You are on page 1of 13

Note : All Drawing Title shall match with Title

Approved in Project Charter for final IFB


Package Submittal.

SC Reply
Done & Incorporated
SC Reply
Done & Incorporated
1- DESIGN DETAILING AND CONSTRUCTION SHALL BE IN ACCORDANCE WITH 7- DO NOT BACKFILL AGAINST CONCRETE WALLS UNTIL SUPPORTING SLABS AND OTHER 1. ALL REINFORCEMENT SHALL BE DETAILED, FABRICATED, AND PLACED IN ACCORDANCE
R.C STRUCTURAL CODE AND R.C TECHNICAL SPECIFICATIONS. SUPPORTING ELEMENTS , INCLUDING SLABS ON GRADE ARE IN PLACE FULLY WITH ACI-318, ACI-315, AND R.C TECHNICAL SPECIFICATION.
APPROVAL BY THE ROYAL COMMISSION BEFORE CONSTRUCTION WITHOUT ANY EXTRA COST ANCHORED AND HAVE REACHED FULL DESIGN STRENGTH . 2. ALL REINFORCING STEEL SHALL BE HIGH STRENGTH, HIGH BONDED DEFORMED BARS GRADE 60
2- ALL STRUCTURAL DRAWINGS SHOULD BE READ IN CONJUNCTION WITH SPECIFICATIONS, 8- ALL STRUCTURAL EXCAVATION AND BACK FILL SHALL BE IN ACCORDANCE WITH (MINIMUM YIELD STRENGTH 60,000 psi OR 410 N / mm )OF ASTM A615 M AND A775 M CONFORMING
ARCHITECTURAL, CIVIL, MECHANICAL, HVAC, FIRE FIGHTING, PLUMBING, ELECTRICAL AND RC TECHNICAL SPECIFICATION TO THE REQUIREMENTS OF RC GUIDELINE SPECIFICATIONS FOR CONCRETE REINFORCEMENT.
TELECOMMUNICATION DRAWINGS . 3. CONCRETE COVER FOR REINFORCEMENT SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS
9- CONTRACTOR SHALL PROPOSE THE DETAILS OF TEMPORARY WORKS TO SUPPORT
3- ALL DIMENSIONS SHALL BE VERIFIED BY THE CONTRACTOR BEFORE CONSTRUCTION. OF R.C TECHNICAL SPECIFICATION.
THE SOIL DURING EXCAVATION AND TO PROPOSE THE METHOD OF DEWATERING
4- DO NOT SCALE , USE WRITTEN DIMENSIONS ONLY . IF REQUIRED. TEMPORARY WORKS FOR SOIL EXCAVATION AND METHOD OF DEWATERING 4. REINFORCING BARS USED IN CONCRETE WHICH IS DIRECTLY IN CONTACT WITH SOIL AND UPTO
SHALL BE SUBJECT FOR APPROVAL BY ROYAL COMMISSION . 1.0 METER ABOVE GRADE SHALL BE FUSION BONDED, EPOXY COATED AS PER ASTM A775 M
5- ALL OPENINGS SHALL BE FORMED OR SLEEVED BEFORE PLACING CONCRETE.
INCLUDING REINFORCEMENT (WWF) TO BE USED IN SLAB ON GRADE .
SEE ARCHITECTURAL , LANDSCAPING , CIVIL , MECHANICAL, ELECTRICAL AND 10- AFTER EXCAVATION, SOIL AT THE BOTTOM OF EXCAVATION SHALL BE CHECKED
TELECOMMUNICATION DRAWINGS FOR OPENINGS AND SLEEVES IN CONCRETE SLABS FOR ANY LOOSE OR COMPRESSIBLE MATERIAL. IF SUCH MATERIAL IS ENCOUNTERED
AND WALLS NOT SHOWN ON STRUCTURAL DRAWINGS AND FOR SIZE AND LOCATIONS IT SHOULD BE REMOVED AND REPLACED BY WELL COMPACTED STRUCTURAL BACK FILL . (V) STRUCTURAL STEEL :
OF OPENINGS NOT DIMENSIONED .
6- NO OPENINGS OR SLEEVES SHALL BE PLACED IN BEAMS OR COLUMNS EXCEPT WHEN 11- BACKFILLING IN FRONT OF, AND BEHIND RETAINING WALLS SHALL BE DONE SIMULTANEOUSLY.
1. THESE STANDARD DETAILS (INCLUDING GENERAL STEEL NOTES) ARE A PART OF ALL DESIGN
INDICATED ON THE STRUCTURAL DRAWINGS . DRAWINGS. IN CASE OF A CONFLICT BETWEEN THE DESIGN DRAWINGS. STANDARD DETAIL
DRAWINGS AND SPECIFICATIONS. THE ORDER OF PRECEDENCE SHALL BE:
7- PROVIDE ALL NECESSARY INSERTS , CLIPS , ANCHORS , TIES , REGLETS AND OTHER
FASTENING DEVICES AS REQUIRED CAST INTO CONCRETE .
(III) CONCRETE: FIRST - THE DESIGN DRAWINGS
SECOND - THE STANDARD DETAIL DRAWINGS
8- PROVIDE 25 MM CHAMFER AT CORNERS OF ALL CONCRETE BEAMS , WALLS , AND 1- ALL CONCRETE WORK SHALL BE AS PER LATEST EDITION OF ACI AND R.C SPECIFICATIONS
COLUMNS EXPOSED IN THE COMPLETED WORK , UNLESS OTHERWISE INDICATED . THIRD - THE SPECIFICATIONS
03300 AND 03400 .
9- ALL DIMENSIONS ARE IN MILLIMETERS AND ALL ELEVATIONS ARE IN METERS UNLESS 2- MINIMUM 28 DAYS CYLINDER COMPRESSIVE STRENGTH SHALL BE AS FOLLOWS:
2. ALL STRUCTURAL AND MISCELLANEOUS STEEL
OTHERWISE NOTED . SHALL CONFORM TO THE FOLLOWING.
CAST IN PLACE REINFORCED CONCRETE ------------------- 35 MPa 2.1 ASTM A 36, GRADE 36 STEEL
10- FINISHES TO ALL EXPOSED FORMED SURFACES ARE CONSIDERED TO BE OF GREAT
PRECAST CONCRETE ------------------------------- 40 MPa CHANNELS, ANGLES, W SHAPES, WT SHAPES, GUSSET PLATES, BASE PLATES,
IMPORTANCE. THE CONTRACTOR SHALL DEMONSTRATE WORKMANSHIP BEFORE
COMMENCEMENT OF WORK BY MEANS OF TESTS TO THE SATISFACTION OF THE ROYAL STIFFENER PLATES, POST PLATES, AND ALL OTHER MISCELLANEOUS PLATES.
LEAN OR BLINDING CONCRETE -------------------------- 17 MPa
COMMISSION THAT EACH TYPE OF SPECIFIED FINISH CAN BE CONSISTENTLY ACHIEVED . 2.2 ASTM A500, GRADE B STEEL,
-
- TYPE I WITH POZZOLAN (MINERAL ADMIXTURE) SHALL BE USED FOR ALL CONCRETE STRUCTURAL PIPE SHAPES.
11- CONTRACTOR SHALL PREPARE SHOP DRAWINGS FOR ALL DIFFERENT TYPES OF BUILDINGS
BASED ON STRUCTURAL SYSTEM AND DETAILS SHOWN ON THE DRAWINGS . BELOW GRADE AND UP TO ONE METER ABOVE GRADE,ALL OTHER CONCRETE SHALL
2.3 ASTM A53, GRADE B STEEL,
CONTRACTOR SHALL SUBMIT SHOP DRAWINGS AND ADDITIONAL DESIGN CALCULATIONS FOR BE TYPE I PLAIN.TYPE V CEMENT SHALL BE USED FOR LEAN OR BLINDING CONCRETE
STRUCTURAL PIPE SHAPES.
TO THE ROYAL COMMISSION. ONLY.
3 2.4 ALL STRUCTURAL STEEL SHALL BE FABRICATED PER PROJECT SPECIFICATION 05120
3- FOAM CONCRETE WITH A DENSITY OF NOT MORE THAN 5.0 KN / m (31.0 PCF)
12- ALL BEAMS, COLUMNS AND FOOTINGS ARE CENTERED ON GRID LINES OR REFERENCED WITH
SHALL BE PROVIDED AS A SCREED LAYER ABOVE THE ROOF CONCRETE SLAB 2.5 ALL METAL ROOF DECK PER PROJECT SPECIFICATION 05310
DISTANCES FROM GRID LINES UNLESS NOTED OTHERWISE .
TO ATTAIN THE SLOPES FOR DRAINAGE . 2.6 ALL STEEL SHALL BE ERECTED PER PROJECT SPECIFICATION 05120
13- SHORING AND SEQUENCE OF CONSTRUCTION SHALL BE CAREFULLY STUDIED AND
CONSIDERED BY THE CONTRACTOR BEFORE CONSTRUCTION. THE CONTRACTOR MUST 4- INDIVIDUAL PANELS OF CONCRETE SLAB ON GRADE SHALL BE BOUND BY CONTROL / 3. CONNECTIONS
TAKE INTO ACCOUNT ANY CONSTRUCTION LOADS EXCEEDING DESIGN LOADS GIVEN IN THE CONSTRUCTION JOINTS LOCATED ON COLUMN OR R.C. WALLS CENTERLINES AND AT 3.1 CONNECTIONS SHALL BE SHOP WELDED AND FIELD BOLTED UNLESS NOTED OTHERWISE
DESIGN CRITERIA AND IS RESPONSIBLE FOR THE ADEQUACY OF ALL SUPPORTING ELEMENTS
INTERMEDIATE LOCATIONS AS REQUIRED AT A MAXIMUM SPACING OF 6500 MM (USO) IN EACH ON DESIGN DRAWINGS.
DURING CONSTRUCTION. SHORING SHALL NOT BE REMOVED UNTIL SUPPORTED ELEMENTS HAVE
DEVELOPED DESIGN PROPERTIES REQUIRED TO SUPPORT ALL LOADS AND LIMIT DEFLECTIONS DIRECTION. LOCATE JOINTS SO THAT ALL COLUMNS OR R.C. WALLS OCCUR ON EDGES OF 3.2 ALL PRIMARY FIELD CONNECTIONS SHALL BE BOLTED USING (20mm) DIA. A325 HIGH
AND CRACKING AT TIME OF SHORING REMOVAL . PANELS UNLESS SHOWN OTHERWISE. PROVIDE EXPANSION JOINT IN SLAB ON GRADE STRENGTH BOLTS (UNO). BEARING TYPE WITH THREADS INCLUDED IN SHEAR PLANE WITH ONE
(1) HARDENED WASHER AND USING A MINIMUM OF TWO BOLTS UNLESS NOTED OTHERWISE.
MATCHING LOCATION OF EXPANSION JOINTS ON STRUCTURAL SLABS AND BEAMS ABOVE .
I) SOIL DATA: 3.3 ALL WELDED CONNECTIONS SHALL CONFORM TO THE REQUIREMENTS OF AWS D1.1
5- CONSTRUCTION JOINTS IN FLOORS SHALL BE LOCATED WITHIN THE MIDDLE THIRD OF

