You are on page 1of 1

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

GRID LOCATION
CH-B32 C-B"/3-2 +22.050 BILL OF MATERIAL
NET WEIGHT(Kg) AREA
A No. SPECIFICATION LENGTH GRADE QTY. A
(mm) UNIT TOTAL M2
CH-B32 1 PSC IN TOTAL
CH-B32 UB305X165X54 3955 E250 1 213.55 213.55 4.983
EP52 PL16*180 250 E250 2 5.65 11.30 0.208
FL4 FL6*76 200 E250 2 0.67 1.34 0.063
FL4 FL6*76 200 E250 2 0.67 1.34 0.063
FL4 FL6*76 200 E250 2 0.67 1.34 0.063
B FL4 FL6*76 200 1.34 B
E250 2 0.67 0.063
GP885 PL12*296 430 E250 1 10.96 10.96 0.249
GP887 PL12*285 563 E250 1 14.06 14.06 0.318
TOTAL NET WEIGHT: 255.21 * 1 = 255.21 Kg 6.008

BOLT LIST
CONNECTED
C SITE/SHOP BOLT DESCRIPTION QTY. /ONE QTY. /ALL GRADE ASSEMBLIES REMARKS C
Site M 20 X 75 Lg. 6 6 8.8 CH-B452 CH-B33
Site M 20 X 55 Lg. 6 6 8.8 CH-B84
TOTAL 12

D D

E E

100
4*D18 HOLES
F F
36

92
4*D18 HOLES 89
64 GP885
100
37 39

35

32
250
55

55
50 75 75 50
55

70

55
55

155
50

111

296
55

263
G FL4 G
200

191

97
92
180

90
15 15 53 122 142 56 57

45
EP52 430
76 6*D22 HOLES

H H

1133 90 851 90 729 90 971


86

80
72

100
98 102 4*D18 HOLES
100 4*D18 HOLES
6*D22 HOLES 6*D22 HOLES
CH-B32 97

15
4*D22 HOLES
40

55

80
55
55

91
78

80

80

40 55

55
I I

121
103

285
55
70

70
100

205
179
70

70

96
92
GP887
52 129 112 57
3955 563
J J

951 122 142 56 1436 129 213 112 793

8 GP887
GP885
8
8
K K
8
155

FL4

121
FL4
111

103

CH-B32
FL4 FL4
EP52
EP52
101

100
96

96

L L
FL4
FL4
FL4
FL4
TYP. 6 NOTES:
200 3555
6
200 1. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS ARE IN METERS
2. FOR MARKING DRAWING REFER DRGAWING NO.
NTPC-FGD-TAL-LCH-E01 TO E32
SECTION A - A
3. DENOTES FACE ORIENTATION MARK & SHALL BE PROVIDED BY
FABRICATOR ON EACH ASSEMBLY AS IN SHOP DETAIL DRAWINGS.
M SAME IS TO BE REFERRED FOR ORIENTATION DURING M
3987 (UB305X165X54 x 3955) ERECTION OF THE ASSEMBLY

16 3955 16 45 45
1133 90 851 90 729 90 971 CH-B32
FL4
B
98 FL4

90
131
N 102 N
FL4 FL4 1 06.07.2021 BOM REVISED RC NMK CRM
CH-B32 GP887
A A

75
FL4 GP885 FL4 0 13.06.2021 ISSUED FOR FABRICATION RC NMK CRM

75

75
REV. DATE Revision Object DRAWN CHKD. APPD.
78

80

80

EMPLOYER

105
122

122
40

40

FL4
70

70
100

EP52 EP52 FL4


70

70

EP52 PROJECT
O
SECTION B - B FLUE GAS DESULPHURISATION (FGD) SYSTEM PACKAGE FOR O

TALCHER STPS STAGE-I (2X500MW) & STAGE-II (4X500MW)


FL4 EPC CONTRACTOR
FL4
FL4
TYP. 8 TATA PROJECTS LIMITED
FL4
8 B HYDERABAD - INDIA
QFGDM
P P
ANDRITZ AG
GRAZ - AUSTRIA
CONTRACTOR:
PASSIVE INFRA PROJECTS PVT. LTD.
CRUSHER HOUSE
TITLE

DETAIL OF BEAM CH-B32


Q 1 NO. BEAM REQD. AS DRAWN MKD CH-B32 SCALE : DRAWN BY CHECKED BY DRAWING NO: REV
Q

SH. SIZE A1 RC NMK NTPC-FGD-TAL-CH-B32 1


Tekla structures

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 ISO A1

You might also like