This is to certify the structural stability of the Six-meter (6-m.) Bi-pod pole tower (**Note:
Measured from the finished elevation up to the highest pole mounting frame), structural connection
between the Bi-pod pole tower and the building framing through post constructed pedestal and
concrete anchorage.
Structural appraisal involves site visit and/or visual inspection to ensure that the added structures by
Globe Telecoms Network Inc. have no visual damage that might affect its longevity and its users. Also, the
location of the said additions was identified to measure the “As-built” structural elements as well as the
existing concrete elements of the structure directly affected by the added loadings for structural investigation
purposes.
Estimation or calculation needed to produce this output are all based on the standard and code
mandated by the law and by the profession of Civil Engineering in the Philippines. Here lies the references
used for the analysis extracted from the National Structural code of the Philippines 2015 (NSCP2015,
SEVENTH EDITION, VOLUME I):
Based on the results of the provided structural stability checking, the Bi-pod pole tower setup is adequate
for its intended use. The connection of the said structure to the existing concrete framed building is deemed
safe as it is analyzed within the most conservative approach due to detail/data insufficiency. Moreover, no
load combination that is checked separately/iterated throughout different mode of failure that is represented
by utilization ratio, for anchorage through concrete element exceeded the maximum utilization ratio of 100%.
Thus, different base supports are adequate for its intended use.
However, additional loadings due to alteration of the structure and improper usage outside the
jurisdiction of the code/s stated above are beyond the scope and responsibility of the undersigned. Moreover,
poor workmanship, modification, and construction are beyond the jurisdiction of the engineer involved with
the assessment of the structural stability of the existing building and outsidethe scope of this report.
Note: This structural investigation report shall not be construed as part of the construction
documents. This is prepared for information purposes only. This report contains the results of
the investigation into the structure.
AVAILABLE DATA
The engineers have gathered available data which will be used for analysis such as
As-built architectural and structural drawings of the building provided by the owner, and
actual conditions based on ocular inspection. The material properties and other design
considerations have been provided by the client and have been used as the basis for the
structural investigation.
Commentary: Owner of the building and Owner of the post constructed tower did
not provide any data regarding their building due to internal issues. Engineers in-charge
with this analysis went to the site to conduct evaluation and measurements for the Globe
material, the engineer in-charge of this analysis make use of what is the most readily
This review presented herein is intended for the project entitled PROJECT
UNIVERSE (PROJECT U.) by Globe Telecoms Network. The existing structure is
located at CITYLAND CONDO III, 105 V.A. RUFINO ST., COR. ESTEBAN ST.
SAN LORENZO MAKATI CITY. owned by CITYLAND CORP. This document shall
be read in conjunction with the following documents:
construction.
constructed Six-meter (6-m.) Bi-pod pole tower setup (Measured from the roof deck floor
level up to the upper most pole mounting frame) carrying antennas/equipment necessary
connected to the existing concrete framed building through pedestal, anchor bolts, and base
plates. The main pole is assumed to be fixedly connected; thus, it resists axial forces and
rotation for all possible plains and axes. The strut supports are assumed to be pin connected
as the purpose of this said element is to resist horizontal forces such as earthquakes and
wind loadings.
The structural steel framing setup is measured in actual and was found out that it was
confirming with the standard section properties of ASTM (American Society for Testing
and Materials). The reinforced concrete pedestal is measured in actual as well, though we
cannot determine the structural design of the concrete pedestal, geometrical dimension of
the concrete pedestal was obtained through actual measurements and analyzed
conservatively.
The Bi-pod pole tower is located at an accessible roof deck for a suggested feasible
equipment inclinedly attached, appurtenances, and other attachments that are not part of
the main framing system of the steel structure are extracted from the manufacturer’s
members is measured upon the day of inspection and made sure that there are no early
indications of failure such as hairline cracking for concrete elements, improper weld of two
extracted mechanical data from the manufacturer’s manual was used and is converted into
desired units and load of transfer going through the main framing system of the floor
mounted setup.
For the computation of lateral load, Wind load, directional procedure of ANSI/TIA-
222-H (2017) was used because of having commentaries, and explanations for the
procedural approaches for wind loadings that are more specific, descriptive, and updated
for the ANSI/TIA-222-H-2017 than our local code, thus, combination of the two are
justified. The said governing codes and procedural approaches are manually deciphered by
the engineer in-charge of this analysis and was computed through the help of Microsoft
office (excel) software. Formulas used, and criteria for judgement will be discussed further
in this report. Also, it is stated in our local code that for tower structures, it is not prohibited
to use other references through which our code referred to ANSI/TIA-222. However,
parameters that are provided and more suited for our geographical location were obtained
steel members for failures such as slenderness checking, compression failure, tension
AISI-16 (LRFD METHOD) was used as method of adequacy checking for the cold
formed steel members for failures such as slenderness checking, compression failure,
From STAAD pro connect edition v22 update 6, the said design checking was
performed as well as extraction of base support loadings due to different load combination.
This reaction is necessary to provide checking for adequacy for other design elements
elements such as concrete breakout, concrete side face breakout, concrete edge breakout;
as well as for the anchor bolts, whether it can carry out tension failure, anchor pull out,
shear failure, and pry-out. Finite element analysis was performed through structural
The aim of the report was to provide adequate theoretical justification to ensure
that the added structure is safe for its intended usage, ensuring the safety of its users, and
due to different factors. It may be caused by the wind forces, self-weight, or combination
of such said forces. All assumptions and factors used for the computation of said forces are
extracted from the National Structural Code of the Philippines (NSCP 2015, volume 7)
and other references that is bounded by the said code.To fulfil the objective, step by step
On this part of the report, the inputs such as code-based parameters, engineering
judgement or computation, would be discussed and certify with the assurance and justification
that each structural member would or would not meet the desired requirements. Regarding the
structural steel members, Load and Resistance Factor Design (AISC LRFD) was deemed
efficient and up to date as a method of design adequacy checking as it provides more adequacy
checking than Allowable stress design (ASD) based on the design software use for the base
• Compressive strength at 28th day, Fc’ = 2500 psi (17.24 MPa) in 6-in-diameter (150-mm-
• Yield strength of Structural steel, Fy = 248 Mpa (ASTM - A36) for all Prefabricated steel
SPECIFICATIONS USED.
MOUNTING FRAMES)
ANSI/TIA-222-
23 Velocity Pressure qz 17.40834914 N/sq.m.
H
Sumation of the
Projected Areas of flat ANSI/TIA-222-
24 ∑Af 0.2667
components of the H
mounting frame
Summation of the
Projected Area of ANSI/TIA-222-
25 ∑Ar 0
round components of H
the mounting frame
Gross area of the frame
as if it were solid
defined by the largest ANSI/TIA-222-
26 Ag 0.2667 sq.m. One face only
outside dimensions of H
the elements included
in Af and Ar
Solidity ratio of
NSCP
mounting frame (Af+Ar)/Ag of
27 2015/ANSI/TIA- ε 1 -
without antennas and one face
222-H
mounting pipes
28 Shielding Factor Ka 1 -
Relative angle between
azimuth associated
with the normal face of ANSI/TIA-222-
29 θ 0 degrees
the H (Figure 2-6)
appurtenances/framing
and the wind direction
For square and
triangular truss
mounting frames
(refer to Figure
ANSI/TIA-222-
Force coefficient for a 2-7), Cas shall be
30 H (Section Cas 2.0008 -
mounting frame equal to Cf in
2.6.11.2.2)
accordance with
2.6.11.1
(ANSI/TIA-222-
H)
Geometric type of ANSI/TIA-222-
31 Rrf 1
mounting frame H
Effective projected area
ANSI/TIA-222-
32 of the frame (Mounting (EPA)MN 0.53361336
H
Frame)
Projected area of flat
components supporting ANSI/TIA-222-
33 Afs -
the mounting frame H
without regard to
shielding or
overlapping members.
ANTENNAS/APPURTENANCES)
Figure 4. Actual picture of the Bi-pod pole tower located at the roof deck of the residential building (Dated: MM/DD/YR 06/08/2023)
Density of steel = 7850 kg/m3 → The software used has its own way to compute the
weight of the structure by simply clicking self-weight on the design analysis. However,
this is the density of steel used multiplied to the volume of the structural elements used.
DEAD LOAD
Length of
Pole
Weight Staad the Pin Start End
Pole No. Description Units Remarks Units Remarks length
(kG) inputs Connection (m) (m)
(m)
(m)
TOP
34.78 - - 0.3411918 kN - 0.825 - 0 0
SUPPORT
BOTTOM
31.68 - - 0.3107808 kN - 1.35 - 0.4895 0
SUPPORT
ASI4517R3v06
(CLAMPS 52.8 1 - - - - - 1.273 - -
INCLUDED)
DOWNTILT 3.1 1 - - - - - - - -
P1 WIRINGS 10.56 - - - - - - - - -
- - - - - - - - - - -
TOP
32.9 - - 0.322749 kN - 1.35 - - -
SUPPORT
- - - - - - - - - - -
RRU 3268 25 1 - - - - - - - -
CLAMPS 2.9 1 - - - - - - - -
WIRINGS 5 - - - - - - - - -
- - - - - - - - - - -
TOP
34.78 - - 0.3411918 kN - 0.825 - 0 0
SUPPORT
BOTTOM
31.68 - - 0.3107808 kN - 1.35 - 0.4895 0
SUPPORT
ASI4517R3v06
(CLAMPS 52.8 1 - - - - - 1.273 - -
INCLUDED)
DOWNTILT 3.1 1 - - - - - - - -
WIRINGS 10.56 - - - - - - - - -
- - - - - - - - - - -
TOP
35.4 - - 0.347274 kN - 1.35 - 1.0725 0
SUPPORT
BOTTOM
32.3 - - 0.316863 kN - 1.35 - 0.2775 0
SUPPORT
AAU 5613 45 1 - - - - - 0.795 - -
DOWNTILT 3.1 1 - - - - - - - -
P2 CLAMPS 5.3 2 - - - - - - - -
WIRINGS 9 - - - - - - - - -
TOP
32.9 - - 0.322749 kN - 1.35 - 0.55 -
SUPPORT
- - - - - - - - - - -
RRU 5502 25 1 - - - - - - - -
CLAMPS 2.9 1 - - - - - - - -
WIRINGS 5 - - - - - - - - -
- - - - - - - - - - -
TOP
32.9 - - 0.322749 kN - 1.35 - - -
SUPPORT
- - - - - - - - - - -
RRU 3268 25 1 - - - - - - - -
CLAMPS 2.9 1 - - - - - - - -
WIRINGS 5 - - - - - - - - -
- - - - - - - - - - -
TOP
34.78 - - 0.3411918 kN - 0.825 - 0 0
SUPPORT
BOTTOM
31.68 - - 0.3107808 kN - 1.35 - 0.4895 0
SUPPORT
ASI4517R3v06
P3 (CLAMPS 52.8 1 - - - - - 1.273 - -
INCLUDED)
DOWNTILT 3.1 1 - - - - - - - -
WIRINGS 10.56 - - - - - - - - -
- - - - - - - - - - -
TOP
32.9 - - 0.322749 kN - 1.35 - - -
SUPPORT
- - - - - - - - - - -
RRU 3268 25 1 - - - - - - - -
CLAMPS 2.9 1 - - - - - - - -
WIRINGS 5 - - - - - - - - -
- - - - - - - - - - -
TOP
24.6 - - 0.241326 kN - 0.6 - 0.1 0
SUPPORT
BOTTOM
21.5 - - 0.210915 kN - 1.8 - 1.105 0
SUPPORT
AAU5639W
27 1 - - - - - 0.795 - -
(3700 MHZ)
DOWNTILT 3.1 1 - - - - - - - -
CLAMPS 5.3 2 - - - - - - - -
P4 WIRINGS 5.4 - - - - - - - - -
TOP
32.9 - - 0.322749 kN - 0.6 - 0.4 -
SUPPORT
- - - - - - - - - - -
RRU 5502 25 1 - - - - - - - -
CLAMPS 2.9 1 - - - - - - - -
WIRINGS 5 - - - - - - - - -
- - - - - - - - - - -
TOP
24.6 - - 0.241326 kN - 0.6 - 0.1 0
SUPPORT
BOTTOM
21.5 - - 0.210915 kN - 1.8 - 1.105 0
SUPPORT
AAU5639W
27 1 - - - - - 0.795 - -
(3700 MHZ)
DOWNTILT 3.1 1 - - - - - - - -
CLAMPS 5.3 2 - - - - - - - -
P5 WIRINGS 5.4 - - - - - - - - -
TOP
32.9 - - 0.322749 kN - 0.6 - 0.4 -
SUPPORT
- - - - - - - - - - -
RRU 5502 25 1 - - - - - - - -
CLAMPS 2.9 1 - - - - - - - -
WIRINGS 5 - - - - - - - - -
- - - - - - - - - - -
TOP
24.6 - - 0.241326 kN - 0.6 - 0.1 0
SUPPORT
BOTTOM
21.5 - - 0.210915 kN - 1.8 - 1.105 0
SUPPORT
P6 AAU5639W
27 1 - - - - - 0.795 - -
(3700 MHZ)
DOWNTILT 3.1 1 - - - - - - - -
CLAMPS 5.3 2 - - - - - - - -
WIRINGS 5.4 - - - - - - - - -
TOP
32.9 - - 0.322749 kN - - - - -
SUPPORT
- - - - - - - - - - -
RRU 3959 25 1 - - - - - - - -
CLAMPS 2.9 1 - - - - - - - -
WIRINGS 5 - - - - - - - - -
- - - - - - - - - - -
HP1
TOP
32.9 - - 0.322749 kN - - - - -
SUPPORT
- - - - - - - - - - -
RRU 3959 25 1 - - - - - - - -
CLAMPS 2.9 1 - - - - - - - -
WIRINGS 5 - - - - - - - - -
- - - - - - - - - - -
TOP
32.9 - - 0.322749 kN - - - - -
HP2 SUPPORT
- - - - - - - - - - -
RRU 3959 25 1 - - - - - - - -
CLAMPS 2.9 1 - - - - - - - -
WIRINGS 5 - - - - - - - - -
- - - - - - - - - - -
MAIN POLE
JOINT NODAL 20 - - 0.1962 kN NODAL - - - -
CONNECTION
POLE TO
POLE JOINT NODAL 5 - - 0.04905 kN NODAL - - - -
CONNECTION
CABLE MEMBER LINE
20 - - 0.1962 Kn/m - - - -
LADDER LOAD LOAD
1. 1.4DL
2. 1.2DL + 1.0 WL (+X)
3. 1.2DL + 1.0 WL (-X)
4. 1.2DL + 1.0 WL (+Z)
5. 1.2DL + 1.0 WL (-X)
Where:
DL = Dead Loads
WL = Wind Loads
III. OUTPUTS
In this part of the analysis report, values obtained from running the analysis from
Staad Pro connect edition 6 V22, would be provided and indication whether each
concerned structural steel framing element would be adequate for its intended purpose.
Loads combination, consideration for base support, resisting factor such as releases for
end supports of each steel element, would also be shown for the reader to check the
correctness of the analysis. Aside from providing adequacy checks, Staad Pro connect
edition 6 V22 provided the base reaction of the concerned Bi-pod pole tower setup and
is imported to another structural software for design checking of the base support
element such as base plate, anchor bolts, base plate, stiffener plate, and other adequacy
checking for concrete previously mention (HILTI PROFIS ENGINEER). The
purpose of the multiplier is to transpose the sign convention to change the direction of
the loading reaction.
Figure 5. Shown above is the three-dimensional axis for modeling in STAAD PRO connect
V6. This is important to show the face/s of the whole structure.
Figure 6. Shown above is the three-dimensional (3d) orientation used for HILTI Profis.
Job No Sheet No Rev
1
Software licensed to only @ ::LAVTeam:: (R) Part
CONNECTED User: User is not logged in to CONNECTION Client.
Job Title Ref
By Date17-Nov-23 Chd
3D Rendered View
Job Information
Engineer Checked Approved
Name:
Date: 17-Nov-23
Project ID
Project Name
Print Time/Date: 24/11/2023 15:59 STAAD.Pro CONNECT Edition 22.06.00.138 Print Run 1 of 8
Job No Sheet No Rev
2
Software licensed to only @ ::LAVTeam:: (R) Part
CONNECTED User: User is not logged in to CONNECTION Client.
Job Title Ref
By Date17-Nov-23 Chd
Primary 1 DL
Primary 2 WL - FACE 1
Primary 3 WL - FACE 2
Primary 4 WL - FACE 3
Primary 5 WL - FACE 4
Combination 6 1.4DL
Combination 7 1.2DL+1.0WL(+X)
Combination 8 1.2DL+1.0WL(-X)
Combination 9 1.2DL+1.0WL(+Z)
Combination 10 1.2DL+1.0WL(-Z)
Beams
Beam Node A Node B Length Property
(m) (degrees)
1 1 11 2.000 1 0
2 11 34 0.400 1 0
3 8 16 1.350 1 0
12 16 2 0.150 1 0
13 8 17 0.600 4 0
14 16 18 0.600 4 0
15 8 19 0.600 4 0
16 16 20 0.600 4 0
17 8 21 0.600 4 0
18 16 22 0.600 4 0
19 17 18 1.350 4 0
20 21 22 1.350 4 0
21 19 20 1.350 4 0
22 18 23 0.825 4 0
23 20 24 0.825 4 0
24 22 25 0.825 4 0
26 27 19 0.825 4 0
27 28 21 0.825 4 0
28 29 35 0.200 1 0
29 9 32 2.074 2 0
30 10 33 2.074 2 0
31 11 32 0.550 3 0
32 11 33 0.550 3 0
33 32 29 2.074 2 0
34 33 29 2.074 2 0
35 33 32 0.778 3 0
36 34 29 1.600 1 0
37 35 8 0.300 1 0
Print Time/Date: 24/11/2023 15:59 STAAD.Pro CONNECT Edition 22.06.00.138 Print Run 2 of 8
Job No Sheet No Rev
3
Software licensed to only @ ::LAVTeam:: (R) Part
CONNECTED User: User is not logged in to CONNECTION Client.
Job Title Ref
By Date17-Nov-23 Chd
Beams Cont...
Beam Node A Node B Length Property
(m) (degrees)
38 34 36 0.600 5 0
40 35 37 0.600 5 0
41 26 17 0.825 4 0
42 36 37 1.800 4 0
43 37 38 0.600 4 0
44 39 36 0.600 4 0
45 34 40 0.600 5 0
46 35 41 0.600 5 0
47 40 41 1.800 4 0
48 41 42 0.600 4 0
49 43 40 0.600 4 0
50 34 44 0.600 5 0
51 35 45 0.600 5 0
52 44 45 1.800 4 0
53 45 46 0.600 4 0
54 47 44 0.600 4 0
Section Properties
Prop Section Area Iyy Izz J Material
(m2) (in4) (in4) (in4)
1 PIPS60 0.003 26.500 26.500 52.924 STEEL_36_KSI
2 Round 0.1X0.1X0.0 0.003 4.283 4.283 8.566 STEEL
3 PIPS15 0.000 0.293 0.293 0.586 STEEL_36_KSI
4 PIPS30 0.001 2.850 2.850 5.689 STEEL_36_KSI
5 250CU150-27 0.000 0.037 0.181 0 STEEL_36_KSI
Materials
Mat Name E Density
(kN/mm2) (kg/m3) (/°C)
1 STEEL 205.000 0.300 7.83E+3 12E -6
2 CONCRETE 21.718 0.170 2.4E+3 10E -6
3 ALUMINUM 68.948 0.330 2.71E+3 23E -6
4 STAINLESSSTEEL 197.930 0.300 7.83E+3 18E -6
5 STEEL_36_KSI 199.948 0.300 7.83E+3 11.7E -6
6 STEEL_50_KSI 199.948 0.300 7.83E+3 11.7E -6
7 STEEL_275_NMM2 205.000 0.300 7.85E+3 12E -6
8 STEEL_355_NMM2 205.000 0.300 7.85E+3 12E -6
Print Time/Date: 24/11/2023 15:59 STAAD.Pro CONNECT Edition 22.06.00.138 Print Run 3 of 8
Job No Sheet No Rev
4
Software licensed to only @ ::LAVTeam:: (R) Part
CONNECTED User: User is not logged in to CONNECTION Client.
Job Title Ref
By Date17-Nov-23 Chd
Supports
Node X Y Z rX rY rZ
(kN/mm) (kN/mm) (kN/mm) (kN-m/deg) (kN-m/deg) (kN-m/deg)
1 Fixed Fixed Fixed Fixed Fixed Fixed
9 Fixed Fixed Fixed - - -
10 Fixed Fixed Fixed - - -
Y
X
Z
Load 5
Whole Structure
Releases
Beam ends not shown in this table are fixed in all directions.
Beam Node x y z rx ry rz
Print Time/Date: 24/11/2023 15:59 STAAD.Pro CONNECT Edition 22.06.00.138 Print Run 4 of 8
Job No Sheet No Rev
5
Software licensed to only @ ::LAVTeam:: (R) Part
CONNECTED User: User is not logged in to CONNECTION Client.
