Swarnambika Foods (8 O' Clock)

(OCT-2023)
S. No. Observations & Requirements Timeline Closure status
1 Mixing area needs to be Seperated from Production area. Going on Pending
2 Dough Cover needed 11/15/2023 Pending
3 More fly-catcher needed for RM and Production are. 11/6/2023 Pending
4 Lab not in Function needs to be in function 12/20/2023 Pending
5 Door needed in the production area and RM area. 11/10/2023 Pending
6 Shifter is not in USE. 11/27/2023 Closed
7 Checklist shoud be followed. 11/27/2023 Closed
8 RM should be on the pallets and shouldn’t be left in open condition. 11/27/2023 Closed
9 Weekly training are required for the new QC & QA , Supervisors and Workers. 11/6/2023 Closed
10 Rodent boxes needs to be alligned by the map. 11/6/2023 Pending
11 Proper Chapati crates are needed Going on Pending
12 Strip curtain needed in the RM area. 11/10/2023 Pending
13 Daily observation reports needs to be maintained. 11/12/2023 Closed
14 All the gaps should be closed (Production and RM) 11/4/2023 Pending
15 Deep cleaning weekly once are required. 10/30/2023 Pending