You are on page 1of 4

Customer Data Sheet for Solar Power Plant

Personal Information:

Sl. Name
No
1 Contact Person
2 Contact Number(Mobile)

3 Contact Number(Landline)
4 Email Address

5 Website Address

6 Address

7 City
8 State

9 Already a solar user(Y/N)

10 If above is yes then which company and


product
11 Budget of the customer

12 Time line of customer to execute project

13 PV solution required for : Residential /


Education Institute / Hospital /
Defense/ Petrol pump/ Bank/Others
etc.
14 Customer’s reason to go for a solar
solution.
Technical Information:

S.No Particulars Remarks

1 Load Details Complete with Power factor


Consideration
2 Type ( Single and Three Phase)
3 Hours of backup required
7 Latitude and Longitude
8 Wind speed in particular area
9 Shadow free Space Available (Y/N)
Ground Mounted (Sqr mtr/sqr Feet)
Roof Top (Sqr mtr/Sqr Feet)
Level of floor for module mounting i.e 1st /2nd/3rd… etc
10 Control Room Specification
Size
Flooring (Cemented/non cemented )
Roof (Cemented/non cemented )
11 Source Of power ( Gen-set /Grid)
12 Grid Available (Y/N)
13 Grid Type(Single / Three Phase)
14 Hours of Availability of Grid (Approx)
15 Time of grid Available
16 Gen-set rating if available
17 Type of Gen-set (Single /Three Phase)
18 No. Of hrs DG set used Avg. in a Day
19 Distance Between Panel and Control room
20 Autonomy required (Y/N)
21 If Autonomy required then specify No of days
22 Expectations
23 Copy of Grid Bill attached(Y/N)
24 Data logging required (Y/N)
25 Remote data monitoring required (Y/N)
26 Certifications required
Load Chart (Single Phase)

S. Application Numbers Load Hours of Time of Power


No. Wattage backup operation Factor (VA)
(a.m./p.m.)
1 Light Load
2 Fan Load
3 Drinking
water Jet
Pump load
4 Computer/
IT Deptt.
Load
5
6
7

Load Chart (Three Phases)

S. No. Application Numbers Load Hours of Time of Power


Wattage backup operation Factor (VA)
(a.m./p.m)
1
2

4
5

You might also like