Professional Documents
Culture Documents
Group Members:
No. Name ID
1. Hamdi usmael R/0312/08
2. Obsa Mohammad R/0312/08
3. Arif Mohammad R/0312/08
4. Najat Hassan R/0312/08
5. Mohammad Abrahim R/0312/08
6. SHEYBI AHMED R/0312/08
Advisor Name: YODIT Signature_________________
22/NOV/2018
2
No use photos to publish online advertisement in any country or region of the
world.
It consumes much time to perform each and every activity step by step.
It’s a must to attend physically at the place where the assets are there. Because, in
order to look at the place and make decision.
Doesn’t give time for customers to know more about the assets.
Final price become limited as compared to the price it expected to have if the
product’s has more life time in public sale process.
Our new system is web based online dwelling items buying and/or selling system
for houses and other assets there is no need for buyer and seller to attend
physically at the place of assets.
There is no middle person involved in new system.
Limitations are problems that occur when the team is doing the works.
That includes:-
Sudden fluctuation of power.
May be Sickness of group members.
If the computer attack by virus.
Internet connection problem.
Time limitation.
Resource related problems.
To solve the above problems we have used different techniques for protecting the data
from infection. The methods include making copies in CD-RW, flash and copying on the
other computers.
3
2. Project Goal and Objectives
2.1General Objective
The general objective of our website is changing the traditional way of sells system by a
web based computerized and easily implemented System. People can easily find assets what they
need to buy like house and land.
4
Like when sellers upload new items’ info to be sold; users search and look for items Because of,
budget and time our project is limited only satisfying the general objectives and do major work
on the specific objectives.
4. Significance of the project
5. Methodology
Interview
We will be gather information by interviewing the Harar people about the existing traditional
dwelling and assets work. The questions we have prepared were open ended questions. We
choose this type questions we can get detailed information about the existing system. It’s the
easiest way of data collection which is done between individuals orally. It’s the most effective
data gathering method since the interview is done face to face and able to collect primary data.
5
Practical observation
Enables us to list out the existing system problems, since it is what we see or observe in
reality.
5.2 Document analysis
Documents are one of the basic sources for the project development. Relevant documents and
techniques that help to improve the performance of database. How they are arranging, accessing
styles, security etc..
5.3 Requirement Modeling Technique
1.6.1Hardware Requirements
Any computer which can support windows 7 or windows 8 and with the following minimum
specifications
500 GB Hard disk
512 MB RAM
CD-RW: for storing data
Flash: for moving or exchange of data from one computer to another
After requirement gathering we used object oriented analysis approach to model the new
system. Object oriented analysis is our choice to develop new system, because it focuses
more on capturing the real world objects in current system that are important to the new
system. Modeling techniques used in object oriented analysis are UML (Unified modeling
language), that can present both structural and procedural aspect of the system. UML
includes:-
Tools
The tools we are going to use for document analysis in our project are:
6
Microsoft office 2007:- For documentation as word processor
edraw:- in order to model the system requirement in UML (unified modeling language).
Xara website 3.0:.for interface design
Notepad++ - for client side scripting(for code editing)
During Implementation, we are going to use;
For front end:
Microsoft Dream weaver (8)
JavaScript:-script language enable as to constraint client side interactions.
Css:-styling our page to attract.
PHP: - for server-side scripting.
For back end:
My SQL Database: - for storing the data that are going to be retrieved later.
Server that we use
Wamp: - – for making the computer, we are working on, a server is apache
Work breakdown
Harar Online dwelling and assets management system
7
Analyst
2386/08 - Analysts
6. MOHAMMED -Documentation
ABRAHIM
Project Advisor: Instructor Vijay
5 Project Schedule
1.11 Time line
Time
Activities
June 19-
June 20
Nov 20-
Mar17-
Dec 25-
Nov 02-
May 15
Dec 20
Feb 17
Apr 8-
Project Apr 5
Proposal
Requirement Analysis
Design
Implementation & Coding
Testing
project Defense
7. References
www.adelaidecitycouncil.com/assets/Policies-Papers/docs/STRATEGY-strategic
www.ipwea.org.au/IIMM
8