SC Reply
SHIELDED METAL ARC AWS A5.1 E70XX WELD ELECTRODES, SUBMERGED ARC
SPANS OF SLABS , BEAMS , AND GIRDERS. JOINTS IN GIRDERS SHALL BE OFFSET AWS A5.7 F7X-EXXX WELD ELECTRODS, OR FLUX-CORED ARC A5.20 E7X-TX. LOW
1. APPROVED GRANULAR MATERIAL THAT WILL PRODUCE A DENSE, WELL COMPACTED
A MINIMUM DISTANCE OF TWO TIMES THE WIDTH OF INTERSECTING BEAMS. HYDROGEN ELECTRODES SHALL BE USED FOR ALL FIELD WELDS.

Done & Incorporated


BACK FILL SHALL BE USED FOR BACK FILLING. THE FILL SHALL BE COMPACTED AT
LOCATE CONSTRUCTION / CONTRACTION JOINTS IN RETAINING WALLS AT MAXIMUM 3.5 MINIMUM SIZE OF FILLET WELD SHALL BE 6mm UNLESS NOTED OTHERWISE.
OPTIMUM MOISTURE CONTENT TO 95% OF THE MAXIMUM DRY DENSITY AS DETERMINED
SPACING OF 10 M. DO NOT PLACE VERTICAL CONSTRUCTION JOINTS IN SHEAR WALLS .
BY MODIFIED PROCTOR TEST (ASTM D-1557). 3.6 MINIMUM GUSSET PLATE THICKNESS SHALL BE 10mm UNLESS NOTED OTHERWISE. GUSSET
HORIZONTAL CONSTRUCTION JOINTS IN WALLS SHALL BE LOCATED ONLY AS INDICATED . PLATES AT BRACING CONNECTIONS SHALL BE CONNECTED TO BOTH ADJACENT BEAM AND
2. THE ROYAL COMMISSION WILL PROVIDE THE EPC CONTRACTOR WITH A SITE-SPECIFIC FACTUAL HORIZONTAL CONSTRUCTION JOINTS IN FOOTINGS , SLABS , JOISTS , BEAMS AND GIRDERS COLUMN MEMBERS. IF THIS IS NOT PRACTICAL. GUSSET PLATES SHALL BE PROPERLY
GEOTECHNICAL REPORT. THE EPC CONTRACTOR SHALL RETAIN CONSULTANTS NECESSARY TO ARE NOT PERMITTED EXCEPT AS SPECIFICALLY INDICATED ON STRUCTURAL DRAWINGS . DESIGNED FOR STRESSES DUE TO ECCENTRICITY.
PREPARE GEOTECHNICAL ENGINEERING, INCLUDING SUBSURFACE EXPLORATIONS, SAMPLING,
6- SURFACE OF CONCRETE CONSTRUCTION JOINTS SHALL BE ROUGHENED, CLEANED AND 3.7 FRAMED BEAM CONNECTIONS NOT SUBJECT TO MOMENTS AND AXIAL FORCES. WHERE
TESTING, ANALYSES, AND ENGINEERING AND TO GENERATE FINAL INTERPRETIVE GEOTECHNICAL
LAINTANCE REMOVED. VERTICAL REACTIONS OR SHEARS ARE NOT INDICATED ON DESIGN DRAWINGS. SHALL BE
INVESTIGATION REPORTS, SUBMITTED TO RC FOR REVIEW, COMMENT, AND APPROVAL.
DETAILED IN ACCORDANCE WITH TABLE II AND TABLE III (CASE I) PART 4 OF THE AISC
THE EPC CONTRACTOR SHALL DESIGN THE CONCRETE BOX CULVERT BASED ON APPROVED 7- CONSTRUCTION JOINTS SHALL BE SO MADE AND LOCATED AS NOT TO IMPAIR THE
MANUAL OF STEEL CONSTRUCTION. ALLOWABLE STRESS DESIGN. NINTH EDITION.
FINAL INTERPRETIVE GEOTECHNICAL INVESTIGATION REPORT. STRENGTH OF THE STRUCTURE.
3.8 WHERE BEAM AXIAL FORCES ONLY (NO VERTICAL REACTIONS/SHEAR INDICATED) ARE
3. SOIL AT EXCAVATION BASE SHALL BE COMPACTED TO AT LEAST 95% OF THE MAXIMUM 8- PROVIDE THICKENED SLAB ON GRADE UNDER ALL INTERIOR MASONRY PARTITIONS 150 MM SHOWN ON THE DRAWINGS. THE BEAM END CONNECTION SHALL BE DESIGNED FOR THE This drawing and the design it covers are the property of the
Royal Commission for Jubail and Yanbu, Royal Commission
DRY DENSITY AS DETERMINED BY MODIFIED PROCTOR TEST (ASTM D-1557). AND MORE IN THICKNESS. FOR LOCATION OF INTERIOR WALLS, SEE APPLICABLE ARCHITECTURAL AXIAL LOAD SHOWN AND 50% OF THE ALLOWABLE VERTICAL LOAD. BASED ON THE at Yanbu. These drawings are loaned on the borrower's

