You are on page 1of 6
Civil Works at HZF Chanderia Major Scope Matrix Heads. ‘Ambika Lat industrial Relationship & Local Liasioning |All Taxes & Duties applicable on Contractor's Scope of Works. Labour Full and Final benefits including employers PF , ESI etc. fetes Daily inspection/checking with Customer, preparation of Pour cards as per the approved FOP. ransportation of all the materials inside the plant premises from L&T Store/Yard to complete the job in all respect. 2s lt 26 [Job has to be carried out within the stipulated time frame with accepted schedule between L&T and Sub-Contractor < 27__ |Ply, Timber & Other Consumable for shuttering work 28 [Tie rod for shuttering work and all type of supporting material for shuttering work a9_|Pre-requisite for preparation of Gate Pass incl. police verification, medical checking and other necessary documentation las per HZFPL standerd. 30__|Monthly reconciliation of all free issue materials along with monthly RA 31_[Short Term Permit (STP) for all quary related material & Royalty Challan to be provided along with the 32__|Necessary Arrangement for Lab facility will be done by L&T. 33 _ [Concrete Mix design 34 _|Scaffloding/Staging Materials ig safe and stable slopes, preparation of Ramp and 4gs_|Hard Barricading of excavated pit, shoring, shuttering, maintai dewatering during excavation. 36__ [Managing all the required work permits applicable as per HZF Payment Terms 5 Stage -1 : 95 % to be released after work done within 45.days subjected to certification M/s L&q's Bill by H2F 596 retention to be applicable for every running bill and the same will be released after completion of entire civil works 2 _ Jin DAP area subjected to the certification by EIC. 3__ [5% CPBG applicable over LOI as well as work order value. Civil Works at HZF Chanderia Major Scope Matrix Heads Ambika (aT Labour Accomodation [To and fro Conveyance from Labour Accomodation to Work Site Medical test for workmen and all mobilisation expenses Basic amenities & Site Infrastructures facilities like Site Office, Storage Space, Rest Sheds for Labors, etc. [sfc Watch ward & Security for L&T supplied Free issue material (FIM), Contractor's supplied materials and Contractor’s establishments like office, Stores, etc. shall be in Contractor's scope. a ¢ _[SuPbly ofall materials like aggregates, Sand etc. as per approved design mix and Bricks for Brickwork, Plastering a concrete finishing etc. 7 [Unloading, Stacking, Storage, Handling, Shifting and Transportation of FIM within the Site Premises, . 8 For entire DAP area, Construction Power at Two points shall be provided at Free-of-Cost near to the construction Site. 7 9 _ [Further distribution of Construction Power including all bors, Machinery, Tools & Tackles, ete. to complete thejobin |, all respect. 39 _ [Distribution of Construction Water as per Site requirement including all Labors, machinery, tools & Tackles, etc. to F complete the job in all respect. 11_[Area Lighting including electricians and all electrical items, : 12 [Material & Resources required for further distribution of Construction Power, Water & its regular maintenance . 13 {All the P&M like Batching Plant,Transit Mixer, JCB, Rebar cutting & bending machine, Concrete vibrators, all tools and m tackles & all other P&M to complete the Civil works in all respect. All P&M shall be as per HZFPL safety Guidelines. 14 [Batching Plant and it's operation. : a5 _[Allconcrete pouring equipments including Boom Placer, concrete pumps, and other tools & tackles required for a lcompleting concreting works. ag _ [Other Materials like Power Cables for Power tools and Welding Cable Lugs, Flash Back arrestors for DA & Oxygen, Cable | {Tray for Carrying Welding / Power Cables in Rebar Yard, Hammer Drill Machine & Drill Bits, All Cutting Drill mc, etc. 17 _ [Supply of all Consumables required for concrete and other civil works as per approved make only, ¥ 18 _ [Temporary structures, platforms and all other facilities required to complete the job. : to _|Work Procedure, Field Quality Plan (FOP) and inspection Records (100% Compliance by Contractor, including i [preparation of Inspection Report as per approved Format). 