You are on page 1of 22

PROYEK

GAMBAR GAMBAR GAMBAR GAMBAR NOTES

No TEKTUR No. Gambar:


ARSI Judul Gambar Skala STRUKTUR
No No. Gambar: Judul Gambar Skala
1 ARS-01 Daftar Gambar NTS 1 STR-01 Rencana Titik Pile 1 : 100, 1 : 20
2 ARS-02 Potongan Melintang 1 : 120 2 STR-02 Denah Pondasi Poer 1 : 100
3 ARS-03 Potongan Memanjang 1 : 100 3 STR-03 Denah Pondasi Batu Kali 1 : 100, 1 : 20
4 STR-04 Detail Pondasi Batu Kali Saluran Air 1 : 20
5 STR-05 Detail Pondasi Poer Tipe T2A 1 : 20
6 STR-06 Denah Sloof 1 : 100
7 STR-07 Detail Tulangan Sloof 1 : 100, 1 : 20
8 STR-08 Denah Pedestal 1 : 100
OWNER
9 STR-09 Detail Pedestal 1 : 20
10 STR-10 Denah Kolom Lt. 1 1 : 100
11 STR-11 Detail Kolom Lt. 1 1 : 20, 1 : 10
12 STR-12 Denah Plat Lt.1 1 : 100, 1 : 20
13 STR-13 Denah Balok Lt. 2 1 : 100
14 STR-14 Detail Balok Lt.2 1 : 10
15 STR-15 Denah Dan Detail Plat Lt.2 1 : 100, 1 : 10
DEVELOPER
16 STR-16 Denah Dan Detail Kolom Lt. 2 1 ; 100, 1 : 10
17 STR-17 Denah Atap 1 : 100, 1 : 50
18 STR-18 Detail Atap 1 : 100, 1 : 10
19 STR-19 Detail Gording 1 : 5, 1 : 10

KONTRAKTOR

REVISI
NO TANGGAL KETERANGAN PARAF

JUDUL GAMBAR

DAFTAR GAMBAR

SKALA NO. GAMBAR JUMLAH LEMBAR

NTS ARS-01 -
PROYEK

NOTES

WF 200x100x5,5x8
Trekstang ∅12 mm
+9.465 +9.305
Gording CNP125x50x20x2,3 160

WF 200x100x5,5x8 1305
+8.000

WF 150x75x5x7 OWNER

4000
WF 200x100x6,5x8
Lantai
Spesi 1PC:3PS
Pelat Lantai T=120 mm
+4.000 +4.000 +3.830
170
Bondek 0.75mm
4800

WF 200x100x5,5x8 WF 200x100x5,5x8
WF 300x150x6,5x9 WF 300x150x6,5x9
3480 DEVELOPER

H 200x200x8x12 Lantai
Spesi 1PC:3PS Drive THRU
Pedestal +0.350
Pelat Lantai T=120 mm
±0.000 350 ±0.000
Pedestrian -0.200
-0.400
±0.600
Jalan -0.800
Bondek 0.75mm Sloof 200x400
Beton Bertulang Pondasi
K-300 Pondasi Poer
Batu Kali Tiang 250x250
5000 KONTRAKTOR

Aanstamping
Cerucuk

Drive THRU TEMPAT PARKIR


1500 2000 5000 5000 4000 14000
10000
30000 REVISI
NO TANGGAL KETERANGAN PARAF

POTONGAN MELINTANG
SKALA 1 : 120

JUDUL GAMBAR

POTONGAN MELINTANG

SKALA NO. GAMBAR JUMLAH LEMBAR

1 : 120 ARS-02
PROYEK

NOTES

Atap Onduline
+9.465 +9.305
160

1305
+8.000

OWNER
WF 200x100x6,5x8 WF 200x100x6,5x8 WF 200x100x6,5x8
H 200x200x8x12 H 200x200x8x12 4000

Lantai
Spesi 1PC:3PS
Pelat Lantai T=120 mm
+4.000 +4.000 +4.000
170

WF 300x150x6,5x9 WF 300x150x6,5x9
WF 150x75x5x7 DEVELOPER
WF 200x100x5,5x8 WF 200x100x5,5x8
3480
Besi siku 60x60x6,0mm
Lantai H 200x200x8x12 H 200x200x8x12
Spesi 1PC:3PS Pedestal Pedestal
Pelat Lantai T=120 mm +0.350
350 ±0.000

