Professional Documents
Culture Documents
0.16
1.90
Barandal a base de
A 0.79
0.99
flown from tubo de fierro negro Ø 4" 0.79
2.63 platform base projection 2.63
0.30
1.00 Pend.
2,80
5
Pe
B
nd
B
.
.
nd
2
Pe
0.99 0.99
3.00
0.79
0.30 0.79
0.50 0.49
6.00
Pend.
Pend.
5,20 3.71
3.71 3.74
6.00 3.74
N.P.T. + 1.40
0.99
6
C
0.99
.
base projection 1
C
nd
Pe
Pe
n
d.
columns Ø 20 cm. 0.79
0.16
0.16 1.33
1.33 N.P.T. + 1.00 0.99
1.00
0.79
1.90 ANDEAN TILE
1.90
3 0.59 1.00
1.00
2.80 2 0.59
1 0.59
0.59 0.59
CERAMIC
CERAMIC
0.05 SUBFLOOR
FALSE SUBFLOOR
0.10
flown from
platform
wall confinement
fe head Ø1/4"
0.55 CONCRETE AND/OR AFFIRMED
TARRING COMPACTED
MORTAR 1:5 SQUARE SECTION
0.25
0.30
N.F.C. -
0.68
bay section 1 - 1
ESC. 1 : 30
NPT.= + 0.15
1.8000
TOR
LLEC
E CO
BAG
GAR ETAIL
D
SEE
ETE
NCR
T CO RBS
CAS U
PRE S OR C
B
CUR
NPT.= + 0.15 ES
RILL
AL G
MET ETAIL
D
SEE
NPT.= + 0.65
Cº.
Col. 5
.1
R= 0 Cº.
Col. 5
.1 Cº.
R= 0 Col. 5
.2
CTO
R R= 0
LLE IL
E CO E DETA ction ver NPT.= + 0.65 ETE
A R BAG S E proje Co NCR
G Axis Access T CO RBS
1.9623
CAS U
Cº. Main RILL
ES PRE S OR C
Col. 5 B
AL G CUR
R= 0
.1 MET ETAIL
E E D
S
NT
UME
MON DETAIL
SEE
0.79
OR
LL ECT
E CO
Cº. BAG
Col. 5 0.79 GAR ETAIL
D
R= 0
.1
NPT.= + 1.15 SEE
0.79
Pe
NPT.= + 1.15
.
Pend nd
.
0.79
NPT.= + 0.65
S
BAR
.
nd
IC
ALL
Pe
d.
MET
Pen
ETE
NCR S
T CO CURB
CAS R NPT.= + 1.15
PRE RBS O
CU
.
Pend
0.79
R
CTO
.
LLE
nd
IL S NPT.= + 1.65
E CO E DETA BAR LLIC
Pe
BAG SE A
GAR MET
NPT.= + 1.15 Pe
n d. Cº.
Col. 5
0.79 .2
R= 0
0.79
0.79
ES
RILL IL
AL G A
MET EE DET
S
Cº. OR
Col. 5 LLECT
.1 E CO
R= 0 BAG
GAR ETAIL
E E D
TION S
JEC OVER
NPT.= + 1.65 PRO SC
AXIS ACCES
MAIN
Cº.
Col. 5
.1
R= 0
NPT.= + 1.65
AL NPT.= + 2.15
MET ES
L
GRIL ETAIL
E D
NPT.= + 3.25 SE
NPT.= + 3.25
NPT.= + 2.15
R
CTO
LLE IL
E CO E DETA
AR BAG S E
G
AL
MET S E
LE ET
GRIL AIL NCR
ET T CO RBS
SEE
D CAS U
PRE S OR C
R B
CU