NOTES:

1. This drawing is to be read in conjunction with the following Drawings:


START OF TANK Reinforced Concrete 5521/CE/030 OKANGUATI TR SITE LAYOUT
Detail A Detail B
MANUFACTURER'S Foundation Ring
5521/CE/031 OKANGUATI TR SITE PIPEWORK LAYOUT
PIPEWORK
5521/CE/033 TR FOUNDATION RING DETAILS

450
A A 5521/ME/010 CONTROL VALVE MANHOLE
Water Level Ground Level Terminal Reservoir
2. For setting out of Pipework according to Center Point V and PI25a refer
Volume 1 000 m³
to Drawing 5521/CE/031.
Ø 13.910 m
Height 7.175 m 2. All underground GMS pipework, DCI fittings and valves to be DENSO
wrapped.
4. Tank Manufacturer to design, supply and install all pipework, fittings and
OVERFLOW & valves between "Start- and End of Tank Manufacturer's Pipework" as
Outlet to Terminal Overflow & shown in drawing.
INLET PIPE SCOUR PIPE Pump Station
Center Point V Scour Outlet

Manhole
Access
Ladders

7175
22.5°
B ND200 GMS Pipework. B
Level Indicator
Design and supply by
Tank Manufacturer
ND150 GMS Pipework as Ø 13910 for 1 000 m³ Tank
per Drawing 5521/ME/010
and supplied by Contractor

ND200 PN10 Flanged Inlet from Control


resilient seated Gate Valve Valve Manhole
supplied by Tank Manufacturer

Detail C
450 FL ±1079.90 60 SCHEMATIC LAYOUT OF PIPEWORK SCALE 1 : 200
100

C C

NGL NGL FOR CONSTRUCTION


END OF TANK MANUFACTURER'S PIPEWORK
700

400

700
600 ND150 GMS Pipework with Valve
Detail D as per Drawing 5521/ME/010 and
Reinforced Concrete Foundation Ring supplied by Contractor 1 Changes to Schematic Layout of Pipework FK 10.02.2023

Ø 160 uPVC Class 6 Pipe Ø 200mm uPVC Class 6 Scour Pipe NGL No. REVISIONS APP. DATE
260 260
from Control Valve Manhole

100
Flange Adaptor Ø 200mm/ND200 CLIENT

800
Flange Adaptor Ø 160mm/ND150 END OF TANK MANUFACTURER'S PIPEWORK
Kunene
D D
Regional
TANK PIPEWORK DETAILS NTS Ø 160mm uPVC Class 6 Pipe Council
260 to Terminal Pump Station
PO BOX 502 TEL: (065) 27 3950, FAX: (065) 27 3077
OPUWO, NAMIBIA EMAIL: info@kunenerc.com.na

TANK OUTLET PIPEWORK SCALE 1 : 50 APPROVED DATE


ND150 GMS Pipe
Flanges SANS1123
Roof Roof
TO TERMINAL PUMP STATION COPYRIGHT RESERVED

Table 1000/3 CONSULTANTS


PROJECT ENGINEERS
ND200 GMS Pipe 150 150 PCE POWERCONSULT ENGINEERS
Roof Structure/Beams Flange SANS1123
250

Table 1000/3 PO BOX 3628 TEL: (65) 231 997, FAX: (065) 231 980
E E ONGWEDIVA, NAMIBIA EMAIL: antindi@powerconsult.com.na
Shell Panel
300

Shell Panel CIVIL ENGINEER

KUCHLING CONSULTING ENGINEERS


ND200 GMS Pipe ND150 GMS Pipe PO BOX 801 TEL: (061) 305 420, FAX: (061) 305 418
Flange SANS1123 Flange SANS1123 WINDHOEK, NAMIBIA fkuchling@iway.na
Table 1000/3 Table 1000/3
PROJECT
ND150 Bend
OKANGUATI WATER SUPPLY PROJECT

200

200
Shell Panel
Support bracket affixed to roof structure.
Design and Supply by Tank Manufacturer. Shell Panel Tank Membrane Tank Membrane DRAWING TITLE

150 ND150 GMS Pipe 3.0 m long with ND150 Bend OKANGUATI SITE
Channel Ring Channel Ring
supplied by Tank Manufacturer 1 000 m3 TERMINAL RESERVOIR
F
300 3000 150
F
PIPEWORK DETAILS
Foundation Ring Foundation Ring CIVIL INSTALLATION

CONSULTANT PROJECT NO.:

DETAIL A: TANK INLET DETAIL B: TANK OVERFLOW DETAIL C: TANK SCOUR OUTLET DETAIL D: TANK OUTLET DESIGNED: DRAWN: CHECKED:
NTS SCALE 1 : 10 SCALE 1 : 10 SCALE 1 : 10 SCALE: DATE:

DRAWING NO.: VO.: