Professional Documents
Culture Documents
GRID LOCATION
CH-MRB14 A"-A/3-2 +5.725 BILL OF MATERIAL
LENGTH GRADE NET WEIGHT(Kg) AREA
A No. SPECIFICATION QTY. A
(mm) UNIT TOTAL M2
CH-MRB14 1 PSC IN TOTAL
CH-MRB14 UB254X146X37 6167 E250 1 228.18 228.18 6.700
CLT1 ISA75X75X8 190 E250 2 1.69 3.38 0.111
TOTAL NET WEIGHT: 231.56 * 1 = 231.56 Kg 6.812
BOLT LIST
B B
CONNECTED
SITE/SHOP BOLT DESCRIPTION QTY. /ONE QTY. /ALL GRADE ASSEMBLIES REMARKS
Site M 16 X 50 Lg. 3 3 8.8
Site M 20 X 70 Lg. 4 4 8.8 CH-B313
Site M 20 X 70 Lg. 4 4 8.8 CH-B330
Site M 20 X 70 Lg. 4 4 8.8 CH-B348
Site M 20 X 70 Lg. 4 4 8.8 CH-B372
C
Site M 20 X 90 Lg. 4 4 8.8 CH-B444
C
Site M 20 X 90 Lg. 8 8 8.8 CH-B446
TOTAL 31
D D
E 4725 E
37.5 37.5
4*D22 HOLES
75
F F
CH-MRB14
300
150
G G
CLT1
1418
3*D18 HOLES
1462
H 90 H
°
40
40 55 55 40
190
I I
2300
CLT1
4*D22 HOLES
J J
73
73
0
00
R2
370
386
K K
31 4*D22 HOLES
42
55
55
NOTES:
30
37.5
37.5
1. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS ARE IN METERS
30
37.5
3. DENOTES FACE ORIENTATION MARK & SHALL BE PROVIDED BY
CLT1 FABRICATOR ON EACH ASSEMBLY AS IN SHOP DETAIL DRAWINGS.
M 8*D22 HOLES SAME IS TO BE REFERRED FOR ORIENTATION DURING M
2725 ERECTION OF THE ASSEMBLY
SECTION A - A
2 09.10.2021 REVISED AS MARKED RC NMK CRM
N N
1 06.07.2021 BOM REVISED RC NMK CRM
0 13.06.2021 ISSUED FOR FABRICATION RC NMK CRM
REV. DATE Revision Object DRAWN CHKD. APPD.
EMPLOYER
CLT1
WIRE TO SHIP PROJECT
O 4725 (UB254X146X37 x 4798) O
CLT1 FLUE GAS DESULPHURISATION (FGD) SYSTEM PACKAGE FOR
60 WIRE TO SHIP TALCHER STPS STAGE-I (2X500MW) & STAGE-II (4X500MW)
CH-MRB14
A A EPC CONTRACTOR
TATA PROJECTS LIMITED
70
HYDERABAD - INDIA
55 55
QFGDM
P P
ANDRITZ AG
3*D18 HOLES GRAZ - AUSTRIA
CONTRACTOR:
PASSIVE INFRA PROJECTS PVT. LTD.
TITLE
CRUSHER HOUSE
DETAIL OF MONORAIL BEAM CH-MRB14
Q 1 NO. MONORAIL BEAM REQD. AS DRAWN MKD CH-MRB14 SCALE : DRAWN BY CHECKED BY DRAWING NO: REV
Q