DRAWINGS BUT FOR DETAIL OF INTERIOR WALL FOOTING, SEE STRUCTURAL STANDARD DRAWINGS . ACTUAL SPAN. (AISC MANUAL NINTH EDITION). express agreement that they will not be reproduced, copied,
loaned, exhibited or used except in the limited way, if any,
permitted by written consent of the Royal Commission.
4- ALL FOOTINGS SHALL BE PLACED ON UNDISTURBED SOIL . IN CASE OF ANY DISCREPANCY 9- PROVIDE DEPRESSED SLAB ON GRADE AS INDICATED TO SUIT REQUIRED FLOOR FINISHES. SEE 3.9 CONNECTIONS SUBJECT TO MOMENTS. AXIAL FORCES AND SHEARS SHALL REQUIRE THE
FOLLOWING TO BE SHOWN IN THE CALCULATIONS, (I). VECTORIAL INDICATION OF MOMENTS
OR LOWERING OF FOOTINGS , THE ROYAL COMMISSION SHALL BE INFORMED IMMEDIATELY, ARCHITECTURAL DRAWINGS FOR DIMENSIONS OF DEPRESSED AREAS .
AND FORCES. (II). COMPUTATIONS SUBSTANTIATING THE NUMBER OF BOLTS, SIZES AND
AND THE CONTRACTOR SHALL REDESIGN COLUMNS AND SUBSTRUCTURES AND SUBMIT DESIGN 10- PROVIDE CONCRETE PADS, CURBS AND OTHER SUPPORTING CONCRETE FOR ARCHITECTURAL, LENGTH OF WELDS AND THICKNESS OF CONNECTING MATERIALS.
CALCULATIONS AND SHOP DRAWINGS TO THE ROYAL COMMISSION FOR REVIEW AND APPROVAL LANDSCAPING, MECHANICAL AND ELECTRICAL EQUIPMENT AND INSTALLATIONS AS REQUIRED .
SEE ARCHITECTURAL, LANDSCAPING, CIVIL , MECHANICAL AND ELECTRICAL DRAWINGS FOR SIZE 3.10 FORCES INDICATED ON THE DESIGN DRAWINGS ARE NET FORCES AND FOR THE DESIGN D MAY 2023 SC ISSUED FOR 100% DESIGN REVIEW
BEFORE CONSTRUCTION WITHOUT ANY EXTRA COST TO THE ROYAL COMMISSION .
OF CONNECTIONS. NO FURTHER REDUCTION IS ALLOWED. C DEC 2022 SC ISSUED FOR 90% DESIGN REVIEW
AND LOCATIONS OF PADS, CURBS AND OTHER NON-STRUCTURAL CONCRETE ELEMENTS. SEE
5- DO NOT EXCAVATE BELOW THE ELEVATION OF ANY COMPLETED FOOTING ANY CLOSER B OCT 2022 SC ISSUED FOR 60% REVISED DESIGN REVIEW
TYPICAL DETAILS ON STRUCTURAL DRAWINGS FOR REINFORCING AND 3.11 MEMBERS FORCES SHOWN ON EACH DESIGN DRAWING SHALL HAVE THE FOLLOWING MEANING.
TO THE FOOTING THAN A SLOPE OF 2 HORIZONTAL (MEASURED FROM EDGE OF OTHER CONSTRUCTION DETAILS. PLUS (+) SIGN DESIGNATES AXIAL TENSION A AUG 2022 SC ISSUED FOR 60% DESIGN REVIEW

FOOTING TO NEAREST POINT IN EXCAVATION) TO 1 VERTICAL . MINUS (-) SIGN DESIGNATES AXIAL COMPRESSION NO. DATE BY DESCRIPTION APPROVED BY

11- IN ANY SECTION OF BUILDING GREATER THAN 50 M IN LENGTH BETWEEN EXPANSION JOINTS
6- NO FOUNDATION WORK SHALL BE PERFORMED UNTIL ALL FOUNDATION WORK IS OR EDGE OF BUILDING , PROVIDE CONSTRUCTION JOINTS FOR ALL ELEVATED BEAMS AND SLABS 3.12 CONNECTIONS AT END OF TENSION OR COMPRESSION BRACING MEMBERS SHALL
COORDINATED WITH ALL UNDERGROUND UTILITIES. ALL UTILITIES PLACED AFTER FOOTING CONSTRUCTION AT MAXIMUM SPACING OF 30 M IN THAT DIRECTION. CURE CONCRETE FOR DEVELOP THE STRENGTH REQUIRED TO RESIST FORCES INDICATED ON THE DESIGN
CONSTRUCTION SHALL BE IN ACCORDANCE WITH NOTE (3) ABOVE. UTILITIES PLACED MINIMUM 96 HOURS BEFORE PLACING CONCRETE IN ADJACENT PANELS AT CONSTRUCTION JOINTS. DRAWINGS. WHEN FORCES ARE NOT SHOWN. MINIMUM DESIGN AXIAL FORCE SHALL BE 65 KN.
Royal Commission for Jubail and Yanbu
BEFORE FOOTING CONSTRUCTION SHALL BE IN ACCORDANCE WITH NOTE (3) ABOVE IN ANY SECTION OF BUILDING EXCEEDING THIS LIMIT IN BOTH DIRECTIONS, PROVIDE CONSTRUCT- 3.13 COLUMN SPLICES SHALL BE DESIGNED FOR THE FORCES SHOWN ON THE DESIGN DRAWING.
Royal Commission at Yanbu
WITH HORIZONTAL DISTANCE MEASURED FROM EDGE OF FOOTING TO INVERT OF PIPE, ION JOINTS AT MAXIMUM 30 M SPACING IN BOTH DIRECTIONS, AND PLACE CONCRETE IN AN 3.14 SPLICES FOR TRUSS CHORDS SHALL BE DESIGNED TO DEVELOP THE LOADS INDICATED
FOR COLUMN FOOTINGS AND WALL FOOTINGS PARALLEL TO UTILITY . UTILITIES CROSSING ALTERNATING CHECK BOARD PATTERN WITH EACH INDIVIDUAL PANEL CURED MINIMUM 96 HOURS ON THE DESIGN DRAWINGS.
WALL FOOTINGS SHALL PASS OVER THE FOOTING EXCEPT AS SPECIFICALLY INDICATED BEFORE PLACING CONCRETE IN ADJACENT PANELS. EDGES OF BUILDING, FOR PURPOSES OF DRAWING TITLE
OTHERWISE ON STRUCTURAL OR UTILITY DRAWINGS . UTILITIES MAY BE PLACED EITHER OVER DEFINING CONSTRUCTION JOINT SPACING, SHALL NOT INCLUDE EDGES OF OPENINGS COMPLETELY 3.15 SECONDARY BOLTED CONNECTIONS SHALL BE BOLTED WITH (20mm) DIA. ASTM A307,
OR UNDER GRADE BEAMS. NO UTILITIES SHALL PASS THROUGH WALL FOOTINGS AND COLUMN ENCLOSED WITHIN OVERALL BUILDING SECTION . GRADE A BOLT. UNLESS NOTED OR OTHERWISE SPECIFIED ON THE DRAWINGS. WHERE
FOOTINGS OR GRADE BEAMS UNLESS SPECIFICALLY INDICATED ON STRUCTURAL DRAWINGS. SECONDARY IS DEFINED AS CONNECTIONS FOR GIRTS, PURLINS, LADDERS AND HANDRAIL
ALL UTILITIES PASSING UNDER WALL FOOTINGS OR COLUMN FOOTINGS AND GRADE BEAMS 12- CONTRACTOR SHALL SUBMIT SHOP DRAWINGS SHOWING PROPOSED CONSTRUCTION JOINTS POSTS. STAIR TREADS SHALL BE BOLTED USING (10mm) DIA. ASTM A307 GRADE A BOLTS.
LAYOUT LENGTHS AND LOCATIONS OF SPLICES OF REINFORCEMENT WHEREVER
SHALL BE CONSTRUCTED BEFORE THE FOOTING OR GRADE BEAM . LOWER FOOTINGS AS 3.16 MEMBERS COMPOSED OF TWO ROLLED SHAPES SHALL BE CONNECTED TOGETHER BY STRUCTURAL GENERAL NOTES
REQUIRED TO COORDINATE WITH UNDERGROUND UTILITIES AND IN ACCORDANCE REQUIRED FOR APPROVAL BY THE ROYAL COMMISSION BEFORE CONSTRUCTION.
INTERMITTENT FILLERS IN ACCORDANCE WITH AISC MANUAL OF STEEL CONSTRUCTION
WITH NOTE (2) ABOVE . 13- ADDITIONAL BARS EQUAL TO 1/2 REINFORCING BARS AREA INTERRUPTED BY (9TH EDITION) REQUIREMENTS. M.MAJIED

