PANELBOARD EP1 VOLTS 208/120 3Ø PHASE 4 WIRE MAINS RATING: 250 PANELBOARD EP2 VOLTS 208/120 3Ø PHASE 4 WIRE

4 WIRE MAINS RATING: 250 PANELBOARD EP2 VOLTS 208/120 3Ø PHASE 4 WIRE MAINS RATING: 250
POWER GENERAL NOTES POWER LEGEND
NEW/EXIST. SOLID NEUTRAL: Y NEMA TYPE: 1 MLO/MCB: NEW/EXIST. SOLID NEUTRAL: Y NEMA TYPE: 1 MLO/MCB: FRANKLIN 27 DEVELOPERS,
GROUND BUS: Y A.I.C. SYM.: 22,000 GROUND BUS: Y A.I.C. SYM.: 22,000
1. THE CONTRACTOR SHALL PERFORM ALL ELECTRICAL WORK IN ACCORDANCE
LLC PROPOSED CITYMD
20 AMP BUILDING STANDARD DUPLEX GROUNDED RECEPTACLE.
LOCATION: ELEC #119 MOUNTING: SURFACE LOCATION: ELEC #119 MOUNTING: SURFACE WITH THE 2020 EDITION OF THE NATIONAL ELECTRIC CODE. MOUNT 18" ABOVE FINISH FLOOR. UNLESS OTHERWISE NOTED.

2. CONTRACTOR SHALL DETERMINE AND INCLUDE IN THE WORK ALL FIELD 625 SOMERSET STREET

LOAD(KVA)

LOAD(KVA)

LOAD(KVA)

LOAD(KVA)
POLE POLE POLE POLE CONDITIONS TO INCLUDE AND NOT LIMITED TO: PHYSICAL INTERFERENCE, HOME RUN; NUMBER OF SLASH MARKS INDICATE THE NUMBER OF TOWNSHIP OF FRANKLIN, 08873
SOMERSET COUNTY, NJ

COND.

COND.

COND.

COND.
LOAD SERVED NO. NO. LOAD SERVED LOAD SERVED NO. NO. LOAD SERVED EQUIPMENT TO BE MOVED, EQUIPMENT TO BE ELECTRICALLY DISCONNECTED, CONDUCTORS WITHIN EACH CIRCUIT RUN (INCLUDING GROUND

POLE

POLE

POLE

POLE
GND.

GND.

GND.

GND.
WIRE

WIRE

WIRE

WIRE
TRIP

TRIP
TRIP

TRIP
RELOCATED AND ELECTRICALLY RECONNECTED, CONDUIT, BOXES AND CABLES CONDUCTOR), LONG SLASH INDICATES NEUTRAL CONDUCTOR. MINIMUM
A B C A B C
TO BE CUT, REMOVAL AND RELOCATION OF LIGHTS, RECEPTACLE, SWITCHES, WIRE SIZE #12 THHN.
SPARE 20 1 1 2 1 20 SPARE SPARE 20 1 1 2 1 20 SPARE ABANDONED DEVICES, ALL AT NO ADDITIONAL COST TO THE OWNER. UNLESS
SPARE 20 1 3 4 1 20 SPARE SPARE 20 1 3 4 1 20 SPARE OTHERWISE NOTED, ABANDONED CONDUIT SHALL BE REMOVED BACK TO PANEL.
INDICATES MOUNTING HEIGHT TO CENTERLINE OF DEVICE. LONGO ARCHITECTS
SPARE 20 1 5
7
6
8
1 20 SPARE SPARE 20 1 5
7
6
8
1 20 SPARE
3. MINIMUM SIZE OF CONDUIT SHALL BE 3/4", COUPLINGS AND CONNECTORS SHALL & ASSOCIATES LLC
SPARE 20 1 1 20 SPARE SPARE 20 1 1 20 SPARE BE GLAND/RING COMPRESSION TYPE ONLY. ALL CONNECTORS SHALL CONTAIN 36 SOUTH STREET
9 10 9 10 DENOTES 20 AMP. GROUND FAULT RECEPTACLE. NEW PROVIDENCE, N.J. 07974
SPARE 20 1 1 20 SPARE SPARE 20 1 1 20 SPARE INTEGRAL INSULATED NYLON BUSHINGS.
TELEPHONE (908) 464-9300
SPARE 20 1 11 12 1 20 SPARE SPARE 20 1 11 12 1 20 SPARE FAX (908) 464-3123

