptable
C P Control
Potential HAZARD RISK Impact required? (Yes /No) if Yes Risk /Unaccepta
P* measures
mention R ble
C C P R
Standard scaffolds will be erected equipped
with all safe accessories.
PTW will be issued before starting such jobs &
will be renewed daily.
The work tools will be in a very good
Working at height. condition. Competent and certified
Manual handling.
Continuous housekeeping will be done to persons will do such jobs.
Defective
Injuries. prevent injuries of personnel. Tool box talk will be hold
plant/equipment.
Puncture wounds. Timber will be de-nailed in order to prevent in a regular basis
Hazard of bad
Storage for Fire from 6 8 48 puncture wounds. 6 4 24 Proper fire extinguisher 8 Acceptable
timbers. (combustible Timber will be stored in designated areas away cylinders should be found.
materials). from offices and other buildings. Wearing the appropriate
Flying particles
(Sawdust). Housekeeping will be maintained in order to (PPE).
prevent slips, trips and falls.
Wood chips and sawdust will be removed in a
timely manner to prevent accumulation of a fire
hazard.
Circular saws will be fitted with guards.
Add.: Bldg. #12 st. # 1 branched from El Nasr St. in front of Green Plaza, Semouha, Alexandria – Egypt.
Tel. No.: +2 03 4265180 Fax No.: +2 03 4280961 Lab. No.: +2 03 4200185 Mob: 01276132866
E-mail: info@inspectame.com - inspectame@yahoo.com web: www.inspectame.com
Inspecta Middle East Training Center
Mob: 01271780287 E-mail: imetc@inspectametc.com
INSPECTA MIDDLE EAST Since 1992 انسبـكـتـا مـيـدل ايـست
Material, Welding Inspection, Engineering & Heat Treatment Services
Add.: Bldg. #12 st. # 1 branched from El Nasr St. in front of Green Plaza, Semouha, Alexandria – Egypt.
Tel. No.: +2 03 4265180 Fax No.: +2 03 4280961 Lab. No.: +2 03 4200185 Mob: 01276132866
E-mail: info@inspectame.com - inspectame@yahoo.com web: www.inspectame.com
Inspecta Middle East Training Center
Mob: 01271780287 E-mail: imetc@inspectametc.com
INSPECTA MIDDLE EAST Since 1992 انسبـكـتـا مـيـدل ايـست
Material, Welding Inspection, Engineering & Heat Treatment Services
Risk after
R Existing control measures Final
C P Control Additional control measures required? Acceptable
Potential HAZARD RISK Impact Risk
measures (Yes /No) if Yes mention /Unacceptable
P*C R
C P R
Work permit- before starting welding
jobs- issued & renewed every day.
The debris will be removed regularly from
Slipping and work site to prevent injuries.
tripping hazards
The tools and equipment will be in a very
Flying of concrete (eye skin good condition. (T.B.T) should be
Chemical hazards. irritation) Enclosing work area by caution tapes and conducted in a regular
Hose failure of Serious safety signs. 6 4 24 basis.
concrete machine. 6 6 36 16 Acceptable
injuries. Wearing the appropriate (PPE) Good housekeeping of
Fire Hazards. work area.
Unlikely (2) Happen (4) Likely (6) Slight injury or damage (2) Minor injury or damage (4)
Very likely (8) imminent (10) Major injury or damage (6) Single fatality or massive damage (8)
Multiple fatality or extensive damage (10)
Acceptable Range From 4 to 16
Add.: Bldg. #12 st. # 1 branched from El Nasr St. in front of Green Plaza, Semouha, Alexandria – Egypt.
Tel. No.: +2 03 4265180 Fax No.: +2 03 4280961 Lab. No.: +2 03 4200185 Mob: 01276132866
E-mail: info@inspectame.com - inspectame@yahoo.com web: www.inspectame.com
Inspecta Middle East Training Center
Mob: 01271780287 E-mail: imetc@inspectametc.com
INSPECTA MIDDLE EAST Since 1992 انسبـكـتـا مـيـدل ايـست
Material, Welding Inspection, Engineering & Heat Treatment Services
Risk after
R Existing control measures Final
C P Control Additional control measures Acceptable
Activity Potential HAZARD Risk
measures required? (Yes /No) if Yes mention /Unacceptable
P*C R
C P R
Scaffolding Inspection of the scaffolding
collapse. components before starting job.