OPENING SHALL BE PROVIDED AT EACH SIDE OF OPENING, AT EACH FACE OF R.C. M BILAL
4. BOTTOM OF COLUMNS SHALL BE FINISHED FOR FULL
WALLS, AND AT TOP AND BOTTOM OF SOLID SLABS, AND EXTEND EQUAL TO SPLICE BEARING UNLESS SHOWN OTHERWISE ON THE DESIGN DRAWINGS.
AWAD
Engineer Dr. Tarek M.A. Shawaf
LENGTH (600 MIN.) BEYOND OPENING. MIN. 2-Ø16AT EACH FACE OR AT TOP AND BOTTOM AT
5. GROUTING OF BASES AND BEARING PLATES SHALL BE IN ACCORDANCE WITH RC CR (1010322156)
EACH SIDE SHALL BE USED (UNO). FOR OPENING LESS THAN 300 x 300 MM OFFSET
SPECIFICATION 05120 DRAWING No.
REINFORCEMENT TO CLEAR OPENING, NO ADDITIONAL REINF. REQUIRED.
7564 - SE - A1 - 1001
- REV No.
ROAD
SC Reply
Done & Incorporated
AL SAIEF

This drawing and the design it covers are the property of the
Royal Commission for Jubail and Yanbu, Royal Commission
at Yanbu. These drawings are loaned on the borrower's
express agreement that they will not be reproduced, copied,
loaned, exhibited or used except in the limited way, if any,
permitted by written consent of the Royal Commission.

B MAY 2023 SC ISSUED FOR 100% DESIGN REVIEW


A DEC 2022 SC ISSUED FOR 90% DESIGN REVIEW
NO. DATE BY DESCRIPTION APPROVED BY

Royal Commission for Jubail and Yanbu

Royal Commission at Yanbu

DRAWING TITLE

Engineer Dr. Tarek M.A. Shawaf


CR (1010322156)

DRAWING No.

REV No.
SC Reply
Done & Incorporated

This drawing and the design it covers are the property of the
Royal Commission for Jubail and Yanbu, Royal Commission
at Yanbu. These drawings are loaned on the borrower's
express agreement that they will not be reproduced, copied,
loaned, exhibited or used except in the limited way, if any,
permitted by written consent of the Royal Commission.

B MAY 2023 SC ISSUED FOR 100% DESIGN REVIEW


A DEC 2022 SC ISSUED FOR 90% DESIGN REVIEW
NO. DATE BY DESCRIPTION APPROVED BY

Royal Commission for Jubail and Yanbu

Royal Commission at Yanbu

DRAWING TITLE

Engineer Dr. Tarek M.A. Shawaf


CR (1010322156)

DRAWING No.

REV No.
SC Reply
Done & Incorporated
EXIT SIGN

ELECTRICAL HAZARD

TD
TRAVEL DISTANCE WITHIN THE UNIT
TD=4.5M 28 18

.7M 1 DD
=6 DIAGONAL DISTANCE
DD

FIRE ALARM BELL WITH STROBE (OUTDOOR


WEATHER PROOF)

FIRE ALARM BELL WITH STROBE (INDOOR)

6Kg CO2 PORTABLE FIRE


EXTINGUISHER, FE-1

1
374
800
1900

GROUND FLOOR LIFE SAFETY PLAN 1

ELECTRICAL ROOM - GROUND FLOOR - OCCUPANT LOAD CALCULATION


ROOM NO. ROOM NAME OCCUPANCY CLASSIFICATION NET AREA OCCUPANT OCCUPANTS TOTAL OCCUPANTS
(m²) LOAD FACTOR
(m²) SBC 801

101 ELECTRICAL ROOM FACTORY INDUSTRIAL GROUP F- 1 18 28 0.64 1

TOTAL OCCUPANTS 1

ELECTRICAL ROOM - NO. OF MEANS OF EGRESS & DOOR WIDTH:


REQUIRED PROVIDED
FLOOR OCCUPANTS REQUIRED NO. REQUIRED MIN. ESCAPE
OFFIRE EXITS ESCAPE DOOR WIDTH STAIRCASE STAIRCASE
(mm) SBC HORIZONTAL ESCAPE WIDTH AVAILABLE ( mm) WIDTH (mm) WIDTH
SBC 201 TABLE
1006.3.1 201 SECTION SBC 801 (mm)
1010 SECTION 1009
This drawing and the design it covers are the property of the
Royal Commission for Jubail and Yanbu, Royal Commission
at Yanbu. These drawings are loaned on the borrower's
DOOR TYPE NO. OF EXIT CLEAR TOTAL WIDTH express agreement that they will not be reproduced, copied,
DOORS WIDTH (mm) (mm) loaned, exhibited or used except in the limited way, if any,
CP TD EGRESS PATH permitted by written consent of the Royal Commission.
XX1 XX1
EXIT DOOR GROUND 1 X 800 = 800
8 1
FLOOR FIRE EXIT 1 1,900 1,900 NA NA
COMMON PATH
TERMINATION POINT TOTAL 1,900

TRAVEL DISTANCE PATH

COMMON PATH OF TRAVEL


ELECTRICAL ROOM - CODE ANALYSIS
CODE ANALYSIS DESCRIPTION A MAY 2023 SC ISSUED FOR 100% DESIGN REVIEW
NO. DATE BY DESCRIPTION APPROVED BY
- SAUDI BUILDING CODE - GENERAL SBC 201 (2018)
EGRESS CODES AND STANDARDS - SAUDI FIRE CODE SBC 801 (2018)
OCCUPANT SERVED O.L AREA
CAPACITY - SAUDI CIVIL DEFENSE GUIDELINES
x (M²/P) (M²)
EXIT CAPACITY " FACTORY INDUSTRIAL GROUP F- 1"
x CLEAR BUILDING OCCUPANCY CLASSIFICATION
x REQUIRED DOOR WIDTH (MM) AS REFERENCE SBC 201 (2018) SECTION 306.2
WALL DOOR WIDTH WALL Royal Commission for Jubail and Yanbu
x PER SBC 801 (SEE NOTE BELOW) OCCUPANT
CONSTRUCTION TYPE IIB
Royal Commission at Yanbu
PROVIDED DOOR WIDTH 90°
(MM) (CURRENT DESIGN) GROSS AREA 22.75 SQ.M.
OCCUPANT CALCULATION
OCCUPANT LOAD FACTOR AS PER SBC 201 (2018) TABLE 1004.1.2
REQUIRED EXIST CAPACITY BASED ON LARGEST OF EITHER: DRAWING TITLE

1 MINIMUM REQUIRED EXIT CAPACITY AS PER CODE SBC 201 TOTAL OCCUPANT LOAD 1 PERSON
. (SECTION 1010.1.1).
- FIRE RESISTANCE RATING REQUIRMENT FOR BUILDING ELEMENTS SHALL BE AS PER
2 EXIT CAPACITY BASED UPON MULTIPLYING (FACTOR 5.08MM) AS PER FIRE RESISTANCE OF CONSTRUCTION "TYPE IIB". REFERENCE SBC 201 TABLE 601
. SBC 201 (SECTION-1005.3.2). TYPE

MEANS OF EGRESS MEANS OF EGRESS ARE PROVIDED AS PER SBC 201 (2018) SECTION 1005

NUMBER OF EXIT REQUIRED NO. OF EXITS ARE PROVIDED AS PER SBC 201 (2018) SECTION 1006

MECHANICAL PORTABLE FIRE EXTINGUISHER PROVIDED, REFER TO FIRE PROTECTION SYSTEM LAYOUT DWG. No. ME-A1-2013
Engineer Dr. Tarek M.A. Shawaf
ELECTRICAL FIRE ALARM AND DETECTION SYSTEM PROVIDED, REFER TO DWG. No. IN-A1-2003 CR (1010322156)

DRAWING No.