SPARE 20 1 13 14 1 20 SPARE SPARE 20 1 13 14 1 20 SPARE 4. ALL CIRCUITS SHALL INCLUDE A SEPARATE, CONTINUOUS, COPPER GROUND
15 16 15 16
CONDUCTOR RUN WITH THE CIRCUIT CONDUCTORS. GROUND CONDUCTORS
SPARE 20 1 1 20 SPARE SPARE 20 1 1 20 SPARE SHALL BE SIZED PER NEC.
SPARE 20 1 17 18 1 20 SPARE SPARE 20 1 17 18 1 20 SPARE
SPARE 20 1 19 20 1 20 SPARE SPARE 20 1 19 20 1 20 SPARE 5. ALL WIRING SHALL BE COPPER, TYPE THHN/THWN, #12 AWG MINIMUM, UNLESS
SPARE 20 1 21 22 1 20 SPARE SPARE 20 1 21 22 1 20 SPARE OTHERWISE INDICATED ON THE PLANS.
SPARE 20 1 23 24 1 20 SPARE SPARE 20 1 23 24 1 20 SPARE
6. CIRCUITS SHALL BE DESIGNED FOR MINIMUM OF 20 AMPS.
SPARE 20 1 25 26 1 20 SPARE SPARE 20 1 25 26 1 20 SPARE
SPACE 27 28 SPACE SPACE 27 28 SPACE 7. ALL DEVICES SHALL BE UL APPROVED.
SPACE 29 30 SPACE SPACE 29 30 SPACE
31 32 31 32 8. THE CONTRACTOR SHALL LABEL ALL CIRCUITS IN JUNCTION BOXES AND ON THE
SPACE SPACE SPACE SPACE
COVERS OF J-BOXES. THIS SHALL BE COMPLETED AND LABELED WITH VOLTAGE,
SPACE 33 34 SPACE SPACE 33 34 SPACE AMPERAGE, CIRCUIT NUMBER, PANEL AND BREAKER NUMBER.
SPACE 35 36 SPACE * FIRE ALARM PANEL 12 12 3/4 20 1 1.0 35 36 0.8 1 20 3/4 12 12 ROOFTOP UNIT WP GFI RECEPTACLES
SPACE 37 38 SPACE 37 38 9. LOCATION OF ALL ELECTRICAL DEVICES SHOWN ARE FOR IDENTIFICATION NJ. LIC. AI-11675 SEAL

SPACE 39 40 SPACE RTU-1 8 10 1 45 3 11.2 39 40 12.3 3 40 1 10 8 RTU-2 PURPOSE ONLY. CONTRACTOR SHALL COORDINATE WITH OWNER, ARCHITECT,
41 42 41 42 EQUIPMENT VENDOR AND MECHANICAL CONTRACTOR LOCATIONS OF ALL
SPACE SPACE
ELECTRICAL DEVICES AND REQUIREMENTS PRIOR TO INSTALLATION.

TOTAL CONNECTED LOAD KVA= *.*


* INDICATES BREAKER TO BE INSTALLED WITH HANDLE LOCK

TOTAL CONNECTED LOAD KVA= 25.3


10. WHERE MORE THAN 3 CONDUCTORS ARE INCLUDED IN ONE CONDUIT RUN, THE PREMIER
WIRE SIZE MUST BE INCREASED IN ACCORDANCE WITH NEC REQUIREMENTS FOR ENGINEERING
DE-RATING.
GROUP, INC.
11. THE CONTRACTOR SHALL LABEL ALL CIRCUITS IN THE PANEL BOX. CONTRACTOR MECHANICAL | ELECTRICAL | PLUMBING
SHALL PROVIDE A NEW TYPED PANEL DIRECTORY.
439 Route 46 East, Rockaway, New Jersey 07866
12. CONTRACTOR SHALL COORDINATE EXACT LOCATION OF ALL ELECTRICAL O: 973-586-3004 I F: 973-586-3009
DEVICES WITH ARCHITECT/OWNER. WWW.PEGMEP.COM PEG# YYNNN

13. ALL NEW WALL RECEPTACLES SHALL BE MOUNTED 18" A.F.F. UNLESS
OTHERWISE INDICATED ON THE PLANS.

14. THE NUMBER OF SLASH MARKS INDICATE THE NUMBER OF CONDUCTORS WITHIN
EACH CIRCUIT RUN, LONG SLASH INDICATES A NEUTRAL CONDUCTOR.
Gregory W. Cheney P.E.
15. COLORS AND FINISHES OF ALL ELECTRICAL DEVICES AND COVER PLATES SHALL NJ License No. 24GE04786700
BE AS SELECTED BY ARCHITECT.
UTILITY
TRANSFORMER

ELECTRICAL EQUIPMENT: EXTERIOR INTERIOR CONCESSION #104

NEW UTILITY TRANSFORMER 208/120V, 400A SERVICE.

NEW 400A MOLDED CASE BREAKER IN NEMA 1 ENCLOSURE.


400A
PANEL 'EP1' 200A MCB 208/120V 3Ø-4W SQUARE D MODEL NQ42L2C, MCB 'GP1' 'GP2'
225A MAINS, 42 POLE NEMA-1, 22,000 AIC FULLY RATED. 200A 200A
MCB MCB
PANEL 'EP2' 200A MCB 208/120V 3Ø-4W SQUARE D MODEL NQ42L2C, 400A CT
225A MAINS, 42 POLE NEMA-1, 22,000 AIC FULLY RATED. CABINET
(4) #3/0 KCMIL THHN/THWN COND.
ELECTRICAL TROUGH SIZED PER NEC REQUIREMENTS.
& (1) #6 GND. IN 2-1/2" CONDUIT
(2) 5 8" X 8' GROUNDING RODS.

NEW METER IN NEMA 1 ENCLOSURE

NEW 400A CT CABINET


(4) #600 KCMIL THHN/THWN COND.
& (1) #3 GND. IN 4" CONDUIT

(4) #600 KCMIL THHN/THWN COND. & (1) #3 GND. IN 4" CONDUIT. BOLTED, RIVETED, OR WELDED
RUN (1) ADDITIONAL EMPTY 4" CONDUIT WITH NYLON DRAG LINE.

MIN. 7'-1/2" #6 COPPER WIRE SERVICE EQUIPMENT


GROUNDING
6' MIN.
ELECTRODE
CONDUCTOR

ELECTRICAL RISER DIAGRAM BONDING


JUMPER
SCALE: NOT TO SCALE

REVISIONS
BONDING JUMPER
WATER METER NO. DATE DESCRIPTION BY
MAIN BONDING
JUMPER
ONE ( 1 ) STONCO CAT. #VW-1-GC WITH VXL13
UNIVERSAL BOX, PROVIDE 100 WATT, A-19 LAMP

CONCRETE-ENCASED ELECTRODE

3
4" RIGID GALVANIZED STEEL CONDUIT 8'-0"
LONG WITH PVC CORROSION RESISTANT
2"x4" ROT RESISTANT WOOD SUPPORT
COATING. BONDING JUMPER
BLOCKING, FASTEN TO UNIT WITH 2" RUST
RESISTANT MOLLY BOLTS, (TYP. FOR 3)
METAL WATER PIPE
1" GALVANIZED STEEL STRAP AROUND 1 02-07-24 BID PERMIT SET GWC
CONDUIT, FASTEN TO WOOD BLOCKING WITH
RUST RESISTANT WOOD SCREWS (TYP.) DATE ISSUED: 2/07/24

ISSUED FOR: BID & PERMIT


WEATHER PROOF 125V. DUPLEX GFI CONVIENCE 8" MIN. BETWEEN 10'-0" x 5/8" COPPER CLAD GROUND ROD GROUND RING
OUTLET & 20A 120V. S.P.S.T. TOGGLE SWITCH WOOD BLOCKING REVIEWED BY: G.W.C.
ALL GROUNDING ELECTRODES THAT ARE PRESENT IN EACH BUILDING OR STRUCTURE SERVED SHALL
BE BONDED TOGETHER TO FORM THE GROUNDING ELECTRODE SYSTEM. DRAWN BY: C.L.M.
WEATHER PROOF JUNCTION BOX FASTEN TO
ROOFTOP UNIT WITH SHEET METAL SCREWS
GROUNDING ELECTRODES SHALL INCLUDE THE FOLLOWING: CITY MD PROJECT NUMBER
- METAL UNDERGROUND WATER PIPE
- METAL IN-GROUND SUPPORT STRUCTURE
- CONCRETE ENCASED ELECTRODE
- GROUND RING
PROVIDE GENERAL ELECTRIC
SEALANT ALL AROUND JUNCTION
- ROD AND PIPE ELECTRODES SHEET TITLE
- PLATE ELECTRODES
BOX AND WOOD BLOCKING 3/4" CONDUIT AND CONDUCTORS TO
NEAREST 120V. PANEL, PROVIDE EXCEPTION:
ELECTRICAL -
1-POLE, 20 AMP. BREAKER WHERE CONCRETE-ENCASED ELECTRODES OF EXISTING BUILDING OR STRUCTURE ARE NOT ACCESSIBLE
WITHOUT DISTURBING FINISHED CONCRETE.
NOTES AND DETAILS

ROOF MOUNTED EQUIPMENT LIGHT AND RECEPTACLE SERVICE ENTRANCE GROUNDING DETAIL SHEET NUMBER
SCALE: NOT TO SCALE SCALE: N.T.S.

E-001
ARCHITECT PROJECT NUMBER

22167
FRANKLIN 27 DEVELOPERS,
LLC PROPOSED CITYMD

625 SOMERSET STREET


TOWNSHIP OF FRANKLIN, 08873
SOMERSET COUNTY, NJ

LONGO ARCHITECTS
& ASSOCIATES LLC
36 SOUTH STREET
NEW PROVIDENCE, N.J. 07974
TELEPHONE (908) 464-9300
FAX (908) 464-3123

NJ. LIC. AI-11675 SEAL

PREMIER
ENGINEERING
GROUP, INC.
MECHANICAL | ELECTRICAL | PLUMBING
45 40
439 Route 46 East, Rockaway, New Jersey 07866
O: 973-586-3004 I F: 973-586-3009
WWW.PEGMEP.COM PEG# YYNNN

RTU RTU
Gregory W. Cheney P.E.
2 1 NJ License No. 24GE04786700

FACP

0 2' 4' 8' 12' 20'

ELECTRICAL - FIRST FLOOR - NEW POWER PLAN


SCALE: 1/4"=1'-0"

REVISIONS
NO. DATE DESCRIPTION BY

1 02-07-24 BID PERMIT SET GWC


DATE ISSUED: 2/07/24

ISSUED FOR: BID & PERMIT

REVIEWED BY: G.W.C.

DRAWN BY: C.L.M.

CITY MD PROJECT NUMBER

SHEET TITLE
ELECTRICAL -
FIRST FLOOR PLAN

SHEET NUMBER

E-101
ARCHITECT PROJECT NUMBER

22167
01. GENERAL REQUIREMENTS 18. MOTOR WIRING FRANKLIN 27 DEVELOPERS,
12. WORK IN CONNECTION WITH OTHER TRADES
a. General: In general, motors 1/3 HP and smaller shall be 120 volt single phase, 60 cycle. Motors 1-1/2HP and larger shall be 208
LLC PROPOSED CITYMD
a. General Conditions, Supplemental General Conditions and all applicable portions of Specifications shall be considered part of this a. General: The Electrical Contractor shall include all wiring associated with mechanical equipment as generally shown on the
section. volt, 3 phase, 60 cycle.
drawings but specifically as shown in shop drawings and further described herein. Examine the Architectural and mechanical
plans and specifications to familiarize yourself with the extend of this work. 625 SOMERSET STREET
b. The Contractor shall visit the existing building and site and thoroughly familiarize himself with the existing conditions. No extra b. Flexible Conduit: All motor outlets shall consist of a minimum of a eighteen inch (18") length of flexible Greenfield conduit to
TOWNSHIP OF FRANKLIN, 08873
compensation will be allowed for additional work claimed, if such work could have been anticipated after careful examination of each motor. Where motors are fed from conduits above motors, a box shall be set at approved height and Greenfield run from
b. Mounting Equipment by Others: The General Contractor and Mechanical Contractor shall furnish all controls, starters, SOMERSET COUNTY, NJ
existing conditions. box to motor. Use liquid-tight flexible metallic conduit where required for motors exposed to the weather or in damp locations.
thermostats, etc., and turn them over to the Electrical Contractor, complete with wiring diagrams and installation details, for him
to wire and install. All electric power and control wiring shall be done by the Electrical Contractor.
02. CONTRACT DOCUMENTS