39 _ [Personal Protective Equipment (PPEs) like Safety Helmet, Jacket , Belt, Safety Shoes, safety gloves, goggles etc as per approved HZF norms. Ay 3 Tem Description vom | aty Rate ‘Amount Remarks — (where ever It's necessar loending, cranking including tring wth binding wire fing of couples, manpower for thrending Jeoupter fixing, Cover block preparation & Fixing etc. #s required, al complete as per the direction mr | 99088 | “14000 1,38,72,320 [Rebar Supply: LAT Scape Isrinickomp 20 of RCC*/Sika grout 714 of Ss /EXCEM -GP of SWC/Conbextra GPI of Fosroc OF cum | @ | ~~35000 21,07,000) Irate includes all labour charges, material « fits, eter carryout the entice work . Measurement shall be dane as per the : atl Charges for making & fixing ane removing ofall types of Shuttering at al heights/depths for |piain/reintorcee cement concrete inciudng supplying & applying the shuttering oll with necessary, fixing & remove of scaffolding anc making of shuttering boards ali complete with Loading & |Unloading stacking of Doka/Alutocr, Py exc and ather consumables fie shuttering ol timber, land scaffolding Mat [drawings anc a: per the concrete surtace in contact with the shutter hoards 2s per 'S/Standard [practices Jot will be done all complete as per the specication and as per ‘the direction of Enginner In| |charge. shuttering piywoos with support wooden battens are als in vendor scope and balance all Jother including scaffolding, staging ane consumable materials wl be supplied by the vendor. aye S| 8 RPE Beg 8 ; i soins aio cps atl | | sex Matra we hep eel compe rec by ail charges for supply ane laying with necessary Compaction of 230 thick boulder soling interstices [rte with Moonum / crusher dust) for under fiors, foundation, pavements and in other areas all lcompleve 2s per the drawings, specification ané to the directions of the Engineer. é E \ 8 130,880 . an at charges or fixing a sete WS inert pats wih gs nling Fabrication aigent siting, al fs ah necessary staging, scaffolding, all complete as per the drawings, specification and to the directions ot | mT | 44 |--f500 3n.ga.pon | Rae ate for nse atas da be oro |zhe Engineer. Only Raw Steel willbe provided by LAT fee of cost. "| by Lat aut charges for supply, fabrication and fixing of foundation bolts 2t ste including alignment, Lemplate 4 making. necessary staging, scaffolding -omsumabies, ools ané tackles all complete as per the har 14 |~~“140000 418,90,000 [Ad materials Ambika scope in-tuding Bats |drawings, specification and to the dvections ofthe Engineer. | & i She. item Description vom _|_aty Rate ‘Amount Remarks [supply and application of approved make of Hot bitumen paint for Underground structures nclucing 1M |alllobour, material, consumables, tools and tackles required to complete the job in allespect as per | SQM | 15161 | «225 34,11,270, the direction of Ei, "Subtotal : [Anti cermite Teatment sam_[ 1000 | ~~ 200 oer (0 [Barbed Wire Fencing of Height 2.4m rm | 201 | +4700 |, 9,44,700 |Cement Supply: Shree Ambika Scope P_ [Area Grading and Levelling sam_| 29000 [10 31,90,000 ‘Subtotal (8) 43;34,700 |bisposal of surplus excavated material, eubbish as applicable, The rateshall be inclusive of loading, AL. a Junloasing, transporting & stacking and level cum | 15345, lboundary beyond 4 km upto 5 Km from the: “Ambika Offer __ L&T Offer S.No. Item Description UuOM Qty Rate Amount Rate Amount = PCC : 14:8 / PCC: M15 CUM 985 4600 4531000 200 RCC: M25 / M 30 (Corrosion protection through addition ‘of suitable cul IM 9427 2 |inhibitors/admixture to be considered) neem all charges for supoly and filling with necessary compaction of 220 : boulder soling ( interstices filled with Moorum /- for Gfade 14 | 725/ 1050 2 ISlab work all complete as per the drawings, specification and to the SAM se sf, — |directions of the Engineer. ek 4 lExcavation in Normal Soil (2 to 4 Mitr) cUM 11274 300 | I ‘Ainbika Offer dated 21-05-2023, Rate ‘Amount Remarks shrubs/oushes/ Trees & Is +08, leveliing/dressing of excavated pits and enabling works |tansPortation & disposing of the surplus excavated earth wi JuPto maximum lead of 2 kr including evel specifications/érawings wi cM 200 7376360) ‘cuM. 3007 ‘cum. 700. uM. 7800. uM. j= 480 cum <= 600 cum 1 a00- cum. 7950 com — 7250 3836.20 achieving 90% of proctor density all complete as per specifiations/drawings and |dicections ofthe Engineer incharge. ing, including supplying of sand (River Sane) doung/ spreading, watering, us 250 mm horizontal layers with rollers plate compactors / other approved es c methods or acheving 30% o proc deny allcomplet at per opedentons/ rvdngs set ee a Bes directions ofthe Engineer incharge- Providing, mixing, transporting, tamping, placing, consolidating and caring Pain Cement Concrete [using OPC/PPC confirming to 15:46 as per approved mix design necessary slopes as specified for [foundations grade slabs, camps, sls, copings etc with the following grades: oa Poca ‘com _| 286. 00 [Cement Suny Lt Seope. D2 PCE: MIS ‘cum 99 | <= 200. [Cement Supply: LAT Scope: Providing, mixing. transporting. tamping, placing vibrating, curing and roughening the surfaces € [wherever required, Reinforced Cement Concrete using OPC/PPC as directed by EIC confirming to 456 with as per approved mix design for rade mentioned below: 2 Fol ener pal ‘cia [casi 1-2-4 casei Passe sine RCE: M30 (Corrosion protedion through addlion of sukableInibfers/adrapture to be 2 considered) 512 SS Q/ A a

You might also like