REV No.

SC Reply
Done & Incorporated
(I) GENERAL NOTES: (IV) REINFORCING STEEL:
1- DESIGN DETAILING AND CONSTRUCTION SHALL BE IN ACCORDANCE WITH 7- DO NOT BACKFILL AGAINST CONCRETE WALLS UNTIL SUPPORTING SLABS AND OTHER 1. ALL REINFORCEMENT SHALL BE DETAILED, FABRICATED, AND PLACED IN ACCORDANCE
R.C STRUCTURAL CODE AND R.C TECHNICAL SPECIFICATIONS. SUPPORTING ELEMENTS , INCLUDING SLABS ON GRADE ARE IN PLACE FULLY WITH ACI-318, ACI-315, AND R.C TECHNICAL SPECIFICATION.
APPROVAL BY THE ROYAL COMMISSION BEFORE CONSTRUCTION WITHOUT ANY EXTRA COST ANCHORED AND HAVE REACHED FULL DESIGN STRENGTH . 2. ALL REINFORCING STEEL SHALL BE HIGH STRENGTH, HIGH BONDED DEFORMED BARS GRADE 60
2- ALL STRUCTURAL DRAWINGS SHOULD BE READ IN CONJUNCTION WITH SPECIFICATIONS, (MINIMUM YIELD STRENGTH 60,000 psi OR 410 N / mm )OF ASTM A615 M AND A775 M CONFORMING
8- ALL STRUCTURAL EXCAVATION AND BACK FILL SHALL BE IN ACCORDANCE WITH
ARCHITECTURAL, CIVIL, MECHANICAL, HVAC, FIRE FIGHTING, PLUMBING, ELECTRICAL AND TO THE REQUIREMENTS OF RC GUIDELINE SPECIFICATIONS FOR CONCRETE REINFORCEMENT.
RC TECHNICAL SPECIFICATION
TELECOMMUNICATION DRAWINGS .
3. CONCRETE COVER FOR REINFORCEMENT SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS
9- CONTRACTOR SHALL PROPOSE THE DETAILS OF TEMPORARY WORKS TO SUPPORT
3- ALL DIMENSIONS SHALL BE VERIFIED BY THE CONTRACTOR BEFORE CONSTRUCTION. OF R.C TECHNICAL SPECIFICATION.
THE SOIL DURING EXCAVATION AND TO PROPOSE THE METHOD OF DEWATERING
4- DO NOT SCALE , USE WRITTEN DIMENSIONS ONLY . IF REQUIRED. TEMPORARY WORKS FOR SOIL EXCAVATION AND METHOD OF DEWATERING 4. REINFORCING BARS USED IN CONCRETE WHICH IS DIRECTLY IN CONTACT WITH SOIL AND UPTO
SHALL BE SUBJECT FOR APPROVAL BY ROYAL COMMISSION . 1.0 METER ABOVE GRADE SHALL BE FUSION BONDED, EPOXY COATED AS PER ASTM A775 M
5- ALL OPENINGS SHALL BE FORMED OR SLEEVED BEFORE PLACING CONCRETE.
INCLUDING REINFORCEMENT (WWF) TO BE USED IN SLAB ON GRADE .
SEE ARCHITECTURAL , LANDSCAPING , CIVIL , MECHANICAL, ELECTRICAL AND 10- AFTER EXCAVATION, SOIL AT THE BOTTOM OF EXCAVATION SHALL BE CHECKED
TELECOMMUNICATION DRAWINGS FOR OPENINGS AND SLEEVES IN CONCRETE SLABS
FOR ANY LOOSE OR COMPRESSIBLE MATERIAL. IF SUCH MATERIAL IS ENCOUNTERED
AND WALLS NOT SHOWN ON STRUCTURAL DRAWINGS AND FOR SIZE AND LOCATIONS
IT SHOULD BE REMOVED AND REPLACED BY WELL COMPACTED STRUCTURAL BACK FILL .
(V) STRUCTURAL STEEL :
OF OPENINGS NOT DIMENSIONED .
6- NO OPENINGS OR SLEEVES SHALL BE PLACED IN BEAMS OR COLUMNS EXCEPT WHEN 11- BACKFILLING IN FRONT OF, AND BEHIND RETAINING WALLS SHALL BE DONE SIMULTANEOUSLY. 1. THESE STANDARD DETAILS (INCLUDING GENERAL STEEL NOTES) ARE A PART OF ALL DESIGN
INDICATED ON THE STRUCTURAL DRAWINGS . DRAWINGS. IN CASE OF A CONFLICT BETWEEN THE DESIGN DRAWINGS. STANDARD DETAIL
DRAWINGS AND SPECIFICATIONS. THE ORDER OF PRECEDENCE SHALL BE:
7- PROVIDE ALL NECESSARY INSERTS , CLIPS , ANCHORS , TIES , REGLETS AND OTHER (III) CONCRETE: FIRST - THE DESIGN DRAWINGS
FASTENING DEVICES AS REQUIRED CAST INTO CONCRETE .
1- ALL CONCRETE WORK SHALL BE AS PER LATEST EDITION OF ACI AND R.C SPECIFICATIONS SECOND - THE STANDARD DETAIL DRAWINGS
8- PROVIDE 25 MM CHAMFER AT CORNERS OF ALL CONCRETE BEAMS , WALLS , AND
COLUMNS EXPOSED IN THE COMPLETED WORK , UNLESS OTHERWISE INDICATED . THIRD - THE SPECIFICATIONS
03300 AND 03400 .
9- ALL DIMENSIONS ARE IN MILLIMETERS AND ALL ELEVATIONS ARE IN METERS UNLESS 2. ALL STRUCTURAL AND MISCELLANEOUS STEEL
2- MINIMUM 28 DAYS CYLINDER COMPRESSIVE STRENGTH SHALL BE AS FOLLOWS:
OTHERWISE NOTED . SHALL CONFORM TO THE FOLLOWING.
CAST IN PLACE REINFORCED CONCRETE ------------------- 35 MPa
10- FINISHES TO ALL EXPOSED FORMED SURFACES ARE CONSIDERED TO BE OF GREAT 2.1 ASTM A 36, GRADE 36 STEEL
IMPORTANCE. THE CONTRACTOR SHALL DEMONSTRATE WORKMANSHIP BEFORE PRECAST CONCRETE ------------------------------- 40 MPa CHANNELS, ANGLES, W SHAPES, WT SHAPES, GUSSET PLATES, BASE PLATES,
COMMENCEMENT OF WORK BY MEANS OF TESTS TO THE SATISFACTION OF THE ROYAL STIFFENER PLATES, POST PLATES, AND ALL OTHER MISCELLANEOUS PLATES.
LEAN OR BLINDING CONCRETE -------------------------- 17 MPa
COMMISSION THAT EACH TYPE OF SPECIFIED FINISH CAN BE CONSISTENTLY ACHIEVED . 2.2 ASTM A500, GRADE B STEEL,
- TYPE I WITH POZZOLAN (MINERAL ADMIXTURE) SHALL BE USED FOR ALL CONCRETE
11- CONTRACTOR SHALL PREPARE SHOP DRAWINGS FOR ALL DIFFERENT TYPES OF BUILDINGS - STRUCTURAL PIPE SHAPES.
BASED ON STRUCTURAL SYSTEM AND DETAILS SHOWN ON THE DRAWINGS . BELOW GRADE AND UP TO ONE METER ABOVE GRADE,ALL OTHER CONCRETE SHALL
2.3 ASTM A53, GRADE B STEEL,
CONTRACTOR SHALL SUBMIT SHOP DRAWINGS AND ADDITIONAL DESIGN CALCULATIONS FOR BE TYPE I PLAIN.TYPE V CEMENT SHALL BE USED FOR LEAN OR BLINDING CONCRETE
STRUCTURAL PIPE SHAPES.
TO THE ROYAL COMMISSION. ONLY.
3 2.4 ALL STRUCTURAL STEEL SHALL BE FABRICATED PER PROJECT SPECIFICATION 05120
12- ALL BEAMS, COLUMNS AND FOOTINGS ARE CENTERED ON GRID LINES OR REFERENCED WITH 3- FOAM CONCRETE WITH A DENSITY OF NOT MORE THAN 5.0 KN / m (31.0 PCF)