a. The Drawings and Specifications have been prepared in sufficient detail to enable one proficient in the art of Electrical
c. Wiring Diagrams: Request wiring diagrams from other Contractors in sufficient time to install properly sized and located 19. DISCONNECT SWITCHES LONGO ARCHITECTS
Construction to enter into an equitable contract and carry out the work in the true spirit of the designers intentions in accordance
conduits, outlets, etc. Install conductors required and connect in accord with approved shop drawings. Connect each and every & ASSOCIATES LLC
piece of equipment, motors, starters, control devices, components, etc., complete and ready for satisfactory operation. a. Where required by code, furnish and install disconnect switches for all motors, appliances, etc. unless otherwise shown or 36 SOUTH STREET
with the best practice for this class work. No attempt has been made to detail items of materials or labor that are self-evident as NEW PROVIDENCE, N.J. 07974
necessary to effect a complete and perfect operating installation. Contractor shall furnish any and all items that may be required specified. Disconnect switches shall be general duty type, as manufactured by Westinghouse, Square D or approved equal. TELEPHONE (908) 464-9300
FAX (908) 464-3123
for the proper functioning of the system.
13. RACEWAYS AND BOXES 20. BALANCING LOADS EQUALLY ON PHASES
03. SCOPE OF WORK
a. General: All conduit shall be concealed in wall construction, hung ceilings, etc., where possible. a. The Contractor, in making this installation, shall balance all loads as evenly as possible on all phases at each panel. If necessary,
a. All applicable provisions of the instructions to Bidders, General Conditions, Division 1 and other Divisions of the Specifications
shall be part of this section. he shall reconnect branch circuits as required to provide equal phase balance. As-built drawings and panel schedules shall reflect
b. Raceways: Generally, but not exclusively, use the following as manufactured by National Electric, Triangle, General Cable, in 3/4" circuiting as actually connected to each panel.
minimum size.
b. Furnish all labor, materials, equipment, and permits necessary for proper completion of all new and alteration work as required by
this Specification and applicable Drawings.
1. Rigid hot dipped galvanized - in concrete, wet areas, and mechanical equipment areas. 21. TELEPHONE WORK
2. Thinwall (EMT) - in dropped ceiling areas, interior block walls.
c. Such work shall include but is not necessarily limited to the following:
3. Greenfield (neoprene coated) - to all motors and vibrating equipment, minimum length 3'0" and looped 360 degrees. a. All new telephone work required and installation of telephone wiring shall be arranged for by Owner and done by Owner's
1. Demolition and removals. Use "Sealtite" or weather proof flexible raceway where exposed to weather or wet conditions. telephone equipment company including phones, etc.
2. Branch circuits. 4. All normal power branch circuit wiring not in conduit shall be HFC 90 type or equal in accordance with NEC 517-13
3. Wiring methods and devices. requirements, however all emergency circuit wiring must be in conduit.
NJ. LIC. AI-11675 SEAL
4. Receptacles, raceways, and boxes. 5. Fire alarm wiring may be in plenum rated conductor. 22. TEMPORARY LIGHT AND POWER
5. Work in connection with other trades.
6. Temporary light and power. c. Supports, Hangers, Fittings: Support all raceways and boxes from building structure only, and not the work of other trades, such a. Electrical Contractor shall provide temporary electrical power and light and maintain same during regular working hours.
7.
8.
Shop drawings and approval of materials.
Tests and inspections.
as piping, T-bar, ceilings. Supports and hangers shall be galvanized as manufactured by Fee & Mason or equivalent.
b. Provide for those areas being renovated:
PREMIER
9. Guarantees. d. Pull Boxes: Sheet steel boxes shall be formed of hot dipped galvanized sheet steel, code gauge dimensions. Pull boxes shall be ENGINEERING
installed where necessary to facilitate the pulling or splicing of feeders. 1. One double socket for each 400 square feet or each individual room whichever is smaller. One 100 watt lamp in one half GROUP, INC.
d. Provide all other work as shown on electrical drawings. of double socket and other half of socket to be used for small electric hand tools. Not more than 8 double sockets per
MECHANICAL | ELECTRICAL | PLUMBING
20 amp. circuit.
14. WIRING AND METHODS 2. One 30 amp., 3 phase power outlet per 3,000 square feet, terminals in a 3 pole fused switch and 3 wire, 4 pole, 30 amp. 439 Route 46 East, Rockaway, New Jersey 07866
04. RELATED WORK OF OTHER SECTIONS receptacle. O: 973-586-3004 I F: 973-586-3009
a. Conductors: Branch circuit wiring shall be solid approved copper up to and including size #8 and stranded for size #6 or larger. 3. Use stringers and feeders, and obtain electrical energy from existing panels. Cost of energy will be by Owner. WWW.PEGMEP.COM PEG# YYNNN
a. Ceiling systems by the Contractor for general construction shall be verified by the Electrical Contractor prior to the submission of Insulation in buried conduit and elsewhere shall be type THHN or THW. Voltage rating of all insulation will be 600 volts, with the
lighting fixtures to be installed thereon. exception of limited energy low voltage circuits not in the same raceway or box as 120 or 208 volt circuits. Type insulation, wire
size and manufactures name must be imprinted throughout the entire length.
23. CLEANING AND REMOVAL OF RUBBISH
b. Request wiring diagrams for Heating and Air Conditioning Work, owners equipment, and General Construction Work requiring
power and/or control wiring. b. Grounding: Ground connections shall be as provided by the National Electric Code or specifically indicated on the plans for all
grounded distribution systems, conduits, transformers, panels, motor, switchboards and all metallic uses of apparatus or a. The Contractor shall at all times keep the premises free of all waste or surplus materials, rubbish, and debris, which is caused by
appliances enclosing "Live" electrical wiring or parts. Use grounding type locknuts on all feeder conduits entering and leaving all his employees or results from his work. Gregory W. Cheney P.E.
c. Finishing of work, walls, floors, partitions, and ceilings in existing building cut by Electrical Contractor for installation of his work. NJ License No. 24GE04786700
lighting and power distribution panels, bus ducts, cable tap boxes, motor control center, switchboard wireways, etc.
b. After all equipment and fixtures have been installed, the Electrical Contractor shall remove all labels, stickers, rust stains,
c. Connectors and Splices: Wiring shall be continuous in all raceways and connections made in an approved manner in junction temporary covers, etc. All foreign materials shall be blown out or flushed out of all switches, fixtures, panels, fans, motors,
05. PERMITS, RULES, AND REGULATIONS devices, raceways, etc. Identification plates on all equipment shall be free of excess paint or grease and shall be left clean so as
boxes, pull boxes, or equal. Make connections or taps on small size wiring using the pressure type connector with UL approved
connectors as manufactured by Buchanan, Buck, or Ideal. to be easily readable.
a. Contractor shall obtain and pay for all licenses, permits, and inspection fees in connection with the work of their contract.
d. Branch Circuit Wiring: Wire on any circuit, the outlets, devices, switches, etc., indicated to be connected thereto, but note that c. The Contractor shall leave his portion of the work in a safe and clean condition ready for operation. In cases of dispute, the Owner
b. Contractor shall furnish required certificate of approval of installation upon completion of work. shall remove all rubbish or excess materials or do all cleaning and charge the cost to the Contractor.
actual circuit enumeration need not be identical to that listed so long as the grouping of items on a circuit corresponds in every
c. Comply with all codes or regulations which may apply, and install all electrical work in accordance with the 2017 edition of the case to that which is required. Take branch circuits from panels in such manner that the load will be balanced on all three phases
"National Electrical Code". equally. Note that switch legs require same grade and type wiring as for branch circuits from panels.
24. PAINTING

