Professional Documents
Culture Documents
Degree Of Risk
Degree Of Risk
Officer,
Accident / Ill
Probability
Probability
Implemented Risk Designation,
Severity
Severity
Work Scope / Work
Health & Control Due date
No. Activity/ Sub Hazard Additional Risk Control
Persons-at-
Activity
Risk / EHS
impact
2.1 Transportation of Traffic Fatality/ body Vehicle driven by S4 P3 5 Supervisor to ensure S3 P3 3 Site Engineer
equipment and accident injury personnel with compliance
manpower to site valid licence only;
and vice versa No speeding &
observe traffic
rules &
regulations;
Regular
maintenance of
vehicles.
Workers fall off Fatality/ body Do not exceed S4 P3 5 Ensure max. height of S4 P3 3 Site Engineer
back of trucks injury number of seated worker ≤ 1.1
passenger
allowed;
meters from carriage
Barrier to prevent deck
fall;
Proper adequate
and safe space for
worker to sit.
1
RISK ASSESSMENT FORM
Ace Quality Testing & Inspection Approved by:
Company / Department: RA Leader : Kenny Chow
Services Pte Ltd
Tan Beng Hock (Director)
Magnetic Particle Testing / RA Member 1: Abdul Malek
Process/ Location:
Samsung Project RA Member 2: Suit Swee Loong
Original Assessment Date: 13.12.2011 RA Member 3: Yee Lip Sun
Last Review Date: 22.12.2011 RA Member 4: Chin Soon Woei
Name, Designation, Signature, Date:
Next Review Date 22.12.2014 RA Member 5: - Ref No:
Initial Risk Index Residual Risk Index
1. Hazard Identification
2. Risk Evaluation 3. Risk Control
1a 1b 1c 1d 2a 2b 2c 2d 3a 3b 3c 3d 3e
Action
Possible
Degree Of Risk
Degree Of Risk
Officer,
Accident / Ill
Probability
Probability
Implemented Risk Designation,
Severity
Severity
Work Scope / Work
Health & Control Due date
No. Activity/ Sub Hazard Additional Risk Control
Persons-at-
Activity
Risk / EHS
impact
Falling object Head injury/ Safety helmet to S4 P2 5 Be alert and always S4 P1 3 Site Engineer
fatality be worn look out for falling
Do not walk under objects
suspended load
Walk under
overhead shelters
where available
2
RISK ASSESSMENT FORM
Ace Quality Testing & Inspection Approved by:
Company / Department: RA Leader : Kenny Chow
Services Pte Ltd
Tan Beng Hock (Director)
Magnetic Particle Testing / RA Member 1: Abdul Malek
Process/ Location:
Samsung Project RA Member 2: Suit Swee Loong
Original Assessment Date: 13.12.2011 RA Member 3: Yee Lip Sun
Last Review Date: 22.12.2011 RA Member 4: Chin Soon Woei
Name, Designation, Signature, Date:
Next Review Date 22.12.2014 RA Member 5: - Ref No:
Initial Risk Index Residual Risk Index
1. Hazard Identification
2. Risk Evaluation 3. Risk Control
1a 1b 1c 1d 2a 2b 2c 2d 3a 3b 3c 3d 3e
Action
Possible
Degree Of Risk
Degree Of Risk
Officer,
Accident / Ill
Probability
Probability
Implemented Risk Designation,
Severity
Severity
Work Scope / Work
Health & Control Due date
No. Activity/ Sub Hazard Additional Risk Control
Persons-at-
Activity
Risk / EHS
impact
Falling from Bodily injury Ensure proper S4 P2 5 Follow SWP for working S4 P1 3 Site Engineer
height or fatality assess and at height
working platform
provided by client
Wear and use
safety
harness/safety belt
where necessary
High noise Noise Wear ear S3 P3 3 To be monitored S3 P2 3 Site Engineer
level induced mufflers/ears
deafness plugs
Trip and fall Bodily injury Ensure sufficient S2 P3 5 To be monitored S2 P3 3 Site Engineer
due to poor lighting provided
lighting and by client at work
poor area and good
housekeeping housekeeping
maintained;
Report
tripping hazards to
client.
