You are on page 1of 6

STARASHIYANA CONSTRUCTION PVT LTD

TARGET WORK IN 10 DAYS


SITE:-LAPP INDIA ,PILLUKHEDI;RAJGHARH(M.P.) DATE:-02/12/2023
SR.NO. WORK LOCATION NO OF FOOTING WORKDONE COMPLETION DATE REMARKS

(X2'-X3/Y2-
1 EXCAVATION 3 61.5 M3
Y3)
02-12-2023 TO
(X2'-X3/Y4- 11/12/2023
EXCAVATION 5 88.5M3
Y6)
EXCAVATION (X1/Y5-Y6) 2 48M3
2 PCC (X1/Y5-Y6) 2 1.536M3 12/5/2023 a
(X2'-X3/Y4-
PCC 5 2.625M 12/7/2023
Y6)
(X2'-X3/Y2-
PCC 3 1.89M3 12/11/2023
Y3)

FOOTING AND (X1-X4/


3 COLUMN Y1)&(X4/ 4 27.75M2 12/2/2023
LAYOUT Y2)

FOOTING AND
COLUMN (X1/Y2-Y4) 3 27M2 12/3/2023
LAYOUT

STEEL WORK
OF
4 (X4/Y1-Y2) 2 450KG 12/6/2023
FOOTING&CO
LUMN

STEEL WORK
OF
(X1-X2'/Y1) 2 400KG 12/8/2023
FOOTING&COL
UMN
FOOTING
5 (X4/Y1-Y2) 2 18.3M2 12/8/2023
SHUTTERING
FOOTING
(X1-X2'/Y1) 2 15M2 12/9/2023
SHUTTERING
FOOTING
6 (X4/Y1-Y2) 2 12.78M3 12/10/2023
CASTING
FOOTING
(X1-X2'/Y1) 2 9.375M3 12/11/2023
CASTING

You might also like