PLASTIC PLASTIC PLASTIC PLASTIC PLASTIC PLASTIC

WATER WATER WATER WATER WATER WATER


TANK TANK TANK TANK TANK TANK
3 m3 M 3m3 M 3m3 M
Subsidiary Metre 3 m3 M 3m3 M 3m3 M
Subsidiary Metre
BO2 GR BO2 FF BO2 SF BO2 GR BO2 FF BO2 SF

Roof Roof

F2 F2

F1 F1

Pipe to the tanks


Booster Pump as per the sepcs
DUCT DUCT Valve Water Metre

Valve
GF GF WATER
TANK M
FROM WASAC

Op on 1;
1. Main Tank fed by Wasac Mains
2. Booster Pump to pump water from the mains tank
3. One main meter from Wasac - Subsidiary meters needed - Not supplied by Wasac
4. One pipe supplyng to the roof tanks

CLIENT LOCATION TRANSMISSION DATE SCALE ADVANCEMENT PROJECT


PROJECT: ISANGE PHASE 2 8/24/2023 1:80.70 DD-B IMARA II
DISTRICT :Kicukiro
STAGE SOURCE FIELD NUMBER
SECTOR : Gatenga Object Plumbing Datas INDEX
CELL : Nyarurama
VILLAGE : Bisambu
CD EAA MEP/PLU A.01.14 B
PLOT : 6808/6915/6916 Comment Apartments Water Supply Layout OPTION 1
PLASTIC PLASTIC PLASTIC PLASTIC PLASTIC PLASTIC
WATER WATER WATER WATER WATER WATER
TANK TANK TANK TANK TANK TANK
3 m3 3m3 3m3 3 m3 3m3 3m3
BO2 GR BO2 FF BO2 SF BO2 GR BO2 FF BO2 SF

Roof Roof

F2 F2

F1 F1

Pipe to the individual tanks


Booster Pump as per the sepcs
DUCT DUCT Valve Water Metre

Valve
GF GF
M

M
FROM WASAC
M

Op on 2;
1. NO Main Tank for Wasac Mains
2. 6Pcs - Booster Pumps to pump water from the mains to each tank.
3. 6pcs main meters from Wasac - NO Subsidiary meters needed.
4. Each roof tank has its own supply pipe

CLIENT LOCATION TRANSMISSION DATE SCALE ADVANCEMENT PROJECT


PROJECT: ISANGE PHASE 2 8/24/2023 1:94.27 DD-B IMARA II
DISTRICT :Kicukiro
STAGE SOURCE FIELD NUMBER
SECTOR : Gatenga Object Plumbing Datas INDEX
CELL : Nyarurama
VILLAGE : Bisambu
CD EAA MEP/PLU A.01.15 B
PLOT : 6808/6915/6916 Comment Apartments Water Supply Layout OPTION 2