Job Title Ref
By Date17-Nov-23 Chd
Releases Cont...
Beam Node x y z rx ry rz
R1 DL (APPURTENANCES) Dead
R2 WL - FACE 1 - MAINPOLE Wind
R3 WL - FACE 2 - MAINPOLE Wind
R4 WL - FACE 3 - MAINPOLE Wind
R5 WL - FACE 4 - MAINPOLE Wind
R6 WL - FACE 1 - MOUNTINGFRAME Wind
R7 WL - FACE 2 - MOUNTINGFRAME Wind
R8 WL - FACE 3 - MOUNTINGFRAME Wind
R9 WL - FACE 4 - MOUNTINGFRAME Wind
R10 WL - FACE 1 - APPURTENANCES Wind
R11 WL - FACE 2 - APPURTENANCES Wind
R12 WL - FACE 3 - APPURTENANCES Wind
R13 WL - FACE 4 - APPURTENANCES Wind
1 DL Dead
2 WL - FACE 1 Wind
3 WL - FACE 2 Wind
4 WL - FACE 3 Wind
5 WL - FACE 4 Wind
Print Time/Date: 24/11/2023 15:59 STAAD.Pro CONNECT Edition 22.06.00.138 Print Run 5 of 8
Job No Sheet No Rev
6
Software licensed to only @ ::LAVTeam:: (R) Part
CONNECTED User: User is not logged in to CONNECTION Client.
Job Title Ref
By Date17-Nov-23 Chd
6 1.4DL 1 DL 1.40
7 1.2DL+1.0WL(+X) 1 DL 1.20
2 WL - FACE 1 1.00
8 1.2DL+1.0WL(-X) 1 DL 1.20
3 WL - FACE 2 1.00
9 1.2DL+1.0WL(+Z) 1 DL 1.20
4 WL - FACE 3 1.00
10 1.2DL+1.0WL(-Z) 1 DL 1.20
5 WL - FACE 4 1.00
Reactions
Horizontal Vertical Horizontal Moment
Node L/C FX FY FZ MX MY MZ
(kN) (kN) (kN) (kN-m) (kN-m) (kN-m)
1 1:DL -0.124 4.477 -0.056 -0.079 -0.000 0.164
2:WL - FACE 1 0.026 0.520 -0.021 -0.027 -0.008 -0.031
3:WL - FACE 2 0.000 0.761 0.019 0.021 0.011 0.002
4:WL - FACE 3 -0.023 -0.454 0.014 0.019 0.007 0.028
5:WL - FACE 4 0.014 -0.481 -0.022 -0.027 0.009 -0.020
6:1.4DL -0.174 6.268 -0.079 -0.111 -0.000 0.229
7:1.2DL+1.0WL(+X) -0.123 5.893 -0.088 -0.122 -0.008 0.165
8:1.2DL+1.0WL(-X) -0.149 6.134 -0.049 -0.074 0.010 0.198
9:1.2DL+1.0WL(+Z) -0.173 4.919 -0.054 -0.076 0.007 0.224
10:1.2DL+1.0WL(-Z) -0.135 4.891 -0.090 -0.122 0.009 0.176
9 1:DL -0.002 0.363 0.058 0 0 0
2:WL - FACE 1 0.001 0.101 0.026 0 0 0
3:WL - FACE 2 0.001 -0.590 -0.160 0 0 0
4:WL - FACE 3 0.001 -0.118 -0.032 0 0 0
5:WL - FACE 4 -0.002 0.600 0.162 0 0 0
6:1.4DL -0.003 0.508 0.081804 0 0 0
7:1.2DL+1.0WL(+X) -0.002 0.537 0.096 0 0 0
8:1.2DL+1.0WL(-X) -0.002 -0.155 -0.090 0 0 0
9:1.2DL+1.0WL(+Z) -0.002 0.317 0.038 0 0 0
10:1.2DL+1.0WL(-Z) -0.005 1.036 0.232 0 0 0
10 1:DL 0.127 0.631 -0.002 0 0 0
2:WL - FACE 1 -0.168 -0.622 0.000 0 0 0
3:WL - FACE 2 -0.047 -0.171 0.001 0 0 0
4:WL - FACE 3 0.154 0.572 -0.002 0 0 0
5:WL - FACE 4 -0.032 -0.119 0.001 0 0 0
6:1.4DL 0.178 0.883 -0.003 0 0 0
7:1.2DL+1.0WL(+X) -0.016 0.135 -0.002 0 0 0
8:1.2DL+1.0WL(-X) 0.106 0.586 -0.001 0 0 0
9:1.2DL+1.0WL(+Z) 0.306 1.329 -0.005 0 0 0
Print Time/Date: 24/11/2023 15:59 STAAD.Pro CONNECT Edition 22.06.00.138 Print Run 6 of 8
Job No Sheet No Rev
7
Software licensed to only @ ::LAVTeam:: (R) Part
CONNECTED User: User is not logged in to CONNECTION Client.
Job Title Ref
By Date17-Nov-23 Chd
Reactions Cont...
Horizontal Vertical Horizontal Moment
Node L/C FX FY FZ MX MY MZ
(kN) (kN) (kN) (kN-m) (kN-m) (kN-m)
10:1.2DL+1.0WL(-Z) 0.120 0.638 -0.002 0 0 0
Reaction Summary
Horizontal Vertical Horizontal Moment
Node L/C FX FY FZ MX MY MZ
(kN) (kN) (kN) (kN-m) (kN-m) (kN-m)
Max FX 10 9:1.2DL+1.0WL(+Z) 0.306 1.329 -0.005 0 0 0
Min FX 1 6:1.4DL -0.174 6.268 -0.079 -0.111 -0.000 0.229
Max FY 1 6:1.4DL -0.174 6.268 -0.079 -0.111 -0.000 0.229
Min FY 10 2:WL - FACE 1 -0.168 -0.622 0.000 0 0 0
Max FZ 9 10:1.2DL+1.0WL(-Z) -0.005 1.036 0.232 0 0 0
Min FZ 9 3:WL - FACE 2 0.001 -0.590 -0.160 0 0 0
Max MX 1 3:WL - FACE 2 0.000 0.761 0.019 0.021 0.011 0.002
Min MX 1 7:1.2DL+1.0WL(+X) -0.123 5.893 -0.088 -0.122 -0.008 0.165
Max MY 1 3:WL - FACE 2 0.000 0.761 0.019 0.021 0.011 0.002
Min MY 1 7:1.2DL+1.0WL(+X) -0.123 5.893 -0.088 -0.122 -0.008 0.165
Max MZ 1 6:1.4DL -0.174 6.268 -0.079 -0.111 -0.000 0.229
Min MZ 1 2:WL - FACE 1 0.026 0.520 -0.021 -0.027 -0.008 -0.031
Utilization Ratio
Beam Analysis Design Actual Allowable Ratio Clause L/C Ax Iz Iy Ix
Property Property Ratio Ratio (Act./Allow.) (m2) (in4) (in4) (in4)
1 PIPS60 PIPS60 0.013 1.000 0.013 Eq.H1-1b 6 0.003 26.500 26.500 53.001
2 PIPS60 PIPS60 0.008 1.000 0.008 Eq.H1-1b 6 0.003 26.500 26.500 53.001
3 PIPS60 PIPS60 0.006 1.000 0.006 Eq.H1-1b 9 0.003 26.500 26.500 53.001
12 PIPS60 PIPS60 0.000 1.000 0.000 Cl.E3 6 0.003 26.500 26.500 53.001
13 PIPS30 PIPS30 0.011 1.000 0.011 Eq.H1-1b 6 0.001 2.850 2.850 5.700
14 PIPS30 PIPS30 0.011 1.000 0.011 Eq.H1-1b 6 0.001 2.850 2.850 5.700
15 PIPS30 PIPS30 0.011 1.000 0.011 Eq.H1-1b 6 0.001 2.850 2.850 5.700
16 PIPS30 PIPS30 0.011 1.000 0.011 Eq.H1-1b 6 0.001 2.850 2.850 5.700
17 PIPS30 PIPS30 0.011 1.000 0.011 Eq.H1-1b 6 0.001 2.850 2.850 5.700
18 PIPS30 PIPS30 0.011 1.000 0.011 Eq.H1-1b 8 0.001 2.850 2.850 5.700
19 PIPS30 PIPS30 0.009 1.000 0.009 Eq.H1-1b 6 0.001 2.850 2.850 5.700
20 PIPS30 PIPS30 0.012 1.000 0.012 Eq.H1-1b 6 0.001 2.850 2.850 5.700
21 PIPS30 PIPS30 0.009 1.000 0.009 Eq.H1-1b 6 0.001 2.850 2.850 5.700
22 PIPS30 PIPS30 0.001 1.000 0.001 Eq.H1-1b 7 0.001 2.850 2.850 5.700
23 PIPS30 PIPS30 0.001 1.000 0.001 Eq.H1-1b 10 0.001 2.850 2.850 5.700
24 PIPS30 PIPS30 0.001 1.000 0.001 Eq.H1-1b 7 0.001 2.850 2.850 5.700
26 PIPS30 PIPS30 0.000 1.000 0.000 Cl.D2 6 0.001 2.850 2.850 5.700
27 PIPS30 PIPS30 0.000 1.000 0.000 Cl.D2 6 0.001 2.850 2.850 5.700
28 PIPS60 PIPS60 0.010 1.000 0.010 Eq.H1-1b 9 0.003 26.500 26.500 53.001
Print Time/Date: 24/11/2023 15:59 STAAD.Pro CONNECT Edition 22.06.00.138 Print Run 7 of 8
Job No Sheet No Rev
8
Software licensed to only @ ::LAVTeam:: (R) Part
CONNECTED User: User is not logged in to CONNECTION Client.
Job Title Ref
By Date17-Nov-23 Chd
Failed Members
There is no data of this type.
Print Time/Date: 24/11/2023 15:59 STAAD.Pro CONNECT Edition 22.06.00.138 Print Run 8 of 8
Hilti PROFIS Engineering 3.0.89
www.hilti.com.ph
Company: Power Acts Network Inc. Page: 1
Address: Upper Ground 6 Cityland Herrera Towers, V.A. Rufin Specifier: Aldrin Jonas
Phone I Fax: 09175602146 | E-Mail: ajdeduarte.poweracts@gmail.com
Design: Concrete - Nov 27, 2023 Date: 11/27/2023
Fastening point:
Specifier's comments:
1 Anchor Design
1.1 Input data
Anchor plate
CBFEM
: lx x ly x t = 30.00 cm x 30.00 cm x 2.00 cm;
CBFEM
- The anchor calculation is based on a component-based Finite Element Method (CBFEM)
Input data and results must be checked for conformity with the existing conditions and for plausibility!
PROFIS Engineering ( c ) 2003-2023 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan
1
Hilti PROFIS Engineering 3.0.89
www.hilti.com.ph
Company: Power Acts Network Inc. Page: 2
Address: Upper Ground 6 Cityland Herrera Towers, V.A. Rufin Specifier: Aldrin Jonas
Phone I Fax: 09175602146 | E-Mail: ajdeduarte.poweracts@gmail.com
Design: Concrete - Nov 27, 2023 Date: 11/27/2023
Fastening point:
Input data and results must be checked for conformity with the existing conditions and for plausibility!
PROFIS Engineering ( c ) 2003-2023 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan
2
Hilti PROFIS Engineering 3.0.89
www.hilti.com.ph
Company: Power Acts Network Inc. Page: 3
Address: Upper Ground 6 Cityland Herrera Towers, V.A. Rufin Specifier: Aldrin Jonas
Phone I Fax: 09175602146 | E-Mail: ajdeduarte.poweracts@gmail.com
Design: Concrete - Nov 27, 2023 Date: 11/27/2023
Fastening point:
Anchor forces are calculated based on a component-based Finite Element Method (CBFEM)
Variables
2 2
Ase,N [mm ] futa [N/mm ]
157 500.00
Calculations
Nsa [kN]
78.500
Results
Nsa [kN] f steel f Nsa [kN] Nua [kN]
78.500 0.650 51.025 0.991
Input data and results must be checked for conformity with the existing conditions and for plausibility!
PROFIS Engineering ( c ) 2003-2023 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan
3
Hilti PROFIS Engineering 3.0.89
www.hilti.com.ph
Company: Power Acts Network Inc. Page: 4
Address: Upper Ground 6 Cityland Herrera Towers, V.A. Rufin Specifier: Aldrin Jonas
Phone I Fax: 09175602146 | E-Mail: ajdeduarte.poweracts@gmail.com
Design: Concrete - Nov 27, 2023 Date: 11/27/2023
Fastening point:
Nag = (AA ) y
Na
Na0
ec1,Na y ec2,Na y ed,Na y cp,Na Nba ACI 318-19 Eq. (17.6.5.1b)
f Nag ³ Nua ACI 318-19 Table 17.5.2
ANa see ACI 318-19, Section 17.6.5.1, Fig. R 17.6.5.1(b)
2
ANa0 = (2 cNa) ACI 318-19 Eq. (17.6.5.1.2a)
t uncr
cNa = 10 da √ 1100
ACI 318-19 Eq. (17.6.5.1.2b)
( )
1
'
y ec,Na = eN £ 1.0 ACI 318-19 Eq. (17.6.5.3.1)
1+
cNa
Na
ACI 318-19 Eq. (17.6.5.4.1b)
= MAX(
c ) £
c c a,min Na
y cp,Na , 1.0 ACI 318-19 Eq. (17.6.5.5.1b)
c ac ac
Nba = l a · t k,c · p · da · hef ACI 318-19 Eq. (17.6.5.2.1)
Variables
t k,c,uncr [N/mm ]
2
da [cm] hef [cm] ca,min [cm] aoverhead 2
t k,c [N/mm ]
8.30 1.60 8.00 18.00 1.000 4.10
Calculations
cNa [cm] ANa [mm ]
2
ANa0 [mm ]
2
y ed,Na
16.66 171,039 111,055 1.000
Results
Nag [kN] f bond f Nag [kN] Nua [kN]
22.737 0.550 12.505 1.629
Input data and results must be checked for conformity with the existing conditions and for plausibility!
PROFIS Engineering ( c ) 2003-2023 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan
4
Hilti PROFIS Engineering 3.0.89
www.hilti.com.ph
Company: Power Acts Network Inc. Page: 5
Address: Upper Ground 6 Cityland Herrera Towers, V.A. Rufin Specifier: Aldrin Jonas
Phone I Fax: 09175602146 | E-Mail: ajdeduarte.poweracts@gmail.com
Design: Concrete - Nov 27, 2023 Date: 11/27/2023
Fastening point:
Ncbg = (AA ) y
Nc
Nc0
ec,N y ed,N y c,N y cp,N Nb ACI 318-19 Eq. (17.6.2.1b)
f Ncbg ³ Nua ACI 318-19 Table 17.5.2
ANc see ACI 318-19, Section 17.6.2.1, Fig. R 17.6.2.1(b)
2
ANc0 = 9 hef ACI 318-19 Eq. (17.6.2.1.4)
( )
1
'
y ec,N = 2 eN £ 1.0 ACI 318-19 Eq. (17.6.2.3.1)
1+
3 hef
ef
ACI 318-19 Eq. (17.6.2.4.1b)
= MAX(
c ) £
c 1.5h a,min ef
y cp,N , 1.0 ACI 318-19 Eq. (17.6.2.6.1b)
c ac ac
1.5
Nb = kc l a √ '
fc hef ACI 318-19 Eq. (17.6.2.2.1)
Variables
hef [cm] ec1,N [cm] ec2,N [cm] ca,min [cm] y c,N
8.00 0.00 1.95 18.00 1.000
'
cac [cm] kc la fc [psi]
10.87 17 1.000 2,500
Calculations
ANc [mm ]
2
ANc0 [mm ]
2
y ec1,N y ec2,N y ed,N y cp,N Nb [kN]
100,800 57,600 1.000 0.860 1.000 1.000 21.134
Results
Ncbg [kN] f concrete f Ncbg [kN] Nua [kN]
31.824 0.650 20.686 1.629
Input data and results must be checked for conformity with the existing conditions and for plausibility!
PROFIS Engineering ( c ) 2003-2023 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan
5
Hilti PROFIS Engineering 3.0.89
www.hilti.com.ph
Company: Power Acts Network Inc. Page: 6
Address: Upper Ground 6 Cityland Herrera Towers, V.A. Rufin Specifier: Aldrin Jonas
Phone I Fax: 09175602146 | E-Mail: ajdeduarte.poweracts@gmail.com
Design: Concrete - Nov 27, 2023 Date: 11/27/2023
Fastening point:
Variables
2 2
Ase,V [mm ] futa [N/mm ]
157 500.00
Calculations
Vsa [kN]
47.000
Results
Vsa [kN] f steel f Vsa [kN] Vua [kN]
47.000 0.600 28.200 0.063
Input data and results must be checked for conformity with the existing conditions and for plausibility!
PROFIS Engineering ( c ) 2003-2023 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan
6
Hilti PROFIS Engineering 3.0.89
www.hilti.com.ph
Company: Power Acts Network Inc. Page: 7
Address: Upper Ground 6 Cityland Herrera Towers, V.A. Rufin Specifier: Aldrin Jonas
Phone I Fax: 09175602146 | E-Mail: ajdeduarte.poweracts@gmail.com
Design: Concrete - Nov 27, 2023 Date: 11/27/2023
Fastening point:
Na0
ec1,Na y ec2,Na y ed,Na y cp,Na Nba ] ACI 318-19 Eq. (17.7.3.1b)
f Vcpg ³ Vua ACI 318-19 Table 17.5.2
ANa see ACI 318-19, Section 17.6.5.1, Fig. R 17.6.5.1(b)
2
ANa0 = (2 cNa) ACI 318-19 Eq. (17.6.5.1.2a)
t uncr
cNa = 10 da √ 1100
ACI 318-19 Eq. (17.6.5.1.2b)
( )
1
'
y ec,Na = eN £ 1.0 ACI 318-19 Eq. (17.6.5.3.1)
1+
cNa
Na
ACI 318-19 Eq. (17.6.5.4.1b)
= MAX(
c ) £
c c a,min Na
y cp,Na , 1.0 ACI 318-19 Eq. (17.6.5.5.1b)
c ac ac
Nba = l a · t k,c · p · da · hef ACI 318-19 Eq. (17.6.5.2.1)
Variables
kcp aoverhead t k,c,uncr [N/mm ]
2
da [cm] hef [cm] ca,min [cm]
2
t k,c [N/mm ]
2 1.000 8.30 1.60 8.00 18.00 4.10
Calculations
cNa [cm] ANa [mm ]
2
ANa0 [mm ]
2
y ed,Na
16.66 263,424 111,055 1.000
Results
Vcpg [kN] f concrete f Vcpg [kN] Vua [kN]
53.848 0.700 37.694 0.177
Input data and results must be checked for conformity with the existing conditions and for plausibility!
PROFIS Engineering ( c ) 2003-2023 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan
7
Hilti PROFIS Engineering 3.0.89
www.hilti.com.ph
Company: Power Acts Network Inc. Page: 8
Address: Upper Ground 6 Cityland Herrera Towers, V.A. Rufin Specifier: Aldrin Jonas
Phone I Fax: 09175602146 | E-Mail: ajdeduarte.poweracts@gmail.com
Design: Concrete - Nov 27, 2023 Date: 11/27/2023
Fastening point:
Vcbg = (AA ) y
Vc
Vc0
ec,V y ed,V y c,V y h,V y parallel,V Vb ACI 318-19 Eq. (17.7.2.1b)
f Vcbg ³ Vua ACI 318-19 Table 17.5.2
AVc see ACI 318-19, Section 17.7.2.1, Fig. R 17.7.2.1(b)
2
AVc0 = 4.5 ca1 ACI 318-19 Eq. (17.7.2.1.3)
( )
1
'
y ec,V = ev £ 1.0 ACI 318-19 Eq. (17.7.2.3.1)
1+
1.5ca1
y h,V = √1.5ca1
h ³ 1.0
a
ACI 318-19 Eq. (17.7.2.6.1)
(7 (dl ) )l
0.2
Vb = e
√ da a √f'c c1.5
a1 ACI 318-19 Eq. (17.7.2.2.1a)
a
Variables
ca1 [cm] ca2 [cm] ecV [cm] y c,V ha [cm]
18.00 18.00 2.82 1.000 29.00
'
le [cm] la da [cm] fc [psi] y parallel,V
8.00 1.000 1.60 2,500 1.000
Calculations
AVc [mm ]
2
AVc0 [mm ]
2
y ec,V y ed,V y h,V Vb [kN]
145,800 145,800 0.905 0.900 1.000 32.162
Results
Vcbg [kN] f concrete f Vcbg [kN] Vua [kN]
26.209 0.700 18.346 0.178
1.5 Combined tension and shear loads, per ACI 318-19 section 17.8
z z
bNV = bN + bV <= 1
Input data and results must be checked for conformity with the existing conditions and for plausibility!
