You are on page 1of 1

1 2 3 4 5 8 9 10 11

NOTES :

1. HEIGHT ARE RELATED TO QATAR NATIONAL HEIGHT


BARBED WIRE
HEIGHT DATUM (QNHD).
2.5x2 (TWISTED WIRES)

2. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS


60 U-BOLT&NUT 60 NOTED OTHERWISE.
SOCKET PIPE T=6mm SOCKET PIPE

65
65
48.3x3.7x60L 48.3x3.7x60L 3. FOR FENCE MATERIALS DESCRIPTION, REFER TO
A A
TOP RAIL TOP RAIL PROJECT SPECIFICATION: NFEF-60-45-CI-TS-NA-001.
J-BOLT&NUT
33.7x4.0 (HFCHS) 33.7x4.0 (HFCHS)
T=6mm

85

85
U-BOLT&NUT

300
34

34
T=6mm

t6

t6

85

85
SHORT PIPE TENSION WIRE SHORT PIPE TENSION WIRE
35 35 30 35 35 30
114.3x5.0x100L 5 114.3x5.0x100L 5 I-BOLT&NUT

65

65
BARBED WIRE
100 PL-50x100 PL-50x100 T=6mm
BOLT&NUT M12 2.5x2 (TWISTED WIRES)
BOLT&NUT M12

n
SECTION A

50
50
SECTION SOCKET PIPE H
E

80
80
S=1/5 - 48.3x3.7x60L
S=1/5 - -

80

80

50
50
B B
I-BOLT&NUT
25
TOP RAIL T=6mm
BOLT&NUT

3000
33.7x4.0 (HFCHS)
T=6mm
I
65

HOLE 10 TENSION WIRE


- SHORT PIPE
HOLE 10 5

65

65
76.1x4.0x80L
SHORT PIPE
76.1x4.0x80L J-BOLT&NUT
85

F.G.L T=6mm
DETAIL

85

85
7
SECTION I
S=1/5 101

300
S=1/5 -
85

SOCKET PIPE (FOR LINE POST)


48.3x3.7x60L

85

85
BARBED WIRE
TOP RAIL 2.5x2 (TWISTED WIRES)
c
°

SOCKET PIPE
65

45

33.7x4.0 (HFCHS)
48.3x3.7 I-BOLT&NUT

c
I-BOLT&NUT

°
70

65
65
TENSION WIRE

45
c

C PL-6tx50x100 T=6mm
C
SOCKET PIPE T=6mm SOCKET PIPE
5(WELDING) 60
50

48.3x3.7x60L 48.3x3.7x60L

c
80

A
50

50
80
E

80
-

20
-
40 30
00

37
5 20 1
1

50

40 30

t6
00

00
5
5 20 1
1

70
50

PL-6tx50x100 TOP RAIL BRACE


1

3000

TENSION WIRE 33.7x4.0 (HFCHS) 33.7x4.0 (HFCHS)


SHORT PIPE TOP RAIL
1

HOLE 10 5 SECTION J
114.3x5.0x100L 33.7x4.0 (HFCHS)
SECTION H
S=1/5 -
BOLT&NUT M12 S=1/5 -
F HOLE 10
SHORT PIPE
TENSION WIRE
- 114.3x5.0x100L SOCKET PIPE
STRETCHER BARS 5
BOLT&NUT M12 48.3x3.7x60L
FB-25x5 F.G.L SHORT PIPE
35 35 30 BOLT&NUT M12 76.1x4.0x100L
STRETCHER BARS SHORT PIPE
D PL-6tx32x66.5 D
FB-25x5 114.3x5.0x100L BRACE
30 35 35 SECTION
100 F 33.7x4.0 (HFCHS) HOLE 10
S=1/5 - J
100 -

34

616

32
00

24.5

1
DETAIL DETAIL

1
1 4

66

616
TENSION WIRE
S=1/5 101 S=1/5 101

1
5

32
(FOR CORNER POST) (FOR PULL POST)
PL-6tx32x60

TRUSS ROD 30 36.5 30 30


9 LINE POST
66.5 60
PL-6tx32x100 60.3x4.0

NFEF-60-00-CI-DR-TD-101 DETAIL FOR PERIMETER FENCE (1)