Personnel fall Tool box talk should be
Scaffolding will be erected & inspected conducted by the
down. by competent persons certified.
Unauthorized project engineer in a
Scaff tags are in place . regular basis.
access to
scaffold. Personnel on the scaffolding will be Good housekeeping at
Erection of aware of its supporting capacity.
Falling of all the time.
scaffold Wearing the appropriate personal
materials In case of bad weather
ﺳﻘﺎﻻت ﻧﻤﻮذﺟﻴﺔ causing protective equipment (PPE).moreover, the working on Acceptable
ﺳﻘﺎﻻت اﻃﺎرﻳﺔ 6 4 24
material losses.
Fire risk.
8 8 64 additional PPE will be worn (e.g. scaffolding should be 8
Harness & respirator of chemical) stopped.
ﺳﻘﺎﻻت ﻣﻮاﺳﻴﺮ Invalid scaffold Work permit before starting work
maperids Avoid SIMOPS activities
وﻛﻠﺒﺴﺎت tripping
issued Install safe access Ladder
Competent person will select the for scaffold
erection of scaffold place to avoid the 100%Tie off Dany
corroded places&groud stability. warring
Eliminate any home made tools & Minimum 3 Board during
material. erection
Unlikely (2) Happen (4) Likely (6) Slight injury or damage (2) Minor injury or damage (4)
Very likely (8) imminent (10) Major injury or damage (6) Single fatality or massive damage (8)
Add.: Bldg. #12 st. # 1 branched from El Nasr St. in front of Green Plaza, Semouha, Alexandria – Egypt.
Tel. No.: +2 03 4265180 Fax No.: +2 03 4280961 Lab. No.: +2 03 4200185 Mob: 01276132866
E-mail: info@inspectame.com - inspectame@yahoo.com web: www.inspectame.com
Inspecta Middle East Training Center
Mob: 01271780287 E-mail: imetc@inspectametc.com
INSPECTA MIDDLE EAST Since 1992 انسبـكـتـا مـيـدل ايـست
Material, Welding Inspection, Engineering & Heat Treatment Services
Risk after
R Existing control measures Final
C P Control Additional control measures Acceptable
Activity Potential HAZARD Risk
measures required? (Yes /No) if Yes mention /Unacceptable
P*C R
C P R
Scaffolding Scaffolding will be erected & inspected by
collapse. competent persons. Toe boards should be
Personnel fall scaff tags are in place . mounted on the platform to
down. personnel on the scaffolding will be aware of prevent falling of tools.
Unauthorized its supporting capacity Tool box talk should be
access to Wearing the appropriate personal protective conducted by the project
Working scaffold. Acceptable
equipment (PPE).moreover, additional PPE engineer in a regular basis.
6 4 24
on Falling of 8 8 64 will be worn (e.g. t and harness.) Good housekeeping at all 8
Scaffolding materials Work permit before starting work issued. the time.
causing Mid & hand rails are existed to prevent In case of bad weather the
material losses. falling of personnel. working on scaffolding
Fire risk. 100% tie off on scaffold. should be stopped.
Loos depries to be removes from scaffold,
Unlikely (2) Happen (4) Likely (6) Slight injury or damage (2) Minor injury or damage (4)
Very likely (8) imminent (10) Major injury or damage (6) Single fatality or massive damage (8)
Add.: Bldg. #12 st. # 1 branched from El Nasr St. in front of Green Plaza, Semouha, Alexandria – Egypt.
Tel. No.: +2 03 4265180 Fax No.: +2 03 4280961 Lab. No.: +2 03 4200185 Mob: 01276132866
E-mail: info@inspectame.com - inspectame@yahoo.com web: www.inspectame.com
Inspecta Middle East Training Center
Mob: 01271780287 E-mail: imetc@inspectametc.com
INSPECTA MIDDLE EAST Since 1992 انسبـكـتـا مـيـدل ايـست
Material, Welding Inspection, Engineering & Heat Treatment Services
Risk after
R Existing control measures Final
C P Control Additional control measures Acceptable
Activity Potential HAZARD Risk
measures required? (Yes /No) if Yes mention /Unacceptable
P*C R
C P R
Scaffolding Scaffolding will be dismantled by competent
collapse. persons.