PROFIS Engineering ( c ) 2003-2023 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan
8
Hilti PROFIS Engineering 3.0.89
www.hilti.com.ph
Company: Power Acts Network Inc. Page: 9
Address: Upper Ground 6 Cityland Herrera Towers, V.A. Rufin Specifier: Aldrin Jonas
Phone I Fax: 09175602146 | E-Mail: ajdeduarte.poweracts@gmail.com
Design: Concrete - Nov 27, 2023 Date: 11/27/2023
Fastening point:
1.6 Warnings
• The anchor design methods in PROFIS Engineering require rigid anchor plates as per current regulations (ETAG 001/Annex C, EOTA TR029,
etc.). This means load re-distribution on the anchors due to elastic deformations of the anchor plate are not considered - the anchor plate is
assumed to be sufficiently stiff, in order not to be deformed when subjected to the design loading. PROFIS Engineering calculates the minimum
required anchor plate thickness with CBFEM to limit the stress of the anchor plate based on the assumptions explained above. The proof if the
rigid base plate assumption is valid is not carried out by PROFIS Engineering. Input data and results must be checked for agreement with the
existing conditions and for plausibility!
• Condition A applies where the potential concrete failure surfaces are crossed by supplementary reinforcement proportioned to tie the potential
concrete failure prism into the structural member. Condition B applies where such supplementary reinforcement is not provided, or where pullout
or pryout strength governs.
• Design Strengths of adhesive anchor systems are influenced by the cleaning method. Refer to the INSTRUCTIONS FOR USE given in the
Evaluation Service Report for cleaning and installation instructions.
• For additional information about ACI 318 strength design provisions, please go to https://submittals.us.hilti.com/PROFISAnchorDesignGuide/
• Installation of Hilti adhesive anchor systems shall be performed by personnel trained to install Hilti adhesive anchors. Reference ACI 318-19,
Section 26.7.
• The anchor design methods in PROFIS Engineering require rigid anchor plates, as per current regulations (AS 5216:2021, ETAG 001/Annex C,
EOTA TR029 etc.). This means that the anchor plate should be sufficiently rigid to prevent load re-distribution to the anchors due to elastic/plastic
displacements. The user accepts that the anchor plate is considered close to rigid by engineering judgment."
Input data and results must be checked for conformity with the existing conditions and for plausibility!
PROFIS Engineering ( c ) 2003-2023 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan
9
Hilti PROFIS Engineering 3.0.89
www.hilti.com.ph
Company: Power Acts Network Inc. Page: 10
Address: Upper Ground 6 Cityland Herrera Towers, V.A. Rufin Specifier: Aldrin Jonas
Phone I Fax: 09175602146 | E-Mail: ajdeduarte.poweracts@gmail.com
Design: Concrete - Nov 27, 2023 Date: 11/27/2023
Fastening point:
Hilti HAS-U threaded rod with HIT-RE 100 injection mortar with 8 cm embedment h_ef, M16, Hot dip galvanized, Hammer drilled installation per
ESR-3829
y
15.00 15.00
6.00
3 4
15.00
18.00
x
15.00
1 2
6.00
Input data and results must be checked for conformity with the existing conditions and for plausibility!
PROFIS Engineering ( c ) 2003-2023 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan
10
Hilti PROFIS Engineering 3.0.89
www.hilti.com.ph
Company: Power Acts Network Inc. Page: 11
Address: Upper Ground 6 Cityland Herrera Towers, V.A. Rufin Specifier: Aldrin Jonas
Phone I Fax: 09175602146 | E-Mail: ajdeduarte.poweracts@gmail.com
Design: Concrete - Nov 27, 2023 Date: 11/27/2023
Fastening point:
2.2 Summary
Description Profile Stiffeners Anchor plate Welds [%] Concrete [%]
sEd [N/mm²] ePl [%] sEd [N/mm²] ePl [%] sEd [N/mm²] ePl [%] Hole bearing
[%]
1 DL 2.28 0.00 1.26 0.00 1.87 0.00 1 2 1
2 WL - FACE 1 0.45 0.00 0.23 0.00 0.44 0.00 1 1 1
3 WL - FACE 2 0.42 0.00 0.21 0.00 0.34 0.00 1 1 1
4 WL - FACE 3 0.36 0.00 0.19 0.00 0.32 0.00 1 1 1
5 WL - FACE 4 0.32 0.00 0.17 0.00 0.31 0.00 1 1 1
6 1.4DL 3.19 0.00 1.76 0.00 2.62 0.00 1 2 1
7 1.2DL+1.0WL 2.26 0.00 1.28 0.00 2.25 0.00 1 2 1
(+X)
8 1.2DL+1.0WL 3.15 0.00 1.73 0.00 2.29 0.00 1 2 1
(-X)
9 1.2DL+1.0WL 3.21 0.00 1.73 0.00 2.29 0.00 1 2 1
(+Z)
10 1.2DL+1.0WL 2.39 0.00 1.36 0.00 2.26 0.00 1 2 1
(-Z)
2.3 Anchor plate classification
Results below are displayed for the decisive load combinations: 1.4DL
Anchor tension forces Equivalent rigid anchor plate (CBFEM) Component-based Finite Element Method
(CBFEM) anchor plate design
Anchor 1 0.000 kN 0.000 kN
Input data and results must be checked for conformity with the existing conditions and for plausibility!
PROFIS Engineering ( c ) 2003-2023 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan
11
Hilti PROFIS Engineering 3.0.89
www.hilti.com.ph
Company: Power Acts Network Inc. Page: 12
Address: Upper Ground 6 Cityland Herrera Towers, V.A. Rufin Specifier: Aldrin Jonas
Phone I Fax: 09175602146 | E-Mail: ajdeduarte.poweracts@gmail.com
Design: Concrete - Nov 27, 2023 Date: 11/27/2023
Fastening point:
Anchor tension forces Equivalent rigid anchor plate (CBFEM) Component-based Finite Element Method
(CBFEM) anchor plate design
Anchor 2 0.181 kN 0.604 kN
Anchor 3 0.000 kN 0.064 kN
Anchor 4 1.233 kN 1.136 kN
User accepted to consider the selected anchor plate as rigid by his/her engineering judgement. This means the anchor design guidelines can be
applied.
2.4 Profile/Stiffeners/Plate
Profile and stiffeners are verified at the level of the steel to concrete connection. The connection design does not replace the steel design for critical
cross sections, which should be performed outside of PROFIS Engineering.
248.21 N/mm²
0.00 N/mm²
Input data and results must be checked for conformity with the existing conditions and for plausibility!
PROFIS Engineering ( c ) 2003-2023 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan
12
Hilti PROFIS Engineering 3.0.89
www.hilti.com.ph
Company: Power Acts Network Inc. Page: 13
Address: Upper Ground 6 Cityland Herrera Towers, V.A. Rufin Specifier: Aldrin Jonas
Phone I Fax: 09175602146 | E-Mail: ajdeduarte.poweracts@gmail.com
Design: Concrete - Nov 27, 2023 Date: 11/27/2023
Fastening point:
5.00%
0.00%
2.4.2 Plate hole bearing resistance, AISC 360-16 Section J3
Decisive load combination: 6 - 1.4DL
Equations
FRn = 0.75 Rn
V ≤ FRn
Variables
lc [cm] t [cm] Fu [N/mm²] d [cm] Rn [kN]
Anchor 1 5.67 2.00 399.90 1.60 307.120
Anchor 2 13.04 2.00 399.90 1.60 307.120
Anchor 3 5.72 2.00 399.90 1.60 307.120
Anchor 4 25.20 2.00 399.90 1.60 307.120
Results
V [kN] FRn [kN] Utilization [%] Status
Anchor 1 0.047 230.340 1 OK
Anchor 2 0.049 230.340 1 OK
Anchor 3 0.048 230.340 1 OK
Input data and results must be checked for conformity with the existing conditions and for plausibility!
PROFIS Engineering ( c ) 2003-2023 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan
13
Hilti PROFIS Engineering 3.0.89
www.hilti.com.ph
Company: Power Acts Network Inc. Page: 14
Address: Upper Ground 6 Cityland Herrera Towers, V.A. Rufin Specifier: Aldrin Jonas
Phone I Fax: 09175602146 | E-Mail: ajdeduarte.poweracts@gmail.com
Design: Concrete - Nov 27, 2023 Date: 11/27/2023
Fastening point:
2.5 Welds
Profiles are modeled without taking the corner radius into account. Special rules for welding (e.g. for cold-formed profiles ...) are not taken into
account by the software.
Equations
FRn = F Fnw Aw
Fn
Utilization =
F Rn
Variables
Edge Xu Th [cm] Ls [cm] L [cm] Lc [cm] FEXX [N/mm²] Q [°] Aw [mm²]
Member 1 E70xx 0.34 0.48 50.75 1.59 482.63 79.2 54
Results
Edge Fn [kN] FRn [kN] Utilization [%] Status
Member 1 0.187 17.412 2 OK
Equations
FRn = F Fnw Aw
Fn
Utilization =
F Rn
Variables
Edge Xu Th [cm] Ls [cm] L [cm] Lc [cm] FEXX [N/mm²] Q [°] Aw [mm²]
Stiffenera E70xx 0.34 0.48 6.44 1.07 482.63 28.6 36
(Anchor plate)
Stiffenera E70xx 0.34 0.48 6.44 1.07 482.63 7.7 36
(Anchor plate) 1
Stiffenerb E70xx 0.34 0.48 6.47 1.08 482.63 68.5 36
(Anchor plate)
Stiffenerb E70xx 0.34 0.48 6.47 1.08 482.63 59.8 36
(Anchor plate) 1
Stiffenerc E70xx 0.34 0.48 6.44 1.07 482.63 30.1 36
(Anchor plate)
Stiffenerc E70xx 0.34 0.48 6.44 1.07 482.63 9.5 36
(Anchor plate) 1
Input data and results must be checked for conformity with the existing conditions and for plausibility!
