NOTES
CROSSING FOR CABLE TRENCH 1. ABBREVIATIONS ;
LPP : LOWEST LEVEL FOR CONCRETE PAVING
CONCRETE CABLE TRENCH DIRECT BURIED CABLE TRENCH B. O. T : BOTTOM OF TRENCH
B. O. DB : BOTTOM OF DUCT BANK

2. CABLE ROUTE MARKER POST


A A
400 200 200 400 2.1 CONCRETE MARKER POST SHALL BE LOCATED
AT THE FOLLOWING POINTS.

AT ALL CHANGES IN DIRECTIONS


A
BOTH ENDS OF DUCT BANK
D
AT EACH 90m STRAIGHT RUN

2.2 THE TOTAL WIDTH OF THE CABLE TRENCH FOR


1.2m WIDTH OR BIGGER, CONCRETE MARKER POST
PLAN-1 SHALL BE INSTALLED ALONG EACH SIDE OF THE
CABLE TRENCH. HOWEVER, LESS THAN 1.2m WIDTH,
PLAN CONCRETE MARKER POST SHALL BE INSTALLED
ALONG CENTER OF THE CABLE TRENCH.

B 2.3 THE SIGN SHALL BE ENGRAVED ON CONCRETE B


MARKER POST DIRECTLY.
600 400 400 600 2.4 COLOR OF CABLE ROUTE MARKER IS AS FOLLOWS.
(MIN.) (MIN.) INSTRUMENT ELECTRICAL ELECTRICAL : RED
A D1 INSTRUMENT : GREEN

D
PROTECTION TILE
400 200 200 400

N.)
45
3. FOR GENERAL NOTES, SEE DWG NO. NFEF-60-44-CI-DR-TD-001.

100

(MI
B.O.T

°
4. MARKER POST CONCRETE SHALL BE MIXED TYPE D.

5. SAND BAG CAN BE USED FOR SAND FILLING AT TRENCH SLOPE.


1 SAND IN BAGS SHOULD BE SAME QUALITY WITH SAND IN TRENCH.
2 (TYP.)
PLAN-2
B.O.T

DUCT BANK
C C

SECTION D

PIPE TO DIRECT BURIED/CONCRETE CABLE TRENCH

600 400

D
(MIN.) E D
B

PLAN

N.)
100 (MI

PROTECTION TILE

D
PLAN-3
E E

N.)
100

(MI
1
d

2 (TYP.)
TRENCH 400
B.O.T
(MIN.)

400
(MIN.)
DUCT BANK

B.O.T (B.O.DB)
SECTION E
APPROVED FOR DESIGN
MIN.
F F
(SEE TABLE) CABLE ROUTE MARKER POST (UNPAVED AREA) (SEE NOTE 2)
SECTION A NFEF-60-44-CI-DR-TD-005 STANDARD DRAWING CABLE TRENCH AND DUCT BANK (1)

DUCT BANK NFEF-60-44-CI-DR-TD-001 STANDARD DRAWING GENERAL NOTES OF CIVIL WORK


MIN. DISTANCE SIGN
LAYERS DWG NO. TITLE

NOTE 2.3 REFERENCE DRAWINGS


TRENCH 1-LAYER MIN. 1200mm
1
00
2-LAYERS MIN. 1700mm 100
3-LAYERS
00
1 MARKER
MIN. 2200mm D1 APPROVED FOR DESIGN D.O S.I Y.H OCT.19.'18

MARKER C1 ISSUED FOR APPROVAL D.O S.I Y.H JUL.12.'18


150

A1 ISSUED FOR INTERNAL REVIEW D.O S.I Y.H JUN.27.'18

NO. DESCRIPTION BY CHKD APVD APVD DATE


DUCT BANK
GL. REVISIONS

REV DATE APPROVED


END WALL ISSUED FOR CONSTRUCTION
450

C
L
300

DATE

G BY G

DRAWN DSGND CHKD APVD APVD

ALL RIGHTS RESERVED


THIS DOCUMENT IS THE PROPERTY OF QATARGAS OPERATING COMPANY LIMITED AND CONTAINS
INFORMATION WHICH IS PROPRIETARY. THIS INFORMATION IS TO BE HELD IN CONFIDENCE.
NO DISCLOSURE OR OTHER USE OF THIS DOCUMENT IS TO BE MADE WITHOUT THE PRIOR
WRITTEN CONSENT OF QATARGAS OPERATING COMPANY LIMITED.

NORTH FIELD EXPANSION PROJECT


PLAIN CONCRETE
Onshore Facilities FEED
Contract No.
TRENCH UNDERGROUND CABLE ROUTE
400 Qatargas Operating
(MIN.)
INSTALLATION OF CONCRETE ARRANGEMENT OF CONCRETE MARKER POST
Company Limited
(SEE NOTE 2.2) QATARGAS
MARKER POST

TITLE
DUCT BANK
STANDARD DRAWING
H H

CABLE TRENCH AND DUCT BANK (2)


CABLE

SPLICE SCALE NONE JOB NO.

PROJECT DRAWING NO. REVISION


SECTION B
NFEF-60-44-CI-DR-TD-006
SIGN "A" SIGN "B" SIGN "C" SIGN "D" SIGN "E" SIGN "F" NFEF D1

1
1 2 3 4 5 8 9 10 11 WORK NO.

FILE NAME : NFEF-60-44-CI-DR-TD-006_D1_000.dgn