You are on page 1of 4

ABU DHABI GAS DEVELOPMENT COMPANY LIMITED

SHAH GAS DEVELOPMENT (SGD) PROGRAM


RISK ASSESSMENT and WORK INSTRUCTIONS

Task/Activity Description: Precast Coping works. Reference Number:


EPC10-34-R0
Note : Risk Assessment Matrix adopted from ADNOC-CoPV5-06 Date of Issue: 13 Feb13
Page 1 of 4

Risk Hazard Risk/Impact Risk Assessment Control Measures Risk Assessment Responsible
No (Pre Controls) (Post Controls) Person

Risk Rating

Risk Rating
Probability

Probability
Categories

Categories
Severity

Severity
 Obtain permit to work for precast coping works 1 A P Low Site Engineer/
1. Inappropriate work Risks of falling 4 C P High Supervisor
platform/ Inadequate  Adequate Edge protection shall be in place to
edge protection/ prevent fall from height while executing the job.
 Adequate scaffold working platform with scaff
tagged shall be provided to carry out the activity.
 Ladder shall not be used for precast coping
installation.

2. Site Engineer/
 Simops operations shall be avoided in same area. A P Low
SIMOPS 1 Supervisor
4 C P High
Operations-  Area underneath shall be cordon off and falling
Risks of physical hazard signage posted.
injury
 110 v power supply to be used for power tools
 Only trained operators shall operate the power
3 tools.
C P Medium A p Low
 Power tools shall be inspected and colour coded as 1 Site Engineer/
3. Electrical operated Risks of physical per project procedure. Supervisor
power tools / Air injuries /electrocution.
 Additional face shield shall be used to prevent from ,
Blower Eye injury
faying dirt and debris.
 Power tools and air blower shall be tie to fixed
structure to prevent falling below.
ABU DHABI GAS DEVELOPMENT COMPANY LIMITED
SHAH GAS DEVELOPMENT (SGD) PROGRAM
RISK ASSESSMENT and WORK INSTRUCTIONS

Task/Activity Description: Precast Coping works. Reference Number:


EPC10-34-R0
Note : Risk Assessment Matrix adopted from ADNOC-CoPV5-06 Date of Issue: 13 Feb13
Page 2 of 4

Risk Hazard Risk/Impact Risk Assessment Control Measures Risk Assessment Responsible
No (Pre Controls) (Post Controls) Person

Risk Rating

Risk Rating
Probability

Probability
Categories

Categories
Severity

Severity
3 A P Low
C P Medium 1
4 Dust inhalation while  MEP clearance shall be obtained before drilling
Respiratory related Site Engineer/
drilling Holes activity.
disease like Supervisor
occupational asthma.  Appropriate respiratory protection shall be provided
to workmen
 Face shield shall be used by workmen while drilling
to minimise exposure.
 Personal hygiene to be followed.
3
A P Low Site Engineer/
C P Medium
Supervisor
5.  Safety glass with face shield shall be used. 1
Improper application Risks of eye and skin  Rubber gloves shall be used while applying.
of HILTI-RE 500 irritation, respiratory  Left out/ container shall be disposed off as
problems hazardous waste.
 Practices good hygiene practices.
ABU DHABI GAS DEVELOPMENT COMPANY LIMITED
SHAH GAS DEVELOPMENT (SGD) PROGRAM
RISK ASSESSMENT and WORK INSTRUCTIONS

Task/Activity Description: Precast Coping works. Reference Number:


EPC10-34-R0
Note : Risk Assessment Matrix adopted from ADNOC-CoPV5-06 Date of Issue: 13 Feb13
Page 3 of 4

Risk Hazard Risk/Impact Risk Assessment Control Measures Risk Assessment Responsible
No (Pre Controls) (Post Controls) Person

Risk Rating

Risk Rating
Probability

Probability
Categories

Categories
Severity

Severity
Work Instructions:
1. All hazard control measures prescribed in this Risk Assessment is issued as a work instruction to be implemented by site supervision.
2. All persons and vehicles must comply with Site HSE Rules and Requirements.
3. Under no circumstance shall any person will work under suspended load / bucket while manually handling/ loading / offloading from equipment.
4. Hand brake to be applied when workers are working near equipment for lifting/ transferring load to and from the equipment
5. Do a tool box talk with all site supervision, operators and operatives. Explain these control measures to all relevant operatives.
6. Housekeeping to be done and workplace to be made safe prior to leaving the workplace.
7. All persons shall sign their understanding and confirmation in the Tool Box Talk attendance sheet.
8. All construction waste will be removed daily from the work area.
9. All Near Misses and Accidents will be reported immediately to the on-duty Medic and site safety officers
10. Copy of this RA will be discussed in pre- start TBT. Copy will be available on site.

In Case of emergency, contact ASCON 24 Hour Emergency Numbers - 0566848083 or 0566848220

Prepared by Name Date and Signature Approved by Name Date and Signature
HSE Manager Karthitkeyan B
Project Engineer Issued by Name Date and Signature
ABU DHABI GAS DEVELOPMENT COMPANY LIMITED
SHAH GAS DEVELOPMENT (SGD) PROGRAM
RISK ASSESSMENT and WORK INSTRUCTIONS

Task/Activity Description: Precast Coping works. Reference Number:


EPC10-34-R0
Note : Risk Assessment Matrix adopted from ADNOC-CoPV5-06 Date of Issue: 13 Feb13
Page 4 of 4

Risk Hazard Risk/Impact Risk Assessment Control Measures Risk Assessment Responsible
No (Pre Controls) (Post Controls) Person

Risk Rating

Risk Rating
Probability

Probability
Categories

Categories
Severity

Severity
HSE Engineer Mohd. Salauddin Construction Manager
Cc: HSE Files, Worksite