Sloof 200x400 Sloof 200x400 Sloof 200x400 Sloof 200x400 Sloof 200x400 KONTRAKTOR

Pondasi Poer Pondasi Poer Pondasi Poer Pondasi Poer Pondasi Poer
Tiang 250x250 Tiang 250x250 Tiang 250x250 Tiang 250x250 Tiang 250x250

5000 5000 5000 5000

20000

POTONGAN MEMANJANG REVISI


SKALA 1 : 100 NO TANGGAL KETERANGAN PARAF

JUDUL GAMBAR

POTONGAN MEMANJANG

SKALA NO. GAMBAR JUMLAH LEMBAR

1 : 100 ARS-03
PROYEK

A B C D E
5000 5000 5000 5000
750 750 750 750 750 NOTES
3
375 375 375 375 375
375 375 375 375 375

5000 5000

750 750 750 750 750


2 10000
OWNER
375 375 375 375 375
375 375 375 375 375

5000 5000

750 750 750 750 750


DEVELOPER
1
375 375 375 375 375
375 375 375 375 375
5000 5000 5000 5000
20000
KONTRAKTOR

RENCANA TITIK PILE


SKALA 1 : 100

Tiang Yang Dipecah


Muka Tanah

REVISI
250 500 250 375 NO TANGGAL KETERANGAN PARAF
POT Tiang Pnacang 250x250
1 250
Galian Tanah
750
Lt. Kerja T= 3cm
1pc : 3Ps : 5Kr JUDUL GAMBAR

DETAIL A
SKALA 1 : 20 RENCANA TITIK PILE
300 750 300
1350

POTONGAN 1 SKALA NO. GAMBAR JUMLAH LEMBAR


SKALA 1 : 20 1 : 100
STR-01 -
1 : 20
PROYEK

NOTES

A B C D E
5000 5000 5000 5000

3 600 600 600 600 600


T2A 375 T2A 375 T2A 375 T2A 375 T2A 375
OWNER
375 375 375 375 375
1350 1350 1350 1350 1350

5000 5000

DETAIL PEMBESIAN POER


1350 1350 1350 1350 1350

2 600 600 600 600 600 10000 DEVELOPER


T2A 375 T2A 375 T2A 375 T2A 375 T2A 375
375 375 375 375 375

5000 5000

KONTRAKTOR
1350 1350 1350 1350 1350

1 600 600 600 600 600


T2A 375 T2A 375 T2A 375 T2A 375 T2A 375
375 375 375 375 375
5000 5000 5000 5000
20000 REVISI
NO TANGGAL KETERANGAN PARAF

DENAH PONDASI POER


SKALA 1 : 100

JUDUL GAMBAR

DENAH PONDASI POER

NOTE :
JUMLAH TITIK PANCANG PONDASI STRUKTUR : 30 TITIK PANCANG 250X250 SKALA NO. GAMBAR JUMLAH LEMBAR

1 : 100 STR-02 -
PROYEK

A B C D E
5000 5000 5000 5000
NOTES

5000 5000

POT
P1

2 10000 OWNER

1100
400
Pasangan Batu Kali
Saluran Air
5000 2000 2800 5000

400
DEVELOPER
1100
1

5000 5000 5000 5000


20000 KONTRAKTOR

DENAH PONDASI BATU KALI


SKALA 1 : 100 Sloof 200x400
200 Urugan Tanah Yang Dipadatkan

400
REVISI
NO TANGGAL KETERANGAN PARAF

700 Pasangan Batu Kali


Pasir Yang Dipadatkan JUDUL GAMBAR
70
300
DENAH PONDASI
500 BATU KALI
700
SKALA NO. GAMBAR JUMLAH LEMBAR
POTONGAN P1
SKALA 1 : 20 1 : 100
STR-03 -
1 : 20
PROYEK