PROFIS Engineering ( c ) 2003-2023 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan
14
Hilti PROFIS Engineering 3.0.89
www.hilti.com.ph
Company: Power Acts Network Inc. Page: 15
Address: Upper Ground 6 Cityland Herrera Towers, V.A. Rufin Specifier: Aldrin Jonas
Phone I Fax: 09175602146 | E-Mail: ajdeduarte.poweracts@gmail.com
Design: Concrete - Nov 27, 2023 Date: 11/27/2023
Fastening point:
Results
Edge Fn [kN] FRn [kN] Utilization [%] Status
Stiffenera (Anchor plate) 0.045 9.160 1 OK
Stiffenera (Anchor plate) 1 0.025 8.050 1 OK
Stiffenerb (Anchor plate) 0.037 11.436 1 OK
Stiffenerb (Anchor plate) 1 0.041 11.065 1 OK
Stiffenerc (Anchor plate) 0.034 9.253 1 OK
Stiffenerc (Anchor plate) 1 0.020 8.121 1 OK
Stiffenerd (Anchor plate) 0.031 11.244 1 OK
Stiffenerd (Anchor plate) 1 0.040 10.066 1 OK
Stiffenera (Member 1-arc 1) 0.040 8.103 1 OK
Stiffenera (Member 1-arc 1) 0.036 8.540 1 OK
1
Stiffenerb (Member 1-arc 9) 0.076 8.255 1 OK
Stiffenerb (Member 1-arc 9) 0.080 8.427 1 OK
1
Stiffenerc (Member 1-arc 17) 0.034 8.140 1 OK
Stiffenerc (Member 1-arc 17) 0.028 8.560 1 OK
1
Stiffenerd (Member 1-arc 25) 0.063 8.206 1 OK
Stiffenerd (Member 1-arc 25) 0.065 8.328 1 OK
1
Input data and results must be checked for conformity with the existing conditions and for plausibility!
PROFIS Engineering ( c ) 2003-2023 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan
15
Hilti PROFIS Engineering 3.0.89
www.hilti.com.ph
Company: Power Acts Network Inc. Page: 16
Address: Upper Ground 6 Cityland Herrera Towers, V.A. Rufin Specifier: Aldrin Jonas
Phone I Fax: 09175602146 | E-Mail: ajdeduarte.poweracts@gmail.com
Design: Concrete - Nov 27, 2023 Date: 11/27/2023
Fastening point:
2.6 Concrete
Decisive load combination: 6 - 1.4DL
0.00 N/mm²
2.6.2 Concrete block compressive strength resistance check, AISC 360-16 Section J8
Equations
Fp = F fp,max
A A
2 2
fp,max = 0.85 fc' √( ) ≤ 1.7 fc; √( )≤2
A A
1 1
N
s = A
1
Utilization =
s
Fp
Variables
N [kN] fc' [N/mm²] F A1 [mm²] A2 [mm²]
1.249 17.24 0.65 50,070 219,404
Input data and results must be checked for conformity with the existing conditions and for plausibility!
PROFIS Engineering ( c ) 2003-2023 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan
16
Hilti PROFIS Engineering 3.0.89
www.hilti.com.ph
Company: Power Acts Network Inc. Page: 17
Address: Upper Ground 6 Cityland Herrera Towers, V.A. Rufin Specifier: Aldrin Jonas
Phone I Fax: 09175602146 | E-Mail: ajdeduarte.poweracts@gmail.com
Design: Concrete - Nov 27, 2023 Date: 11/27/2023
Fastening point:
Results
Load combination Fp [N/mm²] s [N/mm²] Utilization [%] Status
DL 19.05 0.02 1 OK
2.8 Warnings
● By using the CBFEM calculation functionality of PROFIS Engineering you may act outside the applicable design codes and your specified
anchor plate may not behave rigid. Please, validate the results with a professional designer and/or structural engineer to ensure suitability and
adequacy for your specific jurisdiction and project requirements.
● The anchor is modeled considering stiffness values determined from load displacement curves tested in an independent laboratory. Please
note that no simple replacement of the anchor is possible as the anchor stiffness has a major impact on the load distribution results.
Input data and results must be checked for conformity with the existing conditions and for plausibility!
PROFIS Engineering ( c ) 2003-2023 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan
17
Hilti PROFIS Engineering 3.0.89
www.hilti.com.ph
Company: Power Acts Network Inc. Page: 18
Address: Upper Ground 6 Cityland Herrera Towers, V.A. Rufin Specifier: Aldrin Jonas
Phone I Fax: 09175602146 | E-Mail: ajdeduarte.poweracts@gmail.com
Design: Concrete - Nov 27, 2023 Date: 11/27/2023
Fastening point:
3 Summary of results
Design of the anchor plate, anchors, welds and other elements are based on CBFEM (component based finite element method) and AISC.
Load combination Max. utilization Status
Anchors 1.2DL+1.0WL(+Z) 14% OK
Anchor plate 1.4DL 2% OK
Welds DL 2% OK
Stiffeners 1.4DL 1% OK
Concrete DL 1% OK
Profile 1.2DL+1.0WL(+Z) 2% OK
Input data and results must be checked for conformity with the existing conditions and for plausibility!
PROFIS Engineering ( c ) 2003-2023 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan
18
Hilti PROFIS Engineering 3.0.89
www.hilti.com.ph
Company: Power Acts Network Inc. Page: 19
Address: Upper Ground 6 Cityland Herrera Towers, V.A. Rufin Specifier: Aldrin Jonas
Phone I Fax: 09175602146 | E-Mail: ajdeduarte.poweracts@gmail.com
Design: Concrete - Nov 27, 2023 Date: 11/27/2023
Fastening point:
Input data and results must be checked for conformity with the existing conditions and for plausibility!
PROFIS Engineering ( c ) 2003-2023 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan
19
Hilti PROFIS Engineering 3.0.89
www.hilti.com.ph
Company: Power Acts Network Inc. Page: 1
Address: Upper Ground 6 Cityland Herrera Towers, V.A. Rufin Specifier: Aldrin Jonas
Phone I Fax: 09175602146 | E-Mail: ajdeduarte.poweracts@gmail.com
Design: Concrete - Nov 27, 2023 (1) Date: 11/27/2023
Fastening point:
Specifier's comments:
1 Anchor Design
1.1 Input data
Anchor plate
CBFEM
: lx x ly x t = 25.00 cm x 20.00 cm x 2.00 cm;
CBFEM
- The anchor calculation is based on a component-based Finite Element Method (CBFEM)
Input data and results must be checked for conformity with the existing conditions and for plausibility!
PROFIS Engineering ( c ) 2003-2023 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan
1
Hilti PROFIS Engineering 3.0.89
www.hilti.com.ph
Company: Power Acts Network Inc. Page: 2
Address: Upper Ground 6 Cityland Herrera Towers, V.A. Rufin Specifier: Aldrin Jonas
Phone I Fax: 09175602146 | E-Mail: ajdeduarte.poweracts@gmail.com
Design: Concrete - Nov 27, 2023 (1) Date: 11/27/2023
Fastening point:
Input data and results must be checked for conformity with the existing conditions and for plausibility!
PROFIS Engineering ( c ) 2003-2023 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan
2
Hilti PROFIS Engineering 3.0.89
www.hilti.com.ph
Company: Power Acts Network Inc. Page: 3
Address: Upper Ground 6 Cityland Herrera Towers, V.A. Rufin Specifier: Aldrin Jonas
Phone I Fax: 09175602146 | E-Mail: ajdeduarte.poweracts@gmail.com
Design: Concrete - Nov 27, 2023 (1) Date: 11/27/2023
Fastening point:
Anchor forces are calculated based on a component-based Finite Element Method (CBFEM)
Variables
2 2
Ase,N [mm ] futa [N/mm ]
157 500.00
Calculations
Nsa [kN]
78.500
Results
Nsa [kN] f steel f Nsa [kN] Nua [kN]
78.500 0.650 51.025 0.201
Input data and results must be checked for conformity with the existing conditions and for plausibility!
PROFIS Engineering ( c ) 2003-2023 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan
3
Hilti PROFIS Engineering 3.0.89
www.hilti.com.ph
Company: Power Acts Network Inc. Page: 4
Address: Upper Ground 6 Cityland Herrera Towers, V.A. Rufin Specifier: Aldrin Jonas
Phone I Fax: 09175602146 | E-Mail: ajdeduarte.poweracts@gmail.com
Design: Concrete - Nov 27, 2023 (1) Date: 11/27/2023
Fastening point:
Nag = (AA ) y
Na
Na0
ec1,Na y ec2,Na y ed,Na y cp,Na Nba ACI 318-19 Eq. (17.6.5.1b)
f Nag ³ Nua ACI 318-19 Table 17.5.2
ANa see ACI 318-19, Section 17.6.5.1, Fig. R 17.6.5.1(b)
2
ANa0 = (2 cNa) ACI 318-19 Eq. (17.6.5.1.2a)
t uncr
cNa = 10 da √ 1100
ACI 318-19 Eq. (17.6.5.1.2b)
( )
1
'
y ec,Na = eN £ 1.0 ACI 318-19 Eq. (17.6.5.3.1)
1+
cNa
Na
ACI 318-19 Eq. (17.6.5.4.1b)
= MAX(
c ) £
c c a,min Na
y cp,Na , 1.0 ACI 318-19 Eq. (17.6.5.5.1b)
c ac ac
Nba = l a · t k,c · p · da · hef ACI 318-19 Eq. (17.6.5.2.1)
Variables
t k,c,uncr [N/mm ]
2
da [cm] hef [cm] ca,min [cm] aoverhead 2
t k,c [N/mm ]
8.30 1.60 8.00 9.22 1.000 4.10
Calculations
cNa [cm] ANa [mm ]
2
ANa0 [mm ]
2
y ed,Na
16.66 154,001 111,055 0.866
Results
Nag [kN] f bond f Nag [kN] Nua [kN]
19.770 0.550 10.873 0.802
Input data and results must be checked for conformity with the existing conditions and for plausibility!
PROFIS Engineering ( c ) 2003-2023 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan
4
Hilti PROFIS Engineering 3.0.89
www.hilti.com.ph
Company: Power Acts Network Inc. Page: 5
Address: Upper Ground 6 Cityland Herrera Towers, V.A. Rufin Specifier: Aldrin Jonas
Phone I Fax: 09175602146 | E-Mail: ajdeduarte.poweracts@gmail.com
Design: Concrete - Nov 27, 2023 (1) Date: 11/27/2023
Fastening point:
Ncbg = (AA ) y
Nc
Nc0
ec,N y ed,N y c,N y cp,N Nb ACI 318-19 Eq. (17.6.2.1b)
f Ncbg ³ Nua ACI 318-19 Table 17.5.2
ANc see ACI 318-19, Section 17.6.2.1, Fig. R 17.6.2.1(b)
2
ANc0 = 9 hef ACI 318-19 Eq. (17.6.2.1.4)
( )
1
'
y ec,N = 2 eN £ 1.0 ACI 318-19 Eq. (17.6.2.3.1)
1+
3 hef
ef
ACI 318-19 Eq. (17.6.2.4.1b)
= MAX(
c ) £
c 1.5h a,min ef
y cp,N , 1.0 ACI 318-19 Eq. (17.6.2.6.1b)
c ac ac
1.5
Nb = kc l a √ '
fc hef ACI 318-19 Eq. (17.6.2.2.1)
Variables
hef [cm] ec1,N [cm] ec2,N [cm] ca,min [cm] y c,N
8.00 0.02 0.00 9.22 1.000
'
cac [cm] kc la fc [psi]
10.87 17 1.000 2,500
Calculations
ANc [mm ]
2
ANc0 [mm ]
2
y ec1,N y ec2,N y ed,N y cp,N Nb [kN]
123,695 57,600 0.998 1.000 0.930 1.000 21.134
Results
Ncbg [kN] f concrete f Ncbg [kN] Nua [kN]
42.144 0.650 27.393 0.802
Input data and results must be checked for conformity with the existing conditions and for plausibility!
