2-BASE PLATE-Model

The document provides notes for a construction project including specifications for concrete strength, rebar grade, cover thickness, lap length, cement requirements, and waterproofing membrane. It also notes the need for soil testing and ground preparation according to a soil report before placing the raft foundation.

Uploaded by

laith saad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
36 views1 page

2-BASE PLATE-Model

The document provides notes for a construction project including specifications for concrete strength, rebar grade, cover thickness, lap length, cement requirements, and waterproofing membrane. It also notes the need for soil testing and ground preparation according to a soil report before placing the raft foundation.

Uploaded by

laith saad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

NOTES

1. REFERENCE DRAWINGS :
BP8
2. NOTATION:
1-COMPRESSIVE STRENGTH OF RCC CONCRETE = 30 Mpa
AT 28 DAY FOR CUBE STRENGTH.
BP7 2- STEEL BAR WITH GRADE 60 , Fy=420 MPa
3. CLEAR COVER TO R/F:

4376
FOOTING 50 MM.
STRAP FOOTING 40 MM.
SLABS 25 MM.

BP8 4. LAP LENGTH SHOULD BE 50 x BAR DIAMETER


BP7
5. CHARACTERISTIC CUBE STRENGTH OF CONCRETE SHOULD BE NOT
LESS THAN 30 MPA AT 28 DAYS.

SPECIAL NOTES

4635
1. CEMENT USED FOR CONCRETING OF RAFT FOUNDATION,
RETAINING WALLS AND OTHER STRUCTURAL ELEMENTS
HAVING CONTACT WITH THE SOIL MUST BE SULPHATE
RESISTING CEMENT.

BP8 2. WATER PROOFING MEMBRANE USED FOR PROTECTION OF


BP7 RETAINING WALLS & RAFT FOUNDATION SHALL BE MULTI
LAYER ATACTIC POLYPROPYLENE MODIFIED BITUMINOUS 4.0
mm. THICK TORCH APPLIED MEMBRANE.

3. MINIMUM CEMENT CONTENT TO BE 350 kg/m.

4664
4. GROUND PREPARATION SHOULD BE DONE AS PER THE SOIL
4250 4000 4125 4125 4000 4250 INVESTIGATION REPORT AND THE FILLING TO BE TESTED
BEFORE PLACING THE RAFT FOUNDATION.

BP1 BP1 BP1 BP2 BP2 BP1 BP1

BP8

BP7
4250

4051
BP1 BP1 BP1 BP1 BP1

BP8

BP7
2450

BP1 BP1 BP1 BP2 BP2 BP1 BP1

4650
3970

BP8

BP7

BP3 BP4 BP4 BP5

GOOD FOR CONSTRUCTION

4654
3970

BP8
DESIGN _____________ DATE ________________
BP3 BP4 BP4 BP5 BP7

CHECKED ___________ REVISION ___________

4229
3970

BP8
BP3 BP4 BP4 BP5
BP7

13/12/2022 R2 A1 ALL STRUCTURAL FRAMES

Revisions & Prints

4387
3970

Mukhallad Murad Obied


BP3 BP4 BP4 BP5
BP8

BP7
3970

4991
BP6 BP6 BP4 BP4 BP6 BP6
1950
2750

BP7 BP8

BP6 BP6 BP6 BP6

BP6 BP6 BP6 BP6


1960

4252
BP6 BP6

1825 4600 1825 BP7 BP8

BASE PLATE
BASE PLATE