4000
600 400 2000 400 600

NOTES
120

Beton Bertulang K-300

Pondasi Batu Kali

2000

OWNER

DEVELOPER

300

Aanstamping KONTRAKTOR

Cerucuk

REVISI
NO TANGGAL KETERANGAN PARAF

1000 2000 1000


4000

JUDUL GAMBAR
DETAIL PONDASI BATU KALI
SKALA 1 : 20 AIR
SALURAN DETAIL PONDASI
BATU KALI SALURAN AIR

SKALA NO. GAMBAR JUMLAH LEMBAR

1 : 20 STR-04 -
PROYEK

NOTES

POT
2
1350

POT 175 250 500 250


1 300
600 250 600
300 OWNER
175

300 750 300


1350

PONDASI POER TIPE T2A


SKALA 1 : 20

300 DEVELOPER
Tulangan Kolom Pedestal 300
Tulangan Kolom Pedestal
Pedestal S1 D13-200 Pedestal
Selimut Beton 50 mm B1 D13-200
S1 D13-200 B1 D13-200
Pemecahan Kepala Tiang Selimut Beton 50 mm
Pemecahan Kepala Tiang
600 B3 D13-200 375
KONTRAKTOR
600 B3 D13-200 375

Selimut Beton 50 mm
B2 D16-200 Selimut Beton 50 mm
Lt. Kerja T= 3cm S2 D16-200 B2 D16-200
1pc : 3Ps : 5Kr S2 D16-200
Selimut Beton T= 75 mm
Tiang 250x250 Selimut Beton T= 75 mm
Tiang 250x250 REVISI
NO TANGGAL KETERANGAN PARAF
250 500 250
300 750 300 175 250 175
600
1350

POTONGAN 1 POTONGAN 2 JUDUL GAMBAR


SKALA 1 : 20 SKALA 1 : 20

PONDASI POER TIPE T2A

SKALA NO. GAMBAR JUMLAH LEMBAR

1 : 20 STR-05 -
PROYEK

A B POT C D E
C POT
5000 5000 5000 B 5000 NOTES
200x400B 200x400B 200x400B 200x400B
3

KS1 KS1 KS1 KS1 KS1

200x400A

200x400A

200x400A

200x400A
200x400B

200x400B

200x400B

200x400B

200x400B
5000 5000

200x400B 200x400B 200x400B 200x400B


2 10000 OWNER

KS1 KS1 KS1 KS1 KS1


200x400A

200x400A

200x400A

200x400A
200x400B

200x400B

200x400B

200x400B
5000 4800
5000

4800
POT DEVELOPER
A
1
200x400B 200x400B 200x400B 200x400B
KS1 KS1 KS1 KS1 KS1
2500 2500 2500 2500 2500 2500 2500 2500
5000 5000 5000 5000
KONTRAKTOR

DENAH SLOOF
SKALA 1 : 100

REVISI
NO TANGGAL KETERANGAN PARAF

JUDUL GAMBAR

DENAH SLOOF

SKALA NO. GAMBAR JUMLAH LEMBAR

1 : 100 STR-06
PROYEK

S2a 4 D16 S2b 4 D16 S2b 4 D16 S2b 4 D16 S2a 4 D16
R1 ∅8-100 R1 ∅8-200 R1 ∅8-100 R1 ∅8-200 R1 ∅8-100 R1 ∅8-200 R1 ∅8-100 R1 ∅8-200

S1 4 D16 S2b 4 D16 S2b 4 D16 S1 4 D16 S2b 4 D16 S2b 4 D16 NOTES

1250 2500 1250 1250 2500 1250 1250 2500 1250 1250 2500 1250

20000

POTONGAN A
SKALA 1 : 100

S2a 4 D16 S2b 4 D16 S2a 4 D16


R1 ∅8-100 R1 ∅8-200 R1 ∅8-100 R1 ∅8-200

OWNER
S1 4 D16 S2b 4 D16 S2b 4 D16

1250 2500 1250 1250 2500 1250

10000

POTONGAN B
SKALA 1 : 100 DEVELOPER

S2a 4 D16 S2b 4 D16 S2a 4 D16


R1 ∅8-100 R1 ∅8-200 R1 ∅8-100 R1 ∅8-200

S1 4 D16 S2b 4 D16 Sloof 200x400B S2b 4 D16


KONTRAKTOR

1250 2500 1250 1250 2500 1250

10000
POTONGAN C
SKALA 1 : 100

REVISI
DETAIL TULANGAN SLOOF 200x400A DETAIL TULANGAN SLOOF 200x400B NO TANGGAL KETERANGAN PARAF

S3 1 D16 S3 1 D16
R1 ∅8-100 R1 ∅8-100 S2a 1 S2b 1
S2a 1 200 S2b 1 200
R1 ∅8-100D16 R1 ∅8-100D16
D16 D16

