This document contains a list of 5 personnel deployed for highway construction work between Km 8 to Km 65, including their names, designations, contact numbers, and locations. It notes that the surveyor and CAD engineer are deployed from Km 41+500 to Km 65+00 and the quantity surveyor is located at the RE office. The lab technician and field engineer are currently on leave.
This document contains a list of 5 personnel deployed for highway construction work between Km 8 to Km 65, including their names, designations, contact numbers, and locations. It notes that the surveyor and CAD engineer are deployed from Km 41+500 to Km 65+00 and the quantity surveyor is located at the RE office. The lab technician and field engineer are currently on leave.
This document contains a list of 5 personnel deployed for highway construction work between Km 8 to Km 65, including their names, designations, contact numbers, and locations. It notes that the surveyor and CAD engineer are deployed from Km 41+500 to Km 65+00 and the quantity surveyor is located at the RE office. The lab technician and field engineer are currently on leave.