PROFIS Engineering ( c ) 2003-2023 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan
5
Hilti PROFIS Engineering 3.0.89
www.hilti.com.ph
Company: Power Acts Network Inc. Page: 6
Address: Upper Ground 6 Cityland Herrera Towers, V.A. Rufin Specifier: Aldrin Jonas
Phone I Fax: 09175602146 | E-Mail: ajdeduarte.poweracts@gmail.com
Design: Concrete - Nov 27, 2023 (1) Date: 11/27/2023
Fastening point:
Variables
2 2
Ase,V [mm ] futa [N/mm ]
157 500.00
Calculations
Vsa [kN]
47.000
Results
Vsa [kN] f steel f Vsa [kN] Vua [kN]
47.000 0.600 28.200 0.043
Input data and results must be checked for conformity with the existing conditions and for plausibility!
PROFIS Engineering ( c ) 2003-2023 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan
6
Hilti PROFIS Engineering 3.0.89
www.hilti.com.ph
Company: Power Acts Network Inc. Page: 7
Address: Upper Ground 6 Cityland Herrera Towers, V.A. Rufin Specifier: Aldrin Jonas
Phone I Fax: 09175602146 | E-Mail: ajdeduarte.poweracts@gmail.com
Design: Concrete - Nov 27, 2023 (1) Date: 11/27/2023
Fastening point:
Na0
ec1,Na y ec2,Na y ed,Na y cp,Na Nba ] ACI 318-19 Eq. (17.7.3.1b)
f Vcpg ³ Vua ACI 318-19 Table 17.5.2
ANa see ACI 318-19, Section 17.6.5.1, Fig. R 17.6.5.1(b)
2
ANa0 = (2 cNa) ACI 318-19 Eq. (17.6.5.1.2a)
t uncr
cNa = 10 da √ 1100
ACI 318-19 Eq. (17.6.5.1.2b)
( )
1
'
y ec,Na = eN £ 1.0 ACI 318-19 Eq. (17.6.5.3.1)
1+
cNa
Na
ACI 318-19 Eq. (17.6.5.4.1b)
= MAX(
c ) £
c c a,min Na
y cp,Na , 1.0 ACI 318-19 Eq. (17.6.5.5.1b)
c ac ac
Nba = l a · t k,c · p · da · hef ACI 318-19 Eq. (17.6.5.2.1)
Variables
kcp aoverhead t k,c,uncr [N/mm ]
2
da [cm] hef [cm] ca,min [cm]
2
t k,c [N/mm ]
2 1.000 8.30 1.60 8.00 9.22 4.10
Calculations
cNa [cm] ANa [mm ]
2
ANa0 [mm ]
2
y ed,Na
16.66 154,001 111,055 0.866
Results
Vcpg [kN] f concrete f Vcpg [kN] Vua [kN]
39.599 0.700 27.719 0.171
Input data and results must be checked for conformity with the existing conditions and for plausibility!
PROFIS Engineering ( c ) 2003-2023 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan
7
Hilti PROFIS Engineering 3.0.89
www.hilti.com.ph
Company: Power Acts Network Inc. Page: 8
Address: Upper Ground 6 Cityland Herrera Towers, V.A. Rufin Specifier: Aldrin Jonas
Phone I Fax: 09175602146 | E-Mail: ajdeduarte.poweracts@gmail.com
Design: Concrete - Nov 27, 2023 (1) Date: 11/27/2023
Fastening point:
Vcbg = (AA ) y
Vc
Vc0
ec,V y ed,V y c,V y h,V y parallel,V Vb ACI 318-19 Eq. (17.7.2.1b)
f Vcbg ³ Vua ACI 318-19 Table 17.5.2
AVc see ACI 318-19, Section 17.7.2.1, Fig. R 17.7.2.1(b)
2
AVc0 = 4.5 ca1 ACI 318-19 Eq. (17.7.2.1.3)
( )
1
'
y ec,V = ev £ 1.0 ACI 318-19 Eq. (17.7.2.3.1)
1+
1.5ca1
y h,V = √1.5ca1
h ³ 1.0
a
ACI 318-19 Eq. (17.7.2.6.1)
(7 (dl ) )l
0.2
Vb = e
√ da a √f'c c1.5
a1 ACI 318-19 Eq. (17.7.2.2.1a)
a
Variables
ca1 [cm] ca2 [cm] ecV [cm] y c,V ha [cm]
19.33 9.22 0.00 1.000 29.00
'
le [cm] la da [cm] fc [psi] y parallel,V
8.00 1.000 1.60 2,500 1.000
Calculations
AVc [mm ]
2
AVc0 [mm ]
2
y ec,V y ed,V y h,V Vb [kN]
94,250 168,200 1.000 0.795 1.000 35.801
Results
Vcbg [kN] f concrete f Vcbg [kN] Vua [kN]
15.956 0.700 11.169 0.171
1.5 Combined tension and shear loads, per ACI 318-19 section 17.8
z z
bNV = bN + bV <= 1
Input data and results must be checked for conformity with the existing conditions and for plausibility!
PROFIS Engineering ( c ) 2003-2023 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan
8
Hilti PROFIS Engineering 3.0.89
www.hilti.com.ph
Company: Power Acts Network Inc. Page: 9
Address: Upper Ground 6 Cityland Herrera Towers, V.A. Rufin Specifier: Aldrin Jonas
Phone I Fax: 09175602146 | E-Mail: ajdeduarte.poweracts@gmail.com
Design: Concrete - Nov 27, 2023 (1) Date: 11/27/2023
Fastening point:
1.6 Warnings
• The anchor design methods in PROFIS Engineering require rigid anchor plates as per current regulations (ETAG 001/Annex C, EOTA TR029,
etc.). This means load re-distribution on the anchors due to elastic deformations of the anchor plate are not considered - the anchor plate is
assumed to be sufficiently stiff, in order not to be deformed when subjected to the design loading. PROFIS Engineering calculates the minimum
required anchor plate thickness with CBFEM to limit the stress of the anchor plate based on the assumptions explained above. The proof if the
rigid base plate assumption is valid is not carried out by PROFIS Engineering. Input data and results must be checked for agreement with the
existing conditions and for plausibility!
• Condition A applies where the potential concrete failure surfaces are crossed by supplementary reinforcement proportioned to tie the potential
concrete failure prism into the structural member. Condition B applies where such supplementary reinforcement is not provided, or where pullout
or pryout strength governs.
• Design Strengths of adhesive anchor systems are influenced by the cleaning method. Refer to the INSTRUCTIONS FOR USE given in the
Evaluation Service Report for cleaning and installation instructions.
• For additional information about ACI 318 strength design provisions, please go to https://submittals.us.hilti.com/PROFISAnchorDesignGuide/
• Installation of Hilti adhesive anchor systems shall be performed by personnel trained to install Hilti adhesive anchors. Reference ACI 318-19,
Section 26.7.
• The anchor design methods in PROFIS Engineering require rigid anchor plates, as per current regulations (AS 5216:2021, ETAG 001/Annex C,
EOTA TR029 etc.). This means that the anchor plate should be sufficiently rigid to prevent load re-distribution to the anchors due to elastic/plastic
displacements. The user accepts that the anchor plate is considered close to rigid by engineering judgment."
Input data and results must be checked for conformity with the existing conditions and for plausibility!
PROFIS Engineering ( c ) 2003-2023 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan
9
Hilti PROFIS Engineering 3.0.89
www.hilti.com.ph
Company: Power Acts Network Inc. Page: 10
Address: Upper Ground 6 Cityland Herrera Towers, V.A. Rufin Specifier: Aldrin Jonas
Phone I Fax: 09175602146 | E-Mail: ajdeduarte.poweracts@gmail.com
Design: Concrete - Nov 27, 2023 (1) Date: 11/27/2023
Fastening point:
Hilti HAS-U threaded rod with HIT-RE 100 injection mortar with 8 cm embedment h_ef, M16, Hot dip galvanized, Hammer drilled installation per
ESR-3829
y
12.50 12.50
2.97
3 4
10.00
14.06
x
10.00
1 2
2.97
Input data and results must be checked for conformity with the existing conditions and for plausibility!
PROFIS Engineering ( c ) 2003-2023 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan
10
Hilti PROFIS Engineering 3.0.89
www.hilti.com.ph
Company: Power Acts Network Inc. Page: 11
Address: Upper Ground 6 Cityland Herrera Towers, V.A. Rufin Specifier: Aldrin Jonas
Phone I Fax: 09175602146 | E-Mail: ajdeduarte.poweracts@gmail.com
Design: Concrete - Nov 27, 2023 (1) Date: 11/27/2023
Fastening point:
2.2 Summary
Description Profile Anchor plate Welds [%] Concrete [%]
sEd [N/mm²] ePl [%] sEd [N/mm²] ePl [%] Hole bearing [%]
1 DL 0.46 0.00 0.35 0.00 1 1 1
2 WL - FACE 1 0.51 0.00 0.99 0.00 1 1 1
3 WL - FACE 2 0.07 0.00 0.05 0.00 1 1 1
4 WL - FACE 3 0.51 0.00 0.33 0.00 1 1 1
5 WL - FACE 4 0.15 0.00 0.21 0.00 1 1 1
6 1.4DL 0.65 0.00 0.49 0.00 1 1 1
7 1.2DL+1.0WL(+ 0.11 0.00 0.07 0.00 1 1 1
X)
8 1.2DL+1.0WL(-X 1.07 0.00 0.75 0.00 1 1 1
)
9 1.2DL+1.0WL(+ 0.63 0.00 0.47 0.00 1 1 1
Z)
10 1.2DL+1.0WL(-Z 0.42 0.00 0.35 0.00 1 1 1
)
2.3 Anchor plate classification
Results below are displayed for the decisive load combinations: WL - FACE 1
Anchor tension forces Equivalent rigid anchor plate (CBFEM) Component-based Finite Element Method
(CBFEM) anchor plate design
Anchor 1 0.158 kN 0.200 kN
Anchor 2 0.159 kN 0.201 kN
Anchor 3 0.158 kN 0.200 kN
Anchor 4 0.159 kN 0.201 kN
User accepted to consider the selected anchor plate as rigid by his/her engineering judgement. This means the anchor design guidelines can be
Input data and results must be checked for conformity with the existing conditions and for plausibility!