400
S1 4 D16
400
S1 4 D16
400
S1 4 D16
400
S1 4 D16
400
S1 4 D16
400
S1 4 D16 JUDUL GAMBAR
S2b 1 S2b 1
200 D16 200 200 D16 200
DETAIL TULANGAN SLOOF
R1 ∅8-200 R1 ∅8-200

Tumpuan Kiri Lapangan Tumpuan Kanan Tumpuan Kiri Lapangan Tumpuan Kanan
SKALA NO. GAMBAR JUMLAH LEMBAR

1 : 100 STR-07 -
1 : 20
PROYEK

NOTES

A B C D E
20000
5000 5000 5000 5000

3
OWNER
KP1 KP1 KP1 KP1 KP1

5000 5000

DEVELOPER
2 10000 10000

KP1 KP1 KP1 KP1 KP1

5000 5000
KONTRAKTOR

KP1 KP1 KP1 KP1 KP1


2500 2500 2500 2500 2500 2500 2500 2500
5000 5000 5000 5000 REVISI
NO TANGGAL KETERANGAN PARAF

DENAH PEDESTAL
SKALA 1 : 100

JUDUL GAMBAR

DENAH PEDESTAL

SKALA NO. GAMBAR JUMLAH LEMBAR

1 : 100 STR-08 -
PROYEK

NOTES
300
110 80 110

125 300

Angkur ∅19
300

300
K2 ∅8-150
K1 8 D16 OWNER
300 Angkur 2x2 ∅19
Panjang 50 cm

K2 ∅8-150

500
Sloof 200x400

DEVELOPER

400
K1 8 D16

600 KONTRAKTOR

30
300 750 300
1350

REVISI
NO TANGGAL KETERANGAN PARAF

DETAIL PEDESTAL
SKALA 1 : 20

JUDUL GAMBAR

DETAIL PEDESTAL

SKALA NO. GAMBAR JUMLAH LEMBAR

1 : 20 STR-09 -
PROYEK

NOTES

A B C D E
20000
5000 5000 5000 5000

KS1 KS1 KS1 KS1 KS1 OWNER

5000 5000

2 10000 10000 DEVELOPER

KS1 KS1 KS1 KS1 KS1

5000 5000

KONTRAKTOR

KS1 KS1 KS1 KS1 KS1


2500 2500 2500 2500 2500 2500 2500 2500
5000 5000 5000 5000
REVISI
NO TANGGAL KETERANGAN PARAF

DENAH KOLOM LT.1


SKALA 1 : 100

JUDUL GAMBAR

DENAH KOLOM LT.1

SKALA NO. GAMBAR JUMLAH LEMBAR

1 : 100 STR-10 -
PROYEK

NOTES

250
300
200 25 60 80 60 25

Angkur 2x2 D19 50


POT Panjang 50 cm
1 225 125

50
500 H 200x200x8x12
Sloof 200x400 BASE PL.16x225x250 OWNER
STIFE PL.12
ANGKUR 2x2 D19, LUBANG ∅22

400 POTONGAN 1
SKALA 1 : 10

600 DEVELOPER

20 20
30
300 750 300 150
1350
30 30
30 30 KONTRAKTOR

DETAIL KOLOM LT.1


SKALA 1 : 20 125

500 REVISI
NO TANGGAL KETERANGAN PARAF

120
JUDUL GAMBAR
DETAIL ANGKUR
SKALA 1 : 10 DETAIL KOLOM LT.1

SKALA NO. GAMBAR JUMLAH LEMBAR

1 : 20 STR-11 -
1 : 10
PROYEK

POT
D
20000
5000 5000 5000 5000
NOTES

5000 5000

10000 10000 OWNER

5000 5000

DEVELOPER

5000 5000 5000 5000


20000

DENAH PLAT LT.1


SKALA 1 : 100 KONTRAKTOR

Beton Bondek T= 7,5 mm


Wiremesh M6
Bondek T= 0,75 mm Wiremesh M6
Detail A
120
120
5000 5000
10000 REVISI
NO TANGGAL KETERANGAN PARAF

POTONGAN D DETAIL A
SKALA 1 : 100 SKALA 1 : 20

JUDUL GAMBAR

DENAH PLAT LT.1

SKALA NO. GAMBAR JUMLAH LEMBAR

1 : 100
1 : 20 STR-12 -
PROYEK

NOTES

20000
5000 5000 5000 5000
3000 2000
WF 300x150x6.5x9 WF 300x150x6.5x9 WF 300x150x6.5x9 WF 300x150x6.5x9
4995 OWNER