15. WIRING DEVICES a. Except as otherwise specified, no painting will be required. Thoroughly clean all base metal surfaces of piping conduit, hangers,
06. MATERIALS AND WORKMANSHIP
panels, etc. and leave same in a neat and workmanlike condition for application of paint by others.
a. All materials shall be new, conforming to Standards as specified. a. General: Furnish and install quality devices bearing UL label for the service and electrical rating where used of size specified, all
similar and equal to Hubbell, Arrow Hart, Bryant, or approved substitutes, inclusive of the following: Where more than one device b. If factory finishes of equipment are marred, worn, rusted, or otherwise defaced, the Contractor shall repaint same with two coats
is indicated in the location, they shall be ganged together in one box and under one plate as required. of enamel of matching color.
b. All labor shall be performed by skilled mechanics under experienced superintendence. All work shall be properly executed
presenting a neat and workmanlike appearance subject to Architect's approval.
b. Receptacles: As specified on drawings.
c. Disconnects: As specified on drawings. 25. JOB COMPLETION
07. CUTTING AND PATCHING d. Accessories: As selected by Architect.
a. Completion of the Electrical Work shall be diligently pressed with a work force adequate to meet all schedules and in
a. The Contractor for this work shall do all cutting and patching in existing building as required for this work. All necessary cutting completeness by the Electrical Contractor before offering for final inspection.
shall be done by and with means approved by Architect, inclusive of holes in structural members, wall, floors, etc. Keep all cutting
to a minimum. All holes through existing concrete floors, etc. shall be core drilled. 16. ELECTRICAL PANEL b. Install accurate typed directories of circuits in frame under plastic in all panels and identify same with approved means such as
card holders with type designations or lamcoid plates; check all electrical facilities, including pullboxes, and properly identify in
b. The Contractor for general construction shall do all patching of walls, floors, etc. for his work as required and similar to a. General: Panelboard shall be UL labeled and rated for the voltage supplied, complete with circuit breakers scheduled and capable readable and approved manner suitable for the place where positioned. Label wiring of systems operating at less than 50 volts at
requirements as specified in General Construction Documents. of interrupting the fault current that can be supplied at the point of installation, (including motor feed-back). all boxes to identify same fully. Multiple conductor control, etc., wiring shall be identified by number using E-Z markers and
provide a directory showing numbers and connections thereto. New panel directories shall also be provided for existing panels
c. The Contractor for General Construction, shall do all final finishing and painting of walls, floors, etc., as required. b. Style: that have been altered.

