Civil Works at HZF Chanderia
Major Scope Matrix
Heads.
‘Ambika
Lat
industrial Relationship & Local Liasioning
|All Taxes & Duties applicable on Contractor's Scope of Works.
Labour Full and Final benefits including employers PF , ESI etc.
fetes
Daily inspection/checking with Customer, preparation of Pour cards as per the approved FOP.
ransportation of all the materials inside the plant premises from L&T Store/Yard to complete the job in all respect.
2s lt
26 [Job has to be carried out within the stipulated time frame with accepted schedule between L&T and Sub-Contractor
<
27__ |Ply, Timber & Other Consumable for shuttering work
28 [Tie rod for shuttering work and all type of supporting material for shuttering work
a9_|Pre-requisite for preparation of Gate Pass incl. police verification, medical checking and other necessary documentation
las per HZFPL standerd.
30__|Monthly reconciliation of all free issue materials along with monthly RA
31_[Short Term Permit (STP) for all quary related material & Royalty Challan to be provided along with the
32__|Necessary Arrangement for Lab facility will be done by L&T.
33 _ [Concrete Mix design
34 _|Scaffloding/Staging Materials
ig safe and stable slopes, preparation of Ramp and
4gs_|Hard Barricading of excavated pit, shoring, shuttering, maintai
dewatering during excavation.
36__ [Managing all the required work permits applicable as per HZF
Payment Terms 5
Stage -1 : 95 % to be released after work done within 45.days subjected to certification M/s L&q's Bill by H2F
596 retention to be applicable for every running bill and the same will be released after completion of entire civil works
2 _ Jin DAP area subjected to the certification by EIC.
3__ [5% CPBG applicable over LOI as well as work order value.Civil Works at HZF Chanderia
Major Scope Matrix
Heads
Ambika
(aT
Labour Accomodation
[To and fro Conveyance from Labour Accomodation to Work Site
Medical test for workmen and all mobilisation expenses
Basic amenities & Site Infrastructures facilities like Site Office, Storage Space, Rest Sheds for Labors, etc.
[sfc
Watch ward & Security for L&T supplied Free issue material (FIM), Contractor's supplied materials and Contractor’s
establishments like office, Stores, etc. shall be in Contractor's scope. a
¢ _[SuPbly ofall materials like aggregates, Sand etc. as per approved design mix and Bricks for Brickwork, Plastering a
concrete finishing etc.
7 [Unloading, Stacking, Storage, Handling, Shifting and Transportation of FIM within the Site Premises, .
8 For entire DAP area, Construction Power at Two points shall be provided at Free-of-Cost near to the construction Site. 7
9 _ [Further distribution of Construction Power including all bors, Machinery, Tools & Tackles, ete. to complete thejobin |,
all respect.
39 _ [Distribution of Construction Water as per Site requirement including all Labors, machinery, tools & Tackles, etc. to F
complete the job in all respect.
11_[Area Lighting including electricians and all electrical items, :
12 [Material & Resources required for further distribution of Construction Power, Water & its regular maintenance .
13 {All the P&M like Batching Plant,Transit Mixer, JCB, Rebar cutting & bending machine, Concrete vibrators, all tools and m
tackles & all other P&M to complete the Civil works in all respect. All P&M shall be as per HZFPL safety Guidelines.
14 [Batching Plant and it's operation. :
a5 _[Allconcrete pouring equipments including Boom Placer, concrete pumps, and other tools & tackles required for a
lcompleting concreting works.
ag _ [Other Materials like Power Cables for Power tools and Welding Cable Lugs, Flash Back arrestors for DA & Oxygen, Cable |
{Tray for Carrying Welding / Power Cables in Rebar Yard, Hammer Drill Machine & Drill Bits, All Cutting Drill mc, etc.
17 _ [Supply of all Consumables required for concrete and other civil works as per approved make only, ¥
18 _ [Temporary structures, platforms and all other facilities required to complete the job. :
to _|Work Procedure, Field Quality Plan (FOP) and inspection Records (100% Compliance by Contractor, including i
[preparation of Inspection Report as per approved Format).
39 _ [Personal Protective Equipment (PPEs) like Safety Helmet, Jacket , Belt, Safety Shoes, safety gloves, goggles etc as per
approved HZF norms. Ay
3Tem Description vom | aty Rate ‘Amount
Remarks
— (where ever It's necessar
loending, cranking including tring wth binding wire fing of couples, manpower for thrending
Jeoupter fixing, Cover block preparation & Fixing etc. #s required, al complete as per the direction
mr | 99088 | “14000 1,38,72,320 [Rebar Supply: LAT Scape
Isrinickomp 20 of RCC*/Sika grout 714 of Ss /EXCEM -GP of SWC/Conbextra GPI of Fosroc OF cum | @ | ~~35000 21,07,000)
Irate includes all labour charges, material
« fits, eter carryout the entice work . Measurement shall be dane as per the :
atl Charges for making & fixing ane removing ofall types of Shuttering at al heights/depths for
|piain/reintorcee cement concrete inciudng supplying & applying the shuttering oll with necessary,
fixing & remove of scaffolding anc making of shuttering boards ali complete with Loading &
|Unloading stacking of Doka/Alutocr, Py exc and ather consumables fie shuttering ol timber,
land scaffolding Mat
[drawings anc a: per the concrete surtace in contact with the shutter hoards 2s per 'S/Standard
[practices Jot will be done all complete as per the specication and as per ‘the direction of Enginner In|
|charge. shuttering piywoos with support wooden battens are als in vendor scope and balance all
Jother including scaffolding, staging ane consumable materials wl be supplied by the vendor.
