1. READ THIS DRAWINGS IN CONJUNCTION WITH 1. GRADE OF STEEL USED FOR RCC WORKS SHALL BE OF GRADE 410.
ARCHITECTS' AND OTHER ENGINEERS' DRAWINGS 1. FOOTINGS ARE DESIGNED FOR AN ALLOWABLE STRESS OF SOIL OF 150kN/SQM. 2. BAR NOTATION GIVES THE FOLLOWING INFORMATION IN THIS ORDER:NUMBER
AND SPECIFICATIONS, AND SUCH OTHER WRITTEN VERIFY THE SOIL STRENGTH AND OBTAIN APPROVAL FROM THE ENGINEER BEFORE OF BARS; BAR SIZE(MM); SPACING (MM, IF REQUIRED).
INSTRUCTIONS AS MAY BE ISSUED. PLACING CONCRETE. 3. REINFORCEMENT IS REPRESENTED DIAGRAMMATICALLY AND NOT
2. FOUNDATION SHALL BEAR ON UNDISTURBED NATURAL MATERIAL OR PROPERLY NECESSARILY IN TRUE PROJECTION.
2. ALL DIMENSIONS ARE IN MILLIMETER UNLESS 4. LAP REINFORCEMENT ONLY AT LOCATIONS SHOWN IN THE DRAWINGS.
OTHERWISE STATED. PLACED AND COMPACTED CONTROLLED STRUCTURAL FILL HAVING A MINIMUM
ALLOWABLE STRESS OF 150kN/SQM. 5. REINFORCEMENT SHALL NOT BE CUT, BENT OR HEATED ON SITE WITHOUT
3. DIMENSIONS SHALL NOT BE SCALED FROM THE ENGINEER'S PRIOR APPROVAL.
DRAWINGS. 3. CONTROLLED STRUCTURAL FILL SHALL CONSIST OF CLEAN GRANULAR
MATERIAL FREE OF ORGANIC OR OTHER DELETERIOUS MATTER AND CONFORM TO THE 6. THE DEVIATION OF REINFORCEMENT FROM ITS SPECIFIED POSITION SHALL NOT
4. DESIGN CONFORMS TO: EXCEED THE FOLLOWING(MM):
BS8110-1997 UK CONCRETE CODE REQUIREMENTS OF STANDARDS AND QUALITY CONTROL AUTHORITY.
4. FOOTINGS ARE DESIGNED CONSIDERING THE MINIMUM DEPTH OF 1200MM 6.1) TOLERANCE FOR COVER -0,+10 MM. WHERE A NEGATIVE VALUE INDICATES A
BS6399 UK LOADING CODE DECREASE IN SPECIFIED COVER, AND POSITIVE VALUE INDICATES AN INCREASE IN
5. IF IN DOUBT, ASK. BELOW THE ORIGINAL GROUND LEVEL. NOTIFY ENGINEER IF THE DEPTH OF FOOTINGS
REQUIRED TO BE PROVIDED VARIES FROM THE DEPTH SPECIFIED ABOVE. COVER.
6. REFER ANY DISCREPANCY TO 6.2) TOLERANCE ON PLACING OF REINFORCEMENT: I) FOR SLABS AND
ENGINEER/ARCHITECT BEFORE PROCEEDING WITH 5. ALL EXCAVATION SHALL BE DRY BEFORE PLACING ANY CONCRETE.
6. IF SEEPAGE IS ENCOUNTERED DURING FOUNDATION EXCAVATION, PUMP OUT STAIRCASE -10,+10MM. II) FOR BEAMS COLUMNS AND FOUNDATION -15,+15 MM.
THE WORK. 7. SPACERS AND SUPPORTS SHALL BE LOCATED AT CENTERS CLOSE
WATER BEFORE PLACING CONCRETE.
7. ALL CONSTRUCTION MATERIALS AND ENOUGH(PREFERABLY NOT EXCEEDING 750MM C/C FOR COLUMN AND BEAM
7. THE FOUNDATIONS UNDER THE CONCRETE BASE SLAB SHALL BE COMPACTED
WORKMANSHIP SHALL COMPLY WITH THE REINFORCEMENT, AND 450MM FOR SLAB REINFORCEMENT) TO PREVENT
THROUGHLY AND A MINIMUM 200MM LAYER OF COURSE AGGREGATE SHALL BE
SPECIFICATIONS FOR BUILDING AND ROAD WORKS DISPLACEMENT OF REINFORCEMENT BY WORKMEN OR EQUIPMENT DURING FIXING
PLACED OVER THE COMPACTED EARTH AND SEALED WITH 75MM THICK LAYER OF
TOGETHER WITH THE REQUIREMENTS OF ALL AND SUBSEQUENT CONCRETE PLACEMENT WITHIN THE TOLERANCE GIVEN IN 6
BLINDING CONCRETE.