3
RISK ASSESSMENT FORM
Ace Quality Testing & Inspection Approved by:
Company / Department: RA Leader : Kenny Chow
Services Pte Ltd
Tan Beng Hock (Director)
Magnetic Particle Testing / RA Member 1: Abdul Malek
Process/ Location:
Samsung Project RA Member 2: Suit Swee Loong
Original Assessment Date: 13.12.2011 RA Member 3: Yee Lip Sun
Last Review Date: 22.12.2011 RA Member 4: Chin Soon Woei
Name, Designation, Signature, Date:
Next Review Date 22.12.2014 RA Member 5: - Ref No:
Initial Risk Index Residual Risk Index
1. Hazard Identification
2. Risk Evaluation 3. Risk Control
1a 1b 1c 1d 2a 2b 2c 2d 3a 3b 3c 3d 3e
Action
Possible
Degree Of Risk
Degree Of Risk
Officer,
Accident / Ill
Probability
Probability
Implemented Risk Designation,
Severity
Severity
Work Scope / Work
Health & Control Due date
No. Activity/ Sub Hazard Additional Risk Control
Persons-at-
Activity
Risk / EHS
impact
Slip and fall on Bodily injury Wear Slip resistant S2 P2 5 To be monitored S2 P1 3 Site Engineer
slippery floor safety shoes;
Report any
spillage/ slippery
floor to client
immediately
Presence of Fire and Follow no smoking S3 P3 5 Familiarise with client’s S3 P3 3 Site Engineer
flammable explosion rule strictly emergency response
substances/ resulting in procedures
gases bodily injury
and fatality
2.3 Surface preparation Sharp edges Head injury Wear gloves S2 P1 2 To be monitored S2 P1 2 Site Engineer
(cleaning using during
solvent or surface handling
grinding)
Degree Of Risk
Degree Of Risk
Officer,
Accident / Ill
Probability
Probability
Implemented Risk Designation,
Severity
Severity
Work Scope / Work
Health & Control Due date
No. Activity/ Sub Hazard Additional Risk Control
Persons-at-
Activity
Risk / EHS
impact
5
RISK ASSESSMENT FORM
Ace Quality Testing & Inspection Approved by:
Company / Department: RA Leader : Kenny Chow
Services Pte Ltd
Tan Beng Hock (Director)
Magnetic Particle Testing / RA Member 1: Abdul Malek
Process/ Location:
Samsung Project RA Member 2: Suit Swee Loong
Original Assessment Date: 13.12.2011 RA Member 3: Yee Lip Sun
Last Review Date: 22.12.2011 RA Member 4: Chin Soon Woei
Name, Designation, Signature, Date:
Next Review Date 22.12.2014 RA Member 5: - Ref No:
Initial Risk Index Residual Risk Index
1. Hazard Identification
2. Risk Evaluation 3. Risk Control
1a 1b 1c 1d 2a 2b 2c 2d 3a 3b 3c 3d 3e
Action
Possible
Degree Of Risk
Degree Of Risk
Officer,
Accident / Ill
Probability
Probability
Implemented Risk Designation,
Severity
Severity
Work Scope / Work
Health & Control Due date
No. Activity/ Sub Hazard Additional Risk Control
Persons-at-
Activity
Risk / EHS
impact
Spark during Fire and Ensure flammable S4 P3 4 Cover flammable S4 P2 3 Site Engineer
grinding and explosion materials or materials/substances
presence of resulting in substances are with fire blanket if
flammable bodily injury, removed before cannot be removed
materials/ fatality and grinding;
substances property Ensure fire
damage extinguisher in
close proximity;
Approved permit-
to-work
6
RISK ASSESSMENT FORM
Ace Quality Testing & Inspection Approved by:
Company / Department: RA Leader : Kenny Chow
Services Pte Ltd
