You are on page 1of 1

ROAD PROGRESS IN-HOUSE (L&T) Date: Oct 24, 2023

S No Description Road Type Location Scope (M) Previous (M) Today (M) Cummulative (M) Remaining (M) Progress in %age REMARKS

1 Subgrade Preparation with Surface Miner Type D IHR - 03 3698.48 2700 2700 998.48 73.00% Machine is under Maintaince

2 Subgrade Preparation Type B PR - 01 3202.12 1550 3202.12 0 100.00%

3 Subgrade Preparation Type B PR - 02 111.0994 111.0994 0 100.00%

4 Subgrade Preparation Type B PR - 03 1896.821 1200 100 1300 596.821 68.54% BULLDOZER was broken

ROAD SURVEY PROGRESS IN-HOUSE (L&T) Date: Oct 24, 2023

S No Description Road Type Location Length (M)

1 Survey Progress Type D IVR - 21 1010.9881

2 Survey Progress Type D IVR - 26 1010.9845

EXCAVATED MATERIALS SHIFTING PROGRESS IN-HOUSE (L&T) Date: Oct 24, 2023

3 Today Quantity Cummulative Number of Dump


S No Description Road Type Location Previous Quantity M 3 3 Number of Trips
M Quantity M Trucks
Excavated Materials/Boulders/Loose Sand
1 Type B PR - 01 480 480 2 20
Shifting from both sides of the road

You might also like