RELEVANT CODES OF PRACTICE REFERRED TO ABOVE.
8. BACKFILLING AGAINST BUILDING FOUNDATION WALLS SHALL BE DONE ONLY
HEREIN. 8. THE COVER TO THE REINFORCEMENT NEAREST TO THE CONCRETE SURFACE
AFTER WALLS ARE BRACED TO PREVENT MOVEMENT.
8. CHECK ALL DIMENSIONS BEFORE STARTING 9. CARE SHALL BE TAKEN NOT TO OVERSTRESS ANY ADJACENT RETAINING WALLS SHALL NOT BE LESS THAN THE FOLLOWING EXCEPT WHERE SPECIFIED OTHERWISE:
WORK AND STRUCTURES DURING BACKFILLING AROUND FOUNDATIONS. BEAMS - 25 MM COLUMNS - 40 MM FLOOR SLABS AND
9. ALWAYS REFER ADDITIONAL NOTES PROVIDED 10. COMPACTION OF FOUNDATION SHALL BE APPROVED BY ENGINEER PRIOR TO STAIRCASE 25 MM FOUNDATION - 40 MM
IN THE DRAWINGS. PLACEMENT OF CONCRETE. 9. BENDING OF REINFORCEMENT IN BEAMS AND COLUMNS SHALL COMPLY WITH
10.UNLESS OTHERWISE INDICATED, DETAILS THE REQUIREMENTS OF BS8110-1997.
SHOWN ARE TO BE CONSIDERED TYPICAL FOR 10. REINFORCEMENT SHALL BE SUBJECT TO LABORATORY TEST TO DETERMINE
SIMILAR CONDITIONS DUCTILE PROPERTY.
11. NO FRAMING OR STRUCTURAL MEMBERS ARE C. CONCRETE 11. INSTALLATION OF REINFORCEMENT SHALL BE COMPLETED AT LEAST 24 HOURS
TO BE MODIFIED, NOTCHED, OR CUT WITHOUT THE PRIOR TO SCHEDULED CONCRETE PLACEMENT. NOTIFY ENGINEER AT LEAST 48 HOURS
APPROVAL OF THE ENGINEER. 1. CONCRETE QUALITY SHALL COMPLY WITH BS8110-1997 UK CONCRETE CODE PRIOR TO SCHEDULED CONCRETE PLACEMENT, TO ALLOW TIME FOR INSPECTION.
12. THE OWNNER SHALL FAMILIARIZE 2. PROJECT ASSESSMENT OF CONCRETE STRENGTH IS REQUIRED.
THEMSELVES WITH THE DRAWINGS. ANY 3. GRADE OF CONCRETE IS M20(1:1.5:3) FOR ALL RCC WORKS.
DISCREPANCIES SHALL BE BROUGHT TO THE 4. FOR THE ABOVE GRADE TO BE ACHIEVED, MAXIMUM FREE WATER-CEMENT RATIO
ATTENTION OF THE ENGINEER BEFORE SHALL BE 0.55, MINIMUM CEMENT CONTENT SHALL BE 300KG/M3 AND MAXIMUM
PROCEEDING WITH THE AFFECTED WORK. AMOUNT OF WATER SHALL BE 165L FOR 300KG/M3 OF CEMENT.
13. ANY VARIATIONS OR SUBSTITUTIONS OF 5. ONLY POTABLE WATER SHALL BE USED FOR MIXING AND CURING, AND SHALL
MATERIALS OR DETAILS FROM THOSE COMPLY TO THE REQUIREMENTS OF BS8110-1997.
INDICATED ON THE DRAWINGS MAY ONLY BE 6. MECHANICALLY VIBRATE CONCRETE IN THE FORM TO GIVE MAXIMUM
COMPACTION WITHOUT SEGREGATION OF THE CONCRETE. F. TIMBER
MADE WITH PRIOR APPROVAL OF THE ENGINEER.