POT
2

WF 200x100x5.5x8
WF 200x100x5.5x8

WF 200x100x5.5x8

WF 200x100x5.5x8

WF 200x100x5.5x8

WF 200x100x5.5x8

WF 200x100x5.5x8

WF 200x100x5.5x8

WF 200x100x5.5x8
5000 5000

Wiremesh M6
4850

POT
4
DEVELOPER
POT WF 300x150x6.5x9 WF 300x150x6.5x9 WF 300x150x6.5x9 WF 300x150x6.5x9
3 9815
10000

Bondek T=0.75mm

WF 200x100x5.5x8
WF 200x100x5.5x8

WF 200x100x5.5x8

WF 200x100x5.5x8

WF 200x100x5.5x8

WF 200x100x5.5x8

WF 200x100x5.5x8

WF 200x100x5.5x8

WF 200x100x5.5x8
5000 5000
KONTRAKTOR

WF 300x150x6.5x9 WF 300x150x6.5x9 WF 300x150x6.5x9 WF 300x150x6.5x9


5000 5000 5000 5000
20000 REVISI
NO TANGGAL KETERANGAN PARAF

DENAH BALOK LT.2


SKALA 1 : 100

JUDUL GAMBAR

DENAH BALOK LT.2

SKALA NO. GAMBAR JUMLAH LEMBAR

1 : 100 STR-13
PROYEK

NOTES

100
OWNER

WF 200x100x5,5x8

150 120 120


35 80 35 30 60 30 30 60 30
WF 200x100x5,5x8
DEVELOPER
60 40 4 40
60
70 70 4
100 100 4 220 4
Stiff,PL.10 70 4 70
300 370 30
100 6 40
100 30
540 50 70
50 540 4 WF 200x100x5,5x8
60 60 Baut 2x5M16-HTB KONTRAKTOR
60
HB 200x200x8x12 Base PL.10x120x220
Stiff.PL.10 100 100
WF 200x100x5,5x8
70 Baut 2x5M16-HTB POTONGAN 4
70 Base PL.12x120x370 SKALA 1 : 10
150 WF 300x150x6,5x9
Base PL.12x150x540 POTONGAN 3
Stiff.PL.8 SKALA 1 : 10
200 Baut 2x5M16-HTB REVISI
NO TANGGAL KETERANGAN PARAF
POTONGAN 2A
SKALA 1 : 10
POTONGAN 2
SKALA 1 : 10

JUDUL GAMBAR

DETAIL BALOK LT.2

SKALA NO. GAMBAR JUMLAH LEMBAR

1 : 10 STR-14 -
PROYEK

20000
NOTES
5000 5000 5000 5000

5000 VOID 5000


5000
LUAS ATAP 112.5
M2
OWNER
17100

10000

LUAS ATAP 136.5


5000 5150
5000
M2
DEVELOPER

20100

5000 5000 5000 5000


20000 KONTRAKTOR

DENAH PLAT LT.2


SKALA 1 : 100

Wiremesh M6
REVISI
120 NO TANGGAL KETERANGAN PARAF

Arah Bondek 0,75 mm


( Sejenis )
Shear Connector ∅12-250
JUDUL GAMBAR
Las Titik

DENAH DAN DETAIL PLAT LT.2

DETAIL PLAT LT.2


SKALA 1 : 10 SKALA NO. GAMBAR JUMLAH LEMBAR

1 : 100
STR-15 -
1 : 10
PROYEK

A B C D E
20000
5000 5000 5000 5000 NOTES

3000 2000 2500 2500 2500 2500 2500 2500


3000

KS1 KS1 KS2 KS2 KS2

5000 5070

87.21 M2
5100
5000
200 100

HB 200x200x8x12
WF 200x100x5,5x8
POT
2A

HB 200x200x8x12 HB 200x200x8x12

50 100 50 50 100 50

200 200

17100
OWNER
2 10000

KS1 KS1

5000 102.51 M2 5100 5000

DEVELOPER

1
20100

KS2 KS2 KS2 KS2 KS2


5000 5000 5000 5000
20000 KONTRAKTOR

DENAH KOLOM LT.2


SKALA 1 : 100

200 100
REVISI
200 NO TANGGAL KETERANGAN PARAF
HB 200x200x8x12 50 100 50
WF 200x100x5,5x8
POT
2A
50
HB 200x200x8x12 50
HB 200x200x8x12 200
50
50
JUDUL GAMBAR
50 100 50 50 100 50
WF 200x100x6,5x8
200
Base PL.10x200x200 DENAH DAN DETAIL KOLOM LT.2
200 Baut 2x2 M16-HTB

