GONDOLA DETAILS

POINTS OF CHECKING

Boom extended from front COUNTER


SL. NO. RSP NO. LOCATION
leg(MTR) WEIGHT(Kg) TPIDATE Valid Upto SWL(Kg)As per TPI
6th Floor to 43rd
1 1 floor(Open Terrace) 1.4 1200 27/12/2023 26/06/2024 600

LMR Top to Ground Square MS Box


2 10 Floor(Shaft) channel(Approved Design) NA 3/1/2024 2/7/2024 400

Ground to 39th Floor 1.4 1200 3/1/2024 2/7/2024 400

1200 12/12/2023 11/6/2024 400


4 4 Ground to 28th Floor 1.2
43rd Floor to Ground Square MS Box
NA 24/11/2023 23/05/2024 300
5 9 Floor channel(Approved Design)
Ground floor to 43rd
1200 27/12/2023 26/06/2024 400
floor west side 1
6 6
LMR Top to Ground 400
1 1200 27/12/2023 26/06/2024
7 7 Floor