: (Project
No.Project:
Project To
MONTHLY
CC: 5. 4. 3. 2. 1.
14. 13. 12. 11. 10. 9. 8 7. 6.
GHSEM 5.4 5.3 5.2
Total Total#Tool-boxX
meeting
Total Total
Restricted Total Total Total 5.2.2 5.2.1 Fatality5.1 (LTITotal Total Total b) a)
Total Total Total
PermanentPermanent Lost =Fatality
Near-miss (NM) b) a)
SAFETY / Lost No. First-Aid
Medical
#
# # Man-hours Reportable
Lost
TrainingWeeklyWeekly Occupational Work of Total SiteOffice PROJECT
Workday
DEPT. Workday Workday
Work Lost employee-
S Injury +DangerousTreatment Caseemployee- 023/KOL/88
EAST
Safety Sfety Partial Total LWDC
given worked Case Incident Case Time
FILE I EAST 88
(LWD) (LWD) Disabilityllness Case (FAC)
MAJUMDER
RANAJIT
MR.
meeting
meeting
(External (RWC) Disability (LWDC)
+
Injury SAFETY
PTD Occurrence Case Daily
(Workforce) (ACC (RI) -
Daily
(due (due Case +
(LTI) average
case (MTC)
(Staff
+ (Trade
&S/Cs) case = PPD) average
Internal) to to 5.2.1
RI) LTI) (PPD) (PTD) (DO) REPORT
Foremen) 5.2.2
+
(LONG
10440 Nil NiI Nil Nil Nil
ACC
Nil Nil Nil Nil Nil Nil Nil Nil Nil 31 05
03 00 00 Nil
Nil
Date:
VERSION)
Contractor Month: Report
No.: No.: Date:
Serial
HSE 36830 (Will
08 00 00 52 Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil 01 Nil Nil 04 127 Nil Sub continue
04/11/2023Manager (Will CONSTRUCTINCO
ARAGAN
OCTOBER-2023ternminate to
accumulate
Persons 48
22 04.11.2023
Other
/ Nil Nii Nil Nil Nil Nil Nil Nil Nil Nil Nil Ni every
Safety
In-charge
Ni
December)
from
project
ACC
47270 2023 | incep
Nil Nil Nil Total
11 00 00 52
Nil Nil Nil Nil Nil Nil Nil Nil 01 Nil Nil 04 188 05 tion)
MONTHLY SAFETY PERFORMANCE MEASUREMENT REPORT
ACC
ARABIAN CONSTRUCTION CO
2.0 SUBCON. 36830 2393772 36830 2393772 127 04 123 Ni N Ni Ni 01 15 Nil Nil Nil Nil 0.0
Nil Nil Nil 0.00
1
TOTAL
47270
3047612
47270
3047612 163 04 123 Nil Nil Nil Nil 01 Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil
Project: 88 EAST For the Month of: OCTOBER2023 Date Updated: 04/11/2023
Lost
Sr. Date of Workdays Lost Split Days Fridays & Effective Date of
Emp. No. Name Trade Workdays
No. Incident From To Month wise Holidays Lost Days Rejoining
Category
NIL
9. Cut, puncture or 10.Exposure 12. Pressure 14. Other HSE Manager / Safety In-charge
8. Caught in, under or 11. Falls from height 13. Struck by
electrical release
between scrape
Project: 88 EAST For the Month of: OCTOBER2023 Date Updated: 04/11/2023
NIL
Project: 88 EAST
For the Month of: OCTOBER'2023 Date Updated: 04/14/2023
Sr No Date of Report Name of Reporting Name of Mgr / Supervisor HSE Personnel to whom
Employee to whom DO. Reported DO. Reported Description of Dangerous Occurrence Precise Locatíon Remarks
1
NIL
5
10
Sr
No File No. Name Work Locations Designation Mobile No Remarks
10
20 MALE NURSE
1
3 NIL
30TAlDER
1 01 Anindya Sarkar 88 EAST FIRST AIDER 9330382 165
2
9.
1C
11
13
14
15
16
17
18
19
AEENEASSIsTANT
1
10
11
NIL
12
13.
14
13
16
17
18
19.
20
GA EEPER
10
60RIGGER
1 01 Majijul Alam THE 88 EAST Rigger
2
6.0 SAFETASSIST
10
NIL
11
12
13
14
15
16
17
18
19
20
QUANTITY
Item TOTAL
ACC HIRED
Project: 88 EAST
Mr. Anindya Sarkar
Project Maie Nurse / First Aider: OCTOBER'23
Month /Year:
ARABIAb
ACC
SIKUCllONCO
First Aid Treatment Register
register nlay be ept electronicaly n Ical
This form should be used by Male Nurse to record treatment provided. The
shared folder or kept in a hard copy file by the Maie Nurse
rade (salectf m be
Dlaonosreatment
SC Name of Patient Name
Date: YN SC st Proidec
(ACO
When the
\r first iven
Worker was
him lce-Pck &
doing stel
06/10 M/S Svam Biswas Trst- \i
Pain Relie ol slhitting
SKILLED
2023 \CCPL Ment thronugh work thal
bandage. time he yt
ut iny ln
his right
lhand index
finger by
sted.
IWhen the
worker was
\r first given
him First- \id coing
às per his nevd scatfolding
Sahirl \lomim work that
\W/S Sanaul Skilled
Iirst- \i by batadite
023 time he got
lotion & oil
Cut injury in
Menr though his left leg
bandage ankle.
IWhen the
Artirst given worker was
him First-\id
in his
as per his necd hutment that
U'ijwal Banu Un-Skilled
\/S Rishi birst- jd bybatadine
2023 ConsructiO1 loion & oil tinne fillng
very hot and
AMent through he was trying
bandage. to righr.
Iis tan
suddenlvgo
thogh bs
Iwo fingr
inside rhe
tn then lhe
Ot indeN
tnger &
\iddle
Inger
S File # O
No. Name Trade Signature
1
AS ATTACHED
7
10
11
12
13
14
15
Remarks:
c7siondaie: SOP
Dus ppruter (irup S: ce
ACC
MEDICAL TREATMENT CASES
ACC
ARABIANCONSTRUCTION CO
Month: OCTOBER2023
Project 88 EAST
Project No. 023/KOL/88 EAST
Location Kolkata
Safety In-charge ASIF IQBAL
NIL
A MALE NURSE
CC: CM/FILE
Malot
SN EAST Rotoolo#
ile #.
AS ATTACHED
Rmark