You are on page 1of 16

Manager):

: (Project
No.Project:
Project To
MONTHLY
CC: 5. 4. 3. 2. 1.
14. 13. 12. 11. 10. 9. 8 7. 6.
GHSEM 5.4 5.3 5.2
Total Total#Tool-boxX
meeting
Total Total
Restricted Total Total Total 5.2.2 5.2.1 Fatality5.1 (LTITotal Total Total b) a)
Total Total Total
PermanentPermanent Lost =Fatality
Near-miss (NM) b) a)
SAFETY / Lost No. First-Aid
Medical
#
# # Man-hours Reportable
Lost
TrainingWeeklyWeekly Occupational Work of Total SiteOffice PROJECT
Workday
DEPT. Workday Workday
Work Lost employee-
S Injury +DangerousTreatment Caseemployee- 023/KOL/88
EAST
Safety Sfety Partial Total LWDC
given worked Case Incident Case Time
FILE I EAST 88
(LWD) (LWD) Disabilityllness Case (FAC)
MAJUMDER
RANAJIT
MR.
meeting
meeting
(External (RWC) Disability (LWDC)
+
Injury SAFETY
PTD Occurrence Case Daily
(Workforce) (ACC (RI) -
Daily
(due (due Case +
(LTI) average
case (MTC)
(Staff
+ (Trade
&S/Cs) case = PPD) average
Internal) to to 5.2.1
RI) LTI) (PPD) (PTD) (DO) REPORT
Foremen) 5.2.2
+

(LONG
10440 Nil NiI Nil Nil Nil
ACC
Nil Nil Nil Nil Nil Nil Nil Nil Nil 31 05
03 00 00 Nil
Nil

Date:
VERSION)
Contractor Month: Report
No.: No.: Date:
Serial
HSE 36830 (Will
08 00 00 52 Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil 01 Nil Nil 04 127 Nil Sub continue
04/11/2023Manager (Will CONSTRUCTINCO
ARAGAN
OCTOBER-2023ternminate to
accumulate
Persons 48
22 04.11.2023
Other
/ Nil Nii Nil Nil Nil Nil Nil Nil Nil Nil Nil Ni every
Safety

In-charge
Ni
December)
from
project
ACC
47270 2023 | incep
Nil Nil Nil Total
11 00 00 52
Nil Nil Nil Nil Nil Nil Nil Nil 01 Nil Nil 04 188 05 tion)
MONTHLY SAFETY PERFORMANCE MEASUREMENT REPORT
ACC
ARABIAN CONSTRUCTION CO

To. (Project Manager) MR. RANAJIT MAJUMDER


Project 88EAST Lost Time Injury Frequency Rate Calculation =1.000,000 x No. cf LT
Man- hours Worked

Month OCTOBER-2023 Note: A.P. = Accounting Period, accounted for 28 days


But all practical purposes we will consider APas a 30 davs Month.

cUMULATIVE MAN HOURS NO. OF NO. OF FIRST NO. OF


CUMULATIVE MAN NO, OF MEDCAL RESTRICTED NO. OF LOST TOTAL LOST LOST THE
SR (Since Commencement) HOURS Wthout LTI) EMPLOYE AID CASES REPORTABLE DANGEROUS NO. OF NEAR
TREATHENT WORK CASES TIHE N RN WORKDAYS INJURY
NO CATEGORY E OccURRENCE HISS (NH)
(FAC) INCIDENTS (RI) CASES (MTC) (RWC) CASESLTI) LWD oue to FREQUENCY
(DO) RATE (LTF
AP CUM AF CUM AP AP CUM AF CUH AF CUM AP CUM AP CUM AP CUM cUM AF cUH AP CUM
1.0 ACC 10440 653840 10440 653840 36 Ni Ni Nil Ni Ni Nil Nil Nil Nil 0.0
Nil Ni Nil Nil Nil Nil 0.00

2.0 SUBCON. 36830 2393772 36830 2393772 127 04 123 Ni N Ni Ni 01 15 Nil Nil Nil Nil 0.0
Nil Nil Nil 0.00
1

TOTAL
47270
3047612
47270
3047612 163 04 123 Nil Nil Nil Nil 01 Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil

CC: GHSEM / SAFETY DEPT. /FILE

7ONTsLY PROJECT SAFETY REPORT- ANach1ent No 1


41 /R5 IersioR date.
Paaf l6
AACC
ARABIAN CONSTRUCTION CO.
REPORTABLE INCIDENT DETALS

Project: 88 EAST For the Month of: OCTOBER2023 Date Updated: 04/11/2023

Lost
Sr. Date of Workdays Lost Split Days Fridays & Effective Date of
Emp. No. Name Trade Workdays
No. Incident From To Month wise Holidays Lost Days Rejoining
Category

