RENCANA ANGGARAN BIAYA


NO NAMA BARANG VOLUME SATUAN HARGA SATUAN JUMLAH
1 Besi beton 6 Inc 90 Btg 27,500 2,475,000
2 Besi beton 10 Inc 120 Btg 60,000 7,200,000
3 Besi beton 8 Inc 300 Btg 38,000 11,400,000
4 Besi beton 12 Inc 75 Btg 80,000 6,000,000
5 Bendarat 50 Kg 15,000 750,000
6 Semen 400 Zak 55,000 22,000,000
7 Batu Belah 20 Engkle 220,000 4,400,000
8 Pasir Cor 25 Engkle 350,000 8,750,000
9 Pasir Pasang 35 Engkle 230,000 8,050,000
10 Batu Seplit 13 Engkle 350,000 4,550,000
11 Paku 50 Kg 12,000 600,000
12 Papan Cor 7 Kb 1,200,000 8,400,000
13 Kusen 400 m 35,000 14,000,000
14 Pintu 8 Bh 350,000 2,800,000
15 Daun Jendela 60 Bh 50,000 3,000,000
16 Kaca 3 mm 60 Bh 50,000 3,000,000
17 Internit 30 Kas 45,000 1,350,000
18 Engsel Jendela 60 Psg 10,000 600,000
19 Kunci Pintu 8 Psg 120,000 960,000
20 Engsel Pintu 8 Psg 25,000 200,000
21 Batu Merah 15000 Bh 400 6,000,000
22 Keramik 200 Duz 55,000 11,000,000
23 Cat Tembok 5 GL 400,000 2,000,000
24 Cat Kayu 10 GL 50,000 500,000
25 Koas besar 3 Bh 10,000 30,000
26 Koas kecil 3 Bh 7,500 22,500
27 Roll Cat 2 Bh 20,000 40,000
28 Bak Cat 2 Bh 15,000 30,000
29 Terpentin 5 Btl 7,500 37,500
30 Lem Kayu 2 Buah 8,000 16,000
31 Milk/Calsium 25 Kg 1,000 25,000
32 Cape 3 Buah 7,500 22,500
33 Hampelas 5 Lbr 2,000 10,000
34 Cemped 4 m 13 Btg 15,000 195,000
35 Intalasi Listrik 80 m 35,000 2,800,000
36 Dudukan Colokan 4 Buah 10,000 40,000
37 Dudukan Lampu 8 Bh 10,000 80,000
38 Lampu 8 Bh 30,000 240,000
39 Pagar Besi/Tempa 60 m 110,000 6,600,000
40 Pasir Urug 30 Truk 150,000 4,500,000
41 Pekerja Tukang 4 orang 90 Hr 50,000 4,500,000
42 Pekeja laden 7 orang 90 Hr 40,000 3,600,000
Jumlah 152,773,500

