You are on page 1of 1

40 50

ETIHAD RAIL STAGE 2 & 3 PROJECT C0304 - PACKAGE 2B


CONCRETE TESTING LOG
Location Initial Crushed Readings 57
Design Stamped Result Avg.(7 Stamped Result Cube Strenght Standard
Sr. No. ITR Ref. No. Company Casting date Conc. Strength Source of Concrete Conc. Qty. M³ 7 days crushing No. of Cubes Report # Report 7 Days Cube Ref. # Result(7 Days) 28 days crushing date Report # Report 28 Days Cube Ref. # Result Avg. Difference(Design 15% Criteria Deviation Cl & SO3 Cube Cl % by SO3 % by Status
24 hrs 48 hrs 36 hrs 72 hrs date (N/mm²)
Days)
(N/mm²) RCP Cube Ref. Water Absorption cube Ref. Water Penetration Cube Ref. ISAT Cube Ref. CMC Cube Ref. Remarks
Structure Type/Description Grade Mpa Available (N/mm²) Available (N/mm²) vs actual) RCP ≤1000 Coulombs Water Absorption 28 Water Penetration @28 ISAT @ 28 Days Max 0.2 ml/m²/s Migration Coefficient @ 28 Ref. weight weight
Max @28 Day Days Max 2.0% Days Max 10mm Days m²/s X 10 -12
N/mm2
1.0 ITR-C0304-DMA-GQC-IR-59001-00 Girder Beams 8-Mar-2021 60 60 UPC DIP FACTORY 28.80 64.10 1 ARC21019879 1 2 3 61.5 62.5 60.5 61.50
2.0 ITR-C0304-DMA-GQC-IR-59001-00 Solid Slabs 8-Mar-2021 60F 60 UPC DIP FACTORY 1.10 60.80 1
3.0 ITR-C0304-DMA-GQC-IR-59004-00 Girder Beams 9-Mar-2021 60 60 UPC DIP FACTORY 28.70 43.00 64.40 1 ARC21019877 1 2 3 59.5 61.5 60 60.33
4.0 ITR-C0304-DMA-GQC-IR-59004-00 Solid Slabs 9-Mar-2021 60F 60 UPC DIP FACTORY 3.40 62.30 1
5.0 ITR-C0304-DMA-GQC-IR-59006-00 Solid Slabs 10-Mar-2021 60F 60 UPC DIP FACTORY 2.40 62.50 1
6.0 ITR-C0304-DMA-GQC-IR-59009-00 Solid Slabs 11-Mar-2021 60F 60 UPC DIP FACTORY 2.20 59.60 1
7.0 ITR-C0304-DMA-GQC-IR-59009-00 Girder Beams 12-Mar-2021 60 60 UPC DIP FACTORY 28.80 61.80 1
8.0 ITR-C0304-DMA-GQC-IR-59012-00 Girder Beams 13-Mar-2021 60 60 UPC DIP FACTORY 28.50 44.70 60.50 1
9.0 ITR-C0304-DMA-GQC-IR-59012-00 Solid Slabs 13-Mar-2021 60F 60 UPC DIP FACTORY 2.20 60.70 1
10.0 ITR-C0304-DMA-GQC-IR-59014-00 Solid Slabs 14-Mar-2021 60F 60 UPC DIP FACTORY 2.20 60.00 1
11.0 ITR-C0304-DMA-GQC-IR-59016-00 Solid Slabs 15-Mar-2021 60F 60 UPC DIP FACTORY 2.20 61.20 1
12.0 ITR-C0304-DMA-GQC-IR-59019-00 Girder Beams 16-Mar-2021 60 60 UPC DIP FACTORY 57.70 31.20 37.70 50.70 56.40 61.70 1
13.0 ITR-C0304-DMA-GQC-IR-59019-00 Solid Slabs 16-Mar-2021 60F 60 UPC DIP FACTORY 2.20 60.40 1
14.0 ITR-C0304-DMA-GQC-IR-59021-00 Solid Slabs 17-Mar-2021 60F 60 UPC DIP FACTORY 2.20 59.80 1
15.0 ITR-C0304-DMA-GQC-IR-59024-00 Solid Slabs 18-Mar-2021 60F 60 UPC DIP FACTORY 2.20 59.80 1
16.0 ITR-C0304-DMA-GQC-IR-59026-00 Solid Slabs 20-Mar-2021 60F 60 UPC DIP FACTORY 2.20 59.60 1
17.0 ITR-C0304-DMA-GQC-IR-59030-00 Solid Slabs 21-Mar-2021 60F 60 UPC DIP FACTORY 2.20 63.60 1
18.0 ITR-C0304-DMA-GQC-IR-59032-00 Solid Slabs 22-Mar-2021 60F 60 UPC DIP FACTORY 2.10 63.90 1
19.0 ITR-C0304-DMA-GQC-IR-59034-00 Solid Slabs 23-Mar-2021 60F 60 UPC DIP FACTORY 2.20 59.60 1
20.0 ITR-C0304-DMA-GQC-IR-59036-00 Solid Slabs 24-Mar-2021 60F 60 UPC DIP FACTORY 2.10
21.0 ITR-C0304-DMA-GQC-IR-59048-00 Girder Beams 24-Mar-2021 60 60 UPC DIP FACTORY 29.20
22.0 ITR-C0304-DMA-GQC-IR-59038-00 Solid Slabs 25-Mar-2021 60F 60 UPC DIP FACTORY 2.20
23.0 ITR-C0304-DMA-GQC-IR-59038-00 Girder Beams 25-Mar-2021 60 60 UPC DIP FACTORY 29.30 40.10 55.00 50.30 56.70
24.0 ITR-C0304-DMA-GQC-IR-59040-00 Solid Slabs 27-Mar-2021 60F 60 UPC DIP FACTORY 2.10
25.0 ITR-C0304-DMA-GQC-IR-59043-00 Solid Slabs 28-Mar-2021 67 67 UPC DIP FACTORY 2.10
26.0 ITR-C0304-DMA-GQC-IR-59043-00 Girder Beams 28-Mar-2021 60F 60 UPC DIP FACTORY 29.60
27.0 ITR-C0304-DMA-GQC-IR-59043-00 Solid Slabs 29-Mar-2021 67 67 UPC DIP FACTORY 2.10
28.0 ITR-C0304-DMA-GQC-IR-59043-00 Girder Beams 29-Mar-2021 60F 60 UPC DIP FACTORY 29.40 36.20 42.70 52.20 58.40

You might also like