Tan Beng Hock (Director)
Magnetic Particle Testing / RA Member 1: Abdul Malek
Process/ Location:
Samsung Project RA Member 2: Suit Swee Loong
Original Assessment Date: 13.12.2011 RA Member 3: Yee Lip Sun
Last Review Date: 22.12.2011 RA Member 4: Chin Soon Woei
Name, Designation, Signature, Date:
Next Review Date 22.12.2014 RA Member 5: - Ref No:
Initial Risk Index Residual Risk Index
1. Hazard Identification
2. Risk Evaluation 3. Risk Control
1a 1b 1c 1d 2a 2b 2c 2d 3a 3b 3c 3d 3e
Action
Possible
Degree Of Risk
Degree Of Risk
Officer,
Accident / Ill
Probability
Probability
Implemented Risk Designation,
Severity
Severity
Work Scope / Work
Health & Control Due date
No. Activity/ Sub Hazard Additional Risk Control
Persons-at-
Activity
Risk / EHS
impact
Wet hand/Wet Electrocution Wear shoe with S4 P3 4 Follow SWP for power S4 P2 3 Site Engineer
ground/Faulty non-conductive tools & control of
equipment/ sole; electrical hazards
Damaged Avoid wet ground;
electrical wire
Equipment that
or socket/ are faulty or with
Using damaged electrical
equipment not wire or sockets to
approved be replaced
immediately;
Use equipment
with approved
industrial sockets
while on site
7
RISK ASSESSMENT FORM
Ace Quality Testing & Inspection Approved by:
Company / Department: RA Leader : Kenny Chow
Services Pte Ltd
Tan Beng Hock (Director)
Magnetic Particle Testing / RA Member 1: Abdul Malek
Process/ Location:
Samsung Project RA Member 2: Suit Swee Loong
Original Assessment Date: 13.12.2011 RA Member 3: Yee Lip Sun
Last Review Date: 22.12.2011 RA Member 4: Chin Soon Woei
Name, Designation, Signature, Date:
Next Review Date 22.12.2014 RA Member 5: - Ref No:
Initial Risk Index Residual Risk Index
1. Hazard Identification
2. Risk Evaluation 3. Risk Control
1a 1b 1c 1d 2a 2b 2c 2d 3a 3b 3c 3d 3e
Action
Possible
Degree Of Risk
Degree Of Risk
Officer,
Accident / Ill
Probability
Probability
Implemented Risk Designation,
Severity
Severity
Work Scope / Work
Health & Control Due date
No. Activity/ Sub Hazard Additional Risk Control
Persons-at-
Activity
Risk / EHS
impact
2.4 Magnetic Particle Exposure to III health to Wear mask S3 P3 3 Provide fan to S3 P3 3 Site Engineer
Inspection chemical and workers and blow/disperse vapours
Safety glasses
nuisance surrounding
particulates personnel gloves
due to
inhalation or
ingestion of
chemical and
nuisance
particulates
Fire hazard Physical Ensure no heat; S4 P3 4 Supervisor to check S4 P3 3 Site Engineer
(when using injury or and ensure compliance
Flame or sparks
White Contrast fatality and near testing area;
Paint) property
Ensure fire fighting
damage due
equipment
to fire and provided at testing
explosion area
Sharp edges Hand injury Wear gloves S2 P2 3 To be monitored S2 P2 3 Site Engineer
during
handling
8
RISK ASSESSMENT FORM
Ace Quality Testing & Inspection Approved by:
Company / Department: RA Leader : Kenny Chow
Services Pte Ltd
Tan Beng Hock (Director)
Magnetic Particle Testing / RA Member 1: Abdul Malek
Process/ Location:
Samsung Project RA Member 2: Suit Swee Loong
Original Assessment Date: 13.12.2011 RA Member 3: Yee Lip Sun
Last Review Date: 22.12.2011 RA Member 4: Chin Soon Woei
