NSL EAST COUNTY


(TOWER-02)

ACTION TAKEN REPORT AGAINST


EHS OBSERVATIONS DATED 27-05 2023

REPORT DATED- 8TH JUNE 2023

13/07/2023
Operator contact number load chart to be displayed 13/07/2023
Hard barrication to be provide in all edge areas
Action initiated,
fire extinguishers are expected
to site by 12-June-23

Fire extinguisher to be placed in material hoist 13/07/2023


Water & debris should be removed from 1st floor OTS area 13/07/2023
Hard barrication should be provide at 2nd floor pour1 area 13/07/2023
Material Safety Data Sheet (MSDS) to be displayed 13/07/2023
Hard barrication required at 6th floor pour-1 area 13/07/2023
SPB cut-out should be closed at 6th floor pour-2 area 13/07/2023
Unwanted materials & debris to be removed from
13/07/2023
7th floor for safe access
Hard barrication need at SPB cut Out at 7th floor 13/07/2023
Hard barrication needed at lift lobby at 8th floor 13/07/2023
Temporary railing to be provide in ST1 from 8th floor level 13/07/2023
Portable DB removed from water leakage from SPB cut-out at 9th
floor level 13/07/2023
Hard barrication needed at 9th floor pour-1area 13/07/2023
13/07/2023
Bare cables to be removed & use proper sockets at 9th floor level
Shafts to be Barricate at 9th floor 13/07/2023
Material to be removed from edges & proper stacking required at clubhouse
area 13/07/2023
Power cables to be maintain 7 feet height & male socket missing in DB for
connection 13/07/2023
Proper stacking is pending 13/07/2023
13/07/2023
13/07/2023