Ketua Sekretaris

H. DUDUNG ABDULAH ENI HUSAENI


YAYASAN PENDIDIKAN PESANTREN AL-HIKMAH SELAKASO
NO BARANG / BAHAN Akta Notaris
VOLUME : RACHMAHNIA, S.H., M.Kn
SATUAN HARGA SATUAN JUMLAH
Nomor : 1 Tanggal 02-06-2008
I Bahan Material KEP. MENHUM DAN HAM RI NO : AHU-3275.AH.01.02.Tahun 2008
Sekretariat : Kp. Selakaso Desa Selawangi Kecamatan Sariwangi Kabupaten Tasikmalaya Provinsi Jawa Barat
1 Semen 900 zak 65,000 58,500,000
2 Bata Merah RENCANA
10000 PENGGUNAAN
biji DANA 600 6,000,000
3 Keramik 650 dus 31,000 20,150,000
4 Internit 83 kas 27,000 2,241,000
5 Loster 160 biji 10,000 1,600,000
6 Batu 20 engkel 350,000 7,000,000
7 Pasir Gunung 40 engkel 350,000 14,000,000
8 Batu Split 10 engkel 600,000 6,000,000
9 Pasir Air 15 engkel 400,000 6,000,000
10 Kapur 10 ton 350,000 3,500,000
II Besi dan Perlengkapan
1 Standar Kunci 3 psg 175,000 525,000
2 Baud Sofi 335 biji 5,000 1,675,000
3 Ram Kawat 34 m 15,000 510,000
4 Selot Jendela 35 biji 12,000 420,000
5 Selot Pintu 6 biji 14,000 84,000
6 Besi 12 mm 145 lente 96,000 13,920,000
7 Besi 10 mm 295 lente 68,000 20,060,000
8 Besi 8 mm 655 lente 48,000 31,440,000
9 Besi 6 mm 400 lente 28,000 11,200,000
10 Paku berbagai ukuran 200 kg 12,000 2,400,000
11 kawat 120 kg 16,000 1,920,000
12 Kunci Pintu 14 biji 75,000 1,050,000
13 Engsel Jendela 40 pasang 15,000 600,000
14 Engsel Pintu 7 pasang 25,000 175,000
15 Atap Spandek 460 m2 65,000 29,900,000
III Kayu,Kaca Dan Perlengkapan
1 Kayu pasagian 10 m3 2,500,000 25,000,000
2 Kayu usuk 6 m3 2,000,000 12,000,000
3 Kayu papan cor 14 m3 1,500,000 21,000,000
4 Pintu 6 buah 500,000 3,000,000
5 Kusen Pintu 3 buah 250,000 750,000
6 Kusen Jendela 30 buah 200,000 6,000,000
7 Daun Jendela 30 buah 70,000 2,100,000
8 Kaca 30 m3 55,000 1,650,000
9 Bambu 559 jejer 8,000 4,472,000
IV Cat Tembok / Kayu
1 Cat Tembok 300 kg 18,000 5,400,000
2 Cat Kayu 92 kg 30,000 2,760,000
3 Tinner 134 kg 20,000 2,680,000
4 Cat Meni 134 kg 15,000 2,010,000
5 Kuas 10 buah 10,800 108,000
V Upah tukang 3 orang x Rp. 80.000,- 130 hari 240,000 31,200,000
VI Upah laden 6 orang x Rp. 50.000,- 130 hari 300,000 39,000,000
JUMLAH 400,000,000
TERBILANG : EMPAT RATUS JUTA RUPIAH
nsi Jawa Barat
YAYASAN PENDIDIKAN PESANTREN AL-HIKMAH SELAKASO
NO NAMA PEKERJAAN Akta Notaris
VOLUME: RACHMAHNIA, S.H., M.Kn
SATUAN HARGA SATUAN JUMLAH
Nomor : 1 Tanggal 02-06-2008
1 Persiapan KEP. MENHUM DAN HAM1 RI NO : AHU-3275.AH.01.02.Tahun
- 500,000 2008 500,000
Sekretariat : Kp. Selakaso Desa Selawangi Kecamatan Sariwangi Kabupaten Tasikmalaya Provinsi Jawa Barat
2 Pemasangan Pondasi 12 M3 600,000 7,200,000
3 Pemasangan Bata RENCANA 45 PENGGUNAAN
M2 DANA 250,000 11,250,000
4 Pembesian 14 M3 2,100,000 29,400,000
5 Pemasngan Begisting Kayu 5 M3 2,300,000 11,500,000
Pemasangan Baja Ringan + Genteng
6 234.8 M2 240,000 56,352,000
Metal + Rangka Plafon & GRC
7 Pemasangan Keramik Setara Mulya 100.5 M2 110,000 11,055,000
8 Pemasangan Kusen 55 M 110,000 6,050,000
9 Pemasangan Pintu 4 Bh 700,000 2,800,000
10 Kunci 4 Bh 120,000 480,000
11 Plesteran + Acian 280 M2 30,000 8,400,000
12 Pemasangan Kaca 9 Lembar 60,000 540,000
13 Engsel Jendela 9 Bh 12,000 108,000
14 Bingkai Jendela 9 Bh 70,000 630,000
15 Pengecatan 50 Kg 50,000 2,500,000
-