1. 120/208 volt type: Recess mounted, 3 phase, 4 wire as noted. c. Provide the services of the foreman in charge of the installation of the Electrical Work on this project, or other equally qualified
08. PROTECTION OF WORK AND MATERIAL 2. Panelboard shall be as manufactured by Square D or equal by G.E., Cutler Hammer, or Siemens. Union Journeyman, for one (1) working day or as may be otherwise required to be devoted to instructions to Owner's
representative in all details of operating, servicing, and maintaining all electrical items.
a. Take all precautions and be responsible for proper care and protection of all portions of all materials delivered and work c. Circuit Breaker Types: Ambient temperature compensated thermal magnetic over-center trip single handle (no bales allowed) on
performed, until the completion and acceptance of the work as a whole and issuance of certificates for final payment of such breakers in frame and trip sizes schedule. The circuit breakers shall be quick make - quick break on manual as well as automatic
Contract. operation and shall have inverse time characteristics secured through the use of Bi-metallic tripping element supplemented by a 26. RECORD DRAWINGS
magnetic trip and shall be of the indicating type, providing on-off "tripped" positions of the operating handle. When the breaker
b. Cap all incomplete lines until ready for final connections after which they shall be thoroughly cleaned and left unobstructed. is tripped automatically, the handle shall assume a middle position between "on" and "off". All multi-pole breakers shall be so a. During construction, Contractor shall keep an accurate record of all deviations between work as shown on the drawings and that
designed that on overload on one pole automatically causes all poles to open. which is actually installed. The cost of furnishing prints and preparing record drawings showing all deviations shall be borne by
c. Any and all portions of the work liable to damage by reason of operation and conducted under this Contract, by weather or by this Contractor and shall be included in his bid.
other engaged on the work, must be securely protected by temporary but substantial boarding or covering which must be d. Circuit Breaker Arrangement: Single pole breakers in phase sequenced order so that any 3 adjacent breaker poles will connect A,
b. Preparation of record drawings shall be carried on as the work progresses and be available for inspection be Architect. When all
maintained in position until not required, and its removal is approved by Architect. B, and C phases sequentially; main bus and phase to which connected clearly identified; full removability of any unit without
revisions showing work as finally installed are made, prints shall be submitted for review to Architect and upon approval, two sets
REVISIONS
disturbing adjacent units, loosening or affecting supplemental insulation supplied to obtain clearances, or other code
09. CONTRACT DRAWINGS requirements. shall be delivered to Architect before final payment for completed work will be made.
NO. DATE DESCRIPTION BY
Modification as may be found necessary or desirable at time of installation in order to meet any structural condition e. Circuit Breaker Sizes and Quantities: See the various electrical panel schedules and panel equipment schedules etc., on drawings;
equip with sufficient quantities of circuit breakers, as scheduled. Coordinate all circuit breakers in entire electrical systems for 27. MAINTENANCE INSTRUCTIONS
a. Drawings accompanying these Specifications are intended to show only general arrangement and extent of all work to be done. code approved RMS, amperes, trip sizes, etc. The main circuit breaker shall be a shunt trip type, of the rating indicated on the
Determine exact location and arrangement of all work as work progresses. plans. a. This Contractor shall provide instructions on the operation of all systems in all details, to representative of the Owner, who will be
operating and maintaining systems. Notify Architect in advance, when all arrangements have been made for time when
b. Locations of equipment, outlets, etc., shown on drawings are approximately correct but are subject to such and avoid interference f. Internal Mounting and Bussing: Back pan flanged for entire length of angle iron securely fastened to same for rigidity; screws, instructions are to be given, so that Architect or his representative may be present.
with other work or equipment provided by others. Make such changes as are required without extra cost. bolts, and lock washers only for copper connections; bus bars securely fastened to bases independent of breakers for support main
and branch circuit connections of copper cross-section based upon NEMA standards; main busses and back pan arranged so that
branch circuits may be changed without additional machining, drilling, or tapping. 28. GUARANTEE
10. LOCATIONS OF OUTLETS