DETAIL KOLOM KS1 DETAIL KOLOM KS2 POTONGAN 2A


SKALA 1 : 10 SKALA 1 : 10 SKALA 1 : 10 SKALA NO. GAMBAR JUMLAH LEMBAR

1 : 100
STR-16 -
1 : 10
PROYEK

20000
5000 5000 5000 5000
NOTES
WF 300x150x6.5x9 1050 WF 150x75x5x7 WF 150x75x5x7 WF 150x75x5x7

WF 200x100x5.5x8

WF 200x100x5.5x8

WF 200x100x5.5x8
6900

5000 1200 x 4 =4800


6865

Rafter WF 200x100x5,5x8

Rafter WF 200x100x5,5x8

Rafter WF 200x100x5,5x8
Rafter WF 200x100x5,5x8
WF 300x150x6.5x9 150 150 10000 OWNER
Rafter WF 200x100x5,5x8

5000 1200 x 4 =4800


2
1

DEVELOPER

WF 150x75x5x7 WF 150x75x5x7 WF 150x75x5x7 WF 150x75x5x7


1050

POT
1C
5000 5000 5000 5000
KONTRAKTOR
20000 6825

DENAH ATAP
SKALA 1 : 100

1200 160
6210 5065
1200
1200 510 510
1305
REVISI
1200 NO TANGGAL KETERANGAN PARAF
930
1175 Trekstang ∅12 mm
Gording CNP125x50x20x2,3
WF 200x100x5,5x8 500
WF 150x75x5x7 WF 200x100x5,5x8 JUDUL GAMBAR
5000 5000
10000

POTONGAN 1C NOTE : DENAH ATAP


SKALA 1 : 50 KS2 = Kolom
WF 200x100x5,5x8
Rafter = WF
200x100x5,5x8 SKALA NO. GAMBAR JUMLAH LEMBAR
Gording = CNP
1 : 100
125x50x20x2.3 STR-17
Trekstang = ∅12 mm 1 : 50
PROYEK

DETAIL B NOTES

DETAIL A
Trekstang ∅12 mm

A.1
Gording CNP 125x50x20x2,3

POTONGAN ATAP WF 150x75x5x7


Stiff.PL.10
SKALA 1 : 100
4
WF 200x100x5,5x8
WF 200x100x5,5x8 40
Baut 2x5 M16-HTB 70 OWNER
Base PL.12x120x370 WF 150x75x5x7
Baut 2x2 M16-HTB 70
40 4 Base PL.10x120x170 Stiff.PL.10 370
60
70 4 4
45 4 70 WF200x100x5,5x8
70 4
370 70 170 70 60
70 45 500
70
30 60 30 DEVELOPER
60
120
30 60 30
120 DETAIL RING BALOK
SKALA 1 : 10
POTONGAN 3A DETAIL A
SKALA 1 : 10 SKALA 1 : 10
KONTRAKTOR

Gording CNP 125x50x20x2,3 A.1

Trekstang ∅12 mm
40 WF200x100x5,5x8 REVISI
70 NO TANGGAL KETERANGAN PARAF
Stiff.PL.10
70
4 60
70
60 JUDUL GAMBAR
500 500
DETAIL ATAP

DETAIL B SKALA NO. GAMBAR JUMLAH LEMBAR


SKALA 1 : 10
1 : 100 STR-18 -
1 : 10
PROYEK

Y NOTES

DETAIL IKATAN ANGIN II


POTONGAN Y OWNER

DETAIL IKATAN ANGIN I

DEVELOPER

DETAIL TREKSTANG
KONTRAKTOR

REVISI
NO TANGGAL KETERANGAN PARAF

JUDUL GAMBAR

DETAIL GORDING
DETAIL GORDING
POTONGAN Z
SKALA NO. GAMBAR JUMLAH LEMBAR

1:5 STR-19 -
1 : 10

You might also like