Name, Designation, Signature, Date:
Next Review Date 22.12.2014 RA Member 5: - Ref No:
Initial Risk Index Residual Risk Index
1. Hazard Identification
2. Risk Evaluation 3. Risk Control
1a 1b 1c 1d 2a 2b 2c 2d 3a 3b 3c 3d 3e
Action
Possible
Degree Of Risk
Degree Of Risk
Officer,
Accident / Ill
Probability
Probability
Implemented Risk Designation,
Severity
Severity
Work Scope / Work
Health & Control Due date
No. Activity/ Sub Hazard Additional Risk Control
Persons-at-
Activity
Risk / EHS
impact
2.5 Working at height Falling from Bodily injury Use of proper S4 P3 5 Ensure proper assess S4 P2 3 Site Engineer
height or fatality ladders; and working platform
Ensure ladders provided by client; Use
are secured scaffold with valid
scaffold tag only; Do
not remove scaffold
components; wear and
use safety harness/
safety belt where
necessary; Follow SWP
for working at height &
mobile scaffold
9
RISK ASSESSMENT FORM
Ace Quality Testing & Inspection Approved by:
Company / Department: RA Leader : Kenny Chow
Services Pte Ltd
Tan Beng Hock (Director)
Magnetic Particle Testing / RA Member 1: Abdul Malek
Process/ Location:
Samsung Project RA Member 2: Suit Swee Loong
Original Assessment Date: 13.12.2011 RA Member 3: Yee Lip Sun
Last Review Date: 22.12.2011 RA Member 4: Chin Soon Woei
Name, Designation, Signature, Date:
Next Review Date 22.12.2014 RA Member 5: - Ref No:
Initial Risk Index Residual Risk Index
1. Hazard Identification
2. Risk Evaluation 3. Risk Control
1a 1b 1c 1d 2a 2b 2c 2d 3a 3b 3c 3d 3e
Action
Possible
Degree Of Risk
Degree Of Risk
Officer,
Accident / Ill
Probability
Probability
Implemented Risk Designation,
Severity
Severity
Work Scope / Work
Health & Control Due date
No. Activity/ Sub Hazard Additional Risk Control
Persons-at-
Activity
Risk / EHS
impact
Falling object Head injury/ Safety helmet to S4 P3 5 Barricade work area S4 P3 3 Site Engineer
fatality be worn; and post warning sign
Proper
coordination to
ensure no work
above work area;
Provide overhead
protection where
necessary ;
Ensure tools and
equipment
secured properly
on platform
Trip and fall Bodily injury Ensure sufficient S2 P3 3 To be monitored S2 P3 3 Site Engineer
due to poor lighting provided
lighting and by client at work
poor area and good
housekeeping housekeeping
maintained
Report tripping
hazards to client
10
RISK ASSESSMENT FORM
Ace Quality Testing & Inspection Approved by:
Company / Department: RA Leader : Kenny Chow
Services Pte Ltd
Tan Beng Hock (Director)
Magnetic Particle Testing / RA Member 1: Abdul Malek
Process/ Location:
Samsung Project RA Member 2: Suit Swee Loong
Original Assessment Date: 13.12.2011 RA Member 3: Yee Lip Sun
Last Review Date: 22.12.2011 RA Member 4: Chin Soon Woei
Name, Designation, Signature, Date:
Next Review Date 22.12.2014 RA Member 5: - Ref No:
Initial Risk Index Residual Risk Index
1. Hazard Identification
2. Risk Evaluation 3. Risk Control
1a 1b 1c 1d 2a 2b 2c 2d 3a 3b 3c 3d 3e
Action
Possible
Degree Of Risk
Degree Of Risk
Officer,
Accident / Ill
Probability
Probability
Implemented Risk Designation,
Severity
Severity
Work Scope / Work
Health & Control Due date
