NO:OIL/PDPP/T/HIRA/HSE/006 Rev: 01
Recommend
ed control
Risk Action
Risk Identification Desired controls and Existing gaps, if any actions to Remarks
assessment by
reduce the
risk level
Activity Type
Associated
Condition
(N/AN/E)
Consequences Desired Control Gaps If
Risk
Risk
Risk
S.N Activity P S
/ Hazards Measures Any
Level of consequence – Refer Guidance criteria for this i.e. possible degree of damage; Condition- N: Normal, AN: Abnormal, E-Emergency Activity Type: R- Routine, NR- Non Routine
Low Risk (1-3) Medium Risk (4- 9) High Risk (10- 25)
HAZARD IDENTIFICATION AND RISK ASSESSMENT HIRA FOR TANK HYDRO TEST DOC.NO:OIL/PDPP/T/HIRA/HSE/006 Rev: 01
Recommend
ed control
Risk Action
Risk Identification Desired controls and Existing gaps, if any actions to Remarks
assessment by
reduce the
risk level
Activity Type
Associated
Condition
(N/AN/E)
Consequences Desired Control Gaps If
Risk
Risk
Risk
S.N Activity P S
/ Hazards Measures Any
Level of consequence – Refer Guidance criteria for this i.e. possible degree of damage; Condition- N: Normal, AN: Abnormal, E-Emergency Activity Type: R- Routine, NR- Non Routine
Low Risk (1-3) Medium Risk (4- 9) High Risk (10- 25)
HAZARD IDENTIFICATION AND RISK ASSESSMENT HIRA FOR TANK HYDRO TEST DOC.NO:OIL/PDPP/T/HIRA/HSE/006 Rev: 01
Recommend
ed control
Risk Action
Risk Identification Desired controls and Existing gaps, if any actions to Remarks
assessment by
reduce the
risk level
Activity Type
Associated
Condition
(N/AN/E)
Consequences Desired Control Gaps If
Risk
Risk
Risk
S.N Activity P S
/ Hazards Measures Any
Tool Box meeting should be conducted before the start of the job / HIRA to be strictly implemented
In night time proper and adequate lights should be provided and arranged.
Housekeeping around the area / 100% supervision from staff level.
All job to be performed with the proper authorization PTW.
Level of consequence – Refer Guidance criteria for this i.e. possible degree of damage; Condition- N: Normal, AN: Abnormal, E-Emergency Activity Type: R- Routine, NR- Non Routine
Low Risk (1-3) Medium Risk (4- 9) High Risk (10- 25)
HAZARD IDENTIFICATION AND RISK ASSESSMENT HIRA FOR TANK HYDRO TEST DOC.NO:OIL/PDPP/T/HIRA/HSE/006 Rev: 01
Recommend
ed control
Risk Action
Risk Identification Desired controls and Existing gaps, if any actions to Remarks
assessment by
reduce the
risk level
Activity Type
Associated
Condition
(N/AN/E)
Consequences Desired Control Gaps If
Risk
Risk
Risk
S.N Activity P S
/ Hazards Measures Any
Risk Matrix
Impact
RISK MATRIX 1 2 3 4 5
Level of consequence – Refer Guidance criteria for this i.e. possible degree of damage; Condition- N: Normal, AN: Abnormal, E-Emergency Activity Type: R- Routine, NR- Non Routine
Low Risk (1-3) Medium Risk (4- 9) High Risk (10- 25)