ELECTRICAL SYSTEMS & ENGINEERING CENTER ABTS/ES&EC/FMT/33:B

TEST REPORT FOR CURRENT TRANSFORMER Date: 01/11/2015


CUSTOMER :
SHEET OF
PROJECT :

TEST REPORT FOR CURRENT TRANSFORMER


0
Weather Condition: Temperature: C Humidity: %

1. Date of Testing :

2. Equipment Details :

Make :
CT. Ratio :
Insulation Level :
Short circuit current :
Sl. No. :
Mfg Year :

Min Knee point Max Iext


SECONDARY RATIO CLASS BURDEN Terminals ISF
voltage Vk (V) at VK/4
Core-1
Core-2

3. Location & Feeder Name:

4. Insulation Resistance Test:

Circuit Ref R ph Y ph B ph Megger Duration Acceptance criteria


( MΩ ) ( MΩ ) ( MΩ ) Used
Primary - Earth
Primary – core 1
Primary – core 2 2 X Rated Voltage+1
Core 1 – Earth i.e. 2 X 11+1 ≥23Mohms
Core 2 – Earth
Core 1 – Core 2

5. Winding Resistance :

Circuit Ref R ph (Ω) Y ph (Ω) B ph (Ω)


Primary
Core-1
Core-2

Tested by Verified By Witnessed by


ELECTRICAL SYSTEMS & ENGINEERING CENTER ABTS/ES&EC/FMT/33:B

TEST REPORT FOR CURRENT TRANSFORMER Date: 01/11/2015


CUSTOMER :
SHEET OF
PROJECT :

6. Polarity Test :

INPUT OUTPUT(Secondary)
SECONDAR CT PHAS (Primary)
RESULT
Y RATIO E ╋ ━
╋ ━ POINT
(WIRING NO.) (WIRING NO.)
R ╋ ━
Terminal
CORE-1 Y ╋ ━
B ╋ ━
Block
R ╋ ━
Terminal
CORE-2 Y ╋ ━
B ╋ ━
Block

7. Ratio Test :

Applied Measured Current in (A) Calculated


Circuit Ref CT Ratio
Current R ph Y ph B ph Ratio (A)

CORE-1

CORE-2

8. Applicable Standards
 IS 2705-1 : Current Transformer

Note:

1. CT Secondary connections checked and ensure that all connections are tight.

2. Ensure that all unused secondary terminals are kept shorted.

9. Testing instruments

Calibration
Instrument Type Serial no Specification Manufacture
due date

10. Remarks :

Tested by Verified By Witnessed by