Personnel fall scaff tags are in place .
down. personnel on the scaffolding will be aware of
Unauthorized its supporting capacity Tool box talk should be
access to Wearing the appropriate personal protective conducted by the project
scaffold. equipment (PPE).moreover, additional PPE engineer in a regular basis.
Dismantling Falling of will be worn (e.g. and harness.) Acceptable
6 4 24
of materials
8 8 64 Work permit before starting work issued. strictly not allowed to start 8
Scaffolding causing Mid & hand rails are existed to prevent dismantling of scaffolding
material losses. falling of personnel. from the scaffolding base to
Fire risk. Any parts of dismantled scaffold will be avoid scaffolding collapse.
removed directly & transferred to warehouse.
Standing will be at wood plates only & do not
on pipes.
Work area will be restricted by caution tapes.
Unlikely (2) Happen (4) Likely (6) Slight injury or damage (2) Minor injury or damage (4)
Very likely (8) imminent (10) Major injury or damage (6) Single fatality or massive damage (8)
Add.: Bldg. #12 st. # 1 branched from El Nasr St. in front of Green Plaza, Semouha, Alexandria – Egypt.
Tel. No.: +2 03 4265180 Fax No.: +2 03 4280961 Lab. No.: +2 03 4200185 Mob: 01276132866
E-mail: info@inspectame.com - inspectame@yahoo.com web: www.inspectame.com
Inspecta Middle East Training Center
Mob: 01271780287 E-mail: imetc@inspectametc.com
INSPECTA MIDDLE EAST Since 1992 انسبـكـتـا مـيـدل ايـست
Material, Welding Inspection, Engineering & Heat Treatment Services
Risk after
R Existing control measures Additional control measures Final
C P Control Acceptable
Activity Potential HAZARD required? (Yes /No) if Yes Risk
measures /Unacceptable
P*C mention R
C P R
Personnel Personnel at height will be aware of the Tool box talk should
fall down. float supporting capacity. be conducted by the
Falling of Wearing the appropriate personal project engineer in a
materials. protective equipment (PPE).moreover, regular basis.
Fire risk. additional PPE will be worn (e.g. Good housekeeping at
harness.) all the time.
Working Work permit before starting work issued In case of bad weather
6 4 24 Accepta
At 8 8 64 by Badr the working at height 8
height Mid & hand rails are existed to prevent should be stopped. ple
falling of personnel. 100% tie of during
Use inspection scaffold with green tag. working at height.
Scaffold to be erected by comptent person Avoid simos
Area to be barricaded
Unlikely (2) Happen (4) Likely (6) Slight injury or damage (2) Minor injury or damage (4)
Very likely (8) imminent (10) Major injury or damage (6) Single fatality or massive damage (8)
Add.: Bldg. #12 st. # 1 branched from El Nasr St. in front of Green Plaza, Semouha, Alexandria – Egypt.