aye S|
8 RPE
Beg
8
;
i
soins aio cps atl | |
sex Matra
we hep eel compe rec by
ail charges for supply ane laying with necessary Compaction of 230 thick boulder soling interstices
[rte with Moonum / crusher dust) for under fiors, foundation, pavements and in other areas all
lcompleve 2s per the drawings, specification ané to the directions of the Engineer.
é
E
\
8
130,880 .
an
at charges or fixing a sete WS inert pats wih gs nling Fabrication aigent siting, al
fs
ah
necessary staging, scaffolding, all complete as per the drawings, specification and to the directions ot | mT | 44 |--f500 3n.ga.pon | Rae ate for nse atas da be oro
|zhe Engineer. Only Raw Steel willbe provided by LAT fee of cost. "|
by Lat
aut charges for supply, fabrication and fixing of foundation bolts 2t ste including alignment, Lemplate 4
making. necessary staging, scaffolding -omsumabies, ools ané tackles all complete as per the har 14 |~~“140000 418,90,000 [Ad materials Ambika scope in-tuding Bats
|drawings, specification and to the dvections ofthe Engineer. |
& iShe. item Description vom _|_aty Rate ‘Amount Remarks
[supply and application of approved make of Hot bitumen paint for Underground structures nclucing
1M |alllobour, material, consumables, tools and tackles required to complete the job in allespect as per | SQM | 15161 | «225 34,11,270,
the direction of Ei,
"Subtotal :
[Anti cermite Teatment sam_[ 1000 | ~~ 200 oer
(0 [Barbed Wire Fencing of Height 2.4m rm | 201 | +4700 |, 9,44,700 |Cement Supply: Shree Ambika Scope
P_ [Area Grading and Levelling sam_| 29000 [10 31,90,000
‘Subtotal (8) 43;34,700
|bisposal of surplus excavated material, eubbish as applicable, The rateshall be inclusive of loading,
AL. a Junloasing, transporting & stacking and level cum | 15345,
lboundary beyond 4 km upto 5 Km from the:“Ambika Offer __ L&T Offer
S.No. Item Description UuOM Qty Rate Amount Rate Amount
= PCC : 14:8 / PCC: M15 CUM 985 4600 4531000 200
RCC: M25 / M 30 (Corrosion protection through addition ‘of suitable cul
IM 9427
2 |inhibitors/admixture to be considered) neem
all charges for supoly and filling with necessary compaction of 220 :
boulder soling ( interstices filled with Moorum /- for Gfade
14 | 725/ 1050
2 ISlab work all complete as per the drawings, specification and to the SAM se sf, —
|directions of the Engineer.
ek
4 lExcavation in Normal Soil (2 to 4 Mitr) cUM 11274 300 |
I‘Ainbika Offer dated 21-05-2023,
Rate ‘Amount Remarks
shrubs/oushes/ Trees & Is
+08, leveliing/dressing of excavated pits and enabling works
|tansPortation & disposing of the surplus excavated earth wi
JuPto maximum lead of 2 kr including evel
specifications/érawings wi
cM 200 7376360)
‘cuM. 3007
‘cum. 700.
uM. 7800.
uM. j= 480
cum <= 600
cum 1 a00-
cum. 7950
com — 7250 3836.20
achieving 90% of proctor density all complete as per specifiations/drawings and
|dicections ofthe Engineer incharge.
ing, including supplying of sand (River Sane) doung/ spreading, watering,
us 250 mm horizontal layers with rollers plate compactors / other approved es
c
methods or acheving 30% o proc deny allcomplet at per opedentons/ rvdngs set ee a Bes
directions ofthe Engineer incharge-
Providing, mixing, transporting, tamping, placing, consolidating and caring Pain Cement Concrete
[using OPC/PPC confirming to 15:46 as per approved mix design necessary slopes as specified for
[foundations grade slabs, camps, sls, copings etc with the following grades:
oa Poca ‘com _| 286. 00 [Cement Suny Lt Seope.
D2 PCE: MIS ‘cum 99 | <= 200. [Cement Supply: LAT Scope:
Providing, mixing. transporting. tamping, placing vibrating, curing and roughening the surfaces
€ [wherever required, Reinforced Cement Concrete using OPC/PPC as directed by EIC confirming to
456 with as per approved mix design for rade mentioned below:
2 Fol ener pal ‘cia [casi 1-2-4 casei Passe sine
RCE: M30 (Corrosion protedion through addlion of sukableInibfers/adrapture to be
2
considered)
512
SS
Q/
A a