SHALL BE PROVIDED AS A SCREED LAYER ABOVE THE ROOF CONCRETE SLAB 2.5 ALL METAL ROOF DECK PER PROJECT SPECIFICATION 05310
DISTANCES FROM GRID LINES UNLESS NOTED OTHERWISE .
TO ATTAIN THE SLOPES FOR DRAINAGE . 2.6 ALL STEEL SHALL BE ERECTED PER PROJECT SPECIFICATION 05120
13- SHORING AND SEQUENCE OF CONSTRUCTION SHALL BE CAREFULLY STUDIED AND
CONSIDERED BY THE CONTRACTOR BEFORE CONSTRUCTION. THE CONTRACTOR MUST 4- INDIVIDUAL PANELS OF CONCRETE SLAB ON GRADE SHALL BE BOUND BY CONTROL / 3. CONNECTIONS
TAKE INTO ACCOUNT ANY CONSTRUCTION LOADS EXCEEDING DESIGN LOADS GIVEN IN THE CONSTRUCTION JOINTS LOCATED ON COLUMN OR R.C. WALLS CENTERLINES AND AT 3.1 CONNECTIONS SHALL BE SHOP WELDED AND FIELD BOLTED UNLESS NOTED OTHERWISE
DESIGN CRITERIA AND IS RESPONSIBLE FOR THE ADEQUACY OF ALL SUPPORTING ELEMENTS
INTERMEDIATE LOCATIONS AS REQUIRED AT A MAXIMUM SPACING OF 6500 MM (USO) IN EACH ON DESIGN DRAWINGS.
DURING CONSTRUCTION. SHORING SHALL NOT BE REMOVED UNTIL SUPPORTED ELEMENTS HAVE
DEVELOPED DESIGN PROPERTIES REQUIRED TO SUPPORT ALL LOADS AND LIMIT DEFLECTIONS DIRECTION. LOCATE JOINTS SO THAT ALL COLUMNS OR R.C. WALLS OCCUR ON EDGES OF 3.2 ALL PRIMARY FIELD CONNECTIONS SHALL BE BOLTED USING (20mm) DIA. A325 HIGH
AND CRACKING AT TIME OF SHORING REMOVAL . PANELS UNLESS SHOWN OTHERWISE. PROVIDE EXPANSION JOINT IN SLAB ON GRADE STRENGTH BOLTS (UNO). BEARING TYPE WITH THREADS INCLUDED IN SHEAR PLANE WITH ONE
(1) HARDENED WASHER AND USING A MINIMUM OF TWO BOLTS UNLESS NOTED OTHERWISE.
MATCHING LOCATION OF EXPANSION JOINTS ON STRUCTURAL SLABS AND BEAMS ABOVE .
(II) SOIL DATA: 3.3 ALL WELDED CONNECTIONS SHALL CONFORM TO THE REQUIREMENTS OF AWS D1.1
5- CONSTRUCTION JOINTS IN FLOORS SHALL BE LOCATED WITHIN THE MIDDLE THIRD OF
SHIELDED METAL ARC AWS A5.1 E70XX WELD ELECTRODES, SUBMERGED ARC
SPANS OF SLABS , BEAMS , AND GIRDERS. JOINTS IN GIRDERS SHALL BE OFFSET AWS A5.7 F7X-EXXX WELD ELECTRODS, OR FLUX-CORED ARC A5.20 E7X-TX. LOW
1. APPROVED GRANULAR MATERIAL THAT WILL PRODUCE A DENSE, WELL COMPACTED
A MINIMUM DISTANCE OF TWO TIMES THE WIDTH OF INTERSECTING BEAMS. HYDROGEN ELECTRODES SHALL BE USED FOR ALL FIELD WELDS.
BACK FILL SHALL BE USED FOR BACK FILLING. THE FILL SHALL BE COMPACTED AT
OPTIMUM MOISTURE CONTENT TO 95% OF THE MAXIMUM DRY DENSITY AS DETERMINED LOCATE CONSTRUCTION / CONTRACTION JOINTS IN RETAINING WALLS AT MAXIMUM 3.5 MINIMUM SIZE OF FILLET WELD SHALL BE 6mm UNLESS NOTED OTHERWISE.
BY MODIFIED PROCTOR TEST (ASTM D-1557). SPACING OF 10 M. DO NOT PLACE VERTICAL CONSTRUCTION JOINTS IN SHEAR WALLS .
3.6 MINIMUM GUSSET PLATE THICKNESS SHALL BE 10mm UNLESS NOTED OTHERWISE. GUSSET
HORIZONTAL CONSTRUCTION JOINTS IN WALLS SHALL BE LOCATED ONLY AS INDICATED . PLATES AT BRACING CONNECTIONS SHALL BE CONNECTED TO BOTH ADJACENT BEAM AND
2. THE ROYAL COMMISSION WILL PROVIDE THE EPC CONTRACTOR WITH A SITE-SPECIFIC FACTUAL HORIZONTAL CONSTRUCTION JOINTS IN FOOTINGS , SLABS , JOISTS , BEAMS AND GIRDERS COLUMN MEMBERS. IF THIS IS NOT PRACTICAL. GUSSET PLATES SHALL BE PROPERLY
GEOTECHNICAL REPORT. THE EPC CONTRACTOR SHALL RETAIN CONSULTANTS NECESSARY TO ARE NOT PERMITTED EXCEPT AS SPECIFICALLY INDICATED ON STRUCTURAL DRAWINGS . DESIGNED FOR STRESSES DUE TO ECCENTRICITY.
PREPARE GEOTECHNICAL ENGINEERING, INCLUDING SUBSURFACE EXPLORATIONS, SAMPLING, 3.7 FRAMED BEAM CONNECTIONS NOT SUBJECT TO MOMENTS AND AXIAL FORCES. WHERE
6- SURFACE OF CONCRETE CONSTRUCTION JOINTS SHALL BE ROUGHENED, CLEANED AND
TESTING, ANALYSES, AND ENGINEERING AND TO GENERATE FINAL INTERPRETIVE GEOTECHNICAL VERTICAL REACTIONS OR SHEARS ARE NOT INDICATED ON DESIGN DRAWINGS. SHALL BE
LAINTANCE REMOVED.
INVESTIGATION REPORTS, SUBMITTED TO RC FOR REVIEW, COMMENT, AND APPROVAL. DETAILED IN ACCORDANCE WITH TABLE II AND TABLE III (CASE I) PART 4 OF THE AISC
THE EPC CONTRACTOR SHALL DESIGN THE CONCRETE BOX CULVERT BASED ON APPROVED 7- CONSTRUCTION JOINTS SHALL BE SO MADE AND LOCATED AS NOT TO IMPAIR THE MANUAL OF STEEL CONSTRUCTION. ALLOWABLE STRESS DESIGN. NINTH EDITION.
FINAL INTERPRETIVE GEOTECHNICAL INVESTIGATION REPORT. STRENGTH OF THE STRUCTURE.
3.8 WHERE BEAM AXIAL FORCES ONLY (NO VERTICAL REACTIONS/SHEAR INDICATED) ARE
This drawing and the design it covers are the property of the
3. SOIL AT EXCAVATION BASE SHALL BE COMPACTED TO AT LEAST 95% OF THE MAXIMUM 8- PROVIDE THICKENED SLAB ON GRADE UNDER ALL INTERIOR MASONRY PARTITIONS 150 MM SHOWN ON THE DRAWINGS. THE BEAM END CONNECTION SHALL BE DESIGNED FOR THE Royal Commission for Jubail and Yanbu, Royal Commission
DRY DENSITY AS DETERMINED BY MODIFIED PROCTOR TEST (ASTM D-1557). AND MORE IN THICKNESS. FOR LOCATION OF INTERIOR WALLS, SEE APPLICABLE ARCHITECTURAL AXIAL LOAD SHOWN AND 50% OF THE ALLOWABLE VERTICAL LOAD. BASED ON THE at Yanbu. These drawings are loaned on the borrower's
express agreement that they will not be reproduced, copied,
DRAWINGS BUT FOR DETAIL OF INTERIOR WALL FOOTING, SEE STRUCTURAL STANDARD DRAWINGS . ACTUAL SPAN. (AISC MANUAL NINTH EDITION). loaned, exhibited or used except in the limited way, if any,
permitted by written consent of the Royal Commission.