7. CURE CONCRETE AS REQUIRED BY THE CLASUE 13.5 OF IS456:2000 AND WORK
SPECIFICATIONS. 1. ALL STRUCTURAL TIMBER SHALL CONFORM TO THE BS8110-1997.( If available use
8. IN THE DRAWINGS THE BEAM SIZES ARE DESIGNATED WIDTH X DEPTH (INCLUDES the Butanese Timber Code)
SLAB THICKNESS IF ANY). 2. MOISTURE CONTENT OF THE STRUCTURAL TIMBER SHALL NOT EXCEED 12%.
9. CONCRETE SIZES AS DRAWN ARE MINIMUM AND DO NOT INCLUDE APPLIED 3. ALL STRUCTURAL TIMBER SHALL HAVE A MINIMUM ALLOWABLE BENDING
FINISHES. STRESS, Fb, OF 7MPA, A MINIMUM ALLOWABLE HORIZONTAL SHEAR STRESS, Fv, OF
10. DO NOT MAKE UNSPECIFIED HOLES OR CHASES WITHOUT ENGINEER'S PRIOR 0.6MPA, A MINIMUM MODULUS OF ELASTICITY, E, OF 9800MPA, AND MAXIMUM UNIT
APPROVAL. WEIGHT OF 5.75 KN/M3.
11. DO NOT PLACE CONDUITS, PIPES AND THE LIKE WITHIN COVER CONCRETE. G. FORMWORK
12. AGGREGATES SHALL COMPLY WITH CLAUSE OF BS8110-1997. NOMINAL SIZE OF 1. PROPERLY BRACE AND SHORE FORMWORK TO MAINTAIN ALIGNMENT AND
COARSE AGGREGATES SHALL BE 20MM. TOLERANCE IN ACCORDANCE WITH BS8110-1997.
13. THE CHARACTERISTIC STRENGTH OF CONCRETE AT 28 DAYS SHALL BE 20MPA. THE 2. FORMWORK SHALL COMPLY WITH CLAUSE OF BS8110-1997.
CONCRETE SHALL BE ASSESSED AS PER THE ACCEPTANCE CRITERIA OUTLINED IN 3. STRIPPING OF FORMWORK SHALL COMPLY WITH CLAUSE OF BS8110-1997.
CLAUSE 16 OF BS8110-1997 OR ANY OTHER STATUTORY AUTHORITIES.
14. ALL FORMWORKS FOR BEAMS AND SLABS ARE TO BE REMOVED BEFORE
CONSTRUCTION OF WALLS OR OTHER PERMANENT LOADINGS. ALL FORMWORK AND
ITS REMOVAL MUST BE IN ACCORDANCE TO BS8110-1997.
15. ALL FLOOR SLABS ARE REINFORCED CONCRETE SLABS.
GENERAL NOTES
2245
BRC WIRE MESH
BT2
A193 - TOP
BT2
1270
BRC WIRE MESH
A193 - TOP
BT1 BT2
BRC WIRE MESH
A193 - TOP
2390
BRC WIRE MESH
A193 - TOP
BT2 BT2
BT1 BT1
14280
14280
2470
BT1 BT2
BT1
BT1
BRC WIRE MESH
A193 - TOP
2390
BT2 BT2
580
BT2
BT1 BT1
1425
BT1
1510
12760
FOUNDATION LAYOUT
11-Y1203-125B/W
10-Y1202-125B/W
A A A A
BASE TYPE 1
BASE TYPE 2
FOUNDATION DETAILS
1. Do not scale drawings, use figured dimensions only. PROPOSED RESIDENTIAL DEVELOPMENT
2. All dimensions are given in Metric System and to the nearest millimeter (mm). FOR
MR. & MRS. ROSEMARY NDIDI AND GABRIEL
3. Any discrepancy on site should be referred to the Architect for clarification before proceeding IFECHUKWUDE UDOMI
with
new works.