g. Box Enclosure: Cabinet shall be of sufficient size to provide a minimum gutter space of four inches on all sides or as indicated on a. Furnish guarantees for all labor and material for one (1) year from date of final acceptance of contract or full occupancy of
a. Drawings accompanying these specifications are intended to show only general arrangement and extent of all work to be done. the drawings. Box shall be made from code gauge galvanized steel and shall be equipped with an in and out adjustment feature building by Owner, whichever is earlier. Include agreement to repair and make good at own expense any and all defects in work or 1 02-07-24 BID PERMIT SET GWC
Determine exact location and arrangement of all work as work progresses. on back pan mounted studs. Front shall be flush or surface as indicated on the drawings, of code gauge sheet bonderized and material appearing during that time, which in Architects opinion arise from defective workmanship, imperfect, or inferior
finished one coat gray lacquer and shall include door and directory frame with combination lock and catch with two milled keys. materials. DATE ISSUED: 2/07/24
b. Locations of equipment, outlets, etc., shown on drawings are approximately correct but are subject to such modification as may be All locks shall be furnished with vault handle operator and with three point catch. Front shall be furnished with approved
found necessary or desirable at time of installation in order to meet any structural conditions and avoid interference with other adjustable indicating trim clamps as the means for securing the front to the box. b. The manufacturers of equipment to be supplied under this Contract by the Electrical Contractor shall warrant the same against all ISSUED FOR: BID & PERMIT
work or to suit layout of equipment provided by other trades or the Owner. Verify all locations with Architect prior to installation costs, including labor and material, arising out of defects in material and/or workmanship, for a period coextensive with the REVIEWED BY: G.W.C.
of rough work and make such changes as are required without extra cost. h. Panel Interior: The panelboard interior shall be factory assembled complete with circuit breakers as shown in the schedule on the guarantee period provided in the Contract Documents, however the Contractor shall bare the responsibility for manufacturers
drawings. Interior shall be so designed and assembled that any individual breaker can be replaced without disturbing adjacent compliance. DRAWN BY: C.L.M.
c. Gang Boxes: Where two outlets such as convenience, switch, etc., occur together, use a two-gang partitioned box with a common units or without removing main bus or branch circuit connectors. Entire interior assembly shall consist of a reinforced "Z" shaped
combination face or device plate. back pan on which box assembly and breakers are mounted. Panelboard shall be so designed that the branch circuit, connections CITY MD PROJECT NUMBER
to the main bus provide sequence (full distributed) phasing. All main buses shall be copper and shall be securely fastened to
d. Special Cutouts: Consult Architectural Drawings in conjunction with the Electrical Drawings. Where outlets are shown in wood insulating base and shall not depend on the branch circuit breakers for support. Pressure wire connectors shall be used
facings or walls this Contractor shall cut out the necessary apertures of his outlet boxes. Before installing outlet boxes for throughout. Lug stops shall be furnished to prevent lugs from turning and decreasing electrical clearances between live parts and
switches, the Electrical Contractor shall check the swing of all doors and locate the outlet boxes on the strike side of the doors. all electrical connections shall be of 98% conductivity copper to copper (no current carried by screws alone) 100 ampere per
square inch density, with all parts machined and finished. SHEET TITLE
e. Equipment Outlets: Where an outlet is indicated as serving a specific piece of equipment, locate outlet as required by equipment
or layout roughing drawings. Work from approved equipment and roughing shop drawings. ELECTRICAL -
17. SPLICING SPECIFICATIONS
11. SHOP DRAWINGS AND APPROVAL OF MATERIALS
a. Splicing of wires up to 3 No. 8 gauge conductors shall be made with pressure connectors, wire nuts or screw caps. Splices above
a. Prepare and submit shop drawings or manufacturer's drawings as listed below and specified in the Supplementary General this size will be made with approved mechanical connectors and insulated with plastic tape. Splices in damp locations shall be
Conditions. These shop drawings shall include the following information: Manufacturer, sizes, catalog numbers, dimensions, made with approved splice kits, as manufactured by Minnesota Mining and Manufacturing Company.
capacities, performance charts and curves, wiring diagrams, detail drawings, and any other details necessary for complete clarity
SHEET NUMBER
of materials and equipment to be installed.

E-201
ARCHITECT PROJECT NUMBER

22167

You might also like