NIL

Lost Workdays Category:


5. Overexertion, 6. Slips and trips 7. Exposure noise, chemical,
3. Explosion or Water related,
1. Assault or violent act 2. Confined Space burns drowning strain (at same height) biological, vibration

9. Cut, puncture or 10.Exposure 12. Pressure 14. Other HSE Manager / Safety In-charge
8. Caught in, under or 11. Falls from height 13. Struck by
electrical release
between scrape

CC: GHSEM /SAFETY DEPT. / FlL

IMON THLY PRO JECT SAFETY REPORT AtlechIent No. 3 SES-SOP17


SOP
IeNten date:
(iroup IHSE Gice Rev ne.
De approver
dostNnt t iveisieed All othvrwsioIs are aReontrolld
Th controlled vCrston of ths
LOST IME INJURY DETAlLS
AACC
ARABIAN CONSTRUCTION CO.

Project: 88 EAST For the Month of: OCTOBER2023 Date Updated: 04/11/2023

Workdays Lost Lost


Sr Date of Split Days Fridays & Effective Date of
Emp. No. Name Trade
Month wise Lost Days Workdays
No. Injury From To Holidays Rejoining Category

NIL

Lost Workdays Category:


3. Explosion or 4. Water related, 5 Overexertion, 6. Slips and trips 7 Exposure noise, chemical,
1 Assaut or vioient act 2. Confined Space burns drowning strain (at same height) biological, vibration

10.Exposure 12. Pressure HSE Manager / Safety In-charge


9. Cut, puncture or
8. Caught in, under or
between scrape eiectrical
11. Falls from height release
13. Struck by
|114.4. Other

CC GHSEM/ SAFETY DEPT/FILE

AiONhil PJECTSAFET'y REFORY 4ttachnent No. 2


SOP SESSOP-17
2) F24
DANGEROUS OCCURENCE REGISTER
AACC
ARABIAN CONSTRUCTION CO.

Project: 88 EAST
For the Month of: OCTOBER'2023 Date Updated: 04/14/2023

Sr No Date of Report Name of Reporting Name of Mgr / Supervisor HSE Personnel to whom
Employee to whom DO. Reported DO. Reported Description of Dangerous Occurrence Precise Locatíon Remarks
1

NIL
5

10

CC GHSEM / SAFETY DEPT/FILE

HSE Manager / Safety In-charge

MON TLVPROJECT SAFETY REPORT -- Attachment o5


ersin date: 20 2{)23 SOP SES-SO-17
Duc appraver:
AR MISS REGISTER A
ACC
ARABIÂN CONSTRUCTION CO

Name of Reporting Name of Mgr.


Sr No Date of Report Supervisor to whom HSE Personnel to whom
Employee Near-miSs Reported Description of Near miss Precise Location Remarks
Near-miss Repoted
One worker was working grinding work
for external surface above 7th floor
1 16/10/2023 Mithun Bhuniya Mr. Suvam west side chajja, from there a 20 L Tower 7th floor
Mr. Amitava Roy west side chajja
Pattanayak empty water bottle was slip from his
hand on the ground floor.

CC GHSEM / SAFETY DEPT/FILE


HSE Manager / Safety In-charge

AON THLY PROJECTSAFETY REPORT -- Áriachiment No. 4


Tersion date 20 To 2023 SOP SES-SOP-17
Rev no.
vONTHLY SITE STATUS INFORMATION
ACC
For the Month
Project: 88 EAST of: OCTOBER, 2023 Date Updated 04/11/2023

Sr
No File No. Name Work Locations Designation Mobile No Remarks

|0HSE SAFETY ENGINEER, SAFETY OFFICER, JR SAFETY OFFICERA SA NGPEC


01 Asif lgbal 88 EAST Safety Officer 8777579807

3 Suvam Pattanayak 88 EAST Safety Officer 9547693746

10

20 MALE NURSE
1

3 NIL
30TAlDER
1 01 Anindya Sarkar 88 EAST FIRST AIDER 9330382 165
2

9.

1C

11

13

14

15

16

17

18

19

MONTHLY PRJECT SAFETY REPOR


I- SMS
ACO
wONTHLYeiebeN

Sr. Work Locations Mobile No Remaks


No
File No. Name Designation

AEENEASSIsTANT
1

10

11
NIL
12

13.

14

13

16

17

18

19.
20

GA EEPER

One (2) Security at Day and onc (2)


Security at Night have been hired from
5 the Agency.
6

10

60RIGGER
1 01 Majijul Alam THE 88 EAST Rigger
2

02 Tanmoy Das THE 88 EAST Rigger


4

4ONTHLY PROJECT SAFETY REPORT- Attachment No. 6


-Sis-4iRS
ACC
MCNTHLYSITE STATUS INFORMATION
Sr Designation Mobile No. Remarks
File No. Name Work Locations
No.

