Risk/ Imapct
Probability
Hazard / Possible Out Measures ( If a list is
Residual
Impact
Rating
Rating
. Action
Level
Risk
Activity Environmen come Existing Control Measure exhaustive, Give only a
N By
tal Aspect doc Ref no of the Safe
o
Work Method )
Poor Road Road made with leveled, compacted &
Constructio Condition / Vehicle free from pot holes and maintained. Site
1 n Vehicle 1 3 L
Poor toppling Drainage maintained to prevent stagnant of team
Operations ( Drainage Water in road.
Truck,
Person Admin
Trailor, Pedestrian way identified & maintained.
coming in / Site
Tipper, Hit Injury Workers are instructed to use pedestrian 1 3 L
contact with Execut
Tractor , walk way.
Vehicle ion
Transit
Ensuring reverse horn & Reverse light is
Mixer etc ) working.
Banks man posted to guide the reverse
Poor movement. P&M /
Run Over /
visibility System of providing Illumination of at 1 4 L L Site
Hit Injury /
of rear side least 53 lux in practice. Engr
Fall into Pit
Monthly Joint inspection by the HSEO /
P&M Engr.
Risk/ Imapct
Probability
Hazard / Possible Out Measures ( If a list is
Residual
Impact
Rating
Rating
. Action
Level
Risk
Activity Environmen come Existing Control Measure exhaustive, Give only a
N By
tal Aspect doc Ref no of the Safe
o
Work Method )
Drivers are deployed with Valid License. P&M /
Driver list with photo to
Unauthorise Hit Injury Vehicle helpers / Cleaners / person other Site
1 4 L be displayed at vehicle L
d Driving & Fall into than drivers are not allowed to drive the Engr
pit vehicle.
System of Vehicle fitness inspection P&M /
Non before deployment in practice. Site
Inspection Color code
functioning of Hit Injury Daily inspection by the Driver Engr
1 4 L sticker system shall be L
Safety & Fall into Weekly maintenance by the P&M Engr
implemented.
Devices pit Monthly Joint inspection by the HSEO /
P&M Engr.
Substitution No substitution allowed for Diesel Tank P&M /
of diesel tank Fire & cap 1 3 L Site
cap Explosion Lock with Key for Cap is provided Engr
Vehicle Wiper Blade is provided incase of small P&M
Uncontrolled
Operation rain.
movement of 1 3 L
during Vehicle Operation is suspended during
Vehicle
Heavy rain heavy rain
Designated persons are only allowed to P&M /
travel in the cabin Site
operator cabin area , Engr
Carrying Tipper bed ,
Unauthorize Along with the material in the Trailor
1 3 L
d Passengers Hit Injury / Truck ,
Tractor ( Beside Driver seat )
Tractor – bed joint assembly.
Nobody allowed to stand in the footsteps or
Hanging in the bed.
Parking the vehicle in the leveled ground. P&M /
Unmanned Applying the parking brake (Hand brake). Site
Vehicle
parking at
vehicle Keeping wooden block at the tires to 1 4 L Engr
movement / prevent vehicle movement during
Slope
Hit Injury / Unloading or Pouring concrete (Transit
Dashing Mixer)
Uncontrolled Driver under Intoxication are not allowed to P&M /
Intoxicated drive the vehicle.
Vehicle 1 4 L Site
Driving Removing the Suspected Driver / Helper
movement Engr
Additional Control
Sl
Risk/ Imapct
Probability
Hazard / Possible Out Measures ( If a list is
Residual
Impact
Rating
Rating
. Action
Level
Risk
Activity Environmen come Existing Control Measure exhaustive, Give only a
N By
tal Aspect doc Ref no of the Safe
o
Work Method )
Vehicle Vehicles not overloaded beyond its rated
Site
Overloading failure / capacity. 1 3 L
Engr
Collapse
Drive the vehicle slowly at the sharp Convex mirror
bends & Corners to be provided to
facilitate the vehicle
visibility.
P&M /
Blind
Hit & Dash 2 3 M
Safety banners L Site
Turning to be displayed at Engr
entrance / Exit to
indicate the movement
of
construction vehicles.
Vehicle
movement Maintaining at least 2 meter distance P&M /
close to the Vehicle from the excavation edge. 1 4 L Site
pit / fall into pit Rigid barricading for Excavation pit. Engr
Excavation
Loose Materials like
Haphazard & Reinforcement rings,
unsecured / Fall of Scrap Rods Site
1 3 L
over loading material Tile / Granite boxes Engr
Blocks / Bricks
not loaded beyond the bed capacity.
Not allowing materials projection not
more than 1 mtr from the end of the
Projecting
bed for Trailor.
materials Site
Hit injury Projection made with red flag for 1 2 L
beyond the Engr
Caution.
bed
No material projection allowed for
tipper / Truck / Tractor
Contact with All Over head Power cables height Goal Post to be P&M
Over head Electrocution clearance maintained as 2 3 M provided to maintain L
Power Lines recommended in HSE manual. the safe distance.
Moving the vehicle after tipping bed P&M /
Starting the
Tipper Tipper fully seated. Site
2 vehicle with 1 4 L
Operations toppling Engin
raised tipper
eer
Additional Control
Sl
Risk/ Imapct
Probability
Hazard / Possible Out Measures ( If a list is
Residual
Impact
Rating
Rating
. Action
Level
Risk
Activity Environmen come Existing Control Measure exhaustive, Give only a
N By
tal Aspect doc Ref no of the Safe
o
Work Method )
Provision of additional support by the
way of Hydraulic Jack, Timber
Working P&M
Struck in block, packing materials between the
under raised 1 3 L Engin
between Tipping bed & its seat.
tipper bed eer
Implementation of Work Permit
system.
Provision of illumination along the
trailor bed by the way of blinkers,
Invisible Indicators , Lights. P&M /
Trailor trailor bed / Provision of Red flag at the end of Site
3 Hit Injury 1 3 L
Operations Projecting the Projecting material. Engin
Material Provision of reflective light / Tape at eer
the end of the Projecting material
for night operations.
Haphazard Cover to be provided to prevent spill of
loading of Air Earth, Sand & aggregate.
4 General 2 1 L
loose Pollution Other materials to be secured
materials
P&M /
Idle Switch off power or engine to avoid Site
Energy 1 1 L
Running idle running. Engin
consumption
eer
Pollution check as per legal Site
requirement Engin
Exhaust
Weekly maintenance by the P&M 1 2 L eer
emission Air Pollution
Engr