E
U-BOLT&NUT U-BOLT&NUT
DETAIL 8 NFEF-60-00-CI-DR-PL-024 SITE PREPARATION (LOT W2/3)FENCE/GATE PLAN E
U-BOLT&NUT
60 T=6mm 60 S=1/5 101
T=6mm SOCKET PIPE T=6mm SOCKET PIPE NFEF-60-00-CI-DR-PL-033 SITE PREPARATION (LOT W1A) FENCE/GATE PLAN
PL-85x100 U-BOLT&NUT
48.3x3.7x60L 48.3x3.7x60L PL-85x100 I-BOLT&NUT NFEF-60-00-CI-DR-PL-025 SITE PREPARATION (LOT N3)FENCE/GATE PLAN
T=6mm
BRACE BRACE T=6mm
TENSION WIRE DWG NO. TITLE
33.7x4.0 (HFCHS) 33.7x4.0 (HFCHS)
TENSION WIRE
5 REFERENCE DRAWINGS
5
34

t6 20
34
34

34
t6

t6
t6

t6
SHORT PIPE SHORT PIPE 30 30 30 30
SHORT PIPE 35 45 25 SHORT PIPE
35 25 114.3x5.0X85L 35 25 114.3x5.0X85L 35 45 25 TENSION WIRE D1 APPROVED FOR DESIGN M.T/K.U S.I Y.H DEC.07,2018
114.3x5.0x100L 114.3x5.0x100L 5
BOLT&NUT M12 105 C1 ISSUED FOR APPROVAL R.A/K.U S.I Y.H OCT.26,2018
60 PL-50x100 BOLT&NUT M12 60 PL-50x100 BOLT&NUT M12 105
BOLT&NUT M12 A1 ISSUED FOR INTERNAL REVIEW R.A S.I Y.H OCT.19,2018

NO. DESCRIPTION BY CHKD APVD APVD DATE


F
SECTION B SECTION C SECTION G SECTION L SECTION K F
REVISIONS
S=1/5 - S=1/5 - S=1/5 - S=1/5 - S=1/5 -
REV DATE APPROVED

SHORT PIPE ISSUED FOR CONSTRUCTION


I-BOLT&NUT 76.1x4.0x80L
DATE
T=6mm
HOLE 10
BY
K

55
DRAWN DSGND CHKD APVD APVD

80
STRETCHER BARS -

6
16 1

32
PL-25X5 BOLT&NUT M12 ALL RIGHTS RESERVED

25
SOCKET PIPE SOCKET PIPE THIS DOCUMENT IS THE PROPERTY OF QATARGAS OPERATING COMPANY LIMITED AND CONTAINS
INFORMATION WHICH IS PROPRIETARY. THIS INFORMATION IS TO BE HELD IN CONFIDENCE.
48.3x3.7x60L STRETCHER BARS BOLT&NUT M12 48.3x3.7x60L TRUSS ROD NO DISCLOSURE OR OTHER USE OF THIS DOCUMENT IS TO BE MADE WITHOUT THE PRIOR

CORNER POST PL-25X5 9 TENSION WIRE WRITTEN CONSENT OF QATARGAS OPERATING COMPANY LIMITED.

BRACE TRUSS ROD BRACE LINE POST


89.2x4.0 PULL POST 5
30 30
33.7x4.0 (HFCHS) 9
89.2x4.0
33.7x4.0 (HFCHS) 60.3x4.0
PL-6tX32x60
NORTH FIELD EXPANSION PROJECT
B G L
60
- - - Onshore Facilities FEED
25
30

30

C
G
DETAIL Contract No. G
85

- 9
35
25 35 25

00
00

32

PL-6tx32x100
32
50

50
1
1

S=1/5 101
6

25
85

61
61

PL-6tx32x100
20

20

Qatargas Operating
1
1

SHORT PIPE
PL-6tX32x60 PULL POST TENSION WIRE
Company Limited
TENSION WIRE 76.1x4.0x80L
PL-6tx32x60
SHORT PIPE 89.2x4.0 5
QATARGAS
5
114.3x5.0x100L CORNER POST SHORT PIPE HOLE 10 HOLE 10
89.2x4.0 114.3x5.0x100L SHORT PIPE 34.5 K
BOLT&NUT M12 HOLE 10 BOLT&NUT M12
114.3x5.0X85L -
SHORT PIPE

40
34.5 35 45 25
STRETCHER BARS

6
35 25 STRETCHER BARS 35 25

61
114.3x5.0X85L

80

32
FB-25x5

1
35 45 25 TITLE

40
FB-25x5 PL-6tx85x100 105
60 60 DETAIL FOR PERIMETER
PL-6tX85x100 105 TENSION WIRE
5 FENCE (2)
PL-6tx32x60

H DETAIL 2 DETAIL 3 DETAIL 5 DETAIL 6 30 30 H

S=1/5 101 S=1/5 101 S=1/5 101 S=1/5 101 LINE POST SCALE 1/5 JOB NO. AHB01E11
60 60.3x4.0 PROJECT DRAWING NO. REVISION

DETAIL 10 NFEF-60-00-CI-DR-TD-102
S=1/5 101 NFEF D1

1 2 3 4 5 8 9 10 11 WORK NO.

You might also like