PROFIS Engineering ( c ) 2003-2023 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan
11
Hilti PROFIS Engineering 3.0.89
www.hilti.com.ph
Company: Power Acts Network Inc. Page: 12
Address: Upper Ground 6 Cityland Herrera Towers, V.A. Rufin Specifier: Aldrin Jonas
Phone I Fax: 09175602146 | E-Mail: ajdeduarte.poweracts@gmail.com
Design: Concrete - Nov 27, 2023 (1) Date: 11/27/2023
Fastening point:
applied.
2.4 Profile/Stiffeners/Plate
Profile and stiffeners are verified at the level of the steel to concrete connection. The connection design does not replace the steel design for critical
cross sections, which should be performed outside of PROFIS Engineering.
248.21 N/mm²
0.00 N/mm²
Input data and results must be checked for conformity with the existing conditions and for plausibility!
PROFIS Engineering ( c ) 2003-2023 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan
12
Hilti PROFIS Engineering 3.0.89
www.hilti.com.ph
Company: Power Acts Network Inc. Page: 13
Address: Upper Ground 6 Cityland Herrera Towers, V.A. Rufin Specifier: Aldrin Jonas
Phone I Fax: 09175602146 | E-Mail: ajdeduarte.poweracts@gmail.com
Design: Concrete - Nov 27, 2023 (1) Date: 11/27/2023
Fastening point:
5.00%
0.00%
2.4.2 Plate hole bearing resistance, AISC 360-16 Section J3
Decisive load combination: 2 - WL - FACE 1
Equations
FRn = 0.75 Rn
V ≤ FRn
Variables
lc [cm] t [cm] Fu [N/mm²] d [cm] Rn [kN]
Anchor 1 4.57 2.00 399.90 1.60 307.120
Anchor 2 12.26 2.00 399.90 1.60 307.120
Anchor 3 4.57 2.00 399.90 1.60 307.120
Anchor 4 12.26 2.00 399.90 1.60 307.120
Results
V [kN] FRn [kN] Utilization [%] Status
Anchor 1 0.043 230.340 1 OK
Anchor 2 0.043 230.340 1 OK
Anchor 3 0.043 230.340 1 OK
Input data and results must be checked for conformity with the existing conditions and for plausibility!
PROFIS Engineering ( c ) 2003-2023 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan
13
Hilti PROFIS Engineering 3.0.89
www.hilti.com.ph
Company: Power Acts Network Inc. Page: 14
Address: Upper Ground 6 Cityland Herrera Towers, V.A. Rufin Specifier: Aldrin Jonas
Phone I Fax: 09175602146 | E-Mail: ajdeduarte.poweracts@gmail.com
Design: Concrete - Nov 27, 2023 (1) Date: 11/27/2023
Fastening point:
2.5 Welds
Profiles are modeled without taking the corner radius into account. Special rules for welding (e.g. for cold-formed profiles ...) are not taken into
account by the software.
Equations
FRn = F Fnw Aw
Fn
Utilization =
F Rn
Variables
Edge Xu Th [cm] Ls [cm] L [cm] Lc [cm] FEXX [N/mm²] Q [°] Aw [mm²]
Member 1-bfl 1 E70xx 0.40 0.57 19.94 1.53 482.63 55.0 61
Member 1-bfl E70xx 0.40 0.57 19.94 1.53 482.63 55.3 61
Results
Edge Fn [kN] FRn [kN] Utilization [%] Status
Member 1-bfl 1 0.045 18.257 1 OK
Member 1-bfl 0.045 18.287 1 OK
2.6 Concrete
Decisive load combination: 8 - 1.2DL+1.0WL(-X)
Input data and results must be checked for conformity with the existing conditions and for plausibility!
PROFIS Engineering ( c ) 2003-2023 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan
14
Hilti PROFIS Engineering 3.0.89
www.hilti.com.ph
Company: Power Acts Network Inc. Page: 15
Address: Upper Ground 6 Cityland Herrera Towers, V.A. Rufin Specifier: Aldrin Jonas
Phone I Fax: 09175602146 | E-Mail: ajdeduarte.poweracts@gmail.com
Design: Concrete - Nov 27, 2023 (1) Date: 11/27/2023
Fastening point:
0.00 N/mm²
2.6.2 Concrete block compressive strength resistance check, AISC 360-16 Section J8
Equations
Fp = F fp,max
A A
2 2
fp,max = 0.85 fc' √( ) ≤ 1.7 fc; √( )≤2
A A
1 1
N
s = A
1
Utilization =
s
Fp
Variables
N [kN] fc' [N/mm²] F A1 [mm²] A2 [mm²]
0.635 17.24 0.65 48,969 118,629
Results
Load combination Fp [N/mm²] s [N/mm²] Utilization [%] Status
DL 14.82 0.01 1 OK
Input data and results must be checked for conformity with the existing conditions and for plausibility!
PROFIS Engineering ( c ) 2003-2023 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan
15
Hilti PROFIS Engineering 3.0.89
www.hilti.com.ph
Company: Power Acts Network Inc. Page: 16
Address: Upper Ground 6 Cityland Herrera Towers, V.A. Rufin Specifier: Aldrin Jonas
Phone I Fax: 09175602146 | E-Mail: ajdeduarte.poweracts@gmail.com
Design: Concrete - Nov 27, 2023 (1) Date: 11/27/2023
Fastening point:
2.8 Warnings
● By using the CBFEM calculation functionality of PROFIS Engineering you may act outside the applicable design codes and your specified
anchor plate may not behave rigid. Please, validate the results with a professional designer and/or structural engineer to ensure suitability and
adequacy for your specific jurisdiction and project requirements.
● The anchor is modeled considering stiffness values determined from load displacement curves tested in an independent laboratory. Please
note that no simple replacement of the anchor is possible as the anchor stiffness has a major impact on the load distribution results.
Input data and results must be checked for conformity with the existing conditions and for plausibility!
PROFIS Engineering ( c ) 2003-2023 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan
16
Hilti PROFIS Engineering 3.0.89
www.hilti.com.ph
Company: Power Acts Network Inc. Page: 17
Address: Upper Ground 6 Cityland Herrera Towers, V.A. Rufin Specifier: Aldrin Jonas
Phone I Fax: 09175602146 | E-Mail: ajdeduarte.poweracts@gmail.com
Design: Concrete - Nov 27, 2023 (1) Date: 11/27/2023
Fastening point:
3 Summary of results
Design of the anchor plate, anchors, welds and other elements are based on CBFEM (component based finite element method) and AISC.
Load combination Max. utilization Status
Anchors WL - FACE 1 8% OK
Anchor plate WL - FACE 1 1% OK
Welds DL 1% OK
Concrete DL 1% OK
Profile 1.2DL+1.0WL(-X) 1% OK
Input data and results must be checked for conformity with the existing conditions and for plausibility!
PROFIS Engineering ( c ) 2003-2023 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan
17
Hilti PROFIS Engineering 3.0.89
www.hilti.com.ph
Company: Power Acts Network Inc. Page: 18
Address: Upper Ground 6 Cityland Herrera Towers, V.A. Rufin Specifier: Aldrin Jonas
Phone I Fax: 09175602146 | E-Mail: ajdeduarte.poweracts@gmail.com
Design: Concrete - Nov 27, 2023 (1) Date: 11/27/2023
Fastening point:
Input data and results must be checked for conformity with the existing conditions and for plausibility!
PROFIS Engineering ( c ) 2003-2023 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan
18
IV. DISCUSSION OF THE RESULTS
The used of utilization ratio is to compare the actual designed computation to the criteria bind by the code,
when the value for utilization ratio for different mode of failure/s reaches 1.00 that signifies that the designed
actual computation are already at 100% designed capacity of the material that was examined. It is safe to assume
that the utilization ratio should not be equal to or greater than the obtained design capacity for a certain design
criterion. During the design stage it is advisable to have less than or equal to 10% of utilization ratio for the strength
capacity of anchor bolts. This consideration is based on the judgement of the designer. However, since the structure
is already built, the analysis is performed after the tower is designed, based on pages. 29-65, it exceeds the usual
10% utilization rate, but it is still safe as it is below the safe value as stated. This is considered safe as we
conservatively analyzed the concrete pedestal through the criteria of Condition B for provisions of ACI 318-14
(Chapter 17 – ANCHORING TO CONCRETE) wherein it is stated in this conditional analysis that “where
supplementary reinforcement is not present, and for pullout or pry out strength. Also, there is a safety factor of
0.70 (Multiplier for the design capacity) for shear and tension loads when considering the said condition.
As shown from the given data from pages. 28, the Prefabricated steel members were analyzed to resist
axial failure, torsional failure, and slenderness ratio adequacy throughout carrying different load cases/load
combination inputs. The maximum slenderness ratio for compression members is at 200 and 300 for tension
members. The governing mode of failure would be provided and written as “Ref:” along with the governing
equation for mode of failure. The word “ratio: “indicates the design checking ratio for a particular governing mode
of failure for a particular steel member. “Track 2” on page. 21 indicates that LRFD method are used.
Based on the results, the structure is deemed SAFE, AND ADEQUATE to carry out the loads imposed
on it and would not post danger to the users of the building for its original intended purpose.
APPENDICES
This part of the report shows the actual imagery of the equipment, pole tower, as well as
the Computed Aided Drawn (CAD) plans, that are obtained from ocular inspection. Only what
is shown in this part and can be obtained measured in-site are analyzed owners of the building as
well as the pole framing structures cannot provide the as-built plans of the affected areas and
concerned structural members. Analysis and justification provided in the analysis are bind by the
National Structural Code of the Philippines (NSCP 2015) as well as the references that the
said code permits. Whatever is shown and highlighted in this part of the report are what is only
part of the analysis and whatever changes, iterations, and addition of equipment that took place
after the time the ocular inspection is performed are not part of the extent of the certification
provided and is not under the responsibility of the undersigned.
Figure 7. As shown above, the highlighted structure is the pole framing structure that is mainly
focused on this report. The ocular inspection took place at the day when the photo is captured
that is June.9,2023.
Figure 8. Shown above are the Figure 9. Shown above and highlighted are
antennas/appurtenances installed at the pole the anchorage through concrete element of the
infrastructure at the day of the ocular Pole infrastructure.
inspection that is June.9,2023. Weight of the
equipment that are installed in the tower are
considered by the engineer in-charge of this
report, thus, shall not have any additional
equipment to validate the provided deadload
computations.