You are on page 1of 1

Project Spreadsheets to Eurocode 2 The Concrete Centre

Client BigBucks PLC Made by Date Page


Location Pilecap G14 Rod 4-Dec-23 292
PILECAP DESIGN to EN 1992-1: 2004 (without UK NA) Double Pilecap Checked Revision Job No
Originated from TCC82.xls v 3.0 on CD © 2003-2006 TCC - - FB625
Usage: Traffic, 30 to 160kN
MATERIALS fck 35 N/mm² dg 20 mm gc 1.5 concrete
fyk 500 N/mm² T&S cover 50 mm gs 1.15 steel
Steel class A Btm cover 75 mm Conc density 25 kN/m³
Pile capacity 525 kN
DIMENSIONS mm
COLUMN PILECAP
→ = 350 A = 400
 = 350 B = 1500
Pile Ø = 450 C = 400
Tolerance = 0 E = 750
depth H = 400
COLUMN ACTIONS kN, kNm characteristic
DEAD IMPOSED WIND
Axial (kN) 218 104.2 27.5 PLOT (to scale) KEY
M (kNm) 23.2 10.4 2.7
H (kN) 0 0 0 STATUS VALID DESIGN
ψ0 = 0.7 0.5
REINFORCEMENT PILE REACTIONS kN
BOTTOM M = 164.2 kNm PILE 1 PILE 2
d = 309.0 mm,
As = 1,296 mm² Gk + Qk 147.9 192.7
7H16 B = 1,407 mm² Gk + Qk +Wk 159.9 208.3
TOP M = 0.0 kNm
d = 338.0 mm, As = 0 mm²
4H8 T = 201 mm² 4H8 02 T
LINKS
VEd = 293 kN, vEd = 1.185 N/mm²
vRd 2d/av = 0.825 N/mm² 7H16 01 B
Asw/S = 0.9691 mm Links 11H8 03.200 + 2x11H8 04.200
4 Legs H8 @ 200 LINKS = 1.0053 mm ELEVATION