You are on page 1of 2
Civil Works at HZF Chanderia Major Scope Matrix Heads. ‘Ambika Lat industrial Relationship & Local Liasioning |All Taxes & Duties applicable on Contractor's Scope of Works. Labour Full and Final benefits including employers PF , ESI etc. fetes Daily inspection/checking with Customer, preparation of Pour cards as per the approved FOP. ransportation of all the materials inside the plant premises from L&T Store/Yard to complete the job in all respect. 2s lt 26 [Job has to be carried out within the stipulated time frame with accepted schedule between L&T and Sub-Contractor < 27__ |Ply, Timber & Other Consumable for shuttering work 28 [Tie rod for shuttering work and all type of supporting material for shuttering work a9_|Pre-requisite for preparation of Gate Pass incl. police verification, medical checking and other necessary documentation las per HZFPL standerd. 30__|Monthly reconciliation of all free issue materials along with monthly RA 31_[Short Term Permit (STP) for all quary related material & Royalty Challan to be provided along with the 32__|Necessary Arrangement for Lab facility will be done by L&T. 33 _ [Concrete Mix design 34 _|Scaffloding/Staging Materials ig safe and stable slopes, preparation of Ramp and 4gs_|Hard Barricading of excavated pit, shoring, shuttering, maintai dewatering during excavation. 36__ [Managing all the required work permits applicable as per HZF Payment Terms 5 Stage -1 : 95 % to be released after work done within 45.days subjected to certification M/s L&q's Bill by H2F 596 retention to be applicable for every running bill and the same will be released after completion of entire civil works 2 _ Jin DAP area subjected to the certification by EIC. 3__ [5% CPBG applicable over LOI as well as work order value. Civil Works at HZF Chanderia Major Scope Matrix Heads Ambika (aT Labour Accomodation [To and fro Conveyance from Labour Accomodation to Work Site Medical test for workmen and all mobilisation expenses Basic amenities & Site Infrastructures facilities like Site Office, Storage Space, Rest Sheds for Labors, etc. [sfc Watch ward & Security for L&T supplied Free issue material (FIM), Contractor's supplied materials and Contractor’s establishments like office, Stores, etc. shall be in Contractor's scope. a ¢ _[SuPbly ofall materials like aggregates, Sand etc. as per approved design mix and Bricks for Brickwork, Plastering a concrete finishing etc. 7 [Unloading, Stacking, Storage, Handling, Shifting and Transportation of FIM within the Site Premises, . 8 For entire DAP area, Construction Power at Two points shall be provided at Free-of-Cost near to the construction Site. 7 9 _ [Further distribution of Construction Power including all bors, Machinery, Tools & Tackles, ete. to complete thejobin |, all respect. 39 _ [Distribution of Construction Water as per Site requirement including all Labors, machinery, tools & Tackles, etc. to F complete the job in all respect. 11_[Area Lighting including electricians and all electrical items, : 12 [Material & Resources required for further distribution of Construction Power, Water & its regular maintenance . 13 {All the P&M like Batching Plant,Transit Mixer, JCB, Rebar cutting & bending machine, Concrete vibrators, all tools and m tackles & all other P&M to complete the Civil works in all respect. All P&M shall be as per HZFPL safety Guidelines. 14 [Batching Plant and it's operation. : a5 _[Allconcrete pouring equipments including Boom Placer, concrete pumps, and other tools & tackles required for a lcompleting concreting works. ag _ [Other Materials like Power Cables for Power tools and Welding Cable Lugs, Flash Back arrestors for DA & Oxygen, Cable | {Tray for Carrying Welding / Power Cables in Rebar Yard, Hammer Drill Machine & Drill Bits, All Cutting Drill mc, etc. 17 _ [Supply of all Consumables required for concrete and other civil works as per approved make only, ¥ 18 _ [Temporary structures, platforms and all other facilities required to complete the job. : to _|Work Procedure, Field Quality Plan (FOP) and inspection Records (100% Compliance by Contractor, including i [preparation of Inspection Report as per approved Format). 39 _ [Personal Protective Equipment (PPEs) like Safety Helmet, Jacket , Belt, Safety Shoes, safety gloves, goggles etc as per approved HZF norms. Ay 3

You might also like