Civil Works at HZF Chanderia
Major Scope Matrix
Heads.
‘Ambika
Lat
industrial Relationship & Local Liasioning
|All Taxes & Duties applicable on Contractor's Scope of Works.
Labour Full and Final benefits including employers PF , ESI etc.
fetes
Daily inspection/checking with Customer, preparation of Pour cards as per the approved FOP.
ransportation of all the materials inside the plant premises from L&T Store/Yard to complete the job in all respect.
2s lt
26 [Job has to be carried out within the stipulated time frame with accepted schedule between L&T and Sub-Contractor
<
27__ |Ply, Timber & Other Consumable for shuttering work
28 [Tie rod for shuttering work and all type of supporting material for shuttering work
a9_|Pre-requisite for preparation of Gate Pass incl. police verification, medical checking and other necessary documentation
las per HZFPL standerd.
30__|Monthly reconciliation of all free issue materials along with monthly RA
31_[Short Term Permit (STP) for all quary related material & Royalty Challan to be provided along with the
32__|Necessary Arrangement for Lab facility will be done by L&T.
33 _ [Concrete Mix design
34 _|Scaffloding/Staging Materials
ig safe and stable slopes, preparation of Ramp and
4gs_|Hard Barricading of excavated pit, shoring, shuttering, maintai
dewatering during excavation.
36__ [Managing all the required work permits applicable as per HZF
Payment Terms 5
Stage -1 : 95 % to be released after work done within 45.days subjected to certification M/s L&q's Bill by H2F
596 retention to be applicable for every running bill and the same will be released after completion of entire civil works
2 _ Jin DAP area subjected to the certification by EIC.
3__ [5% CPBG applicable over LOI as well as work order value.Civil Works at HZF Chanderia
Major Scope Matrix
Heads
Ambika
(aT
Labour Accomodation
[To and fro Conveyance from Labour Accomodation to Work Site
Medical test for workmen and all mobilisation expenses
Basic amenities & Site Infrastructures facilities like Site Office, Storage Space, Rest Sheds for Labors, etc.
[sfc
Watch ward & Security for L&T supplied Free issue material (FIM), Contractor's supplied materials and Contractor’s
establishments like office, Stores, etc. shall be in Contractor's scope. a
¢ _[SuPbly ofall materials like aggregates, Sand etc. as per approved design mix and Bricks for Brickwork, Plastering a
concrete finishing etc.
7 [Unloading, Stacking, Storage, Handling, Shifting and Transportation of FIM within the Site Premises, .
8 For entire DAP area, Construction Power at Two points shall be provided at Free-of-Cost near to the construction Site. 7
9 _ [Further distribution of Construction Power including all bors, Machinery, Tools & Tackles, ete. to complete thejobin |,
all respect.
39 _ [Distribution of Construction Water as per Site requirement including all Labors, machinery, tools & Tackles, etc. to F
complete the job in all respect.
11_[Area Lighting including electricians and all electrical items, :
12 [Material & Resources required for further distribution of Construction Power, Water & its regular maintenance .
13 {All the P&M like Batching Plant,Transit Mixer, JCB, Rebar cutting & bending machine, Concrete vibrators, all tools and m
tackles & all other P&M to complete the Civil works in all respect. All P&M shall be as per HZFPL safety Guidelines.
14 [Batching Plant and it's operation. :
a5 _[Allconcrete pouring equipments including Boom Placer, concrete pumps, and other tools & tackles required for a
lcompleting concreting works.
ag _ [Other Materials like Power Cables for Power tools and Welding Cable Lugs, Flash Back arrestors for DA & Oxygen, Cable |
{Tray for Carrying Welding / Power Cables in Rebar Yard, Hammer Drill Machine & Drill Bits, All Cutting Drill mc, etc.
17 _ [Supply of all Consumables required for concrete and other civil works as per approved make only, ¥
18 _ [Temporary structures, platforms and all other facilities required to complete the job. :
to _|Work Procedure, Field Quality Plan (FOP) and inspection Records (100% Compliance by Contractor, including i
[preparation of Inspection Report as per approved Format).
39 _ [Personal Protective Equipment (PPEs) like Safety Helmet, Jacket , Belt, Safety Shoes, safety gloves, goggles etc as per
approved HZF norms. Ay
3