You are on page 1of 1

SAYAN ENTERPRISES

HAZARD IDENTIFICATION & RISK ASSESSMENT( HIRA)


Doc. No:-SE/HIRA/1.5-L/R-01 Department :CIVIL
Process / Activity : SCAFFOLDING Date of Study: 20.09.2022
Risk Assessment
Type Manning Facility Hazard Source Consequence * Ranking (1/2/3)
(Score)

Process/ Equipment
Evaluation
Sub Processes /
Sl No.

Remarks / Team including


Hazard

CO/CP/CE etc.

Domino Effect
Activities Reference concerned

Detectibility
HB/HC/OHF
Employee(s)

Probability
ILL Health

S (26-75)
UA (>75)
OAI / IAV

Duration

A (2-25)
Severity
LR/OR

Injury

IS (1)
Scale
R NR Own OS Own OS
Dismentaling of Fall of material
7
scaffolding √ √ √ √ HB √ OS 1 2 3 1 2 12
Fall of person
√ √ √ √ √ OS 1 2 3 1 3 18
Slipage of tools
√ √ √ √ √ OM 1 2 3 1 3 18 Safety

Supervisor
Collection & shifting of Fall of material
8
material to store √ √ √ √ HC √ OM 2 1 3 1 2 12

R- Routine HB- Human Behaviour CO- Change in Organisation UA - Unacceptable


Occupational Health Measure Required / Not Required NR - Non Routine HC- Human capability CP- Change in Process S - Significant
OS -Out Source OHF- Other Human factors CE- Change in Equipment A - Acceptable
Comments: LR - Legal Requirement IAV- Inside affecting Vicinity IS - Insignificant
OR - Other Requirement OAI- Outside affecting inside

* Injuries and Ill health to be mentioned as below: Authorised Signature


C- Cut Injury, F-Fracture, M- Fall of material, P- Fall of person, B- Burn injury, E- Eye injury S- Electrical shock,HC- Haz. chemical exposure
OM- Other minor injury, OS- Other serious injury
R- Respiratory problem, H- Hearing impairment, D- Dehydration, ER- Ergonomic problem, T- Temporary physical problem, O- Other serious health problem