3. REINFORCING STEEL BARS SHALL CONFORM TO SASO
STEEL POLE STEEL POLE SSA 2, HOT-ROLLED HIGH TENSILE DEFORMED STEEL
CONSENT
OVERHEAD POWERLINE OVERHEAD POWERLINE WITH MINIMUM YIELD STRENGTH OF 422 MPA (60 KSI).
TTEN
AS PER APCS-1B SAES-H-101V.
WRI
ANTI-CORROSSION COATING OF COALTAR EPOXY AS
100
100
PER 14-SAMSS-603. COATING SHALL BE APPLIED
300
300
FOR THE EMBEDED DEPTH PLUS 300MM ABOVE THE
THE
TOP OF CONCRETE.
TOC TOC
100
100
7. MARL PAD FOR SABKHA/POOR SOIL SHALL BE
THOUT
COMPACTED COMPACTED
CONSTRUCTED BEFORE INSTALLATION OF POLE
MARL PAD MARL PAD
200
200
FOUNDATION. COMPACTION OF THE MARL PAD SHALL
WI
BE AS PER SAES-A-114.
FGL FGL
3 8. NUT SHALL BE COVERED DURING COATING WORK.
200
NG
1 3
DRAWI
9. OVER EXCAVATION SHALL BE BACKFILLED WITH
600
NGL 1
SELECT FILL AND COMPACTED AS PER SAES-A-114.
S
20-MK-1601 VERTICAL BARS
THI
C/C
C/C
ANTI CORROSION COATING 20-MK-1601 VERTICAL BARS
FROM
2100
2100
@ 250
@ 250
(SEE NOTE 7)
75 MIN. SIDE 75 MIN. SIDE
ANTI CORROSION COATING
CLEAR COVER CLEAR COVER
B
B
(SEE NOTE 7)
(TYP.) (TYP.)
NED
ES
ES
DRILLED HOLE FILLED WITH
DRILLED HOLE FILLED WITH
MK-1001 TI
MK-1001 TI
CONCRETE
OBTAI
CONCRETE
A
A
A A A
BE
A
PART,SHALL
CJ CJ SPLIT BARREL OR
STRAIGHT SIDED
BOTTOM POLE
STEEL DRUM, TAMPED
BASE PLATE
BOTTOM POLE DOWN AS HOLE IS DUG
C
CAST-IN-PLACE REFERENCE DRAWINGS
CONCRETE
DWG. CONTROL FOR J.O.
N
I
CAST-IN-PLACE
CONCRETE WELD
FULL,OR
COVER
COVER
N.
N.
D D
BOTTOM
BOTTOM
MI
MI
N
I
100
100
ON
REPRODUCTI
STEEL POLE FOUNDATION STEEL POLE FOUNDATION DETAIL-1
LEGEND:
IN NORMAL SOIL SABKHA/POOR SOIL
TOC - TOP OF CONCRETE
CJ - CONSTRUCTION JOINT
SAUDIARAMCO.NO
FGL - FINISHED GROUND LEVEL
FDN - FOUNDATION
- MARL PAD
OF
75mm CLEAR COVER
PROPERTY
(TYPICAL) MK-1601 D
HDG. STEEL POLE
VERTICAL BARS
POLE
FOUNDATION
MK-1001 TIES
2A+D)
SOLE
C
L
150
=
(
BLACK STRIPE
THE
150
YELLOW STRIPE
ARE
150
BLACK STRIPE
N
HEREI
150
YELLOW STRIPE
1200
D
NED
SCALE:
CONTAI
300
REVISION VALIDATION
ON
765200-0915-001
NFORMATI
100
DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
(DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)
200
09/01/15 09/01/15 09/01/15 09/01/15
I
NORMAL SOIL SABKHA/POOR SOIL 00 09/01/15 NEW STANDARD FOR STEEL POLE
FGL
LENGTH OF POLE
THE
JOB ORDER/EWO NO.
THIS REVISION IS NOT TO BE USED FOR
METER (FEET) DEPTH (A) DEPTH (B) DEPTH (C) DIA (D) CONC. QTY. DEPTH (A) DEPTH (B) DEPTH (C) DIA (D) CONC. QTY.
3 3
765200 CONSTRUCTION UNTIL CERTIFIED AND DATED
(mm) (mm) (mm) (mm) (m ) (mm) (mm) (mm) (mm) (m )
SAUDI ARABIAN OIL COMPANY
AND
15.240 (50) 2500 2900 400 900 1.40 2800 3200 700 1000 2.04
DRAWING TYPE
NG
16.764 (55) 2500 2900 400 1000 1.56 3000 3400 900 1000 1.95
WARNING SIGN 13.8KV - 34.5KV OVERHEAD POWERLINES
DRAWI
18.288 (60) 2600 3000 500 1100 1.91 3000 3400 900 1100 2.29
STANDARD DRAWING
21.336 (70) 3000 3400 900 1100 2.28 3200 3600 1100 1100 2.47 STD. DWG. SAUDI ARABIA
S
PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.
THI
990 P AA-036142 015 00
Saudi Aramco 2615 ENG. (05/05)