Request For Electrical Installation Works
Request For Electrical Installation Works
Our company Kubik Ethiopia Plastic Manufacturing PLC has started installation of production
machineries at shade # 3. We are working on mechanical, civil, electrical and piping installation.
The existing power of the shade (800KVA) transformer is not enough to run our machineries all
at a time. Therefore, until we get our own 3000KVA Transformer, we have planned to run the
machineries partially based on the available power.
Therefore, we request you to approve electrical installation works based on attached details and
allow us to connect our new Low voltage panel to the existing 800 KVA low voltage panel bus
bar.
We hereby confirm that we will be committed to fix the damages that might be caused during
and after the construction work. We will also hand over the shade after ending the lease
agreement as handed over to us.
With Regards,
Assefa Ayalew
Plant Manager
Kubik Ethiopia Plastic Manufacturing PLC
Encl.
➢ Details of Electrical Load
➢ Low Voltage panel details
140
148
176
216
239
130
291
882
306
230
176
470
470
130
145
147
574
181 569 328 422
122
56
23
731
731
731
98 155
176 591
168
732 423 732
458
1147
279
1030
1442 160
1478
338 38
441
1055
399
732 181 422
1985
Control Board 2
2198
240
Control Board 1
493
158
602 789 Cable -
3x95+2x35mm2 Cable -
171
1410 Cable - 3x95+2x35mm2
3x95+2x35mm2
200
Control Board 4
341
478
200
132
159
185
Cable -
334
Exsisting Cable tray
213
3x120+2x50mm2
352 1148
Control Board 3
Cable -
63 mm PPR pipe 3 pcs - 3x95+2x35mm2
Overhead 1pcs - 3x120+2x50mm2
110 mm drain
pipe
Factory Water
Supply Manhole
Manhole