Date MARCH, 2022 Sheet no
4 Architectural Drawings to be read in conjunction with relevant Engineering Drawings.
5. Standard of Constructions should conform with Architect's and Engineers' Specifications.
6. All critical construction stages should be approved by the Architect.
7. Schedule of Finishes and other Specifications are to be used with these Architectural Drawings.
Drawn by 03
Checked by Scale N.T.S
ROOF LEVEL
300
BT3 1600x1600 (d=400) 18-Y10-02 @
175 C/C Links
4-Y16-03
13-Y1203-125B/W
3450
3150
A A
A A
750
FIRST FLOOR
75mm concrete kicker
FIRST FLOOR
450
450
ROOF LEVEL
A A
A A
450
3450
18-Y10-02 @
3450
175 C/C Links 18-Y10-02 @
3000
175 C/C Links
3000
4-Y16-03 A A
4-Y16-03
3450
18-Y10-02 @
175 C/C Links
3000
750
750
4-Y16-03
75mm concrete kicker
GRUND FLOOR 75mm concrete kicker
GROUND FLOOR
750
1200
4-Y16-03
1200
4-Y16-03
7-Y10-02 @ 75mm concrete kicker
FOUNDATION DETAILS
600
(150mm Slab) (150mm Slab)
F.F Beam 1
C2 C1 C1 C2
F.F Beam 12
F.F Beam 16
2245
(150mm Slab)
(150mm Slab)
1270
(150mm Slab)
F.F Beam 19
C1
C1
F.F Beam 3
F.F Beam 13
C1 C1
F.F Beam 4
2100
F.F Beam 17
15480
15480
370
(150mm Slab)
C1 F.F Beam 5 C1
C1
F.F Beam 14
C1 F.F Beam 6
F.F Beam 18
2390
C1 C1
C1
F.F Beam 7 C1 C1
F.F Beam 15
F.F Beam 11
F.F Beam 8
1425
(150mm Slab)
(150mm Slab)
C2
C1 C1
C2 F.F Beam 10
(150mm Slab)
13960
1. Do not scale drawings, use figured dimensions only. PROPOSED RESIDENTIAL DEVELOPMENT
2. All dimensions are given in Metric System and to the nearest millimeter (mm). FOR
3. Any discrepancy on site should be referred to the Architect for clarification before proceeding MR. & MRS. ROSEMARY NDIDI AND GABRIEL
with IFECHUKWUDE UDOMI
new works.
Date MARCH, 2022 Sheet no
4 Architectural Drawings to be read in conjunction with relevant Engineering Drawings.
5. Standard of Constructions should conform with Architect's and Engineers' Specifications.
6. All critical construction stages should be approved by the Architect.
7. Schedule of Finishes and other Specifications are to be used with these Architectural Drawings.
Drawn by 05
Checked by Scale N.T.S
713 3638 4179 4944 713
F.F Beam 1
F.F Beam 2
F.F Beam 3
F.F Beam 9
F.F Beam 10
F.F Beam 14
F.F Beam 16 FIRST FLOOR BEAM DETAILS
F.F Beam 17
F.F Beam 18
F.F Beam 19
SLAB DETAILS
C3
600
R.F Beam C3
R.F Beam
C3 C1 C3
R.F Beam C1
2245
R.F Beam
R.F Beam
C1 C1
R.F Beam
1270
C1
C1 R.F Beam
R.F Beam
R.F Beam
2100
15480
15480
(150mm Slab)
370
R.F Beam 4
R.F Beam
R.F Beam 5
C1 C1 C1 C1
R.F Beam 2
2390
(150mm Slab)
580
C1
C1
C1 R.F Beam
R.F Beam
C1 C1
R.F Beam 3
1425
775 740
600
C1 C1
C3
C3
R.F Beam
13960
R.F Beam 1
3219
1725 3219
2968 2470
2968 2470
R.F Beam 4
R.F Beam 5
4179
225
225
bottom bars
clear span
LINTEL SCHEDULE
NOTES No. Description Date Consultant:
1. Do not scale drawings, use figured dimensions only. PROPOSED RESIDENTIAL DEVELOPMENT
2. All dimensions are given in Metric System and to the nearest millimeter (mm). FOR
3. Any discrepancy on site should be referred to the Architect for clarification before proceeding MR. & MRS. ROSEMARY NDIDI AND GABRIEL
with IFECHUKWUDE UDOMI
new works.
Date MARCH, 2022 Sheet no
4 Architectural Drawings to be read in conjunction with relevant Engineering Drawings.
5. Standard of Constructions should conform with Architect's and Engineers' Specifications.
6. All critical construction stages should be approved by the Architect.
7. Schedule of Finishes and other Specifications are to be used with these Architectural Drawings.
Drawn by 13
Checked by Scale N.T.S