Tel. No.: +2 03 4265180 Fax No.: +2 03 4280961 Lab. No.: +2 03 4200185 Mob: 01276132866
E-mail: info@inspectame.com - inspectame@yahoo.com web: www.inspectame.com
Inspecta Middle East Training Center
Mob: 01271780287 E-mail: imetc@inspectametc.com
INSPECTA MIDDLE EAST Since 1992 انسبـكـتـا مـيـدل ايـست
Material, Welding Inspection, Engineering & Heat Treatment Services
DOCUMENT NO
INSPECTA MIDDLE EAST ST / H & S / RA – PAUT 04
TITLE RISK ASSESSMENT FOR PAUT INSPECTION
Creation Date Revis ion N o Revis ion Date
19 MARCH 20019 1 28 DECEMBER 2019
Task Task Hazard / Past Risk Safety Health Environ Assess- before control Controls P.P.E Assess- after control
identified performed Risk incident impact impact mental ment ment
by Analysis impact
Prob. Imp. Total Prob. Imp. Total
Inspection Technician, Electricity None Electrocution Yes Yes No 5 5 25 Checking all Hard hat, 3 5 15
Assistant that is used (electro- (electro- electrical Ear plugs,
for the cution) cution) equipment Safety
equipment before using glasses,
it, this Gloves,
includes Overall,
before, Safety
during and shoes
after
inspection
PAUT Technician, Couplant None Electrocution Yes Yes No 5 5 25 Check all Gloves, 3 5 15
Inspection Assistant source (electro- (electro- electrical Overall,
used in cution) cution) equipment, Safety
inspection cables shoes
PAUT Technician, Falling over None Body Yes Yes No 5 3 15 Ensure that Hard hat, 3 3 9
Inspection Assistant cables or injuries (minor (minor all the Ear plugs,
equipment injuries) injuries) equipment Safety
and cables glasses,
are out of the Gloves,
way and that Overall,
the work Safety
area is clear shoes
of all hazards
PAUT Technician, Ergonomics None Body strains Yes Yes No 5 3 15 When Hard hat, 3 3 9
Inspection Assistant from the way (body (ergo- working is a Ear plugs,
you need to strains) nomics) difficult Safety
stand position take glasses,
regular Gloves,
breaks to Overall,
ensure that Safety
your body shoes
does not
sustain any
strains
PAUT Technician, Sharp edges None Hand Yes Yes No 5 3 15 Make sure Hard hat, 3 3 9
Inspection Assistant on item to injuries from (minor (minor tha the item Ear plugs,
be inspected sharp items injuries) cuts) is clear of Safety
sharp edges glasses,
Add.: Bldg. #12 st. # 1 branched from El Nasr St. in front of Green Plaza, Semouha, Alexandria – Egypt.
Tel. No.: +2 03 4265180 Fax No.: +2 03 4280961 Lab. No.: +2 03 4200185 Mob: 01276132866
E-mail: info@inspectame.com - inspectame@yahoo.com web: www.inspectame.com
Inspecta Middle East Training Center
Mob: 01271780287 E-mail: imetc@inspectametc.com
INSPECTA MIDDLE EAST Since 1992 انسبـكـتـا مـيـدل ايـست
Material, Welding Inspection, Engineering & Heat Treatment Services
DOCUMENT NO
INSPECTA MIDDLE EAST ST / H & S / RA – PAUT 04
Add.: Bldg. #12 st. # 1 branched from El Nasr St. in front of Green Plaza, Semouha, Alexandria – Egypt.
Tel. No.: +2 03 4265180 Fax No.: +2 03 4280961 Lab. No.: +2 03 4200185 Mob: 01276132866
E-mail: info@inspectame.com - inspectame@yahoo.com web: www.inspectame.com
Inspecta Middle East Training Center
Mob: 01271780287 E-mail: imetc@inspectametc.com
INSPECTA MIDDLE EAST Since 1992 انسبـكـتـا مـيـدل ايـست
Material, Welding Inspection, Engineering & Heat Treatment Services
DOCUMENT NO
INSPECTA MIDDLE EAST ST / H & S / RA – PAUT 04
I have read and understand the hazards and risks associated with my task. I will work accordingly to the written safe work procedures that have been put in
place and I will work safe at all times. I will not do any work that might lead to an injury to me or to my coworker.
Initials & Surname Signature Initials & Surname Signature Initials & Surname Signature
1. 16. 31.
2. 17. 32.
3. 18. 33.
4. 19. 34.
5. 20. 35.
6. 21. 36.
7. 22. 37.
8. 23. 38.
9. 24. 39.
10. 25. 40.
11. 26. 41.
12. 27. 42.
13. 28. 43.
14. 29. 44.
15. 30. 45.
Add.: Bldg. #12 st. # 1 branched from El Nasr St. in front of Green Plaza, Semouha, Alexandria – Egypt.
Tel. No.: +2 03 4265180 Fax No.: +2 03 4280961 Lab. No.: +2 03 4200185 Mob: 01276132866
E-mail: info@inspectame.com - inspectame@yahoo.com web: www.inspectame.com
Inspecta Middle East Training Center
Mob: 01271780287 E-mail: imetc@inspectametc.com