No. Activity/ Sub Hazard Additional Risk Control
Persons-at-
Activity
Risk / EHS
impact
Slip and fall on Bodily injury Wear slip resistant S2 P3 4 To be monitored S2 P2 3 Site Engineer
slippery floor safety shoes;
Report any
spillage/ slippery
floor to client
immediately
4.6 Working in confined Oxygen Fatality due Approved permit- S2 P3 3 Follow SWP for S2 P2 3 Site Engineer
space deficiency or to oxygen to-work; confined space;
presence of deficiency or Ensure confined Provided lifelines and
harmful gases presence of space is well competent watchman
harmful ventilated;
gases Ensure client carry
out gas test and
confirm confined
space safe for
entry
11
RISK ASSESSMENT FORM
Ace Quality Testing & Inspection Approved by:
Company / Department: RA Leader : Kenny Chow
Services Pte Ltd
Tan Beng Hock (Director)
Magnetic Particle Testing / RA Member 1: Abdul Malek
Process/ Location:
Samsung Project RA Member 2: Suit Swee Loong
Original Assessment Date: 13.12.2011 RA Member 3: Yee Lip Sun
Last Review Date: 22.12.2011 RA Member 4: Chin Soon Woei
Name, Designation, Signature, Date:
Next Review Date 22.12.2014 RA Member 5: - Ref No:
Initial Risk Index Residual Risk Index
1. Hazard Identification
2. Risk Evaluation 3. Risk Control
1a 1b 1c 1d 2a 2b 2c 2d 3a 3b 3c 3d 3e
Action
Possible
Degree Of Risk
Degree Of Risk
Officer,
Accident / Ill
Probability
Probability
Implemented Risk Designation,
Severity
Severity
Work Scope / Work
Health & Control Due date
No. Activity/ Sub Hazard Additional Risk Control
Persons-at-
Activity
Risk / EHS
impact
Trip and fall Bodily injury Ensure sufficient S2 P3 3 To be monitored S2 P2 3 Site Engineer
due to poor lighting provided
lighting and by client at work
poor area and good
housekeeping housekeeping
maintained;
Report tripping
hazards to client
Slip and fall on Bodily injury Wear slip resistant S2 P3 3 To be monitored S2 P2 3 Site Engineer
slippery floor safety shoes;
Report any
spillage/ slippery
floor to client
immediately
12
RISK ASSESSMENT FORM
Ace Quality Testing & Inspection Approved by:
Company / Department: RA Leader : Kenny Chow
Services Pte Ltd
Tan Beng Hock (Director)
Magnetic Particle Testing / RA Member 1: Abdul Malek
Process/ Location:
Samsung Project RA Member 2: Suit Swee Loong
Original Assessment Date: 13.12.2011 RA Member 3: Yee Lip Sun
Last Review Date: 22.12.2011 RA Member 4: Chin Soon Woei
Name, Designation, Signature, Date:
Next Review Date 22.12.2014 RA Member 5: - Ref No:
Initial Risk Index Residual Risk Index
1. Hazard Identification
2. Risk Evaluation 3. Risk Control
1a 1b 1c 1d 2a 2b 2c 2d 3a 3b 3c 3d 3e
Action
Possible
Degree Of Risk
Degree Of Risk
Officer,
Accident / Ill
Probability
Probability
Implemented Risk Designation,
Severity
Severity
Work Scope / Work
Health & Control Due date
No. Activity/ Sub Hazard Additional Risk Control
Persons-at-
Activity
Risk / EHS
impact
RISK MATRIX
Degree Of Risk
Degree Of Risk
Officer,
Accident / Ill
Probability
Probability
Implemented Risk Designation,
Severity
Severity
Work Scope / Work
Health & Control Due date
No. Activity/ Sub Hazard Additional Risk Control
Persons-at-
Activity
Risk / EHS
impact