6.0 SAFETASSIST

10

NIL
11

12

13

14

15

16

17

18

19

20

QUANTITY
Item TOTAL
ACC HIRED

Tower Crane 01 NIL 01

Tower Crane Operator 02 NIL 02


2 Mobile Crane NIL NIL NIL
Mobile Crane Operator NIL NIL
3 Cradles 02 09 11
4 Hoist 01 01 02
5 Shovels NIL NIL NIL
6 Forklfts NIL NIL NIL
7 JCB NIL 00 00

HSE Manager / Safety in-charge

CC: GHSEM / SAFETY DEPT. /FILE

4ONTHLY PROJECT SAFETY REPORT- A trachnment No 6


ACC
ARABIAN CONSTRUCTION CO

FIRST AID TREATMENT REGISTER

Project: 88 EAST
Mr. Anindya Sarkar
Project Maie Nurse / First Aider: OCTOBER'23
Month /Year:

ARABIAb
ACC
SIKUCllONCO
First Aid Treatment Register
register nlay be ept electronicaly n Ical
This form should be used by Male Nurse to record treatment provided. The
shared folder or kept in a hard copy file by the Maie Nurse
rade (salectf m be
Dlaonosreatment
SC Name of Patient Name
Date: YN SC st Proidec
(ACO
When the
\r first iven
Worker was
him lce-Pck &
doing stel
06/10 M/S Svam Biswas Trst- \i
Pain Relie ol slhitting
SKILLED
2023 \CCPL Ment thronugh work thal
bandage. time he yt
ut iny ln

MONTHLY PROJECI S4FEIY RERORY


ACC
ARABIAN CONSTRUCTIONCO.
RST AID TREATMENT REGISTER

his right
lhand index
finger by
sted.

IWhen the
worker was
\r first given
him First- \id coing
às per his nevd scatfolding
Sahirl \lomim work that
\W/S Sanaul Skilled
Iirst- \i by batadite
023 time he got
lotion & oil
Cut injury in
Menr though his left leg
bandage ankle.

IWhen the
Artirst given worker was
him First-\id
in his
as per his necd hutment that
U'ijwal Banu Un-Skilled
\/S Rishi birst- jd bybatadine
2023 ConsructiO1 loion & oil tinne fillng
very hot and
AMent through he was trying
bandage. to righr.

4ONTHLY PROJECI SAFETY REPORT Artacimeni N. 7


ACC
ARABIAN CONSTRUCTION CO
FIRST AID TREATMENT REGISTER

Iis tan
suddenlvgo
thogh bs
Iwo fingr
inside rhe
tn then lhe
Ot indeN
tnger &
\iddle
Inger

\tirst Iven donmy shtt


huu st \id
bacad
as per his need Work thu
23/ 10/ Isul Gazi Skilled Fst \il by batadine
202.3 Nurjaan
IDhli lotion& oil
Ment through
bandage thunb.

/ONIHL Y PROJECT SAFETY REPORT Attachient No 7

Doc 41/RS lorsion date


Dae approe
NGNON
ACC
MR. RANAJIT MAJUMDER (0411

118} Tooibox Mooig Materals Reteence


Pleuse ill inteierence nnber (s in SES-SOP-04) in highlighted space’
FMSES204

TOPCS OF THE MEETING

S File # O
No. Name Trade Signature
1

AS ATTACHED
7

10

11

12

13

14

15
Remarks:

Name; Safeiy Officer / inspector


or Foreman in-charge Signature
CC CM /HSEM/FiLE

AONTHLY PROJECI SAFETY REPORT Altechrnent No. 8

c7siondaie: SOP
Dus ppruter (irup S: ce
ACC
MEDICAL TREATMENT CASES
ACC
ARABIANCONSTRUCTION CO

To (Project Manager). MR. Ranajit Majumder Date 04/11/2023


Serial No 48
(Wttcontnue to cauMulale fron pryetpto)

Month: OCTOBER2023
Project 88 EAST
Project No. 023/KOL/88 EAST
Location Kolkata
Safety In-charge ASIF IQBAL

Sr. Nature of Cause of


File No. Name Trade Location
No. Injury Injury

NIL

A MALE NURSE
CC: CM/FILE

t4ONTHLY PROJFCT SAFETY REPORT Aluachn)ent No 10


ACC
MR RANAJI MAJUMDER Dato 04/1|/2023

Malot
SN EAST Rotoolo#

ile #.

AS ATTACHED

Rmark

Name & Signatut


ALIYL NGINER/OLICR

MON)HLY PROJEC SALEI} REPOR1

You might also like