I. CURRENT METERING
Ratio CT Phase = 5000 : 1 A Source : 50BF
Secondary Measured
Expected
Metering test Injected Accuracy (%) Remarks
Current (Amp)
Current(A) Current(A) Phase A Phase B Phase C
0.25 1250 1251 1231 1235 0.88% Ok
0.5 2500 2510 2490 2468 0.43% Ok
Phase Current
0.75 3750 3750 3678 3749 0.65% Ok
1 5000 5098 4988 4987 0.49% Ok
#REF!
#REF!
711556077.xlsx/PTOC Page 3 of 8
Jalan Arjuna Utara No.50 Jakarta Barat 11510
Jakarta Indonesia
Telp.(021) 5655010-5655020
Fax. (021) 5654630-5655030
Website : GAE.co.id
#REF!
#REF!
10
Trip time (second)
0.1
100% 1000%
I fault
Inject Current
Target (s) Actual (s) Error (%)
(A)
2 0.2 0.229 0.145
3 0.2 0.232 0.16
Inject Current
Target (s) Actual (s) Error (%)
(A)
2 0.5 0.51 0.0200
3 0.5 0.510 0.0200
INTERTRIP 275kV
711556077.xlsx/51P Page 6 of 8
Customer : PT. BDSN
Inject Current
Target (s) Actual (s) Error (%)
(A)
7.8 0.1 0.126 0.2600
8.0 0.1 0.127 0.2700
INTERTRIP 275kV
Inject Current
Target (s) Actual (s) Error (%)
(A)
2 0.2 0.229 0.145
3 0.2 0.224 0.120
711556077.xlsx/51P_2 Page 7 of 8
Customer : PT. BDSN
Inject Current
Target (s) Actual (s) Error (%)
(A)
2 2 2.028 0.014
3 2 2.04 0.020
711556077.xlsx/51N Page 8 of 8