4- ALL FOOTINGS SHALL BE PLACED ON UNDISTURBED SOIL . IN CASE OF ANY DISCREPANCY 9- PROVIDE DEPRESSED SLAB ON GRADE AS INDICATED TO SUIT REQUIRED FLOOR FINISHES. SEE 3.9 CONNECTIONS SUBJECT TO MOMENTS. AXIAL FORCES AND SHEARS SHALL REQUIRE THE
FOLLOWING TO BE SHOWN IN THE CALCULATIONS, (I). VECTORIAL INDICATION OF MOMENTS
OR LOWERING OF FOOTINGS , THE ROYAL COMMISSION SHALL BE INFORMED IMMEDIATELY, ARCHITECTURAL DRAWINGS FOR DIMENSIONS OF DEPRESSED AREAS .
AND FORCES. (II). COMPUTATIONS SUBSTANTIATING THE NUMBER OF BOLTS, SIZES AND
AND THE CONTRACTOR SHALL REDESIGN COLUMNS AND SUBSTRUCTURES AND SUBMIT DESIGN 10- PROVIDE CONCRETE PADS, CURBS AND OTHER SUPPORTING CONCRETE FOR ARCHITECTURAL, LENGTH OF WELDS AND THICKNESS OF CONNECTING MATERIALS.
CALCULATIONS AND SHOP DRAWINGS TO THE ROYAL COMMISSION FOR REVIEW AND APPROVAL LANDSCAPING, MECHANICAL AND ELECTRICAL EQUIPMENT AND INSTALLATIONS AS REQUIRED .
3.10 FORCES INDICATED ON THE DESIGN DRAWINGS ARE NET FORCES AND FOR THE DESIGN
BEFORE CONSTRUCTION WITHOUT ANY EXTRA COST TO THE ROYAL COMMISSION . SEE ARCHITECTURAL, LANDSCAPING, CIVIL , MECHANICAL AND ELECTRICAL DRAWINGS FOR SIZE
OF CONNECTIONS. NO FURTHER REDUCTION IS ALLOWED. C MAY 2023 SC ISSUED FOR 100% DESIGN REVIEW
AND LOCATIONS OF PADS, CURBS AND OTHER NON-STRUCTURAL CONCRETE ELEMENTS. SEE
5- DO NOT EXCAVATE BELOW THE ELEVATION OF ANY COMPLETED FOOTING ANY CLOSER TYPICAL DETAILS ON STRUCTURAL DRAWINGS FOR REINFORCING AND 3.11 MEMBERS FORCES SHOWN ON EACH DESIGN DRAWING SHALL HAVE THE FOLLOWING MEANING. B MAR 2023 SC ISSUED FOR 90% DESIGN REVIEW

TO THE FOOTING THAN A SLOPE OF 2 HORIZONTAL (MEASURED FROM EDGE OF OTHER CONSTRUCTION DETAILS. PLUS (+) SIGN DESIGNATES AXIAL TENSION A OCT 2022 SC ISSUED FOR 60% REVISED DESIGN REVIEW

FOOTING TO NEAREST POINT IN EXCAVATION) TO 1 VERTICAL . MINUS (-) SIGN DESIGNATES AXIAL COMPRESSION NO. DATE BY DESCRIPTION APPROVED BY

11- IN ANY SECTION OF BUILDING GREATER THAN 50 M IN LENGTH BETWEEN EXPANSION JOINTS
6- NO FOUNDATION WORK SHALL BE PERFORMED UNTIL ALL FOUNDATION WORK IS OR EDGE OF BUILDING , PROVIDE CONSTRUCTION JOINTS FOR ALL ELEVATED BEAMS AND SLABS 3.12 CONNECTIONS AT END OF TENSION OR COMPRESSION BRACING MEMBERS SHALL
COORDINATED WITH ALL UNDERGROUND UTILITIES. ALL UTILITIES PLACED AFTER FOOTING CONSTRUCTION AT MAXIMUM SPACING OF 30 M IN THAT DIRECTION. CURE CONCRETE FOR DEVELOP THE STRENGTH REQUIRED TO RESIST FORCES INDICATED ON THE DESIGN
CONSTRUCTION SHALL BE IN ACCORDANCE WITH NOTE (3) ABOVE. UTILITIES PLACED MINIMUM 96 HOURS BEFORE PLACING CONCRETE IN ADJACENT PANELS AT CONSTRUCTION JOINTS. DRAWINGS. WHEN FORCES ARE NOT SHOWN. MINIMUM DESIGN AXIAL FORCE SHALL BE 65 KN.
Royal Commission for Jubail and Yanbu
BEFORE FOOTING CONSTRUCTION SHALL BE IN ACCORDANCE WITH NOTE (3) ABOVE IN ANY SECTION OF BUILDING EXCEEDING THIS LIMIT IN BOTH DIRECTIONS, PROVIDE CONSTRUCT- 3.13 COLUMN SPLICES SHALL BE DESIGNED FOR THE FORCES SHOWN ON THE DESIGN DRAWING.
Royal Commission at Yanbu
WITH HORIZONTAL DISTANCE MEASURED FROM EDGE OF FOOTING TO INVERT OF PIPE, ION JOINTS AT MAXIMUM 30 M SPACING IN BOTH DIRECTIONS, AND PLACE CONCRETE IN AN 3.14 SPLICES FOR TRUSS CHORDS SHALL BE DESIGNED TO DEVELOP THE LOADS INDICATED
FOR COLUMN FOOTINGS AND WALL FOOTINGS PARALLEL TO UTILITY . UTILITIES CROSSING ALTERNATING CHECK BOARD PATTERN WITH EACH INDIVIDUAL PANEL CURED MINIMUM 96 HOURS ON THE DESIGN DRAWINGS.
WALL FOOTINGS SHALL PASS OVER THE FOOTING EXCEPT AS SPECIFICALLY INDICATED BEFORE PLACING CONCRETE IN ADJACENT PANELS. EDGES OF BUILDING, FOR PURPOSES OF
OTHERWISE ON STRUCTURAL OR UTILITY DRAWINGS . UTILITIES MAY BE PLACED EITHER OVER 3.15 SECONDARY BOLTED CONNECTIONS SHALL BE BOLTED WITH (20mm) DIA. ASTM A307, DRAWING TITLE
DEFINING CONSTRUCTION JOINT SPACING, SHALL NOT INCLUDE EDGES OF OPENINGS COMPLETELY
OR UNDER GRADE BEAMS. NO UTILITIES SHALL PASS THROUGH WALL FOOTINGS AND COLUMN GRADE A BOLT. UNLESS NOTED OR OTHERWISE SPECIFIED ON THE DRAWINGS. WHERE
ENCLOSED WITHIN OVERALL BUILDING SECTION .
SECONDARY IS DEFINED AS CONNECTIONS FOR GIRTS, PURLINS, LADDERS AND HANDRAIL
FOOTINGS OR GRADE BEAMS UNLESS SPECIFICALLY INDICATED ON STRUCTURAL DRAWINGS.
12- CONTRACTOR SHALL SUBMIT SHOP DRAWINGS SHOWING PROPOSED CONSTRUCTION JOINTS POSTS. STAIR TREADS SHALL BE BOLTED USING (10mm) DIA. ASTM A307 GRADE A BOLTS.
ALL UTILITIES PASSING UNDER WALL FOOTINGS OR COLUMN FOOTINGS AND GRADE BEAMS
LAYOUT LENGTHS AND LOCATIONS OF SPLICES OF REINFORCEMENT WHEREVER
SHALL BE CONSTRUCTED BEFORE THE FOOTING OR GRADE BEAM . LOWER FOOTINGS AS 3.16 MEMBERS COMPOSED OF TWO ROLLED SHAPES SHALL BE CONNECTED TOGETHER BY STRUCTURAL GENERAL NOTES
REQUIRED FOR APPROVAL BY THE ROYAL COMMISSION BEFORE CONSTRUCTION. INTERMITTENT FILLERS IN ACCORDANCE WITH AISC MANUAL OF STEEL CONSTRUCTION
REQUIRED TO COORDINATE WITH UNDERGROUND UTILITIES AND IN ACCORDANCE
WITH NOTE (2) ABOVE . 13- ADDITIONAL BARS EQUAL TO 1/2 REINFORCING BARS AREA INTERRUPTED BY (9TH EDITION) REQUIREMENTS. SHAHMEER

OPENING SHALL BE PROVIDED AT EACH SIDE OF OPENING, AT EACH FACE OF R.C. M.ARIF ILYAS
4. BOTTOM OF COLUMNS SHALL BE FINISHED FOR FULL

SC Reply
WALLS, AND AT TOP AND BOTTOM OF SOLID SLABS, AND EXTEND EQUAL TO SPLICE BEARING UNLESS SHOWN OTHERWISE ON THE DESIGN DRAWINGS. AWAD
Engineer Dr. Tarek M.A. Shawaf
LENGTH (600 MIN.) BEYOND OPENING. MIN. 2-Ø16AT EACH FACE OR AT TOP AND BOTTOM AT
5. GROUTING OF BASES AND BEARING PLATES SHALL BE IN ACCORDANCE WITH RC CR (1010322156)
EACH SIDE SHALL BE USED (UNO). FOR OPENING LESS THAN 300 x 300 MM OFFSET

Done & Incorporated


SPECIFICATION 05120
DRAWING No.
REINFORCEMENT TO CLEAR OPENING, NO ADDITIONAL REINF. REQUIRED.
7564 - SE - A1 - 2001
- REV No.
SC Reply
Done & Incorporated

This drawing and the design it covers are the property of the
Royal Commission for Jubail and Yanbu, Royal Commission
at Yanbu. These drawings are loaned on the borrower's
express agreement that they will not be reproduced, copied,
loaned, exhibited or used except in the limited way, if any,
permitted by written consent of the Royal Commission.

B MAY 2023 SC ISSUED FOR 100% DESIGN REVIEW


A MAR 2023 SC ISSUED FOR 90% DESIGN REVIEW
NO. DATE BY DESCRIPTION APPROVED BY

Royal Commission for Jubail and Yanbu

Royal Commission at Yanbu

DRAWING TITLE

Engineer Dr. Tarek M.A. Shawaf


CR (1010322156)

DRAWING No.

REV No.
ARV-MH

SC Reply
Done & Incorporated

This drawing and the design it covers are the property of the
Royal Commission for Jubail and Yanbu, Royal Commission
at Yanbu. These drawings are loaned on the borrower's
express agreement that they will not be reproduced, copied,
loaned, exhibited or used except in the limited way, if any,
permitted by written consent of the Royal Commission.

G MAY 2023 SC ISSUED FOR 100% DESIGN REVIEW


F MAR 2023 SC ISSUED FOR 90% DESIGN REVIEW
E OCT 2022 SC ISSUED FOR 60% REVISED DESIGN REVIEW
D AUG 2022 SC ISSUED FOR 60% DESIGN REVIEW
C MAY 2022 SC ISSUED FOR 30% DESIGN REVIEW
B FEB 2022 SC ISSUED FOR CONCEPTUAL DESIGN 15% REVISED SUBMISSION
A DEC 2021 SC ISSUED FOR CONCEPTUAL DESIGN 15% SUBMISSION
NO. DATE BY DESCRIPTION APPROVED BY

Royal Commission for Jubail and Yanbu

Royal Commission at Yanbu

DRAWING TITLE

Engineer Dr. Tarek M.A. Shawaf


CR (1010322156)

DRAWING No.

REV No. G
CONTRACT No: PIC R-T-7564 : ‫عق ــد رقم‬
CONSTRUCTION OF POTABLE WATER TRANSMISSION MAIN AND SEWAGE FOR COMMUNITY AREA 1 AND 2 AT MYAS
(PACKAGE-B)
‫إ شاء الخطوط الرئ س ة الناقلة للم اه الصالحة لل ب و لل ف الص‬
( ‫ ب‬- ‫ مدينة ي بع الصناع ة ) الحزمة‬2 ‫ و‬1 ‫للمنطقة المجتمع ة‬
LIST OF DRAWINGS ( ‫) ق ـ ــائمة المخططات‬
S.NO. DRAWING NO. REV.
DRAWING TITLE
‫رقم مسلسل‬ ‫رقم اللوحة‬ ‫رقم التنقيح‬

STRUCTURAL DETAILS
74 SLOW DOWN CHAMBER STRUCTURAL DETAILS 7564 - SE - A1 - 2005 D
75 SANITARY LIFT STATION SW-25 STRUCTURAL DETAILS (SHEET 1 OF 3) 7564 - SE - A1 - 2006 C
76 SANITARY LIFT STATION SW-25 STRUCTURAL SECTION & DETAILS (SHEET 2 OF 3) 7564 - SE - A1 - 2007 C
77 SANITARY LIFT STATION SW-25 STRUCTURAL DETAILS (SHEET 3 OF 3) 7564 - SE - A1 - 2008 C
REINFORCEMENT DETAIL OF ELECTRICAL ROOM GROUND FLOOR AND ROOF
78 7564 - SE - A1 - 2009 B
PLAN
79 TYPICAL NON-BEARING CMU WALL DETAILS 7564 - SE - A1 - 2010 B
80 REINFORCEMENT PAD DETAILS OF O.C.U , U.G FUEL TANK , & GENERATOR BAY 7564 - SE - A1 - 2011 B
TYPICAL CONCRETE CORROSION PROTECTION DETAILS USING SHEET
81 MEMBRANE ENGINEERING DEPARTMENT TECHNICAL SUPPORT SERVICES RC - S - 13 F
STRUCTURAL ENGINEERING UNIT (SHEET 1 OF 2)
82 TYPICAL CONCRETE CORROSION PROTECTION DETAILS USING SHEET RC - S - 13
MEMBRANE ENGINEERING DEPARTMENT TECHNICAL SUPPORT SERVICES F
STRUCTURAL ENGINEERING UNIT (SHEET 2 OF 2)
UTILITIES COORDINATION SECTIONS
83 UTILITIES CORRIDOR CROSS SECTIONS 7564 - CE - A1 - 2090 G

May, 2023 LOD - 1 Contract No. PIC R-T-7564 (PACKAGE-B)


CONTRACT No: PIC R-T-7564 : ‫عق ــد رقم‬
CONSTRUCTION OF POTABLE WATER TRANSMISSION MAIN AND SEWAGE FOR COMMUNITY AREA 1 AND 2 AT MYAS
(PACKAGE-B)
‫إ شاء الخطوط الرئ س ة الناقلة للم اه الصالحة لل ب و لل ف الص‬
( ‫ ب‬- ‫ مدينة ي بع الصناع ة ) الحزمة‬2 ‫ و‬1 ‫للمنطقة المجتمع ة‬

May, 2023 LOD - 2 Contract No. PIC R-T-7564 (PACKAGE-B)


CONTRACT No: PIC R-T-7564 : ‫عق ــد رقم‬
CONSTRUCTION OF POTABLE WATER TRANSMISSION MAIN AND SEWAGE FOR COMMUNITY AREA 1 AND 2 AT MYAS
(PACKAGE-B)
‫إ شاء الخطوط الرئ س ة الناقلة للم اه الصالحة لل ب و لل ف الص‬
( ‫ ب‬- ‫ مدينة ي بع الصناع ة ) الحزمة‬2 ‫ و‬1 ‫للمنطقة المجتمع ة‬
LIST OF DRAWINGS ( ‫) ق ـ ــائمة المخططات‬
S.NO. DRAWING NO. REV.
DRAWING TITLE
‫رقم مسلسل‬ ‫رقم اللوحة‬ ‫رقم التنقيح‬

May, 2023 LOD - 3 Contract No. PIC R-T-7564 (PACKAGE-B)